CN219240291U - Pouring guard board for bridge engineering construction - Google Patents

Pouring guard board for bridge engineering construction Download PDF

Info

Publication number
CN219240291U
CN219240291U CN202223424442.8U CN202223424442U CN219240291U CN 219240291 U CN219240291 U CN 219240291U CN 202223424442 U CN202223424442 U CN 202223424442U CN 219240291 U CN219240291 U CN 219240291U
Authority
CN
China
Prior art keywords
fixedly connected
socket
bases
slot
bridge engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223424442.8U
Other languages
Chinese (zh)
Inventor
姜宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223424442.8U priority Critical patent/CN219240291U/en
Application granted granted Critical
Publication of CN219240291U publication Critical patent/CN219240291U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the field of bridge engineering, and particularly relates to a pouring guard plate for bridge engineering construction, which comprises two bases and two guard plates, wherein two movable assemblies are arranged at the rear parts of the upper ends of the two bases, plugboards are fixedly connected to the middle parts of the right ends of the two bases, threaded rods are inserted into the upper ends of the two plugboards, first slots are formed in the middle parts of the left ends of the two bases, first sockets are fixedly connected to the right ends of the two guard plates, second slots are formed in the left ends of the two guard plates, fixed structures are arranged at the left parts of the front ends of the two guard plates, and plug-in seats are connected to the left upper parts of the front ends of the two guard plates through bearings. According to the pouring guard board for bridge engineering construction, the two devices are spliced conveniently, and meanwhile the firmness of splicing the two devices is improved, so that the devices are not easy to loosen in the use process, the devices are convenient to move, the labor force of workers is reduced, and the practicability is improved.

Description

一种桥梁工程建设用浇筑护板A pouring guard plate for bridge engineering construction

技术领域technical field

本实用新型涉及桥梁工程技术领域,特别涉及一种桥梁工程建设用浇筑护板。The utility model relates to the technical field of bridge engineering, in particular to a pouring protective plate for bridge engineering construction.

背景技术Background technique

桥梁工程指桥梁勘测、设计、施工、养护和检定等的工作过程,以及研究这一过程的科学和工程技术,它是土木工程的一个分支,桥梁在施工的过程中需要利用混凝土护板对桥梁的各个结构进行安装模板并浇筑,现有桥梁的各个护板多为钢结构护板,能够稳定对桥梁各个结构进行浇筑,在对桥梁主体施工结束后往往需要对桥梁的一些附属结构进行施工时也需要利用桥梁护板进行浇筑。Bridge engineering refers to the working process of bridge survey, design, construction, maintenance and verification, as well as the science and engineering technology for studying this process. Each structure of the bridge is installed with formwork and poured. Most of the guard plates of the existing bridge are steel structure guard plates, which can stably pour each structure of the bridge. After the construction of the main body of the bridge is completed, it is often necessary to construct some auxiliary structures of the bridge. It is also necessary to use the bridge guard plate for pouring.

现有技术专利号为(CN214939384U),公开了一种桥梁工程建设用浇筑护板,包括支撑机构、设置在所述支撑机构上的支架,所述拼接机构包括活动连接在所述支架上的防护板......,该实用新型通过固定螺栓将装置固定在搭建的支撑平台上,然后通过固定块、固定槽等结构的相互配合,能够对多个防护板进行快速拼接,方便工作人员操作,且通过设置的密封垫,便于防止拼接后混凝土出现渗漏,但已公开专利中至少有以下弊端:1、已公开专利中需要人工将装置搬运至指定地点进行拼装使用,而多个装置一个个的搬运会增加工作人员的劳动力,实用性较低;2、已公开专利中通过转动把手,带动齿轮转动,使支架带动防护板在齿轮和齿条的作用下向上移动,使固定块插入另一个防滑板上的固定槽向下移动实现两个防护板之间的拼接固定,但牢固性较差,在使用过程中极易由于不慎转动把手而导致两个防护板之间产生松动,影响使用,故此,我们推出一种新的桥梁工程建设用浇筑护板。The prior art patent number is (CN214939384U), which discloses a pouring guard plate for bridge engineering construction, including a support mechanism, a bracket arranged on the support mechanism, and the splicing mechanism includes a protection panel movably connected to the bracket. Plate..., the utility model fixes the device on the built support platform through fixing bolts, and then through the mutual cooperation of fixing blocks, fixing grooves and other structures, multiple protective plates can be spliced quickly, which is convenient for the staff operation, and through the provided sealing gasket, it is convenient to prevent the concrete from leaking after splicing, but the published patents have at least the following disadvantages: 1. In the published patents, the device needs to be manually transported to the designated place for assembly, and multiple devices Carrying one by one will increase the labor force of the staff, and the practicability is low; 2. In the published patent, by turning the handle, the gear is driven to rotate, so that the bracket drives the protective plate to move upward under the action of the gear and the rack, so that the fixed block is inserted The fixing groove on the other anti-skid plate moves down to realize the splicing and fixing between the two protective plates, but the firmness is poor, and it is very easy to loosen between the two protective plates due to careless turning of the handle during use. Therefore, we have introduced a new pouring guard plate for bridge engineering construction.

