CN219245622U - A Bridge Fixture for Measuring Wire Resistance Value - Google Patents

A Bridge Fixture for Measuring Wire Resistance Value Download PDF

Info

Publication number
CN219245622U
CN219245622U CN202320723282.2U CN202320723282U CN219245622U CN 219245622 U CN219245622 U CN 219245622U CN 202320723282 U CN202320723282 U CN 202320723282U CN 219245622 U CN219245622 U CN 219245622U
Authority
CN
China
Prior art keywords
clamp
current
voltage
wiring
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320723282.2U
Other languages
Chinese (zh)
Inventor
洪伟
李少关
魏美林
丁玲玲
王佳丽
朱聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hagong Intelligent Manufacturing And Testing Technology Co ltd
Original Assignee
Anhui Hagong Intelligent Manufacturing And Testing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hagong Intelligent Manufacturing And Testing Technology Co ltd filed Critical Anhui Hagong Intelligent Manufacturing And Testing Technology Co ltd
Priority to CN202320723282.2U priority Critical patent/CN219245622U/en
Application granted granted Critical
Publication of CN219245622U publication Critical patent/CN219245622U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The utility model relates to the technical field of cable resistance measurement and discloses a bridge clamp for measuring a wire resistance value, which comprises an operation table, a wiring auxiliary tool, a current clamp and a voltage clamp, wherein the wiring auxiliary tool, the current clamp and the voltage clamp are symmetrically arranged on two sides of the top of the operation table respectively; according to the utility model, when the screw rod rotates in the inner wall of the adjusting groove, the current clamps at the two ends of the inner wall of the adjusting groove can slide close to or separate from the inner wall of the adjusting groove under the cooperation of the inner threaded holes of the voltage clamps, so that the distance between the current clamps and the voltage clamps is adjusted, meanwhile, the wiring auxiliary tool slides in the adjusting groove through the through hole and is positioned through the positioning rod, so that the distance between the two groups of wiring auxiliary tools, the current clamps and the voltage clamps in the bridge clamp can be flexibly adjusted, the resistance values of the split conductors with different lengths can be measured, and the bridge clamp can be suitable for measuring the resistance values of the split conductors with different sizes.

Description

一种测量电线电阻值的电桥夹具A Bridge Fixture for Measuring Wire Resistance Value

技术领域technical field

本实用新型涉及电缆电阻测量技术领域,具体为一种测量电线电阻值的电桥夹具。The utility model relates to the technical field of cable resistance measurement, in particular to a bridge fixture for measuring the resistance value of electric wires.

背景技术Background technique

分割导体在使用前需要精确测量其直流电阻,测量设备为电桥,电桥测量分割导体时采用四端接线法测量方式,即将两组电流夹具夹持在分割导体的两端,将两组电压夹具夹持在两组电流夹具之间的分割导体上,两组电压夹具之间的距离为一米,通过电流夹具为分割导体施加恒定电流,并通过电压夹具采集一米分割导体的电压值来计算分割导体的单位电阻。The DC resistance of the split conductor needs to be accurately measured before use. The measuring device is a bridge. When the bridge measures the split conductor, the four-terminal connection method is used to measure the split conductor. The fixture is clamped on the split conductor between the two sets of current fixtures, and the distance between the two sets of voltage fixtures is one meter. A constant current is applied to the split conductor through the current fixture, and the voltage value of the one-meter split conductor is collected by the voltage fixture. Calculate the unit resistance of a segmented conductor.

