CN219263465U - An anti-seepage device for water supply and drainage pipes in construction engineering - Google Patents

An anti-seepage device for water supply and drainage pipes in construction engineering Download PDF

Info

Publication number
CN219263465U
CN219263465U CN202320059954.4U CN202320059954U CN219263465U CN 219263465 U CN219263465 U CN 219263465U CN 202320059954 U CN202320059954 U CN 202320059954U CN 219263465 U CN219263465 U CN 219263465U
Authority
CN
China
Prior art keywords
flange
water supply
wall
pipe
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320059954.4U
Other languages
Chinese (zh)
Inventor
刘汉东
刘利新
杨海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Lianxing Construction Engineering Co ltd
Original Assignee
Sichuan Lianxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Lianxing Construction Engineering Co ltd filed Critical Sichuan Lianxing Construction Engineering Co ltd
Priority to CN202320059954.4U priority Critical patent/CN219263465U/en
Application granted granted Critical
Publication of CN219263465U publication Critical patent/CN219263465U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

本实用新型涉及给排水管防渗技术领域,尤其涉及一种建筑工程给排水管防渗装置。其技术方案包括:连接管,所述连接管的两端均安装有第二法兰盘,所述第二法兰盘通过紧固螺栓与第一法兰盘固定连接,所述第一法兰盘安装在给排水管本体的一端,所述第二法兰盘的一侧外壁中心位置设置有通水管,所述通水管的另一端穿过第一通孔并延伸到给排水管本体的内部,所述通水管的另一端外壁上设置有第一密封圈,且第一密封圈的外壁与给排水管本体的内壁之间为过盈连接,所述第一法兰盘的一侧外壁上开设有第一环状槽孔,所述第二法兰盘的一侧外壁上开设有第二环状槽孔。本实用新型可以有效的防止法兰的接缝处出现渗漏的情况,防渗效果好,实用性强。

Figure 202320059954

The utility model relates to the technical field of anti-seepage of water supply and drainage pipes, in particular to an anti-seepage device for water supply and drainage pipes in construction engineering. The technical solution includes: a connecting pipe, a second flange is installed at both ends of the connecting pipe, the second flange is fixedly connected to the first flange through fastening bolts, and the first flange The plate is installed at one end of the main body of the water supply and drainage pipe, and the center of the outer wall of one side of the second flange is provided with a water pipe, and the other end of the water pipe passes through the first through hole and extends to the inside of the main body of the water supply and drainage pipe , the outer wall of the other end of the water pipe is provided with a first sealing ring, and the outer wall of the first sealing ring is in an interference connection with the inner wall of the water supply and drainage pipe body, and the outer wall of one side of the first flange is A first annular slot is opened, and a second annular slot is opened on one side of the outer wall of the second flange. The utility model can effectively prevent leakage at the seam of the flange, has good anti-seepage effect and strong practicability.

Figure 202320059954

Description

一种建筑工程给排水管防渗装置An anti-seepage device for water supply and drainage pipes in construction engineering

技术领域technical field

本实用新型涉及给排水管防渗技术领域,具体为一种建筑工程给排水管防渗装置。The utility model relates to the technical field of anti-seepage of water supply and drainage pipes, in particular to an anti-seepage device for water supply and drainage pipes in construction engineering.

背景技术Background technique

现代建筑中给排水管的设计安装是十分重要的,在施工过程中,会在浇筑混凝土时给排水管经过的位置预留安装管道的孔洞,以便在后期安装给排管,给排水管安装后需要再对管道与墙体或楼板层间的接触孔隙间浇灌水泥砂浆,防止排水管发生渗漏,而水泥砂浆在浇灌的过程中很容易会发生浇筑不彻底造成渗漏且后期难以维护的情况出现,如若浇灌不彻底则可能会导致管道渗漏、破裂等意外灾害,因此需要使用到给排水管防渗装置。The design and installation of water supply and drainage pipes in modern buildings is very important. During the construction process, holes for installing pipes will be reserved at the positions where the water supply and drainage pipes pass when pouring concrete, so that the water supply and drainage pipes can be installed later. After the water supply and drainage pipes are installed It is necessary to pour cement mortar between the contact pores between the pipe and the wall or the floor layer to prevent leakage of the drainage pipe, and the cement mortar is likely to leak due to incomplete pouring during the pouring process and is difficult to maintain later If the irrigation is not complete, it may cause unexpected disasters such as pipeline leakage and rupture, so it is necessary to use an anti-seepage device for water supply and drainage pipes.