实用新型内容Utility model content

本实用新型的主要目的在于提供一种桥梁工程建设用浇筑护板,可以有效解决背景技术中的问题。The main purpose of the utility model is to provide a pouring protection plate for bridge engineering construction, which can effectively solve the problems in the background technology.

为实现上述目的,本实用新型采取的技术方案为:In order to achieve the above object, the technical scheme that the utility model takes is:

一种桥梁工程建设用浇筑护板,包括两个底座和两个防护板,两个所述底座上端后部均设置有两个移动组件,两个所述底座右端中部均固定连接有插板,两个所述插板上端均穿插螺纹连接有螺纹杆,两个所述底座左端中部均开有一号插槽,且两个底座通过一号插槽和插板插接连接,两个所述底座上端四角均开有凹槽,两个所述防护板前端左部和前端右部均固定连接有支架,四个所述支架前端均分别与两个底座上端共同固定连接有支撑机构,两个所述防护板右端均固定连接有两个一号插座,两个所述防护板左端均开有两个二号插槽,且两个防护板通过一号插座和二号插槽插接连接,两个所述防护板前端左部均设置有固定结构,两个所述防护板前端左上部均通过轴承连接有插接座。A pouring protection plate for bridge engineering construction, comprising two bases and two protection plates, two moving assemblies are arranged on the upper rear parts of the two bases, and the middle parts of the right ends of the two bases are fixedly connected with inserting plates, The upper ends of the two boards are threaded and connected with threaded rods, and the middle part of the left end of the two bases has a No. 1 slot, and the two bases are connected to the board through the No. 1 slot. There are grooves at the four corners of the upper end, and the left and right front ends of the two protective plates are fixedly connected with brackets, and the front ends of the four brackets are respectively fixedly connected with the upper ends of the two bases with supporting mechanisms. The right ends of the protective plates are fixedly connected with two No. 1 sockets, and the left ends of the two protective plates are provided with two No. 2 slots, and the two protective plates are plugged and connected through the No. 1 socket and the No. 2 slot. The left front ends of each of the two protective plates are provided with fixed structures, and the upper left front ends of the two protective plates are connected with sockets through bearings.

优选的,两个所述一号插座前端中部均开有三号插槽,两个所述一号插槽下壁中部开有一号螺纹槽,两个所述一号插槽上壁中部开有上下穿通的螺纹通槽,两个所述底座上端前左部和上端前右部均开有二号螺纹槽,两个所述底座通过插板、螺纹杆、一号插槽、一号螺纹槽和螺纹通槽固定连接,两个所述底座下端均固定连接有防滑垫。Preferably, the middle parts of the front ends of the two No. 1 sockets are provided with No. 3 slots, the middle parts of the lower walls of the two No. 1 slots are provided with No. 1 threaded grooves, and the middle parts of the upper walls of the two No. 1 slots are provided with upper and lower Through threaded slots, No. 2 threaded slots are provided on the front left part and the front right part of the upper end of the two bases, and the two bases pass through the inserting plate, the threaded rod, the No. The threaded grooves are fixedly connected, and the lower ends of the two bases are fixedly connected with anti-skid pads.

优选的,所述固定结构包括二号插座,所述二号插座前壁固定连接有若干个复位弹簧,所述二号插座上端右前部开有插接槽,所述插接槽下壁固定连接有卡块,四个所述复位弹簧后端均与防护板前端左部固定连接。Preferably, the fixed structure includes a No. 2 socket, the front wall of the No. 2 socket is fixedly connected with several return springs, the upper right front part of the No. 2 socket is provided with an insertion slot, and the lower wall of the insertion slot is fixedly connected to There is a block, and the rear ends of the four return springs are all fixedly connected to the left part of the front end of the protective plate.

