CN219252875U - Flushing tank for copper rice shaking table - Google Patents
Flushing tank for copper rice shaking table Download PDFInfo
- Publication number
- CN219252875U CN219252875U CN202320254702.7U CN202320254702U CN219252875U CN 219252875 U CN219252875 U CN 219252875U CN 202320254702 U CN202320254702 U CN 202320254702U CN 219252875 U CN219252875 U CN 219252875U
- Authority
- CN
- China
- Prior art keywords
- water
- copper rice
- flushing
- shaking table
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Adjustment And Processing Of Grains (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及铜米摇床技术领域,具体为一种铜米摇床用冲水槽。The utility model relates to the technical field of a copper rice shaker, in particular to a flushing tank for a copper rice shaker.
背景技术Background technique
目前废旧线缆回收工作较为繁重,一些厂家回收废旧电缆的方式有:手工剥皮、焚烧方式,存在以下缺陷,1、手工剥皮对于一般大小的线缆可操作,对于直径较大或直径较小的线缆手工剥皮无法实施或很难实施;2、手工剥皮的方式对于回收大量线缆来说效率低,导致人工成本增加,经济效益低;3、焚烧方式污染环境比较严重,线缆外层的绝缘橡胶含有大量的卤素,在燃烧时烟里有毒,破坏环境。At present, the work of recycling waste and old cables is relatively heavy. Some manufacturers recycle waste and used cables in the following ways: manual peeling and incineration, which have the following defects. Manual stripping of cables cannot be implemented or is difficult to implement; 2. The method of manual stripping is inefficient for recycling a large number of cables, resulting in increased labor costs and low economic benefits; 3. The incineration method pollutes the environment seriously, and the Insulating rubber contains a large amount of halogen, which is poisonous in the smoke when burned and damages the environment.
现有采用摇床进行回收粉碎的线缆,通过摇床的分流机构实现对铜、橡胶和其他杂货分离,最终获取铜和橡胶。现有的分流结构简单,分离的效果不佳,容易产生漏分离或错分离的现象。现有的收集装置不够牢固稳定,收集的分类不明确,导致收集的铜的纯度不一,收集好的铜和橡胶不方便处理,流向收集装置的水不便循环使用;并且会有部分细小的杂质伴随铜米落在分流结构中而难以被冲走。At present, the shaker is used to recycle and crush the cables, and the separation mechanism of the shaker realizes the separation of copper, rubber and other miscellaneous goods, and finally obtains copper and rubber. The existing shunting structure is simple, the separation effect is not good, and leakage separation or wrong separation is easy to occur. The existing collection device is not strong enough, and the classification of collection is not clear, which leads to the different purity of the collected copper, the collected copper and rubber are inconvenient to handle, and the water flowing to the collection device is inconvenient to recycle; and there will be some small impurities It is difficult to be washed away as the copper rice falls in the diversion structure.
实用新型内容Utility model content
鉴于现有一种铜米摇床用冲水槽中存在的问题,提出了本实用新型。In view of the problems existing in a flushing tank for a copper rice shaker, the utility model is proposed.
因此,本实用新型的目的是提供一种铜米摇床用冲水槽,解决了现有采用摇床进行回收粉碎的线缆,通过摇床的分流机构实现对铜、橡胶和其他杂货分离,最终获取铜和橡胶。现有的分流结构简单,分离的效果不佳,容易产生漏分离或错分离的现象。现有的收集装置不够牢固稳定,收集的分类不明确,导致收集的铜的纯度不一,收集好的铜和橡胶不方便处理,流向收集装置的水不便循环使用;并且会有部分细小的杂质伴随铜米落在分流结构中而难以被冲走的问题。Therefore, the purpose of this utility model is to provide a kind of flushing tank for the copper rice shaker, which solves the existing problem of using the shaker to reclaim and crush the cables, realizes the separation of copper, rubber and other miscellaneous goods through the shunt mechanism of the shaker, and finally Get copper and rubber. The existing shunting structure is simple, the separation effect is not good, and leakage separation or wrong separation is easy to occur. The existing collection device is not strong enough, and the classification of collection is not clear, which leads to the different purity of the collected copper, the collected copper and rubber are inconvenient to handle, and the water flowing to the collection device is inconvenient to recycle; and there will be some small impurities Problems with copper rice falling into the diversion structure and difficult to be washed away.