经检索,专利公告号为CN215928741U公开了一种建筑工程给排水管防渗装置,包括给水管,所述给水管的一侧放置有排水管,所述给水管和排水管的一端均固定安装有连接法兰,一侧所述连接法兰的一端固定安装有固定环,另一侧所述连接法兰的一端对应固定环位置处开设有环形负压槽,本实用新型结构科学合理,通过设置的负压密封安装机构,可形成负压对两个连接法兰之间进行安装,提高了该给排水管防渗装置使用时的安装紧固性,提高了该给排水管防渗装置使用时的密封程度,通过设置的防渗漏密封机构,可对连接法兰的接触位置进行密封,减少从接触位置渗出。After searching, the patent announcement number is CN215928741U, which discloses a kind of water supply and drainage pipe anti-seepage device in construction engineering, including a water supply pipe, a side of the water supply pipe is placed with a drain pipe, and one end of the water supply pipe and the drain pipe is fixedly installed with a Connecting flange, one end of the connecting flange on one side is fixedly installed with a fixed ring, and one end of the connecting flange on the other side is provided with an annular negative pressure groove corresponding to the position of the fixing ring. The structure of the utility model is scientific and reasonable. By setting The negative pressure seal installation mechanism can form a negative pressure to install between the two connecting flanges, which improves the installation fastness of the water supply and drainage pipe anti-seepage device when it is used, and improves the water supply and drainage pipe anti-seepage device when it is used. The degree of sealing is high, through the anti-leakage sealing mechanism, the contact position of the connecting flange can be sealed to reduce leakage from the contact position.

现有的建筑工程给排水管防渗装置防渗漏效果不佳,长时间使用后法兰与法兰之间的接缝处会出现渗漏的情况,为此我们提出一种建筑工程给排水管防渗装置来解决现有的问题。The anti-seepage effect of the existing anti-seepage device for water supply and drainage pipes in construction projects is not good, and leakage will occur at the joints between flanges after long-term use. Therefore, we propose a water supply and drainage system for construction projects. Pipe anti-seepage device to solve the existing problems.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑工程给排水管防渗装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide an anti-seepage device for water supply and drainage pipes in construction engineering, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑工程给排水管防渗装置,包括连接管,所述连接管的两端均安装有第二法兰盘,所述第二法兰盘通过紧固螺栓与第一法兰盘固定连接,所述第一法兰盘安装在给排水管本体的一端,所述第二法兰盘的一侧外壁中心位置设置有通水管,所述通水管的另一端穿过第一通孔并延伸到给排水管本体的内部,所述通水管的另一端外壁上设置有第一密封圈,且第一密封圈的外壁与给排水管本体的内壁之间为过盈连接,所述第一法兰盘的一侧外壁上开设有第一环状槽孔,所述第二法兰盘的一侧外壁上开设有第二环状槽孔,所述第一环状槽孔与第二环状槽孔之间安装有第二密封圈。In order to achieve the above purpose, the utility model provides the following technical solutions: a water supply and drainage pipe anti-seepage device in construction engineering, including a connecting pipe, and a second flange is installed at both ends of the connecting pipe, and the second flange The plate is fixedly connected with the first flange plate through fastening bolts, the first flange plate is installed at one end of the water supply and drainage pipe body, and the center of the outer wall of one side of the second flange plate is provided with a water pipe. The other end of the water pipe passes through the first through hole and extends to the inside of the water supply and drainage pipe body. A first sealing ring is arranged on the outer wall of the other end of the water pipe, and the outer wall of the first sealing ring is in contact with the body of the water supply and drainage pipe. There is an interference connection between the inner walls, a first annular slot is opened on one side of the outer wall of the first flange, and a second annular slot is opened on one side of the second flange. A second sealing ring is installed between the first annular slot and the second annular slot.

通过连接管、给排水管本体、第一法兰盘、第二法兰盘、通水管、第一密封圈等结构的配合设置,给排水管本体进行给排水时,水会从通水管流入到连接管内,连接管内部的水会通过另一侧方向上的通水管流入到另一方向上的给排水管本体内,在此过程中,第一密封圈可起到密封的作用,可以有效的防止法兰的接缝处出现渗漏的情况,提高了防渗效果,通过第一环状槽孔、第二环状槽孔、第二密封圈等一系列结构的配合设置,第二密封圈可再次起到密封的作用,达到双重密封的作用,进一步有效的防止法兰的接缝处出现渗漏的情况,进一步提高了防渗效果。Through the cooperative arrangement of the connecting pipe, the main body of the water supply and drainage pipe, the first flange, the second flange, the water pipe, the first sealing ring, etc., when the water supply and drainage pipe body performs water supply and drainage, the water will flow from the water pipe to the In the connecting pipe, the water inside the connecting pipe will flow into the water supply and drainage pipe body in the other direction through the water pipe on the other side. During this process, the first sealing ring can play a sealing role, which can effectively prevent Leakage occurs at the joint of the flange, which improves the anti-seepage effect. Through the cooperation of a series of structures such as the first annular slot hole, the second annular slot hole, and the second sealing ring, the second sealing ring can It plays the role of sealing again, achieves the function of double sealing, further effectively prevents the leakage at the joint of the flange, and further improves the anti-seepage effect.

优选的,所述第二法兰盘的外壁中心位置开设有第二通孔,所述第二通孔的水平中心线与通水管的水平中心线相重合,所述第二通孔的孔径等于通水管的内径。Preferably, a second through hole is provided at the center of the outer wall of the second flange, the horizontal centerline of the second through hole coincides with the horizontal centerline of the water pipe, and the diameter of the second through hole is equal to The inside diameter of the water pipe.

优选的,所述第一通孔开设在第一法兰盘的外壁中心位置。Preferably, the first through hole is opened at the center of the outer wall of the first flange.

优选的,所述第一法兰盘的外壁上开设有第一固定孔,第一固定孔为八个,且八个所述第一固定孔呈环状阵列分布。Preferably, the outer wall of the first flange is provided with first fixing holes, the number of the first fixing holes is eight, and the eight first fixing holes are distributed in a ring-shaped array.

优选的,所述第二法兰盘的外壁上开设有第二固定孔,第二固定孔为八个,且八个所述第二固定孔呈环状阵列分布。Preferably, the outer wall of the second flange is provided with second fixing holes, the number of the second fixing holes is eight, and the eight second fixing holes are arranged in a circular array.

优选的,所述给排水管本体与第一法兰盘之间通过焊接固定。Preferably, the water supply and drainage pipe body and the first flange are fixed by welding.

优选的,所述连接管与第二法兰盘之间通过焊接固定。Preferably, the connecting pipe and the second flange are fixed by welding.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

1、本实用新型通过连接管、给排水管本体、第一法兰盘、第二法兰盘、通水管、第一密封圈等结构的配合设置,给排水管本体进行给排水时,水会从通水管流入到连接管内,连接管内部的水会通过另一侧方向上的通水管流入到另一方向上的给排水管本体内,在此过程中,第一密封圈可起到密封的作用,可以有效的防止法兰的接缝处出现渗漏的情况,提高了防渗效果。1. The utility model cooperates with the connection pipe, the main body of the water supply and drainage pipe, the first flange, the second flange, the water pipe, the first sealing ring and other structures. When the main body of the water supply and drainage pipe is used for water supply and drainage, the water will From the water pipe to the connecting pipe, the water inside the connecting pipe will flow into the water supply and drainage pipe body in the other direction through the water pipe on the other side. During this process, the first sealing ring can play a sealing role. , can effectively prevent leakage at the joints of the flange, and improve the anti-seepage effect.

2、本实用新型通过第一环状槽孔、第二环状槽孔、第二密封圈等一系列结构的配合设置,第二密封圈可再次起到密封的作用,达到双重密封的作用,进一步有效的防止法兰的接缝处出现渗漏的情况,进一步提高了防渗效果,实用性强。2. The utility model cooperates with a series of structures such as the first annular slot hole, the second annular slot hole, and the second sealing ring, and the second sealing ring can play the role of sealing again to achieve double sealing. Further effectively prevent leakage at the joint of the flange, further improve the anti-seepage effect, and have strong practicability.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型给排水管本体的主视剖视图;Fig. 2 is a front sectional view of the water supply and drainage pipe body of the present utility model;

图3为本实用新型图2中的右视图;Fig. 3 is the right view in Fig. 2 of the utility model;

图4为本实用新型连接管的主视剖视图;Fig. 4 is the front sectional view of the connecting pipe of the present invention;

图5为本实用新型连接管的侧视图。Fig. 5 is a side view of the connecting pipe of the present invention.

图中:1、给排水管本体;2、第一密封圈;3、通水管;4、第一法兰盘;5、紧固螺栓;6、第二法兰盘;7、第二密封圈;8、第一通孔;9、第二通孔;10、连接管;11、第一固定孔;12、第一环状槽孔;13、第二固定孔;14、第二环状槽孔。In the figure: 1. Water supply and drainage pipe body; 2. First sealing ring; 3. Water pipe; 4. First flange; 5. Fastening bolts; 6. Second flange; 7. Second sealing ring ; 8, the first through hole; 9, the second through hole; 10, the connecting pipe; 11, the first fixing hole; 12, the first annular slot; 13, the second fixing hole; 14, the second annular groove hole.

具体实施方式Detailed ways

下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical scheme of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

实施例一Embodiment one

如图1-5所示,本实用新型提出的一种建筑工程给排水管防渗装置,包括连接管10,连接管10的两端均安装有第二法兰盘6,第二法兰盘6通过紧固螺栓5与第一法兰盘4固定连接,第一法兰盘4安装在给排水管本体1的一端,第二法兰盘6的一侧外壁中心位置设置有通水管3,通水管3的另一端穿过第一通孔8并延伸到给排水管本体1的内部,通水管3的另一端外壁上设置有第一密封圈2,且第一密封圈2的外壁与给排水管本体1的内壁之间为过盈连接,第一法兰盘4的一侧外壁上开设有第一环状槽孔12,第二法兰盘6的一侧外壁上开设有第二环状槽孔14,第一环状槽孔12与第二环状槽孔14之间安装有第二密封圈7。As shown in Figures 1-5, a water supply and drainage pipe anti-seepage device for construction projects proposed by the utility model includes a connecting pipe 10, and a second flange 6 is installed at both ends of the connecting pipe 10, and the second flange 6 is fixedly connected with the first flange 4 by fastening bolts 5, the first flange 4 is installed at one end of the water supply and drainage pipe body 1, and the center of the outer wall of one side of the second flange 6 is provided with a water pipe 3, The other end of the water pipe 3 passes through the first through hole 8 and extends to the inside of the water supply and drainage pipe body 1. A first sealing ring 2 is arranged on the outer wall of the other end of the water pipe 3, and the outer wall of the first sealing ring 2 is in line with the water supply pipe body 1. The inner walls of the drainpipe body 1 are interferingly connected, a first annular slot 12 is opened on one side of the outer wall of the first flange 4, and a second annular slot 12 is opened on one side of the second flange 6. The second sealing ring 7 is installed between the first annular slot 12 and the second annular slot 14 .

基于实施例一的建筑工程给排水管防渗装置工作原理是:本实用新型通过连接管10、给排水管本体1、第一法兰盘4、第二法兰盘6、通水管3、第一密封圈2等结构的配合设置,给排水管本体1进行给排水时,水会从通水管3流入到连接管10内,连接管10内部的水会通过另一侧方向上的通水管3流入到另一方向上的给排水管本体1内,在此过程中,第一密封圈2可起到密封的作用,可以有效的防止法兰的接缝处出现渗漏的情况,提高了防渗效果,通过第一环状槽孔12、第二环状槽孔14、第二密封圈7等一系列结构的配合设置,第二密封圈7可再次起到密封的作用,达到双重密封的作用,进一步有效的防止法兰的接缝处出现渗漏的情况,进一步提高了防渗效果,实用性强。The working principle of the anti-seepage device for water supply and drainage pipes in construction projects based on Embodiment 1 is: the utility model passes through the connecting pipe 10, the water supply and drainage pipe body 1, the first flange 4, the second flange 6, the water pipe 3, the second flange A sealing ring 2 and other structures are arranged together. When the water supply and drainage pipe body 1 performs water supply and drainage, water will flow from the water pipe 3 into the connecting pipe 10, and the water inside the connecting pipe 10 will pass through the water pipe 3 on the other side. It flows into the water supply and drainage pipe body 1 in the other direction. During this process, the first sealing ring 2 can play a sealing role, which can effectively prevent leakage at the joint of the flange and improve the anti-seepage As a result, through the cooperative arrangement of a series of structures such as the first annular slot 12, the second annular slot 14, and the second sealing ring 7, the second sealing ring 7 can once again play the role of sealing, achieving the role of double sealing , to further effectively prevent leakage at the joint of the flange, further improve the anti-seepage effect, and have strong practicability.

实施例二Embodiment two

如图1-5所示,本实用新型提出的一种建筑工程给排水管防渗装置,相较于实施例一,本实施例还包括:第二法兰盘6的外壁中心位置开设有第二通孔9,第二通孔9的水平中心线与通水管3的水平中心线相重合,第二通孔9的孔径等于通水管3的内径,第一通孔8开设在第一法兰盘4的外壁中心位置,第一法兰盘4的外壁上开设有第一固定孔11,第一固定孔11为八个,且八个第一固定孔11呈环状阵列分布,第二法兰盘6的外壁上开设有第二固定孔13,第二固定孔13为八个,且八个第二固定孔13呈环状阵列分布,给排水管本体1与第一法兰盘4之间通过焊接固定,连接管10与第二法兰盘6之间通过焊接固定。As shown in Figures 1-5, the utility model proposes an anti-seepage device for water supply and drainage pipes in construction engineering. Compared with Embodiment 1, this embodiment also includes: a second flange 6 is provided with a second Two through holes 9, the horizontal centerline of the second through hole 9 coincides with the horizontal centerline of the water pipe 3, the aperture of the second through hole 9 is equal to the inner diameter of the water pipe 3, and the first through hole 8 is opened on the first flange At the center of the outer wall of the disc 4, the outer wall of the first flange 4 is provided with first fixing holes 11, the number of the first fixing holes 11 is eight, and the eight first fixing holes 11 are distributed in an annular array, the second method There are eight second fixing holes 13 on the outer wall of the blue plate 6, and the eight second fixing holes 13 are distributed in an annular array. The space is fixed by welding, and the connecting pipe 10 and the second flange 6 are fixed by welding.

本实施例中,因第二法兰盘6的外壁中心位置开设有第二通孔9,第二通孔9的水平中心线与通水管3的水平中心线相重合,第二通孔9的孔径等于通水管3的内径,第一通孔8开设在第一法兰盘4的外壁中心位置,从而便于水的流动,第一固定孔11和第二固定孔13的配合设置,便于工作人员通过紧固螺栓5将第一法兰盘4和第二法兰盘6之间进行安装固定。In this embodiment, because the center position of the outer wall of the second flange 6 is provided with a second through hole 9, the horizontal center line of the second through hole 9 coincides with the horizontal center line of the water pipe 3, and the second through hole 9 The aperture is equal to the inner diameter of the water pipe 3, and the first through hole 8 is set at the center of the outer wall of the first flange 4, thereby facilitating the flow of water. Install and fix between the first flange 4 and the second flange 6 by fastening bolts 5 .

上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the related inspirations of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combinations.

Claims (7)

1.一种建筑工程给排水管防渗装置,包括连接管(10),其特征在于:所述连接管(10)的两端均安装有第二法兰盘(6),所述第二法兰盘(6)通过紧固螺栓(5)与第一法兰盘(4)固定连接,所述第一法兰盘(4)安装在给排水管本体(1)的一端,所述第二法兰盘(6)的一侧外壁中心位置设置有通水管(3),所述通水管(3)的另一端穿过第一通孔(8)并延伸到给排水管本体(1)的内部,所述通水管(3)的另一端外壁上设置有第一密封圈(2),且第一密封圈(2)的外壁与给排水管本体(1)的内壁之间为过盈连接,所述第一法兰盘(4)的一侧外壁上开设有第一环状槽孔(12),所述第二法兰盘(6)的一侧外壁上开设有第二环状槽孔(14),所述第一环状槽孔(12)与第二环状槽孔(14)之间安装有第二密封圈(7)。1. A water supply and drainage pipe anti-seepage device for construction engineering, comprising a connecting pipe (10), is characterized in that: the two ends of the connecting pipe (10) are equipped with a second flange (6), and the second The flange (6) is fixedly connected with the first flange (4) through fastening bolts (5), and the first flange (4) is installed at one end of the water supply and drainage pipe body (1), and the first flange (4) The center of one side of the outer wall of the second flange (6) is provided with a water pipe (3), and the other end of the water pipe (3) passes through the first through hole (8) and extends to the water supply and drainage pipe body (1) Inside, the outer wall of the other end of the water pipe (3) is provided with a first sealing ring (2), and there is an interference between the outer wall of the first sealing ring (2) and the inner wall of the water supply and drainage pipe body (1) connection, a first annular slot (12) is opened on one side of the outer wall of the first flange (4), and a second annular slot (12) is opened on one side of the second flange (6). A slot hole (14), a second sealing ring (7) is installed between the first annular slot hole (12) and the second annular slot hole (14). 2.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第二法兰盘(6)的外壁中心位置开设有第二通孔(9),所述第二通孔(9)的水平中心线与通水管(3)的水平中心线相重合,所述第二通孔(9)的孔径等于通水管(3)的内径。2. The anti-seepage device for water supply and drainage pipes in construction engineering according to claim 1, characterized in that: a second through hole (9) is opened at the center of the outer wall of the second flange (6), and The horizontal centerline of the second through hole (9) coincides with the horizontal centerline of the water pipe (3), and the diameter of the second through hole (9) is equal to the inner diameter of the water pipe (3). 3.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第一通孔(8)开设在第一法兰盘(4)的外壁中心位置。3. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: the first through hole (8) is opened at the center of the outer wall of the first flange (4). 4.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第一法兰盘(4)的外壁上开设有第一固定孔(11),第一固定孔(11)为八个,且八个所述第一固定孔(11)呈环状阵列分布。4. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: the outer wall of the first flange (4) is provided with a first fixing hole (11), the first fixing hole There are eight holes (11), and the eight first fixing holes (11) are distributed in a circular array. 5.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第二法兰盘(6)的外壁上开设有第二固定孔(13),第二固定孔(13)为八个,且八个所述第二固定孔(13)呈环状阵列分布。5. The anti-seepage device for water supply and drainage pipes in construction engineering according to claim 1, characterized in that: a second fixing hole (13) is opened on the outer wall of the second flange (6), and the second fixing hole (13) is provided on the outer wall of the second flange (6). There are eight holes (13), and the eight second fixing holes (13) are distributed in a circular array. 6.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述给排水管本体(1)与第一法兰盘(4)之间通过焊接固定。6. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: the water supply and drainage pipe body (1) and the first flange (4) are fixed by welding. 7.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述连接管(10)与第二法兰盘(6)之间通过焊接固定。7. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: the connecting pipe (10) and the second flange (6) are fixed by welding.
CN202320059954.4U 2023-01-10 2023-01-10 An anti-seepage device for water supply and drainage pipes in construction engineering Expired - Fee Related CN219263465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320059954.4U CN219263465U (en) 2023-01-10 2023-01-10 An anti-seepage device for water supply and drainage pipes in construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320059954.4U CN219263465U (en) 2023-01-10 2023-01-10 An anti-seepage device for water supply and drainage pipes in construction engineering

Publications (1)

Publication Number Publication Date
CN219263465U true CN219263465U (en) 2023-06-27

Family

ID=86873512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320059954.4U Expired - Fee Related CN219263465U (en) 2023-01-10 2023-01-10 An anti-seepage device for water supply and drainage pipes in construction engineering

Country Status (1)

Country Link
CN (1) CN219263465U (en)

Similar Documents

Publication Publication Date Title
CN215928741U (en) Anti-seepage device for water supply and drainage pipes in building engineering
CN201099864Y (en) Plastic valve manhole
CN213979225U (en) An inspection well structure for drainage system
CN222594777U (en) Combined simple irrigation canal
CN110701400A (en) Quick self-sealing's pipe joint
CN214657553U (en) Sleeve structure for passing through barrier for drainage pipeline
CN214116915U (en) Novel assembled inspection shaft connection structure
CN220379088U (en) Underground outdoor wall antiseep embedded sleeve
CN223483710U (en) Municipal drain pipe
CN222363502U (en) Waterproof leaking stoppage sealing structure for pipeline penetrating through building floor
CN217683802U (en) Sealing connection structure of integrated flexible pipeline of building engineering
CN218494409U (en) Reinforced concrete drain pipe convenient to butt joint
CN224120824U (en) A pipe connection device for water supply and drainage engineering
CN222614449U (en) A drainage pipe
CN222255491U (en) Building drainage pipe structure
CN221375910U (en) Air pipe leakage-proof device for indirect evaporative cooling system
CN223706543U (en) A prefabricated municipal inspection well
CN212616797U (en) Wall-penetrating pipeline with water seepage prevention function
CN221799160U (en) A kind of anti-leakage structure of pre-buried casing in pool wall
CN223124526U (en) Waterproof structure suitable for underground structure wall body passes through cable pipeline
CN223215904U (en) Basement outer wall pre-buried sleeve and basement outer wall structure
CN220377465U (en) A protective structure at the interface of drainage pipes
CN218564600U (en) Ground source heat pump PE pipeline waterproof sleeve penetrating through concrete bottom plate
CN219931139U (en) Bathroom seepage is layer treatment under water and is repaired subassembly
CN219508733U (en) Easy dredging anti-seepage trap structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230627