优选的,所述二号插座通过三号插槽与一号插座插接连接,若干个所述复位弹簧呈等距离分布,所述二号插座通过插接槽和卡块与插接座卡接连接,所述二号插座呈凹形设置,所述二号插座后端上部和后端下部分别与纵向的两个二号插槽前壁中部穿插活动连接。Preferably, the No. 2 socket is plugged and connected to the No. 1 socket through the No. 3 slot, and the plurality of return springs are distributed equidistantly. Connection, the No. 2 socket is set in a concave shape, and the upper part of the rear end and the lower part of the rear end of the No. 2 socket are respectively interspersed and movably connected with the middle part of the front wall of the two No. 2 slots in the longitudinal direction.

优选的,所述移动组件包括固定块,所述固定块左壁和右壁均通过轴承共同活动连接有转柱,所述转柱外表面固定连接有连接座,所述连接座前端固定连接有搭座,且搭座呈“L”形设置,所述搭座下端前部和下端后部均固定连接有移动轮,所述搭座上端前中部穿插螺纹连接有螺杆,所述固定块下端与底座上端后左部固定连接。Preferably, the moving assembly includes a fixed block, the left wall and the right wall of the fixed block are both movably connected to a rotating column through bearings, the outer surface of the rotating column is fixedly connected to a connecting seat, and the front end of the connecting seat is fixedly connected to a Take a seat, and the seat is arranged in an "L" shape. The front part of the lower end of the seat and the rear part of the lower end are fixedly connected with moving wheels. The rear left part of the upper end of the base is fixedly connected.

优选的,所述搭座通过螺杆和二号螺纹槽与底座固定连接,所述固定块呈凹形设置。Preferably, the pedestal is fixedly connected to the base through a screw rod and a No. 2 thread groove, and the fixing block is set in a concave shape.

与现有技术相比,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、本实用新型中,通过设置移动组件,拨动搭座,使搭座搭接在底座上,再使搭座通过螺杆和二号螺纹槽与底座固定连接,使移动轮与地面接触,使工作人员推动装置,使其通过移动轮移动至指定的地点后,再转动螺杆,使螺杆脱离二号螺纹槽,并向上拨动搭座,使防滑垫与地面接触,从而对装置进行拼接,不需要一个个的搬运,只需要推动装置至指定位置即可,减轻工作人员的劳动力,提高实用性;1. In the present utility model, by setting the moving component and moving the seat, the seat is lapped on the base, and then the seat is fixedly connected to the base through the screw rod and the No. 2 thread groove, so that the moving wheel is in contact with the ground, so that The staff pushes the device to move it to the designated place through the moving wheel, and then turns the screw to make the screw break away from the No. 2 thread groove, and moves the seat upwards to make the anti-skid pad contact the ground, so that the device can be spliced. It needs to be transported one by one, just push the device to the designated position, which reduces the labor of the staff and improves the practicality;

2、本实用新型中,通过设置一号插座、二号插槽、一号插槽、插板、螺纹杆、一号螺纹槽、螺纹通槽、三号插槽和固定结构,在对两个装置进行拼接时,向前拨动二号插座,使二号插座向前移动,再使两个底座通过一号插槽和插板插接连接,此时两个防护板通过一号插座和二号插槽插接连接,再转动螺纹杆,使插板通过螺纹杆、一号螺纹槽和螺纹通槽与底座固定连接,起到一个加固的作用,并释放二号插座,使二号插座在复位弹簧的作用下插入对应的三号插槽内,并拨动插接座,使插接座通过插接槽和卡块与二号插座卡接连接,从而使一号插座与底座固定连接,进一步的起到了一个加固的作用,提高牢固性,从而完成两个装置的拼接,使得装置在使用过程中不易产生松动,避免影响使用。2. In the utility model, by setting No. 1 socket, No. 2 slot, No. 1 slot, inserting plate, threaded rod, No. 1 thread groove, thread through groove, No. 3 slot and fixing structure, in the pair of two When the device is spliced, move the No. 2 socket forward to move the No. 2 socket forward, and then make the two bases connect with the plug-in board through the No. 1 slot. At this time, the two protective plates pass through the No. 1 socket and the No. 2 socket. No. 1 slot is plugged and connected, and then the threaded rod is turned to make the plug-in plate fixedly connected with the base through the threaded rod, No. Insert it into the corresponding No. 3 slot under the action of the return spring, and move the socket, so that the socket is connected to the No. 2 socket through the socket and the block, so that the No. 1 socket is fixedly connected to the base. It further plays a reinforcing role to improve firmness, thereby completing the splicing of the two devices, making the device less likely to loosen during use and avoiding affecting use.

附图说明Description of drawings

图1为本实用新型一种桥梁工程建设用浇筑护板的整体结构示意图;Fig. 1 is the overall structure schematic diagram of a kind of bridge engineering construction of the utility model pouring guard plate;

图2为本实用新型一种桥梁工程建设用浇筑护板的部分结构连接示意图;Fig. 2 is a partial structural connection schematic diagram of a bridge engineering construction pouring guard plate of the present invention;

图3为本实用新型一种桥梁工程建设用浇筑护板的支撑机构整体结构示意图;Fig. 3 is a schematic diagram of the overall structure of the supporting mechanism of the pouring guard plate for bridge engineering construction of the present invention;

图4为本实用新型一种桥梁工程建设用浇筑护板的移动组件整体结构示意图。Fig. 4 is a schematic diagram of the overall structure of a mobile assembly of a cast guard plate used in bridge engineering construction according to the present invention.

图中:1、底座;2、防护板;3、支架;4、支撑机构;5、移动组件;6、固定结构;7、插接座;8、凹槽;9、一号插槽;10、二号插槽;11、一号插座;12、插板;13、螺纹杆;14、一号螺纹槽;15、螺纹通槽;16、二号螺纹槽;17、三号插槽;18、防滑垫;61、二号插座;62、复位弹簧;63、插接槽;64、卡块;51、固定块;52、转柱;53、连接座;54、搭座;55、移动轮;56、螺杆。In the figure: 1. base; 2. protective plate; 3. bracket; 4. supporting mechanism; 5. moving component; 6. fixed structure; 7. socket; 8. groove; 9. slot one; 10 1, No. 2 slot; 11, No. 1 socket; 12, inserting plate; 13, threaded rod; 14, No. 1 thread slot; 15, thread through slot; 16, No. 2 thread slot; 17, No. 3 slot; 18 , anti-slip mat; 61, socket No. 2; 62, return spring; 63, socket slot; 64, clamping block; 51, fixed block; 52, rotating column; 53, connecting seat; 54, seat; 55, moving wheel ; 56, screw rod.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific embodiments.

在本实用新型的描述中,需要说明的是,术语“上”、“下”、“内”、“外”“前端”、“后端”、“两端”、“一端”、“另一端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "another end" The orientation or positional relationship indicated by ", etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, so as to Specific orientation configurations and operations, therefore, should not be construed as limitations on the invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance.

在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise specified and limited, the terms "installed", "set with", "connected", etc. should be understood in a broad sense, such as "connected", which can be a fixed The connection can also be a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

实施例Example

请参阅图1-4,本实用新型提供一种技术方案:Please refer to Figure 1-4, the utility model provides a technical solution:

一种桥梁工程建设用浇筑护板,包括两个底座1和两个防护板2,两个底座1上端后部均设置有两个移动组件5,两个底座1右端中部均固定连接有插板12,两个插板12上端均穿插螺纹连接有螺纹杆13,两个底座1左端中部均开有一号插槽9,且两个底座1通过一号插槽9和插板12插接连接,两个底座1上端四角均开有凹槽8,两个防护板2前端左部和前端右部均固定连接有支架3,四个支架3前端均分别与两个底座1上端共同固定连接有支撑机构4,两个防护板2右端均固定连接有两个一号插座11,两个防护板2左端均开有两个二号插槽10,且两个防护板2通过一号插座11和二号插槽10插接连接,两个防护板2前端左部均设置有固定结构6,两个防护板2前端左上部均通过轴承连接有插接座7。A pouring protective plate for bridge engineering construction, comprising two bases 1 and two protective plates 2, two moving assemblies 5 are arranged at the upper and rear parts of the two bases 1, and a plug plate is fixedly connected to the middle part of the right end of the two bases 1 12. The upper ends of the two boards 12 are threaded and connected with threaded rods 13, and the middle parts of the left ends of the two bases 1 are provided with a No. 1 slot 9, and the two bases 1 are plugged and connected with the No. The four corners of the upper ends of the two bases 1 are provided with grooves 8, the left and right front ends of the two protective plates 2 are fixedly connected with brackets 3, and the front ends of the four brackets 3 are respectively fixedly connected with the upper ends of the two bases 1 with supports. Mechanism 4, the right ends of the two protective plates 2 are fixedly connected with two No. 1 sockets 11, and the left ends of the two protective plates 2 are provided with two No. No. slot 10 is plugged and connected, and the left parts of the front ends of the two protective plates 2 are provided with a fixed structure 6, and the upper left parts of the front ends of the two protective plates 2 are all connected with socket seats 7 by bearings.

本实施例中,两个一号插座11前端中部均开有三号插槽17,两个一号插槽9下壁中部开有一号螺纹槽14,两个一号插槽9上壁中部开有上下穿通的螺纹通槽15,两个底座1上端前左部和上端前右部均开有二号螺纹槽16,两个底座1通过插板12、螺纹杆13、一号插槽9、一号螺纹槽14和螺纹通槽15固定连接,两个底座1下端均固定连接有防滑垫18;固定结构6包括二号插座61,二号插座61前壁固定连接有若干个复位弹簧62,二号插座61上端右前部开有插接槽63,插接槽63下壁固定连接有卡块64,四个复位弹簧62后端均与防护板2前端左部固定连接;二号插座61通过三号插槽17与一号插座11插接连接,若干个复位弹簧62呈等距离分布,二号插座61通过插接槽63和卡块64与插接座7卡接连接,二号插座61呈凹形设置,二号插座61后端上部和后端下部分别与纵向的两个二号插槽10前壁中部穿插活动连接;两个防护板2后端均固定连接有密封垫,以便于便于提高防护板2拼接后的密封性,通过设置一号插座11、二号插槽10、一号插槽9、插板12、螺纹杆13、一号螺纹槽14、螺纹通槽15、三号插槽17和固定结构6,从而便于对两个装置拼接的同时提高两个装置拼接的牢固性,使得装置在使用过程中不易产生松动,避免影响使用。In this embodiment, there are No. 3 slots 17 in the middle of the front ends of the two No. 1 sockets 11, No. 1 threaded grooves 14 in the middle of the lower walls of the two No. 1 slots 9, and No. 1 screw grooves 14 in the middle of the upper walls of the two No. 1 slots 9. The threaded slot 15 that passes through up and down, the front left part and the front right part of the upper end of the two bases 1 are all provided with No. 2 threaded grooves 16, and the two bases 1 pass through the inserting plate 12, the threaded rod 13, the No. 1 slot 9, and the No. 1 slot. No. thread groove 14 and thread through groove 15 are fixedly connected, and the lower ends of the two bases 1 are all fixedly connected with anti-slip pads 18; the fixed structure 6 includes No. No. socket 61 upper end right front part has plug-in groove 63, and plug-in groove 63 lower walls are fixedly connected with block 64, and four back-moving springs 62 rear ends are all fixedly connected with protective plate 2 front-end left parts; No. two socket 61 passes three The No. slot 17 is plugged and connected with the No. 1 socket 11, and several return springs 62 are equidistantly distributed. Concave setting, No. 2 socket 61 rear end upper part and rear end lower part are respectively interspersed with two longitudinal No. 2 slots 10 front wall middle parts; two protective plates 2 rear ends are fixedly connected with gaskets, so that it is convenient To improve the sealing performance of the protective plate 2 after splicing, by setting No. 1 socket 11, No. The slot 17 and the fixing structure 6 facilitate the splicing of the two devices while improving the firmness of the splicing of the two devices, so that the device is not easy to loosen during use and avoids affecting the use.

本实施例中,移动组件5包括固定块51,固定块51左壁和右壁均通过轴承共同活动连接有转柱52,转柱52外表面固定连接有连接座53,连接座53前端固定连接有搭座54,且搭座54呈“L”形设置,搭座54下端前部和下端后部均固定连接有移动轮55,搭座54上端前中部穿插螺纹连接有螺杆56,固定块51下端与底座1上端后左部固定连接;搭座54通过螺杆56和二号螺纹槽16与底座1固定连接,固定块51呈凹形设置;通过设置移动组件5,从而便于装置的移动,不需要人工一个个的搬运,只需要推动装置至指定位置即可,减轻工作人员的劳动力,提高实用性。In this embodiment, the moving assembly 5 includes a fixed block 51, the left wall and the right wall of the fixed block 51 are both movably connected with a rotating column 52 through bearings, the outer surface of the rotating column 52 is fixedly connected with a connecting seat 53, and the front end of the connecting seat 53 is fixedly connected There is a seat 54, and the seat 54 is arranged in an "L" shape. The front part of the lower end of the seat 54 and the rear part of the lower end are fixedly connected with a moving wheel 55. The lower end is fixedly connected with the rear left part of the upper end of the base 1; the seat 54 is fixedly connected with the base 1 through the screw rod 56 and the No. 2 thread groove 16, and the fixed block 51 is concavely arranged; by setting the moving assembly 5, it is convenient for the movement of the device without It needs to be carried manually one by one, just push the device to the designated position, which reduces the labor of the staff and improves the practicability.

需要说明的是,本实用新型为一种桥梁工程建设用浇筑护板,在使用过程中,首先拨动搭座54,使搭座54搭接在底座1上,再使搭座54通过螺杆56和二号螺纹槽16与底座1固定连接,使移动轮55与地面接触,使工作人员推动装置,使其通过移动轮55移动至指定的地点后,再转动螺杆56,使螺杆56脱离二号螺纹槽16,并向上拨动搭座54,使防滑垫18与地面接触,之后,在对两个装置进行拼接时,向前拨动二号插座61,使二号插座61向前移动,再使两个底座1通过一号插槽9和插板12插接连接,此时两个防护板2通过一号插座11和二号插槽10插接连接,再转动螺纹杆13,使插板12通过螺纹杆13、一号螺纹槽14和螺纹通槽15与底座1固定连接,起到一个加固的作用,并释放二号插座61,使二号插座61在复位弹簧62的作用下插入对应的三号插槽17内,并拨动插接座7,使插接座7通过插接槽63和卡块64与二号插座61卡接连接,从而使一号插座11与底座1固定连接,进一步的起到了一个加固的作用,提高牢固性,并使两个底座1通过螺栓与地面固定连接,从而完成两个装置的拼接,使得装置在使用过程中不易产生松动,避免影响使用,不需要一个个的搬运,只需要推动装置至指定位置即可,减轻工作人员的劳动力,提高实用性。It should be noted that the utility model is a pouring guard plate for bridge engineering construction. During use, the seat 54 is first moved so that the seat 54 is lapped on the base 1, and then the seat 54 is passed through the screw 56 and No. 2 thread groove 16 are fixedly connected with the base 1, so that the moving wheel 55 is in contact with the ground, and the staff pushes the device to move to the designated place through the moving wheel 55, and then rotate the screw 56 to make the screw 56 break away from the No. thread groove 16, and move up the seat 54 to make the anti-skid pad 18 contact with the ground, afterward, when the two devices are spliced, move the No. 2 socket 61 forward to make the No. 2 socket 61 move forward, and then The two bases 1 are plugged and connected with the plug board 12 through the No. 1 slot 9. At this time, the two protective plates 2 are plugged and connected with the No. 1 socket 11 and the No. 2 slot 10, and then the threaded rod 13 is rotated to make the plug board 12 is fixedly connected to the base 1 through the threaded rod 13, the No. 1 threaded groove 14 and the threaded through groove 15, which plays a role of reinforcement, and releases the No. 2 socket 61, so that the No. 2 socket 61 is inserted into the corresponding socket under the action of the return spring 62 In the No. 3 slot 17 of the No. 3 socket, and toggle the socket 7, so that the socket 7 is connected to the No. 2 socket 61 through the socket 63 and the block 64, so that the No. 1 socket 11 is fixedly connected to the base 1 , further play a role of reinforcement, improve the firmness, and make the two bases 1 fixedly connected with the ground through bolts, so as to complete the splicing of the two devices, so that the device is not easy to loose during use, avoid affecting the use, and not It needs to be moved one by one, just push the device to the designated position, which reduces the labor of the staff and improves the practicability.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the industry should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.

Claims (6)