为解决上述技术问题,根据本实用新型的一个方面,本实用新型提供了如下技术方案:In order to solve the above technical problems, according to one aspect of the utility model, the utility model provides the following technical solutions:
一种铜米摇床用冲水槽,包括基座,基座上设有铜米摇床,所述铜米摇床上设有分流装置,所述分流装置包括有若干分流条,分流条笔直在铜米摇床上沿床头到床尾敷设;所述分流条包括有第一分流条和第二分流条,所述第一分流条和第二分流条间隔排列,所述第二分流条的长度小于第一分流条,还包括沿着铜米摇床纵向开设的缓流孔;A flushing tank for a copper rice shaker, comprising a base, a copper rice shaker is arranged on the base, a diverter device is provided on the copper rice shaker, and the diverter device includes a plurality of diverter bars, and the diverter bars are straight on the copper rice shaker. Laying along the head of the bed to the end of the bed on a rice shaker; the diverter bar includes a first diverter bar and a second diverter bar, the first diverter bar and the second diverter bar are arranged at intervals, and the length of the second diverter bar is shorter than the first diverter bar A diverter strip also includes slow flow holes provided longitudinally along the copper rice shaker;
所述缓流孔连通若干个第一分流条和第二分流条。The slow flow hole communicates with several first flow bars and second flow bars.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:还包括第一冲水组件和第二冲水组件,所述第二冲水组件的出水速度小于第一冲水组件的出水速度。As a preferred solution of a flushing tank for a copper rice shaker described in the present invention, it further includes a first flushing assembly and a second flushing assembly, and the water output speed of the second flushing assembly is lower than that of the first flushing assembly. 1. The water output speed of the flushing water component.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述第一冲水组件包括第一横置储水管,所述第一横置储水管通过第一导管连接第一横置冲水管,所述第一横置储水管上设有第一供水口,所述第一供水口通过卡箍连接有第一进水管。As a preferred solution of a flushing tank for a copper rice shaker described in the present invention, wherein: the first flushing assembly includes a first horizontal water storage pipe, and the first horizontal water storage pipe passes through the first The conduit is connected to the first horizontal flushing pipe, the first horizontal water storage pipe is provided with a first water supply port, and the first water supply port is connected to a first water inlet pipe through a clamp.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述第一横置储水管上等距离设有第一出水口,第一横置冲水管上等距离设有第一进水口,所述第一出水口和第一进水口之间共同连接所述第一导管。As a preferred solution of a flushing tank for a copper rice shaker described in the present invention, wherein: the first horizontal water storage pipe is equidistantly provided with a first water outlet, the first horizontal flushing pipe, etc. A first water inlet is provided at a distance, and the first conduit is commonly connected between the first water outlet and the first water inlet.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述第二冲水组件包括第二横置储水管,所述第二横置储水管通过第二导管连通缓流孔。As a preferred solution of a flushing tank for a copper rice shaker described in the present invention, wherein: the second flushing assembly includes a second horizontal water storage pipe, and the second horizontal water storage pipe passes through the second The conduit communicates with the slow flow hole.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述缓流孔的一端设有第二进水口,所述第二横置储水管上设有第二出水口,所述第二进水口和第二出水口之间共同连接第二导管,所述第二横置储水管上设有第二供水口,所述第二供水口通过卡箍连接第二进水管。As a preferred solution of the flushing tank for a copper rice shaker described in the present invention, a second water inlet is provided at one end of the slow flow hole, and a second water inlet is provided on the second horizontal water storage pipe. Two water outlets, the second water inlet and the second water outlet are connected to the second conduit, the second horizontal water storage pipe is provided with a second water supply port, and the second water supply port is connected to the second water supply port through a clamp Two water inlet pipes.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:还包括铜米冲洗组件;As a preferred solution of the flushing tank for a copper rice shaker described in the present invention, it also includes a copper rice flushing assembly;
所述铜米冲洗组件包括竖置储水管,所述竖置储水管通过第三导管连接竖置冲水管,所述竖置储水管上设有第三供水口,所述第三供水口通过卡箍连接第三进水管。The copper rice flushing assembly includes a vertical water storage pipe, the vertical water storage pipe is connected to the vertical flushing water pipe through a third conduit, the vertical water storage pipe is provided with a third water supply port, and the third water supply port passes through the card The hoop connects the third water inlet pipe.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述竖置储水管上等距离设有第三出水口,所述竖置冲水管上等距离设有第三进水口,所述第三进水口和第三出水口之间通过第三导管连接。As a preferred solution of a flushing tank for a copper rice shaker described in the present invention, wherein: the vertical water storage pipe is equidistantly provided with a third water outlet, and the vertical flushing pipe is equidistantly provided with a third water outlet. There is a third water inlet, and the third water inlet and the third water outlet are connected through a third conduit.
