CN219239091U - Tower crane underframe supporting weight structure - Google Patents
Tower crane underframe supporting weight structure Download PDFInfo
- Publication number
- CN219239091U CN219239091U CN202223187809.9U CN202223187809U CN219239091U CN 219239091 U CN219239091 U CN 219239091U CN 202223187809 U CN202223187809 U CN 202223187809U CN 219239091 U CN219239091 U CN 219239091U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- rod
- support
- support rod
- bracing piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及起重机技术领域,具体为塔式起重机底架支撑压重结构。The utility model relates to the technical field of cranes, in particular to a structure for supporting a ballast on the underframe of a tower crane.
背景技术Background technique
塔式起重机简称塔机,亦称塔吊,动臂装在高耸塔身上部的旋转起重机,作业空间大,主要用于房屋建筑施工中物料的垂直和水平输送及建筑构件的安装,由金属结构、工作机构和电气系统三部分组成,金属结构包括塔身、动臂和底座等,工作机构有起升、变幅、回转和行走四部分,电气系统包括电动机、控制器、配电柜、连接线路、信号及照明装置等。Tower cranes are referred to as tower cranes for short, also known as tower cranes. The rotating cranes with the boom mounted on the upper part of the tower body have a large working space. They are mainly used for vertical and horizontal transportation of materials in house construction and installation of building components. The working mechanism and the electrical system are composed of three parts. The metal structure includes the tower body, the boom and the base, etc. The working mechanism includes four parts: lifting, luffing, slewing and walking. , Signal and lighting installations, etc.
中国专利公告号为CN216638740U中提供的塔式起重机用高安全性支撑底座,其基本描述为:包括支撑座和底柱,所述底柱焊接在支撑座的下端,还包括:支撑组件,所述支撑组件安装在底柱的下端;所述支撑组件包括延伸支撑组件和连接组件,所述延伸支撑组件安装在底柱的外壁,所述连接组件安装在支撑座的上端。The Chinese patent announcement number is the high-safety support base for tower cranes provided in CN216638740U, which is basically described as: including a support base and a bottom column, and the bottom column is welded at the lower end of the support base, and also includes: a support assembly, the The support assembly is installed at the lower end of the bottom column; the support assembly includes an extension support assembly and a connection assembly, the extension support assembly is installed on the outer wall of the bottom column, and the connection assembly is installed at the upper end of the support seat.
上述装置设置了四个固定杆对塔式起重机四个方向进行了固定,当塔式起重机重量过大时,四个固定杆承受的重量有限,无法承载塔式起重机吊取大重量物体,且上述装置在回收和安装时较为不便,影响整体塔式起重机的安装周期,为此,我们提出塔式起重机底架支撑压重结构。The above-mentioned device is provided with four fixed rods to fix the four directions of the tower crane. When the weight of the tower crane is too large, the weight of the four fixed rods is limited, and it cannot carry the tower crane to lift heavy objects, and the above It is inconvenient for the device to be recovered and installed, which affects the installation cycle of the overall tower crane. Therefore, we propose a tower crane underframe to support the ballast structure.