1.一种桥梁工程建设用浇筑护板,包括两个底座(1)和两个防护板(2),其特征在于:两个所述底座(1)上端后部均设置有两个移动组件(5),两个所述底座(1)右端中部均固定连接有插板(12),两个所述插板(12)上端均穿插螺纹连接有螺纹杆(13),两个所述底座(1)左端中部均开有一号插槽(9),且两个底座(1)通过一号插槽(9)和插板(12)插接连接,两个所述底座(1)上端四角均开有凹槽(8),两个所述防护板(2)前端左部和前端右部均固定连接有支架(3),四个所述支架(3)前端均分别与两个底座(1)上端共同固定连接有支撑机构(4),两个所述防护板(2)右端均固定连接有两个一号插座(11),两个所述防护板(2)左端均开有两个二号插槽(10),且两个防护板(2)通过一号插座(11)和二号插槽(10)插接连接,两个所述防护板(2)前端左部均设置有固定结构(6),两个所述防护板(2)前端左上部均通过轴承连接有插接座(7)。1. A pouring guard plate for bridge engineering construction, comprising two bases (1) and two guard plates (2), is characterized in that: the rear parts of the upper ends of the two bases (1) are provided with two moving assemblies (5), the middle part of the right end of the two bases (1) is fixedly connected with a flashboard (12), the upper ends of the two flashboards (12) are threaded and connected with a threaded rod (13), and the two bases (1) There is a No. 1 slot (9) in the middle of the left end, and the two bases (1) are plugged and connected through the No. 1 slot (9) and the plugboard (12). The four corners of the upper ends of the two bases (1) All have grooves (8), the front left part and the front right part of the two protective plates (2) are fixedly connected with brackets (3), and the front ends of the four brackets (3) are respectively connected to the two bases ( 1) The upper ends are fixedly connected with a support mechanism (4), the right ends of the two protective plates (2) are fixedly connected with two No. 1 sockets (11), and the left ends of the two protective plates (2) are provided with two No. 2 slot (10), and the two protective plates (2) are plugged and connected through the No. 1 socket (11) and the No. 2 slot (10), and the left parts of the front ends of the two protective plates (2) are provided. There is a fixed structure (6), and the upper left parts of the front ends of the two protective plates (2) are connected with socket seats (7) through bearings. 2.根据权利要求1所述的一种桥梁工程建设用浇筑护板,其特征在于:两个所述一号插座(11)前端中部均开有三号插槽(17),两个所述一号插槽(9)下壁中部开有一号螺纹槽(14),两个所述一号插槽(9)上壁中部开有上下穿通的螺纹通槽(15),两个所述底座(1)上端前左部和上端前右部均开有二号螺纹槽(16),两个所述底座(1)通过插板(12)、螺纹杆(13)、一号插槽(9)、一号螺纹槽(14)和螺纹通槽(15)固定连接,两个所述底座(1)下端均固定连接有防滑垫(18)。2. A kind of pouring protective plate for bridge engineering construction according to claim 1, characterized in that: the middle part of the front end of the two No. 1 sockets (11) has a No. 3 slot (17), and the two No. 1 sockets The middle part of the lower wall of No. slot (9) has a thread groove (14), and the middle part of the upper wall of the two described No. 1 slots (9) has a threaded slot (15) that passes through up and down, and the two bases ( 1) There are No. 2 thread grooves (16) on the front left part of the upper end and the front right part of the upper end. The two bases (1) pass through the insert plate (12), the threaded rod (13), and the No. 1 slot (9) 1. No. 1 threaded groove (14) is fixedly connected with the threaded through groove (15), and the lower ends of the two bases (1) are fixedly connected with anti-skid pads (18). 3.根据权利要求1所述的一种桥梁工程建设用浇筑护板,其特征在于:所述固定结构(6)包括二号插座(61),所述二号插座(61)前壁固定连接有若干个复位弹簧(62),所述二号插座(61)上端右前部开有插接槽(63),所述插接槽(63)下壁固定连接有卡块(64),四个所述复位弹簧(62)后端均与防护板(2)前端左部固定连接。3. The pouring guard plate for bridge engineering construction according to claim 1, characterized in that: the fixed structure (6) includes a No. 2 socket (61), and the front wall of the No. 2 socket (61) is fixedly connected to There are several return springs (62), the upper right front part of the No. 2 socket (61) has an insertion slot (63), and the lower wall of the insertion slot (63) is fixedly connected with a block (64), four The rear ends of the back-moving springs (62) are all fixedly connected to the front left part of the protective plate (2). 4.根据权利要求3所述的一种桥梁工程建设用浇筑护板,其特征在于:所述二号插座(61)通过三号插槽(17)与一号插座(11)插接连接,若干个所述复位弹簧(62)呈等距离分布,所述二号插座(61)通过插接槽(63)和卡块(64)与插接座(7)卡接连接,所述二号插座(61)呈凹形设置,所述二号插座(61)后端上部和后端下部分别与纵向的两个二号插槽(10)前壁中部穿插活动连接。4. A kind of pouring guard plate for bridge engineering construction according to claim 3, characterized in that: said No. 2 socket (61) is connected to No. 1 socket (11) through No. 3 slot (17), Several return springs (62) are equidistantly distributed, and the No. 2 socket (61) is clamped and connected with the socket (7) through the insertion slot (63) and the block (64). The socket (61) is concavely arranged, and the upper part of the rear end and the lower part of the rear end of the No. 2 socket (61) are respectively interspersed and movably connected with the middle part of the front wall of two No. 2 slots (10) in the longitudinal direction. 5.根据权利要求1所述的一种桥梁工程建设用浇筑护板,其特征在于:所述移动组件(5)包括固定块(51),所述固定块(51)左壁和右壁均通过轴承共同活动连接有转柱(52),所述转柱(52)外表面固定连接有连接座(53),所述连接座(53)前端固定连接有搭座(54),且搭座(54)呈“L”形设置,所述搭座(54)下端前部和下端后部均固定连接有移动轮(55),所述搭座(54)上端前中部穿插螺纹连接有螺杆(56),所述固定块(51)下端与底座(1)上端后左部固定连接。5. A kind of pouring guard plate for bridge engineering construction according to claim 1, characterized in that: the moving assembly (5) comprises a fixed block (51), and the left and right walls of the fixed block (51) are both A rotating column (52) is movably connected through the bearings, the outer surface of the rotating column (52) is fixedly connected with a connecting seat (53), and the front end of the connecting seat (53) is fixedly connected with a seat (54), and the seat (54) is arranged in "L" shape, and the front part of the lower end of the seat (54) and the rear part of the lower end are all fixedly connected with moving wheels (55), and the front middle part of the upper end of the seat (54) is threaded and connected with a screw rod ( 56), the lower end of the fixed block (51) is fixedly connected with the rear left part of the upper end of the base (1). 6.根据权利要求5所述的一种桥梁工程建设用浇筑护板,其特征在于:所述搭座(54)通过螺杆(56)和二号螺纹槽(16)与底座(1)固定连接,所述固定块(51)呈凹形设置。6. A pouring guard plate for bridge engineering construction according to claim 5, characterized in that: the seat (54) is fixedly connected to the base (1) through the screw rod (56) and the second threaded groove (16) , the fixed block (51) is set in a concave shape.
CN202223424442.8U 2022-12-20 2022-12-20 Pouring guard board for bridge engineering construction Expired - Fee Related CN219240291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223424442.8U CN219240291U (en) 2022-12-20 2022-12-20 Pouring guard board for bridge engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223424442.8U CN219240291U (en) 2022-12-20 2022-12-20 Pouring guard board for bridge engineering construction

