CN219259337U - Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane - Google Patents

Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane Download PDF

Info

Publication number
CN219259337U
CN219259337U CN202320119412.1U CN202320119412U CN219259337U CN 219259337 U CN219259337 U CN 219259337U CN 202320119412 U CN202320119412 U CN 202320119412U CN 219259337 U CN219259337 U CN 219259337U
Authority
CN
China
Prior art keywords
lifting
crane
connecting plate
blade
clamp splice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320119412.1U
Other languages
Chinese (zh)
Inventor
高山
王安鹏
王建东
熊杰
刘鑫
余锟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Chongtong Chengfei New Material Co Ltd
Original Assignee
Jilin Chongtong Chengfei New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Chongtong Chengfei New Material Co Ltd filed Critical Jilin Chongtong Chengfei New Material Co Ltd
Priority to CN202320119412.1U priority Critical patent/CN219259337U/en
Application granted granted Critical
Publication of CN219259337U publication Critical patent/CN219259337U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/70—Wind energy
    • Y02E10/72—Wind turbines with rotation axis in wind direction

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a wind-powered electricity generation blade lifts by crane frock technical field specifically is a wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane, including lifting by crane board, connecting plate, shackle and two clamp splice, lifting by crane board and connecting plate vertical fixation, be equipped with a plurality of lifting by crane holes on the lifting by crane board, the shackle can be dismantled and connect on arbitrary lifting by crane hole, two the clamp splice cross-section is "n" type, two the clamp splice is fixed in the bottom of connecting plate, be equipped with the bolt hole on the clamp splice, bolt hole department can dismantle and be connected with bolt, nut, adopts bolt, nut to fix prefabricated blade root and clamp splice to select to install the shackle in the lifting by crane frock suitable for this prefabricated blade root centrobaric lifting by crane of blade profile according to the blade profile, can realize the prefabricated blade root of different blade profile sharing model, reduce the partial frock input cost that switches over and bring, solved the prefabricated blade root of different blade profiles and lift by crane the incompatible problem of frock.