如中国专利公开的公开号为CN205015371U的一种采用电桥测量大截面分割导体电阻值的夹具,本实用新型结构简单,能够对分割导体进行紧实夹紧,在不改变分割导体形状的基础上,使得电流夹具能够为分割导体提供恒定的电流,保证了测量的精确;For example, the publication number of the Chinese patent publication is CN205015371U, a clamp for measuring the resistance value of a large cross-section segmented conductor using an electric bridge. The utility model has a simple structure and can tightly clamp the segmented conductor without changing the shape of the segmented conductor. , so that the current fixture can provide a constant current for the split conductor, ensuring the accuracy of the measurement;

但是在实际使用时,由于电流夹具与电压夹具以及接线辅具之间间距无法灵活调整,导致被测的分割导体由于不同长度无法与夹具以及接线辅具之间正常接线,使得该电桥夹具无法适用不同长度的导体测量,使用存在局限性。However, in actual use, due to the inability to adjust the distance between the current fixture, the voltage fixture and the wiring aids flexibly, the split conductors to be tested cannot be connected to the fixture and the wiring aids due to different lengths, so that the bridge fixture cannot It is suitable for the measurement of conductors of different lengths, and there are limitations in its use.

实用新型内容Utility model content

本实用新型的目的在于提供一种测量电线电阻值的电桥夹具,以解决现有的电桥夹具之间无法灵活调整间距,导致被测的分割导体由于不同长度无法与夹具以及接线辅具之间正常接线,使得该电桥夹具使用存在局限性的问题。The purpose of this utility model is to provide a bridge fixture for measuring the resistance value of electric wires, so as to solve the problem that the distance between the existing bridge fixtures cannot be adjusted flexibly, resulting in that the measured split conductors cannot be connected with the fixture and the wiring aid due to different lengths. The normal wiring between them makes the use of the bridge fixture have limitations.

为实现上述目的,本实用新型提供如下技术方案:一种测量电线电阻值的电桥夹具,包括操作台、接线辅具、电流夹具、电压夹具,所述操作台顶部两侧分别对称设置有接线辅具、电流夹具、电压夹具,所述操作台一端固定安装有调节电机,所述调节电机输出端固定连接有丝杆,所述电流夹具与所述电压夹具底面均固定连接有第一调节块,所述接线辅具底面固定连接有第二调节块,所述接线辅具正面固定连接有定位杆,所述定位杆正面底端可拆卸安装有定位螺丝。In order to achieve the above purpose, the utility model provides the following technical solutions: a bridge fixture for measuring the resistance value of electric wires, including an operating table, wiring aids, current fixtures, and voltage fixtures, and the two sides of the top of the operating table are symmetrically arranged with wiring Auxiliary tools, current fixtures, and voltage fixtures, one end of the console is fixedly equipped with an adjustment motor, the output end of the adjustment motor is fixedly connected to a screw rod, and the first adjustment block is fixedly connected to the bottom surface of the current fixture and the voltage fixture , the bottom surface of the wiring aid is fixedly connected with a second adjustment block, the front of the wiring aid is fixedly connected with a positioning rod, and the bottom end of the front of the positioning rod is detachably mounted with a positioning screw.

优选的,所述操作台顶面中部开设有调节槽,所述接线辅具一侧贯穿开设有通孔,所述操作台正面两侧分别对称等间距开设有多组定位孔。Preferably, an adjustment slot is provided in the middle of the top surface of the console, a through hole is provided on one side of the wiring aid, and multiple sets of positioning holes are symmetrically and equidistantly provided on both sides of the front of the console.

优选的,所述电流夹具与所述电压夹具均通过第一调节块滑动于所述调节槽内壁中。Preferably, both the current fixture and the voltage fixture slide in the inner wall of the regulating slot through the first regulating block.

优选的,位于操作台一端的所述电流夹具与所述电压夹具一侧均贯穿开设有内螺纹孔,所述丝杆通过外围螺纹配合于内螺纹孔中。Preferably, the current fixture at one end of the console and the side of the voltage fixture are both provided with internal threaded holes, and the screw rod is fitted into the internal threaded holes through peripheral threads.

优选的,所述接线辅具通过通孔活动套设于所述丝杆外围。Preferably, the wiring aid is movably sleeved on the periphery of the screw rod through the through hole.