作为本实用新型所述的一种铜米摇床用冲水槽的一种优选方案,其中:所述基座上设有排水槽、排水腔、第一铜米收集槽和第二铜米收集槽,所述第一铜米收集槽和第二铜米收集槽均与排水腔连通。As a preferred solution of the flushing tank for a copper rice shaker described in the present invention, wherein: the base is provided with a drainage tank, a drainage chamber, a first copper rice collection tank and a second copper rice collection tank , both the first copper rice collection tank and the second copper rice collection tank are in communication with the drainage cavity.
与现有技术相比:Compared with existing technology:
1、通过在铜米摇床上开设连通第一分流条和第二分流条的缓流孔,通过第二冲水组件对铜米摇床冲水,能够使第一分流条和第二分流条中的铜米和小颗粒杂质翻滚,从而将第一分流条和第二分流条中残留杂质排走,使得分离更加彻底;1. By opening a slow flow hole connecting the first diverter bar and the second diverter bar on the copper rice shaker, and flushing the copper rice shaker through the second flushing assembly, the first diverter bar and the second diverter bar can be flushed. The copper rice and small particles of impurities are tumbled, so that the residual impurities in the first shunt bar and the second shunt bar are discharged, making the separation more thorough;
2、本实用新型的分流条自靠近水槽向外逐层变长,这样逐层向外地分流条延长分离时间,能较为准确地分离出粉碎线缆里的铜;2. The shunt bar of the utility model becomes longer layer by layer from close to the water tank, so that the separation time is extended layer by layer, and the copper in the crushed cable can be separated more accurately;
3、本实用新型的粉碎线缆里的大块橡胶自床头开始被水槽内水冲击到侧边,小块的橡胶由于受水冲击力较小,小块的橡胶块会陆续地从侧边自床头到床尾分离出来。3. The large piece of rubber in the crushed cable of the utility model is impacted by the water in the tank to the side from the head of the bed, and the small piece of rubber is less impacted by the water, and the small piece of rubber will be gradually removed from the side Separate from head to foot of the bed.
附图说明Description of drawings
图1为本实用新型提供的结构示意图;Fig. 1 is the structural representation that the utility model provides;
图2为本实用新型提供的基座的俯视图;Fig. 2 is the top view of the base provided by the utility model;
图3为本实用新型提供的图1中A处放大图;Fig. 3 is the enlarged view of place A in Fig. 1 provided by the utility model;
图4为本实用新型提供的图1中B处放大图;Fig. 4 is the enlarged view of place B in Fig. 1 provided by the utility model;
图5为本实用新型提供的铜米摇床的立体图。Fig. 5 is a perspective view of the copper rice shaker provided by the utility model.
图中:基座1、第一铜米收集槽2、第二铜米收集槽3、第一隔板4、排水槽5、第二隔板6、排水腔7、铜米摇床8、缓流孔81、第二进水口811、第一分流条9、第二分流条10、第二横置储水管11、第二出水口111、第二供水口112、第二导管12、第一横置储水管13、第一供水口131、第一出水口132、第一横置冲水管14、第一进水口141、第一进水管15、第二进水管16、竖置储水管17、第三出水口171、第三供水口172、竖置冲水管18、第三进水口181、第三导管19、第三进水管20、第一导管21。In the figure: base 1, first copper
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型的实施方式做进一步的详细描述。In order to make the purpose, technical solutions and advantages of the utility model clearer, the implementation of the utility model will be further described in detail below in conjunction with the accompanying drawings.
本实用新型提供一种铜米摇床用冲水槽,请参阅图1-5,包括基座1,基座1上设有铜米摇床8,铜米摇床8上设有分流装置,分流装置包括有若干分流条,分流条笔直在铜米摇床8上沿床头到床尾敷设;分流条包括有第一分流条9和第二分流条10,第一分流条9和第二分流条10间隔排列,第二分流条10的长度小于第一分流条9,延长分离时间,能较为准确地分离出粉碎线缆里的铜,还包括沿着铜米摇床8纵向开设的缓流孔81,利用第二冲水组件向缓流孔81内注水;The utility model provides a flushing tank for a copper rice shaker, please refer to Fig. 1-5, including a base 1, a
缓流孔81连通若干个第一分流条9和第二分流条10。The
还包括第一冲水组件和第二冲水组件,第二冲水组件的出水速度小于第一冲水组件的出水速度;第二冲水组件向缓流孔81中注水,从而从侧面出水而冲向第一分流条9和第二分流条10。It also includes a first flushing assembly and a second flushing assembly, the water outlet speed of the second flushing assembly is lower than the water outlet speed of the first flushing assembly; the second flushing assembly injects water into the
第一冲水组件包括第一横置储水管13,第一横置储水管13通过第一导管21连接第一横置冲水管14,第一横置冲水管14的一侧开设有矩形通孔,从而水从这个矩形通孔中排出而冲向铜米摇床8,第一横置储水管13上设有第一供水口131,第一供水口131通过卡箍连接有第一进水管15,第一进水管15通过水泵连接水源。The first flush water assembly includes a first horizontal
第一横置储水管13上等距离设有第一出水口132,第一横置冲水管14上等距离设有第一进水口141,第一出水口132和第一进水口141之间共同连接第一导管21,第一导管21通过水泵连接水源;第一横置冲水管14上开设有矩形通孔,水从这个矩形通孔冲入第二进水口811和缓流孔81中。The first horizontal
第二冲水组件包括第二横置储水管11,第二横置储水管11通过第二导管12连通缓流孔81。The second flushing assembly includes a second horizontal
缓流孔81的一端设有第二进水口811,第二横置储水管11上设有第二出水口111,第二进水口811和第二出水口111之间共同连接第二导管12,第二横置储水管11上设有第二供水口112,第二供水口112通过卡箍连接第二进水管16。One end of the
还包括铜米冲洗组件;Also includes copper rice flushing components;
铜米冲洗组件包括竖置储水管17,竖置储水管17通过第三导管19连接竖置冲水管18,竖置冲水管18上开设有矩形通孔,水从这个矩形通孔均匀冲向铜米摇床8,竖置储水管17上设有第三供水口172,第三供水口172通过卡箍连接第三进水管20,第三进水管20通过水泵连接水源。The copper rice flushing assembly includes a vertical
竖置储水管17上等距离设有第三出水口171,竖置冲水管18上等距离设有第三进水口181,第三进水口181和第三出水口171之间通过第三导管19连接。The
基座1上设有排水槽5、排水腔7、第一铜米收集槽2和第二铜米收集槽3,第一铜米收集槽2和第二铜米收集槽3均与排水腔7连通;第一铜米收集槽2和第二铜米收集槽3之间设有第一隔板4,第一隔板4上开设有通孔,通孔内安装有过滤网,过滤网对铜米进行拦截;排水槽5的一端设有第二隔板6,第二隔板6上开设有两个通孔,两个通孔分别连通第一铜米收集槽2和第二铜米收集槽3,且这两个通孔内均安装有过滤网;基座1靠近排水腔7的位置设有排杂孔,用于排出排水腔7中的水、粉碎线缆或轻质橡胶。The base 1 is provided with a
在具体使用时,将掺杂粉碎线缆或轻质橡胶的铜米放到铜米摇床8上,水泵抽水进入第一横置储水管13中,进而均匀进入第一横置冲水管14中,水冲向铜米摇床8上,铜米由于密度大,铜米落到第一分流条9和第二分流条10中;同时另一个水泵将水抽入第二横置储水管11,进而均匀进入缓流孔81中,从而将第一分流条9和第二分流条10中残留的粉碎线缆或轻质橡胶冲走;铜米摇床8上粉碎线缆或轻质橡胶被冲到排水槽5中,之后流入排水腔7中,从而排走水、粉碎线缆或轻质橡胶;停止上述的两个水泵,启动另一个水泵,而通过第三进水管20抽水进入竖置储水管17,进而进入竖置冲水管18,从而水横向冲向铜米摇床8,将第一分流条9和第二分流条10中的铜米充入第一铜米收集槽2中,根据在第一隔板4上设置的过滤网的网孔孔径,颗粒较小的铜米进入第二铜米收集槽3中。In specific use, put the copper rice mixed with crushed cables or light rubber on the copper rice shaker 8, and the water pump pumps water into the first horizontal water storage pipe 13, and then evenly enters the first horizontal flush water pipe 14 , the water rushes to the copper rice shaker 8, and the copper rice falls into the first diverter bar 9 and the second diverter bar 10 due to the high density of the copper rice; at the same time, another water pump pumps water into the second horizontal water storage pipe 11, Then evenly enter the slow flow hole 81, thereby washing away the remaining crushed cables or light rubber in the first shunt bar 9 and the second shunt bar 10; the shredded cables or light rubber on the copper rice shaker 8 are washed away into the drainage tank 5, then flows into the drainage chamber 7, thereby draining away water, crushing cables or light rubber; stopping the above two water pumps, starting another water pump, and pumping water through the third water inlet pipe 20 into the vertical storage The water pipe 17 then enters the vertical flushing pipe 18, so that the water rushes to the copper rice shaker 8 horizontally, and the copper rice in the first shunt bar 9 and the second shunt bar 10 is filled in the first copper rice collection tank 2, according to According to the mesh aperture of the filter screen arranged on the first dividing plate 4 , the copper rice with smaller particles enters the second copper rice collection tank 3 .