Description

Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane
Technical Field
The utility model relates to the technical field of wind power blade lifting tools, in particular to an integrated lifting tool for a prefabricated blade root strip steel flange of a wind power blade.
Background
At present, most wind power blade forming processes all adopt blade root prefabrication forming processes, prefabricated blade roots need to be lifted and assembled, because pneumatic shapes of various wind power blade designs are inconsistent, the gravity center positions of the prefabricated blade roots of the wind power blades of different models are different, the existing prefabricated blade root lifting tool is basically only suitable for wind power blades of specific models, and is difficult to be compatible with various models, tools corresponding to different models need to be replaced when wind power blades of different models are produced, so that the investment of tool cost is increased, and resource waste is caused.
Disclosure of Invention
The utility model aims to provide an integral hoisting tool for a strip steel flange of a prefabricated blade root of a wind power blade so as to solve the problem that hoisting tools for prefabricated blade roots of different blade profiles cannot be compatible.
In order to achieve the above object, the basic scheme of the present utility model is as follows: the utility model provides a wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane, includes lifting plate, connecting plate, shackle and two clamp splice, lifting plate and connecting plate vertical fixation, be equipped with a plurality of lifting holes on the lifting plate, the shackle can be dismantled and connect on arbitrary lifting hole, two the clamp splice cross-section is "n" type, two the bottom at the connecting plate is fixed to the clamp splice, be equipped with the bolt hole on the clamp splice, bolt hole department can be dismantled and be connected with bolt, nut.
The basic scheme has the beneficial effects that: the prefabricated blade root and the clamping blocks are fixed by bolts and nuts, the shackle is installed in the lifting hole suitable for the gravity center of the prefabricated blade root of the blade profile according to the blade profile, the lifting tool of the prefabricated blade root shared by different blade profiles can be realized, and the input cost of part of tools caused by switching between the models is reduced.
Further, a plurality of reinforcing ribs are arranged between the top surface of the clamping block and the connecting plate. The stability of the connection of the clamping blocks and the connecting plates is improved.
Further, the lifting plate and the connecting plate are both steel plates, and the lifting plate is welded with the connecting plate. The steel plate has high strength, is more suitable for hoisting, and the hoisting plate and the connecting plate are welded so that the connection of the hoisting plate and the connecting plate is firmer.
Further, the lifting plate, the connecting plate and the clamping blocks are all provided with chamfers. And the wind power blade or workers are prevented from being scratched by sharp corners.
Further, the lifting plate is L-shaped, a plurality of lifting holes are formed in the horizontal section of the lifting plate, a strip-shaped groove is formed in the lower portion of the vertical section of the lifting plate, and the connecting plate is fixed in the strip-shaped groove. So that the connection between the connecting plate and the lifting plate is more stable. .
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present utility model;
fig. 2 is a usage state diagram of an embodiment of the present utility model.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Reference numerals in the drawings of the specification include: lifting plate 1, connecting plate 2, shackle 3, clamp splice 4, lifting hole 5, strengthening rib 6, bolt 7, prefabricated blade root 8.
Examples
Substantially as shown in figure 1: the utility model provides an integrative lifting fixture of wind-powered electricity generation blade prefabricated blade root belted steel flange, includes lifting plate 1, connecting plate 2, shackle 3 and two clamp splice 4, and lifting plate 1 and connecting plate 2 are fixed perpendicularly, are equipped with a plurality of lifting holes 5 on the lifting plate 1, and lifting plate 1 is L type, and a plurality of lifting holes 5 are located the horizontal segment of lifting plate 1, and the vertical section lower part of lifting plate 1 is equipped with the bar groove, and connecting plate 2 is fixed in the bar groove; the shackle 3 is detachably connected to any lifting hole 5, the cross section of each two clamping blocks 4 is n-shaped, the two clamping blocks 4 are fixed at the bottom of the connecting plate 2, a plurality of reinforcing ribs 6 are arranged between the top surface of each clamping block 4 and the connecting plate 2, bolt 7 holes are formed in the clamping blocks 4, and bolts 7 and nuts are detachably connected to the bolt 7 holes.
Lifting plate 1, connecting plate 2, clamp splice 4 and strengthening rib 6 are the steel sheet, lifting plate 1 and connecting plate 2 welding, and clamp splice 4 and connecting plate 2 welding, strengthening rib 6 welding all are equipped with the chamfer between connecting plate 2 and clamp splice 4, lifting plate 1, connecting plate 2 and clamp splice 4.
The specific implementation process is as follows: with reference to fig. 2, firstly, the shackle 3 is installed according to the corresponding hoisting hole 5 of the blade profile prefabricated blade root 8 for designing the gravity center position, then the clamping block 4 is connected with the prefabricated blade root 8 through the bolt 7 and the nut, the shackle 3 is connected with the travelling crane hook, and then the prefabricated blade root 8 is hoisted through the operation industry.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The foregoing is merely an embodiment of the present utility model, and a specific structure and characteristics of common knowledge in the art, which are well known in the scheme, are not described herein, so that a person of ordinary skill in the art knows all the prior art in the application day or before the priority date of the present utility model, and can know all the prior art in the field, and have the capability of applying the conventional experimental means before the date, so that a person of ordinary skill in the art can complete and implement the present embodiment in combination with his own capability in the light of the present application, and some typical known structures or known methods should not be an obstacle for a person of ordinary skill in the art to implement the present application. It should be noted that modifications and improvements can be made by those skilled in the art without departing from the structure of the present utility model, and these should also be considered as the scope of the present utility model, which does not affect the effect of the implementation of the present utility model and the utility of the patent. The protection scope of the present application shall be subject to the content of the claims, and the description of the specific embodiments and the like in the specification can be used for explaining the content of the claims.