优选的,所述定位杆为L形结构,所述定位螺丝通过外围螺纹配合连接于定位孔内壁中。Preferably, the positioning rod has an L-shaped structure, and the positioning screw is connected to the inner wall of the positioning hole through peripheral threads.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型通过丝杆在调节槽内壁中转动时,调节槽内壁两端的电流夹具与电压夹具在内螺纹孔的配合下,可在调节槽内壁中滑动靠拢或分离运动,进而调整了电流夹具与电压夹具的间距,同时,接线辅具通过通孔在调节槽中滑动,并通过定位杆定位,使得该电桥夹具中两组接线辅具、电流夹具、电压夹具之间间距灵活调节,可对不同长度的分割导体进行测量电阻值,实现了该电桥夹具可适用多尺寸的分割导体电阻值的测量,解决了现有的电桥夹具之间无法灵活调整间距,导致被测的分割导体由于不同长度无法与夹具以及接线辅具之间正常接线,使得该电桥夹具使用存在局限性的问题。When the utility model rotates in the inner wall of the adjusting groove through the screw rod, the current fixture and the voltage fixture at both ends of the inner wall of the adjusting groove cooperate with the internal threaded holes, and can slide closer or separate in the inner wall of the adjusting groove, thereby adjusting the current fixture and the voltage fixture. At the same time, the wiring aid slides in the adjustment slot through the through hole and is positioned by the positioning rod, so that the distance between the two sets of wiring aids, the current clamp, and the voltage clamp in the bridge clamp can be flexibly adjusted. The resistance value of the divided conductors of different lengths is measured, which realizes that the bridge fixture is applicable to the measurement of the resistance value of the divided conductors of multiple sizes, and solves the problem that the distance between the existing bridge fixtures cannot be flexibly adjusted, which causes the measured divided conductors to be Different lengths cannot be connected normally with the fixture and wiring aids, which makes the use of the bridge fixture limited.

附图说明Description of drawings

图1为本实用新型立体结构示意图;Fig. 1 is a schematic diagram of the three-dimensional structure of the utility model;

图2为本实用新型侧剖面结构示意图;Fig. 2 is the utility model side sectional structure schematic diagram;

图3为图2中A处局部放大结构示意图。FIG. 3 is a schematic diagram of a partially enlarged structure at A in FIG. 2 .

图中:1、操作台;2、接线辅具;3、电流夹具;4、电压夹具;5、调节电机;6、调节槽;7、丝杆;8、第一调节块;9、第二调节块;10、通孔;11、定位杆;12、定位孔;13、定位螺丝。In the figure: 1. Operating console; 2. Wiring aids; 3. Current fixture; 4. Voltage fixture; 5. Regulating motor; 6. Regulating slot; 7. Screw rod; 8. First regulating block; 9. Second Adjusting block; 10, through hole; 11, positioning rod; 12, positioning hole; 13, positioning screw.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. The described embodiments are only part of the embodiments of the present invention, not all of them.

请参阅图1-3,本实用新型提供一种技术方案:一种测量电线电阻值的电桥夹具,包括操作台1、接线辅具2、电流夹具3、电压夹具4,操作台1顶部两侧分别对称设置有接线辅具2、电流夹具3、电压夹具4,操作台1一端固定安装有调节电机5;Please refer to Figures 1-3, the utility model provides a technical solution: a bridge fixture for measuring the resistance value of electric wires, including console 1, wiring aid 2, current fixture 3, voltage fixture 4, two top of console 1 Wiring aids 2, current fixtures 3, and voltage fixtures 4 are arranged symmetrically on the sides, and an adjusting motor 5 is fixedly installed at one end of the console 1;

调节电机5输出端固定连接有丝杆7,电流夹具3与电压夹具4底面均固定连接有第一调节块8,接线辅具2底面固定连接有第二调节块9,接线辅具2正面固定连接有定位杆11,定位杆11正面底端可拆卸安装有定位螺丝13;The output end of the adjustment motor 5 is fixedly connected with the screw rod 7, the bottom surface of the current fixture 3 and the voltage fixture 4 are both fixedly connected with the first adjustment block 8, the bottom surface of the wiring aid 2 is fixedly connected with the second adjustment block 9, and the front side of the wiring aid 2 is fixed. A positioning rod 11 is connected, and a positioning screw 13 is detachably mounted on the front bottom of the positioning rod 11;

电流夹具3与电压夹具4均通过滚珠丝杠滑台与夹头构成的夹具结构,电流夹具3与电压夹具4上均设置有连接电桥接线端子的导线柱,接线辅具2均通过上下压块以及紧固螺栓构成,并且,上下压块均设置有接线柱,该电流夹具3与电压夹具4以及接线辅具2的接线方式,通过四端接线法将两个电流夹具3和两个电压夹具4夹持在分割导体上,然后将两个接线辅具2分别装配在电流夹具3外端的分割导体上,完成分割导体的接线操作,该测量方案均为现有技术,在此不做赘述;Both the current fixture 3 and the voltage fixture 4 pass through the fixture structure composed of the ball screw slide table and the chuck. The current fixture 3 and the voltage fixture 4 are both equipped with wire posts connected to the bridge terminals, and the wiring aids 2 are both pressed up and down. block and fastening bolts, and the upper and lower pressure blocks are provided with binding posts, the connection mode of the current clamp 3 and the voltage clamp 4 and the wiring aid 2, the two current clamps 3 and the two voltage clamps are connected by the four-terminal connection method The fixture 4 is clamped on the split conductor, and then the two wiring aids 2 are respectively assembled on the split conductor at the outer end of the current fixture 3 to complete the wiring operation of the split conductor. This measurement scheme is all prior art, and will not be repeated here. ;

丝杆7在调节槽6内壁中转动时,调节槽6内壁两端的电流夹具3与电压夹具4在内螺纹孔的配合下,可在调节槽6内壁中滑动靠拢或分离运动,进而调整了电流夹具3与电压夹具4的间距,同时,接线辅具2通过通孔10在调节槽6中滑动,并通过定位杆11定位,使得该电桥夹具中两组接线辅具2、电流夹具3、电压夹具4之间间距灵活调节,可对不同长度的分割导体进行测量电阻值,实现了该电桥夹具可适用多尺寸的分割导体电阻值的测量。When the screw rod 7 rotates in the inner wall of the adjustment groove 6, the current clamp 3 and the voltage clamp 4 at both ends of the inner wall of the adjustment groove 6 cooperate with the internal threaded holes, and can slide closer or separate in the inner wall of the adjustment groove 6, thereby adjusting the current. At the same time, the wiring aid 2 slides in the adjustment groove 6 through the through hole 10, and is positioned by the positioning rod 11, so that two groups of wiring aids 2, current clamp 3, The distance between the voltage fixtures 4 can be flexibly adjusted, and the resistance value of the divided conductors of different lengths can be measured, realizing that the bridge fixture is applicable to the measurement of the resistance value of the divided conductors of multiple sizes.

其中,操作台1顶面中部开设有调节槽6,接线辅具2一侧贯穿开设有通孔10,操作台1正面两侧分别对称等间距开设有多组定位孔12,接线辅具2可通过L形定位杆11用定位螺丝13定位,使得两组接线辅具2可在调节槽6中滑动调整间距,在电流夹具3、电压夹具4的滑动调整配合下,可对不同长度的分割导体进行接线测量电阻值。Among them, the middle part of the top surface of the console 1 is provided with an adjustment slot 6, one side of the wiring aid 2 is provided with a through hole 10, and the two sides of the front of the console 1 are provided with multiple sets of positioning holes 12 symmetrically and equidistantly. The L-shaped positioning rod 11 is positioned with the positioning screw 13, so that the two sets of wiring aids 2 can slide and adjust the distance in the adjustment groove 6. With the cooperation of the sliding adjustment of the current clamp 3 and the voltage clamp 4, the divided conductors of different lengths can be adjusted. Conduct wiring to measure the resistance value.

其中,电流夹具3与电压夹具4均通过第一调节块8滑动于调节槽6内壁中,电流夹具3与电压夹具4均通过滚珠丝杠滑台与夹头构成的夹具结构,电流夹具3与电压夹具4上均设置有连接电桥接线端子的导线柱。Wherein, both the current clamp 3 and the voltage clamp 4 slide in the inner wall of the adjustment groove 6 through the first adjustment block 8, and the current clamp 3 and the voltage clamp 4 both pass through the clamp structure formed by the ball screw slide table and the chuck, and the current clamp 3 and The voltage fixtures 4 are all provided with wire posts connected to the bridge terminals.

其中,位于操作台1一端的电流夹具3与电压夹具4一侧均贯穿开设有内螺纹孔,丝杆7通过外围螺纹配合于内螺纹孔中,丝杆7在调节槽6内壁中转动时,调节槽6内壁两端的电流夹具3与电压夹具4在内螺纹孔的配合下,可在调节槽6内壁中滑动靠拢或分离运动,进而调整了电流夹具3与电压夹具4的间距。Wherein, the current fixture 3 and the voltage fixture 4 at one end of the console 1 are provided with internally threaded holes, and the screw rod 7 fits in the internally threaded hole through the peripheral thread. When the screw rod 7 rotates in the inner wall of the adjustment groove 6, The current fixture 3 and the voltage fixture 4 at both ends of the inner wall of the adjustment groove 6 cooperate with the internally threaded holes, and can slide closer or separate in the inner wall of the adjustment groove 6, thereby adjusting the distance between the current fixture 3 and the voltage fixture 4.

其中,接线辅具2通过通孔10活动套设于丝杆7外围,定位杆11为L形结构,定位螺丝13通过外围螺纹配合连接于定位孔12内壁中,接线辅具2通过通孔10在调节槽6中滑动,并通过定位杆11定位,使得该电桥夹具中两组接线辅具2、电流夹具3、电压夹具4之间间距灵活调节,可对不同长度的分割导体进行测量电阻值,实现了该电桥夹具可适用多尺寸的分割导体电阻值的测量。Wherein, the wiring aid 2 is movably sleeved on the periphery of the screw rod 7 through the through hole 10, the positioning rod 11 is an L-shaped structure, the positioning screw 13 is connected to the inner wall of the positioning hole 12 through the peripheral thread, and the wiring aid 2 passes through the through hole 10. Sliding in the adjustment groove 6, and positioning by the positioning rod 11, the distance between the two sets of wiring aids 2, the current fixture 3, and the voltage fixture 4 in the bridge fixture can be flexibly adjusted, and the resistance of divided conductors of different lengths can be measured. The value realizes that the bridge fixture is applicable to the measurement of the resistance value of split conductors of multiple sizes.

工作原理:在使用时,先将待测量的分割导体与两组电压夹具4之间间距比较,当分割导体长度大于两组电压夹具4间距时,可将分割导体两端放置于两组电流夹具3与电压夹具4之间,并通过调节电机5带动丝杆7转动,使得两组电流夹具3与电压夹具4在调节槽6中分离滑动调整间距,同理,当分割导体长度小于两组电压夹具4间距时,两组电流夹具3与电压夹具4在调节槽6中靠拢调整间距,可将分割导体呈水平式夹持,减小分割导体的弯曲度,避免测量存在误差,然后,通过四端接线法将两个电流夹具3和两个电压夹具4夹持在分割导体上,并通过将两组接线辅具2在调节槽6中滑动,使得接线辅具2与电流夹具3之间间距控制在8-10毫米之间,并通过定位螺丝13与定位孔12将定位杆11定位,最后,用4平方米的软铜导线将接线辅具2的接线柱和电流夹具3的接线端牢固地连接在一起;使得电桥的电流接线端子连接在电流夹具3的两个导线柱上,将电桥的电压接线端子连接在电压夹具4的两个导线柱上,实现对分割导体直流电阻的测试。Working principle: When in use, first compare the distance between the divided conductor to be measured and the two sets of voltage fixtures 4. When the length of the divided conductor is greater than the distance between the two sets of voltage fixtures 4, the two ends of the divided conductor can be placed on the two sets of current fixtures 3 and the voltage fixture 4, and the screw rod 7 is driven by the adjustment motor 5 to rotate, so that the two sets of current fixtures 3 and voltage fixtures 4 are separated and slid in the adjustment groove 6 to adjust the distance. Similarly, when the length of the divided conductor is less than two sets of voltage When the distance between the clamps 4, the two sets of current clamps 3 and voltage clamps 4 move closer to adjust the distance in the adjustment groove 6, the split conductors can be clamped horizontally, the bending of the split conductors can be reduced, and errors in the measurement can be avoided. Then, through four The terminal wiring method clamps two current clamps 3 and two voltage clamps 4 on the split conductor, and slides the two sets of wiring aids 2 in the adjustment groove 6 to make the distance between the wiring aids 2 and the current clamps 3 Control it between 8-10 mm, and position the positioning rod 11 through the positioning screw 13 and the positioning hole 12, and finally, use 4 square meters of soft copper wire to firmly connect the terminal of the wiring aid 2 and the terminal of the current clamp 3 The ground is connected together; the current connection terminal of the electric bridge is connected on the two lead posts of the current fixture 3, and the voltage connection terminal of the electric bridge is connected on the two lead posts of the voltage fixture 4, so as to realize the direct current resistance of the split conductor test.

采用本实用新型协助电桥对2000平方米分割导体的直流电阻进行测试,试验结果为:两次试验结果为0.0115mΩ、0.0112mΩ,测量浮动误差为1.7%。不使用本实用新型进行测量时,两次试验结果为0.0117mΩ、0.0125mΩ,测量浮动误差为6.4%。可见,使用本实用新型可使试验结果的测量浮动误差大大降低,且完全符合国家标准规定的测量误差不大于2%。The utility model is used to test the direct current resistance of 2000 square meters of divided conductors by using the auxiliary bridge of the utility model. The test results are: the results of two tests are 0.0115mΩ and 0.0112mΩ, and the measurement floating error is 1.7%. When the utility model is not used for measurement, the two test results are 0.0117mΩ and 0.0125mΩ, and the measurement floating error is 6.4%. It can be seen that the use of the utility model can greatly reduce the measurement fluctuation error of the test result, and the measurement error fully conforming to the national standard is not more than 2%.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理下可以对这些实施例进行多种变化和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principles of the present invention. The scope is defined by the claims appended hereto and their equivalents.

Claims (6)

1. The utility model provides a measure bridge anchor clamps of electric wire resistance, includes operation panel (1), wiring assistance utensil (2), current clamp (3), voltage clamp (4), its characterized in that: the utility model discloses a wire connection auxiliary tool, including operation panel (1), current clamp (3), voltage clamp (4), operation panel (1) one end fixed mounting has accommodate motor (5), accommodate motor (5) output fixedly connected with lead screw (7), current clamp (3) with first regulating block (8) of equal fixedly connected with in voltage clamp (4) bottom surface, utensil (2) bottom surface fixedly connected with second regulating block (9) are assisted in the wiring, positive fixedly connected with locating lever (11) are assisted in the wiring, locating lever (11) openly bottom demountable installation has locating screw (13).
2. The bridge clip for measuring the resistance of an electrical wire of claim 1, wherein: the adjusting device is characterized in that an adjusting groove (6) is formed in the middle of the top surface of the operating platform (1), a through hole (10) is formed in one side of the wiring auxiliary tool (2) in a penetrating mode, and a plurality of groups of positioning holes (12) are formed in two sides of the front surface of the operating platform (1) in a symmetrical and equidistant mode respectively.
3. The bridge clip for measuring the resistance of an electrical wire of claim 2, wherein: the current clamp (3) and the voltage clamp (4) slide in the inner wall of the adjusting groove (6) through a first adjusting block (8).
4. A bridge clip for measuring the resistance of an electrical wire as set forth in claim 3 wherein: the current clamp (3) and one side of the voltage clamp (4) which are positioned at one end of the operating platform (1) are respectively provided with an internal threaded hole in a penetrating mode, and the screw rod (7) is matched in the internal threaded holes through peripheral threads.
5. The bridge clip for measuring wire resistance of claim 4, wherein: the wiring auxiliary tool (2) is movably sleeved on the periphery of the screw rod (7) through a through hole (10).
6. The bridge clip for measuring wire resistance of claim 5, wherein: the positioning rod (11) is of an L-shaped structure, and the positioning screw (13) is connected into the inner wall of the positioning hole (12) in a matched mode through peripheral threads.
CN202320723282.2U 2023-04-04 2023-04-04 A Bridge Fixture for Measuring Wire Resistance Value Expired - Fee Related CN219245622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320723282.2U CN219245622U (en) 2023-04-04 2023-04-04 A Bridge Fixture for Measuring Wire Resistance Value