虽然在上文中已经参考实施方式对本实用新型进行了描述,然而在不脱离本实用新型的范围的情况下,可以对其进行各种改进并且可以用等效物替换其中的部件。尤其是,只要不存在结构冲突,本实用新型所披露的实施方式中的各项特征均可通过任意方式相互结合起来使用,在本说明书中未对这些组合的情况进行穷举性的描述仅仅是出于省略篇幅和节约资源的考虑。因此,本实用新型并不局限于文中公开的特定实施方式,而是包括落入权利要求的范围内的所有技术方案。While the invention has been described above with reference to the embodiments, various modifications may be made and equivalents may be substituted for parts thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, all the features in the embodiments disclosed in the present utility model can be used in combination with each other in any way, and the description of these combinations is not exhaustive in this specification. For the sake of omitting space and saving resources. Therefore, the utility model is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320254702.7U CN219252875U (en) | 2023-02-20 | 2023-02-20 | Flushing tank for copper rice shaking table |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320254702.7U CN219252875U (en) | 2023-02-20 | 2023-02-20 | Flushing tank for copper rice shaking table |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219252875U true CN219252875U (en) | 2023-06-27 |
Family
ID=86863286
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320254702.7U Expired - Fee Related CN219252875U (en) | 2023-02-20 | 2023-02-20 | Flushing tank for copper rice shaking table |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219252875U (en) |
-
2023
- 2023-02-20 CN CN202320254702.7U patent/CN219252875U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105089135B (en) | Pre-mounted rainwater treatment device | |
| CN219252875U (en) | Flushing tank for copper rice shaking table | |
| CN204735475U (en) | Old and useless silicon chip washs selects separately recovery unit | |
| CN214262945U (en) | Sand washing barrel for sand washing equipment | |
| CN211774123U (en) | A water collecting device for civil engineering of water plant | |
| CN205975746U (en) | Water conservancy desilting of convenient removal is from belt cleaning device | |
| CN211273780U (en) | Impurity cleaning device for sewage treatment | |
| CN206950799U (en) | A kind of nozzle maintenance-free type filtration system | |
| CN209866629U (en) | A kind of sand dividing device for civil engineering | |
| CN208105270U (en) | A kind of water conservancy construction feeding device | |
| CN207436970U (en) | A kind of slurry transportation filtration system | |
| CN201778117U (en) | Copper plating vehicle metal wire spraying device | |
| CN216765410U (en) | Improved multi-net pulp thickener | |
| CN218486721U (en) | Quartz sand cleaning equipment | |
| CN206955804U (en) | An industrial cleaning water recycling and impurity removal system | |
| CN218774518U (en) | An intelligent sprinkler device for a building construction site | |
| CN223316413U (en) | Domestic sewage recycling treatment device | |
| CN221183920U (en) | Template cleaning machine capable of recycling water source | |
| CN219597225U (en) | High reliability gravel filtration equipment that security is high | |
| CN221387715U (en) | Cleaning device is used in production of papermaking forming wire | |
| CN206454950U (en) | A kind of rice washing device cleaning knot screen | |
| CN210993502U (en) | A kind of waste water recycling dust removal device for coal mining | |
| CN219111011U (en) | A filtering mechanism for chemical circulating water and a cleaning device using the same | |
| CN222151110U (en) | A preliminary filtration device for sewage treatment | |
| CN220900663U (en) | Efficient sand washer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241008 Address after: 437299 Yuyue Town Industrial Park, Jiayu County, Xianning City, Hubei Province (Group 10, Tiepo Village) Patentee after: Jiayu Hengtai Nonferrous Wire Co.,Ltd. Country or region after: China Address before: Yangbian Village, Zhanggang Street, Changle City, Fuzhou City, 350000 Fujian Province Patentee before: Fuzhou Tongxin Material Recycling Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230627 |