Claims (5)

1. Wind-powered electricity generation blade prefabricates belted steel flange an organic whole and lifts by crane frock, its characterized in that: including lifting plate, connecting plate, shackle and two clamp splice, lifting plate and connecting plate vertical fixation are equipped with a plurality of lifting holes on the lifting plate, the shackle can be dismantled and connect on arbitrary lifting hole, two the clamp splice cross-section is "n" type, two the bottom at the connecting plate is fixed to the clamp splice, be equipped with the bolt hole on the clamp splice, bolt hole department can dismantle and be connected with bolt, nut.
2. The wind power blade prefabricated blade root strip steel flange integrated hoisting tool according to claim 1, wherein: a plurality of reinforcing ribs are arranged between the top surface of the clamping block and the connecting plate.
3. The wind power blade prefabricated blade root strip steel flange integrated hoisting tool according to claim 2, wherein: the lifting plate and the connecting plate are both steel plates, and the lifting plate is welded with the connecting plate.
4. The wind power blade prefabricated blade root strip steel flange integrated hoisting tool according to claim 3, wherein: the lifting plate, the connecting plate and the clamping blocks are all provided with chamfers.
5. The wind power blade prefabricated blade root strip steel flange integrated hoisting tool according to claim 4, wherein: the lifting plate is L-shaped, a plurality of lifting holes are formed in the horizontal section of the lifting plate, a strip-shaped groove is formed in the lower portion of the vertical section of the lifting plate, and the connecting plate is fixed in the strip-shaped groove.
CN202320119412.1U 2023-02-06 2023-02-06 Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane Active CN219259337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320119412.1U CN219259337U (en) 2023-02-06 2023-02-06 Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320119412.1U CN219259337U (en) 2023-02-06 2023-02-06 Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane

Publications (1)

Publication Number Publication Date
CN219259337U true CN219259337U (en) 2023-06-27

Family

ID=86870230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320119412.1U Active CN219259337U (en) 2023-02-06 2023-02-06 Wind-powered electricity generation blade prefabricated blade root belted steel flange integrative frock of lifting by crane

Country Status (1)

Country Link
CN (1) CN219259337U (en)

Similar Documents

Publication Publication Date Title
CN201437639U (en) Integral type deformation joint steel moulding plate
CN211846850U (en) Hoisting device for prefabricated building installation
CN109879155B (en) A device for quickly hoisting laminated boards
CN214087285U (en) Light lifting appliance for hoisting lattice beam cable of arch bridge
CN213265343U (en) General stone tongs of prefabricated superimposed sheet
CN204800838U (en) A built -up plate for parapet production
CN203229963U (en) Concrete precast and assembled multipurpose tower crane foundation
CN208121586U (en) A kind of attachment device for porous freely-supported approximation arch steel truss erection
CN216810947U (en) Pier stud connects high light modularization equipment template under confined space
CN216190654U (en) Line-straight-down type station room finite space large-span steel structure lifting tool
CN215926680U (en) A multipurpose scaffolding foot pedal
CN210316518U (en) Detachable aluminum alloy template K plate
CN210151938U (en) Column top supporting device for low-position jacking formwork system
CN212836649U (en) Multipurpose pedal
CN212562519U (en) Pulling-on piece formula aluminum alloy template pulling-on piece clearing device
CN115180501A (en) A H shaped steel track hoist device for arc crown arch
CN223496026U (en) A tower crane attachment clamp suitable for construction of small cross-section steel columns
CN221191233U (en) Multifunctional hoisting connecting device
CN215905676U (en) Adjustable hoisting tool for hoisting large-section H-shaped steel
CN217810544U (en) Bridge steel bent cap hoisting device
CN220664627U (en) Prefabricated cavity post hoist and mount component
CN217780487U (en) Lifting appliance for mounting cold-rolled memorial archways
CN222935861U (en) A bridge lowering tool for artificially assembled bridges
CN110552504A (en) Quick installation device and construction method for welding-free lifting lug of H-shaped steel beam
CN220578699U (en) Hoisting lengthening device for vertical member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant