CN219241332U - Building concrete arc beam fixture - Google Patents

Building concrete arc beam fixture Download PDF

Info

Publication number
CN219241332U
CN219241332U CN202320544723.2U CN202320544723U CN219241332U CN 219241332 U CN219241332 U CN 219241332U CN 202320544723 U CN202320544723 U CN 202320544723U CN 219241332 U CN219241332 U CN 219241332U
Authority
CN
China
Prior art keywords
sleeve
screw rod
clamping mechanism
pipe body
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320544723.2U
Other languages
Chinese (zh)
Inventor
折帅
邓建明
王睿
吴鑫
杨乐
赵双宝
赵文博
高佳鹏
林景祥
贾冠亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN202320544723.2U priority Critical patent/CN219241332U/en
Application granted granted Critical
Publication of CN219241332U publication Critical patent/CN219241332U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种建筑砼弧形梁卡具,包括多个卡具机构,所述卡具机构固定在建筑砼弧形梁模板上,所述卡具机构包括管体,管体内转动连接有第一丝杆,第一丝杆一端贯穿管体端部固定连接有转盘,本实用新型通过转盘转动第一丝杆,第一丝杆通过第一丝杆套驱动移动套移动,实现对活动卡接机构位置的调节,实现对活动卡接机构与固定卡接机构之间间距的调节,满足不同宽度梁的模板之间的卡接,本实用新型通过六角头转动第二丝杆,第二丝杆驱动第二丝杆套在安装套内移动,调节活动卡和固定卡之间的间距,方便夹紧机构对不同厚度的建筑砼弧形梁模板的卡接,反向转动第二丝杆,使得活动卡和固定卡夹紧固定在模板上。

Figure 202320544723

The utility model discloses a construction concrete arc-shaped beam fixture, which comprises a plurality of fixture mechanisms, the fixture mechanisms are fixed on the building concrete arc-shaped beam formwork, the fixture mechanism includes a pipe body, and the pipe body is rotatably connected There is a first screw rod, one end of the first screw rod runs through the end of the pipe body and is fixedly connected with a turntable. The utility model rotates the first screw rod through the turntable, and the first screw rod drives the moving sleeve to move through the first screw rod sleeve to realize the movement The adjustment of the position of the clamping mechanism realizes the adjustment of the distance between the movable clamping mechanism and the fixed clamping mechanism, and satisfies the clamping between the templates of beams with different widths. The utility model rotates the second screw rod through the hexagonal head, and the second The screw rod drives the second screw sleeve to move in the installation sleeve, adjust the distance between the movable card and the fixed card, and facilitate the clamping mechanism to clamp the building concrete arc beam formwork with different thicknesses, and reversely rotate the second screw rod , so that the movable card and the fixed card are clamped and fixed on the template.

Figure 202320544723

Description

一种建筑砼弧形梁卡具A construction concrete curved beam fixture

技术领域technical field

本实用新型涉及建筑技术领域,具体是一种建筑砼弧形梁卡具。The utility model relates to the technical field of construction, in particular to a construction concrete arc beam fixture.

背景技术Background technique

梁是建筑结构中的常见构件,梁在框架结构中把各个方向的柱连接成整体;在墙结构中,洞口上方的连梁,将两个墙肢连接起来,使之共同工作,作为抗震设计的重要构件,起着第一道防线的作用,在框架结构中,梁既有框架结构中的作用,同时也有剪力墙结构中的作用。The beam is a common component in the building structure. The beam connects the columns in all directions into a whole in the frame structure; in the wall structure, the connecting beam above the opening connects the two wall limbs to make them work together. An important component of the beam plays the role of the first line of defense. In the frame structure, the beam not only plays a role in the frame structure, but also plays a role in the shear wall structure.

在建筑施工时,会出现弧形梁和异形梁,异形梁在施工时,为增强模板的稳定性,会用到卡具,但是卡具不能很好的使用不同宽度的梁的模板的卡接固定,增对上述问题,提出了一种建筑砼弧形梁卡具。During building construction, there will be curved beams and special-shaped beams. During the construction of special-shaped beams, in order to enhance the stability of the formwork, clamps will be used, but the clamps cannot be used to clamp the formwork of beams of different widths very well. To fix and increase the problems mentioned above, a construction concrete curved beam fixture is proposed.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑砼弧形梁卡具,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide a construction concrete arc beam fixture to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:

一种建筑砼弧形梁卡具,包括多个卡具机构,所述卡具机构固定在建筑砼弧形梁模板上,所述卡具机构包括管体,管体内转动连接有第一丝杆,第一丝杆一端贯穿管体端部固定连接有转盘,管体靠近转盘的一端套设的固定连接有固定卡接机构,管体上活动连接有活动卡接机构,活动卡接机构与第一丝杆螺纹连接。A construction concrete arc beam fixture, comprising a plurality of fixture mechanisms, the fixture mechanisms are fixed on the building concrete arc beam formwork, the fixture mechanism includes a pipe body, and a first screw rod is rotatably connected in the pipe body One end of the first screw rod runs through the end of the pipe body and is fixedly connected with a turntable, the end of the pipe body close to the turntable is fixedly connected with a fixed snap-in mechanism, and the pipe body is movably connected with a movable snap-in mechanism, and the movable snap-in mechanism is connected with the second turntable. A threaded rod connection.

作为本实用新型进一步的方案:所述固定卡接机构包括固定套,固定套套设在管体上,且固定套与管体外壁固定连接,固定套底部固定安装有夹紧机构。As a further solution of the utility model: the fixed clamping mechanism includes a fixed sleeve, which is sleeved on the pipe body, and the fixed sleeve is fixedly connected with the outer wall of the pipe, and a clamping mechanism is fixedly installed on the bottom of the fixed sleeve.

作为本实用新型再进一步的方案:所述活动卡接机构包括移动套和第一丝杆套,移动套套设在管体上,且移动套内壁与管体外壁滑动连接,第一丝杆套内置在管体内,且第一丝杆套与管体内壁滑动连接,第一丝杆贯穿第一丝杆套,且第一丝杆与第一丝杆套螺纹连接,管体顶壁和底部贯穿开设的第一条形孔,第一丝杆套顶部和底部贯穿对应的第一条形孔与移动套内壁固定连接,移动套底部固定连接有夹紧机构。As a further solution of the utility model: the movable clamping mechanism includes a moving sleeve and a first screw sleeve, the moving sleeve is set on the pipe body, and the inner wall of the moving sleeve is slidably connected with the outer wall of the pipe, and the first screw sleeve is built in In the pipe body, the first screw sleeve is slidingly connected with the inner wall of the pipe, the first screw runs through the first screw sleeve, and the first screw is threadedly connected with the first screw sleeve, and the top wall and bottom of the pipe body are opened The first strip-shaped hole, the top and bottom of the first screw sleeve penetrate the corresponding first strip-shaped hole and are fixedly connected with the inner wall of the moving sleeve, and the bottom of the moving sleeve is fixedly connected with a clamping mechanism.

作为本实用新型再进一步的方案:所述固定卡接机构和活动卡接机构底部固定连接的夹紧机构对称设置,夹紧机构包括安装套,安装套固定安装在对应的固定套和移动套底部,安装套内转动连接有第二丝杆,安装套内滑动连接有第二丝杆套,第二丝杆套套设在第二丝杆上,且第二丝杆套与第二丝杆螺纹连接,安装套底部贯穿的开设有第二条形孔,第二丝杆套底部贯穿第二条形孔且在安装套底部固定连接有活动卡,安装套底部固定连接有固定卡。As a further solution of the utility model: the clamping mechanism fixedly connected to the bottom of the fixed clamping mechanism and the movable clamping mechanism is arranged symmetrically, the clamping mechanism includes a mounting sleeve, and the mounting sleeve is fixedly installed on the bottom of the corresponding fixed sleeve and the movable sleeve , the installation sleeve is rotationally connected with a second screw rod, the installation sleeve is slidingly connected with a second screw rod sleeve, the second screw rod sleeve is set on the second screw rod, and the second screw rod sleeve is threadedly connected with the second screw rod A second strip-shaped hole is opened through the bottom of the installation sleeve, the bottom of the second screw rod sleeve runs through the second strip-shaped hole and a movable card is fixedly connected to the bottom of the installation sleeve, and a fixed card is fixedly connected to the bottom of the installation sleeve.

作为本实用新型再进一步的方案:所述第二丝杆远离活动卡的一端贯穿安装套固定连接有六角头。As a further solution of the present invention: the end of the second screw rod away from the movable card penetrates through the mounting sleeve and is fixedly connected with a hexagonal head.

作为本实用新型再进一步的方案:所述活动卡与固定卡结构相同。As a further solution of the utility model: the structure of the movable card is the same as that of the fixed card.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

1.本实用新型通过转盘转动第一丝杆,第一丝杆通过第一丝杆套驱动移动套移动,实现对活动卡接机构位置的调节,实现对活动卡接机构与固定卡接机构之间间距的调节,满足不同宽度梁的模板之间的卡接。1. The utility model rotates the first screw rod through the turntable, and the first screw rod drives the moving sleeve to move through the first screw rod sleeve to realize the adjustment of the position of the movable clamping mechanism and the adjustment of the movable clamping mechanism and the fixed clamping mechanism. The adjustment of the spacing between the beams meets the clamping connection between the formwork of beams of different widths.

2.本实用新型通过六角头转动第二丝杆,第二丝杆驱动第二丝杆套在安装套内移动,调节活动卡和固定卡之间的间距,方便夹紧机构对不同厚度的建筑砼弧形梁模板的卡接,反向转动第二丝杆,使得活动卡和固定卡夹紧固定在模板上。2. The utility model rotates the second screw rod through the hexagonal head, and the second screw rod drives the second screw rod sleeve to move in the installation sleeve to adjust the distance between the movable card and the fixed card, so that the clamping mechanism can be used for buildings with different thicknesses. For clamping of the concrete arc beam formwork, reversely rotate the second screw mandrel so that the movable clamp and the fixed clamp are clamped and fixed on the formwork.

附图说明Description of drawings

图1为一种建筑砼弧形梁卡具的结构示意图。Fig. 1 is a structural schematic diagram of a construction concrete curved beam fixture.

图2为一种建筑砼弧形梁卡具的剖视图。Fig. 2 is a cross-sectional view of a construction concrete curved beam fixture.

图3为图2中A处的局部放大图。FIG. 3 is a partial enlarged view of A in FIG. 2 .

图4为一种建筑砼弧形梁卡具中固定卡及活动卡的主视图。Fig. 4 is a front view of a fixed card and a movable card in a construction concrete curved beam fixture.

图中:1、卡具机构;2、管体;3、固定卡接机构;4、转盘;5、活动卡接机构;6、第一丝杆;7、固定套;8、夹紧机构;9、移动套;10、第一丝杆套;11、安装套;12、固定卡;13、第二丝杆;14、第二丝杆套;15、活动卡;16、六角头;17、第二条形孔;18、第一条形孔。In the figure: 1. fixture mechanism; 2. pipe body; 3. fixed clamping mechanism; 4. turntable; 5. movable clamping mechanism; 6. first screw rod; 7. fixed sleeve; 8. clamping mechanism; 9. Moving sleeve; 10. First screw sleeve; 11. Installation sleeve; 12. Fixed card; 13. Second screw; 14. Second screw sleeve; 15. Movable card; 16. Hexagonal head; 17. The second strip hole; 18, the first strip hole.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1~4,本实用新型实施例中,一种建筑砼弧形梁卡具,包括多个卡具机构1,卡具机构1固定在建筑砼弧形梁模板上,卡具机构1包括管体2,管体2内转动连接有第一丝杆6,第一丝杆6一端贯穿管体2端部固定连接有转盘4,管体2靠近转盘4的一端套设的固定连接有固定卡接机构3,管体2上活动连接有活动卡接机构5,活动卡接机构5与第一丝杆6螺纹连接,通过调节活动卡接机构5和固定卡接机构3之间的距离,活动卡接机构5和固定卡接机构3固定在卡接在建筑砼弧形梁模板上,增加模板使用时的稳定性。Please refer to Figures 1 to 4. In an embodiment of the present utility model, a construction concrete curved beam fixture includes a plurality of fixture mechanisms 1, and the fixture mechanism 1 is fixed on the building concrete curved beam formwork, and the fixture mechanism 1 Including the tube body 2, the tube body 2 is connected with the first screw rod 6 for rotation, one end of the first screw rod 6 runs through the end of the tube body 2 and is fixedly connected with the turntable 4, and the end of the tube body 2 close to the turntable 4 is fixedly connected with a The fixed clamping mechanism 3 is movably connected with the movable clamping mechanism 5 on the pipe body 2, and the movable clamping mechanism 5 is threadedly connected with the first screw rod 6. By adjusting the distance between the movable clamping mechanism 5 and the fixed clamping mechanism 3 , the movable clamping mechanism 5 and the fixed clamping mechanism 3 are fixed on the construction concrete arc beam template, which increases the stability of the template in use.

固定卡接机构3包括固定套7,固定套7套设在管体2上,且固定套7与管体2外壁固定连接,固定套7底部固定安装有夹紧机构8。The fixed clamping mechanism 3 includes a fixed sleeve 7, which is set on the pipe body 2, and the fixed sleeve 7 is fixedly connected with the outer wall of the pipe body 2, and a clamping mechanism 8 is fixedly installed on the bottom of the fixed sleeve 7.

活动卡接机构5包括移动套9和第一丝杆套10,移动套9套设在管体2上,且移动套9内壁与管体2外壁滑动连接,第一丝杆套10内置在管体2内,且第一丝杆套10与管体2内壁滑动连接,第一丝杆6贯穿第一丝杆套10,且第一丝杆6与第一丝杆套10螺纹连接,管体2顶壁和底部贯穿开设的第一条形孔18,第一丝杆套10顶部和底部贯穿对应的第一条形孔18与移动套9内壁固定连接,移动套9底部固定连接有夹紧机构8,转动第一丝杆6,第一丝杆6通过第一丝杆套10驱动活动卡接机构5移动,调节活动卡接机构5与固定卡接机构3之间的间距,满足不同宽度梁的模板之间的卡接。The movable clamping mechanism 5 includes a moving sleeve 9 and a first screw sleeve 10. The moving sleeve 9 is sleeved on the pipe body 2, and the inner wall of the moving sleeve 9 is slidingly connected with the outer wall of the pipe body 2. The first screw sleeve 10 is built into the pipe body. body 2, and the first screw rod sleeve 10 is slidingly connected with the inner wall of the pipe body 2, the first screw rod 6 runs through the first screw rod sleeve 10, and the first screw rod 6 is threadedly connected with the first screw rod sleeve 10, and the pipe body 2. The top wall and the bottom run through the first strip-shaped hole 18, the top and bottom of the first screw sleeve 10 penetrate the corresponding first strip-shaped hole 18 and the inner wall of the moving sleeve 9 is fixedly connected, and the bottom of the moving sleeve 9 is fixedly connected with a clamping The mechanism 8 rotates the first screw rod 6, and the first screw rod 6 drives the movable clamping mechanism 5 to move through the first screw sleeve 10, and adjusts the distance between the movable clamping mechanism 5 and the fixed clamping mechanism 3 to meet different widths. Snap joints between formwork for beams.

固定卡接机构3和活动卡接机构5底部固定连接的夹紧机构8对称设置,夹紧机构8包括安装套11,安装套11固定安装在对应的固定套7和移动套9底部,安装套11内转动连接有第二丝杆13,安装套11内滑动连接有第二丝杆套14,第二丝杆套14套设在第二丝杆13上,且第二丝杆套14与第二丝杆13螺纹连接,安装套11底部贯穿的开设有第二条形孔17,第二丝杆套14底部贯穿第二条形孔17且在安装套11底部固定连接有活动卡15,安装套11底部固定连接有固定卡12,固定卡12与对应的建筑砼弧形梁的模板外壁贴合,转动第二丝杆13,第二丝杆13驱动第二丝杆套14在安装套11移动,第二丝杆套14带着活动卡15移动,使得活动卡15与模板内壁贴合,并将活动卡15和固定卡12固定在模板上。The clamping mechanism 8 fixedly connected to the bottom of the fixed clamping mechanism 3 and the movable clamping mechanism 5 is arranged symmetrically. The clamping mechanism 8 includes an installation sleeve 11, and the installation sleeve 11 is fixedly installed on the bottom of the corresponding fixed sleeve 7 and the movable sleeve 9. The installation sleeve 11 is rotationally connected with a second screw mandrel 13, and is slidably connected with a second screw mandrel cover 14 in the mounting sleeve 11. Two screw mandrels 13 are threadedly connected, and the bottom of the mounting sleeve 11 runs through a second strip-shaped hole 17, and the bottom of the second screw mandrel sleeve 14 runs through the second strip-shaped hole 17 and is fixedly connected with a movable card 15 at the bottom of the mounting sleeve 11. The bottom of the cover 11 is fixedly connected with a fixed card 12, the fixed card 12 is attached to the outer wall of the formwork of the corresponding building concrete arc beam, the second screw rod 13 is rotated, and the second screw rod 13 drives the second screw rod sleeve 14 on the installation sleeve 11 Move, the second screw mandrel sleeve 14 moves with the movable card 15, so that the movable card 15 is attached to the inner wall of the template, and the movable card 15 and the fixed card 12 are fixed on the template.

第二丝杆13远离活动卡15的一端贯穿安装套11固定连接有六角头16,通过扳手与六角头16卡接,方便驱动第二丝杆13的转动。The end of the second screw rod 13 away from the movable card 15 penetrates the mounting sleeve 11 and is fixedly connected with the hexagonal head 16 , and is clamped with the hexagonal head 16 by a wrench to facilitate the rotation of the second screw rod 13 .

活动卡15与固定卡12结构相同。Movable card 15 is identical with fixed card 12 structures.

本实用新型的工作原理是:The working principle of the utility model is:

使用时,通过转盘4转动第一丝杆6,第一丝杆6驱动第一丝杆套10在管体2内移动,从而驱动移动套9移动,对活动卡接机构5位置的调节,通过六角头16转动第二丝杆13转动,第二丝杆13通过第二丝杆套14带着活动卡15移动,调节活动卡15和固定卡12之间的距离,工作人员将活动卡接机构5和固定卡接机构3的夹紧机构8卡设在对应的建筑砼弧形梁的模板上,即模板顶部内置在夹紧机构8的活动卡15和固定卡12之间,转动转盘4,通过第一丝杆6带着活动卡接机构5移动,使得活动卡接机构5和固定卡接机构3的固定卡12与模板外壁贴合,反向转动第二丝杆13,使得活动卡15和固定卡12夹紧固定在模板上,再次转动转盘4,使得活动卡接机构5锁紧。When in use, the first screw mandrel 6 is rotated by the turntable 4, and the first screw mandrel 6 drives the first screw mandrel sleeve 10 to move in the tube body 2, thereby driving the moving sleeve 9 to move, and the adjustment of the position of the movable clamping mechanism 5 is performed by The hex head 16 rotates the second screw 13 to rotate, the second screw 13 moves with the movable card 15 through the second screw sleeve 14, adjusts the distance between the movable card 15 and the fixed card 12, and the staff will move the clamping mechanism 5 and the clamping mechanism 8 of the fixed clamping mechanism 3 are clamped on the template of the corresponding building concrete arc beam, that is, the top of the template is built between the movable card 15 and the fixed card 12 of the clamping mechanism 8, and the turntable 4 is rotated. The first screw mandrel 6 moves with the movable clamping mechanism 5, so that the fixed clamp 12 of the movable clamping mechanism 5 and the fixed clamping mechanism 3 fits with the outer wall of the template, and the second screw rod 13 is reversely rotated, so that the movable clamp 15 Clamp and fix on the template with the fixed card 12, turn the turntable 4 again, so that the movable clamping mechanism 5 is locked.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or perform equivalent replacements for some of the technical features. Within the spirit and principles of the utility model, any modification, equivalent replacement, improvement, etc., should be included in the protection scope of the utility model.

Claims (6)

1. The utility model provides a building concrete arc roof beam fixture, includes a plurality of fixture mechanisms (1), its characterized in that: the fixture mechanism (1) is fixed on a building concrete arc beam template, the fixture mechanism (1) comprises a pipe body (2), a first screw rod (6) is rotationally connected to the pipe body (2), one end of the first screw rod (6) penetrates through the end part of the pipe body (2) and is fixedly connected with a rotary table (4), one end, close to the rotary table (4), of the pipe body (2) is sleeved with a fixedly connected clamping mechanism (3), a movable clamping mechanism (5) is movably connected to the pipe body (2), and the movable clamping mechanism (5) is in threaded connection with the first screw rod (6).
2. The construction concrete arched beam clamp of claim 1, wherein: the fixing clamping mechanism (3) comprises a fixing sleeve (7), the fixing sleeve (7) is sleeved on the pipe body (2), the fixing sleeve (7) is fixedly connected with the outer wall of the pipe body (2), and a clamping mechanism (8) is fixedly installed at the bottom of the fixing sleeve (7).
3. The construction concrete arched beam clamp of claim 1, wherein: the movable clamping mechanism (5) comprises a movable sleeve (9) and a first screw rod sleeve (10), the movable sleeve (9) is sleeved on the pipe body (2), the inner wall of the movable sleeve (9) is in sliding connection with the outer wall of the pipe body (2), the first screw rod sleeve (10) is arranged in the pipe body (2), the first screw rod sleeve (10) is in sliding connection with the inner wall of the pipe body (2), the first screw rod (6) penetrates through the first screw rod sleeve (10), the first screw rod (6) is in threaded connection with the first screw rod sleeve (10), the top wall and the bottom of the pipe body (2) penetrate through first strip-shaped holes (18) formed in the penetrating mode, the top and the bottom of the first screw rod sleeve (10) penetrate through corresponding first strip-shaped holes (18) to be fixedly connected with the inner wall of the movable sleeve (9), and the bottom of the movable sleeve (9) is fixedly connected with a clamping mechanism (8).
4. The construction concrete arched beam clamp of claim 1, wherein: the clamping mechanism (8) fixedly connected with the bottoms of the fixed clamping mechanism (3) and the movable clamping mechanism (5) are symmetrically arranged, the clamping mechanism (8) comprises a mounting sleeve (11), the mounting sleeve (11) is fixedly mounted at the bottoms of the corresponding fixed sleeve (7) and moving sleeve (9), a second screw rod (13) is rotationally connected to the mounting sleeve (11), a second screw rod sleeve (14) is slidably connected to the mounting sleeve (11), the second screw rod sleeve (14) is sleeved on the second screw rod (13), the second screw rod sleeve (14) is in threaded connection with the second screw rod (13), a second strip-shaped hole (17) is formed in the bottom of the mounting sleeve (11) in a penetrating mode, a movable clamp (15) is fixedly connected to the bottom of the mounting sleeve (11), and a fixing clamp (12) is fixedly connected to the bottom of the mounting sleeve (11).
5. The construction concrete arched beam fixture of claim 4, wherein: one end of the second screw rod (13) far away from the movable clamp (15) penetrates through the mounting sleeve (11) and is fixedly connected with a hexagon head (16).
6. The construction concrete arched beam fixture of claim 4, wherein: the movable card (15) and the fixed card (12) have the same structure.
CN202320544723.2U 2023-03-20 2023-03-20 Building concrete arc beam fixture Expired - Fee Related CN219241332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320544723.2U CN219241332U (en) 2023-03-20 2023-03-20 Building concrete arc beam fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320544723.2U CN219241332U (en) 2023-03-20 2023-03-20 Building concrete arc beam fixture

Publications (1)

Publication Number Publication Date
CN219241332U true CN219241332U (en) 2023-06-23

Family

ID=86838800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320544723.2U Expired - Fee Related CN219241332U (en) 2023-03-20 2023-03-20 Building concrete arc beam fixture

Country Status (1)

Country Link
CN (1) CN219241332U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117513757A (en) * 2023-11-17 2024-02-06 中国二十二冶集团有限公司 Large-span arc beam steel bar arc control device and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117513757A (en) * 2023-11-17 2024-02-06 中国二十二冶集团有限公司 Large-span arc beam steel bar arc control device and its construction method

Similar Documents

Publication Publication Date Title
CN219241332U (en) Building concrete arc beam fixture
CN206397145U (en) The outer eaves mould fixing device of concrete of encorbelmenting
CN211341324U (en) Positioning and splicing device for curtain wall installation
CN218028798U (en) Auxiliary clamp for installation of insulation board
CN211143708U (en) An adjustable top bracket
CN116378281A (en) An external wall connection structure for curtain wall installation
CN217748778U (en) Bending equipment for processing aluminum veneer
CN211692157U (en) Aluminum alloy heat-insulation fireproof window convenient to install
CN220203593U (en) construction fixtures
CN219147024U (en) a board rack
CN222477839U (en) A connection structure between shear wall and inner and outer walls
CN221524046U (en) Assembled building corner connecting element
CN221856267U (en) Supporting device for construction of inner wall of assembled building
CN221741689U (en) A building curtain wall structure
CN221741860U (en) Decorative board fixing device
CN221989892U (en) A cantilever device for special-shaped roof
CN222782863U (en) Aluminum profile capable of being spliced rapidly
CN220768578U (en) Suspended ceiling keel
CN222862643U (en) A building curtain wall installation structure
CN217150686U (en) Corner component with reinforced structure for fabricated building
CN223853808U (en) Building operation frame wall connecting piece convenient to operate
CN219365424U (en) A connection and locking device for building formwork
CN222161580U (en) Bracket supporting auxiliary positioning mechanism with adjustable
CN221559893U (en) Aluminum alloy door and window frame hole processing device
CN222924099U (en) Adjustable template supporting structure for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230623