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320723282.2U CN219245622U (en) 2023-04-04 2023-04-04 A Bridge Fixture for Measuring Wire Resistance Value

Publications (1)

Publication Number Publication Date
CN219245622U true CN219245622U (en) 2023-06-23

Family

ID=86845933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320723282.2U Expired - Fee Related CN219245622U (en) 2023-04-04 2023-04-04 A Bridge Fixture for Measuring Wire Resistance Value

Country Status (1)

Country Link
CN (1) CN219245622U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120908532A (en) * 2025-10-09 2025-11-07 南通市通州区精华电器有限公司 Electrical device resistance measuring device for manufacturing electromechanical equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120908532A (en) * 2025-10-09 2025-11-07 南通市通州区精华电器有限公司 Electrical device resistance measuring device for manufacturing electromechanical equipment
CN120908532B (en) * 2025-10-09 2025-12-02 南通市通州区精华电器有限公司 Electrical device resistance measuring device for manufacturing electromechanical equipment

Similar Documents

Publication Publication Date Title
CN102608428B (en) Testing device for direct-current (DC) resistance of cable conductor
CN103513111B (en) The conductivity test system of a kind of plain conductor and method of testing
CN219245622U (en) A Bridge Fixture for Measuring Wire Resistance Value
CN211554139U (en) Cable conductor resistance detection device
CN103344798A (en) Clamp and method for measuring direct current resistance of twisted wire core of cable
CN209215486U (en) A kind of direct current resistance m easurem ent device of cable
CN203444015U (en) Test system for conductivity of metal conductive wire
CN218938322U (en) Straight-through type binding post test unit and straight-through type binding post quick testing device
CN215813041U (en) Carbon brush connecting resistance test platform
CN219891423U (en) Electrode fixing device for high-density electrical measurement system
CN203551767U (en) Novel on-site calibration instrument voltage crimping device
CN109445415B (en) A precision test equipment for PLC input and output channels
CN215866885U (en) Digital bridge device for high-reliability cable detection
CN118566590A (en) A cable buffer layer volume resistivity test electrode, device and method
CN216657722U (en) Universal tool for testing electronic test equipment
CN216670052U (en) A anchor clamps for electric automobile power cable impedance test
CN204758819U (en) Be used for three -phase mutual -inductor access formula table meter to build mark testing arrangement
CN209590077U (en) Power transformer high-potting multifunctional access wire clamp
CN218470854U (en) Four-end point contact type metal material resistivity measuring tool
CN205787086U (en) Current transformer detection equipment
CN108918592B (en) A modular measuring device for lightning protection grounding materials in a power system and its use method
CN223611614U (en) A DC resistance tester for cable conductors
CN217530587U (en) Rapid clamping device for measuring conductor resistance of wire and cable
CN222866859U (en) Voltage transformer detection device
CN220894382U (en) Connecting wire for detecting air conditioner teaching megohmmeter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230623

CF01 Termination of patent right due to non-payment of annual fee