Publications (1)

Publication Number Publication Date
CN219240291U true CN219240291U (en) 2023-06-23

Family

ID=86807036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223424442.8U Expired - Fee Related CN219240291U (en) 2022-12-20 2022-12-20 Pouring guard board for bridge engineering construction

Country Status (1)

Country Link
CN (1) CN219240291U (en)

Similar Documents

Publication Publication Date Title
CN218509107U (en) Steel structural support convenient to disassemble
CN210685093U (en) Quick installation mechanism of curtain
CN218912359U (en) Support device for subway building construction
CN117166750A (en) Clamping device of concrete baffle for building
CN215254620U (en) Building templates connecting device for civil engineering
CN218912257U (en) Building templates fixing device
CN217126750U (en) Tower machine standard festival convenient to dismouting transportation
CN223402166U (en) Auxiliary fixing component for cloud platform communication interface
CN219086674U (en) Protection device for erecting electromechanical engineering cable
CN211590617U (en) Preparation cement mortar examination mould
CN221663915U (en) A steel structure building beam connector
CN219316415U (en) Aluminum die reentrant corner reinforcing apparatus
CN218493107U (en) Post-cast beam assembly of core cylinder
CN117266376B (en) Transverse loading device for beam slab column joints
CN213731539U (en) Dismounting device for column type heating radiator
CN215421274U (en) Installation structure of a new type of main control board
CN220645202U (en) Template fixing device
CN217976222U (en) High formwork structure of underpass
CN210755150U (en) Horizontal line casting machine
CN218761829U (en) Pipeline strutting arrangement for building
CN219508353U (en) Reinforced concrete connection curved box girder capable of preventing crack from generating
CN222414843U (en) Permanent-facing combined sectional construction device for tunnel thermal insulation inspection well
CN212053729U (en) A prefabricated concrete formwork
CN221646391U (en) A concrete pouring reserved hole formwork device
CN220434201U (en) An aluminum alloy template installation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230623