实用新型内容Utility model content
本实用新型的目的在于提供塔式起重机底架支撑压重结构,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a supporting ballast structure for the underframe of a tower crane, so as to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:塔式起重机底架支撑压重结构,包括底板、支撑板和连杆,所述底板中部设有底座,所述底座内部设有支撑板,所述底板表面设有四个浇筑口,所述支撑板表面上下两侧通过焊接固定底柱C,所述支撑板表面左右两侧通过焊接固定底柱B,所述支撑板表面四角均通过焊接固定有底柱A,所述底柱A上套有套筒C,所述底柱B上套有底柱B,所述底柱C上套有套筒E,所述套筒C左侧通过焊接固定支撑杆C,所述支撑杆C上下两面左侧均通过焊接固定有固定柱A,所述支撑杆C内部套有支撑杆B,所述支撑杆B左侧通过焊接固定套筒B,所述套筒B中部套有插杆,所述插杆下方通过焊接固定支撑座,所述套筒D左侧通过焊接固定支撑杆A,所述支撑杆A中部套有套筒A,所述套筒A上下两侧中部均通过焊接固定有固定柱A,所述套筒A左侧设有通孔B,所述支撑杆A上方左侧设有通孔A,所述支撑杆A左侧通过焊接固定套筒B,所述套筒E左侧通过焊接固定支撑杆E,所述支撑杆E左侧套在支撑杆D内部,所述支撑杆D右侧上下两面均通过焊接固定有固定柱A,所述支撑杆D左侧通过焊接固定套筒B,所述连杆两侧均通过焊接固定有套筒F。优选的,所述套筒F套在固定柱A上,所述连杆上的套筒F套在固定柱A上使其通过连杆将两个固定柱A进行连接,所述套筒A通过连杆连接支撑杆C,所述支撑杆D通过连杆连接支撑杆C,所述支撑杆C分别通过连杆连接套筒F和支撑杆D。In order to achieve the above purpose, the utility model provides the following technical solutions: the tower crane chassis supports the weight structure, including a bottom plate, a support plate and a connecting rod, a base is provided in the middle of the bottom plate, and a support plate is provided inside the base. The surface of the bottom plate is provided with four pouring ports, the upper and lower sides of the surface of the support plate are fixed by welding the bottom column C, the left and right sides of the surface of the support plate are fixed by welding the bottom column B, and the four corners of the surface of the support plate are fixed by welding There is a bottom column A, the bottom column A is covered with a sleeve C, the bottom column B is covered with a bottom column B, the bottom column C is covered with a sleeve E, and the left side of the sleeve C is welded Fix the support rod C, the upper and lower sides of the support rod C are fixed with the fixed column A by welding, the support rod C is covered with the support rod B, and the left side of the support rod B is fixed by welding the sleeve B, so The middle part of the sleeve B is covered with an insertion rod, the support base is fixed by welding under the insertion rod, the support rod A is fixed by welding on the left side of the sleeve D, the middle part of the support rod A is covered with a sleeve A, the sleeve The upper and lower sides of the barrel A are fixed with a fixed column A by welding, the sleeve A is provided with a through hole B on the left side, the support rod A is provided with a through hole A on the left side, and the left side of the support rod A passes through Weld and fix the sleeve B, the left side of the sleeve E is welded to fix the support rod E, the left side of the support rod E is sleeved inside the support rod D, and the upper and lower sides of the right side of the support rod D are fixed with fixed columns by welding A, the left side of the support rod D is welded to fix the sleeve B, and both sides of the connecting rod are fixed with the sleeve F by welding. Preferably, the sleeve F is sleeved on the fixed column A, the sleeve F on the connecting rod is sleeved on the fixed column A so that the two fixed columns A are connected through the connecting rod, and the sleeve A passes through The connecting rod is connected to the supporting rod C, the supporting rod D is connected to the supporting rod C through the connecting rod, and the supporting rod C is connected to the sleeve F and the supporting rod D through the connecting rod respectively.
优选的,所述支撑杆C和支撑杆D均为空心结构,所述支撑杆B套在支撑杆C内部,所述支撑杆E套在支撑杆D内部。Preferably, both the support rod C and the support rod D are hollow structures, the support rod B is sleeved inside the support rod C, and the support rod E is sleeved inside the support rod D.
优选的,所述套筒F和固定柱A之间的连接均为活动连接,所述套筒F可围绕固定柱A转动。Preferably, the connection between the sleeve F and the fixed column A is a flexible connection, and the sleeve F can rotate around the fixed column A.
优选的,所述底柱A与套筒C之间为活动连接,所述底柱B与套筒D之间为死连接,所述底柱C与套筒E之间为死连接,所述套筒C可围绕底柱A进行转动。优选的,所述插杆固定在套筒B内部,所述插杆可通过套筒B表面的限位螺丝进行固定和松开,所述限位螺丝固定时插杆在套筒B内部不可上下移动,所述套筒A可在支撑杆A上左右移动。Preferably, the bottom column A and the sleeve C are in an active connection, the bottom column B and the sleeve D are in a dead connection, and the bottom column C and the sleeve E are in a dead connection, and the The sleeve C is rotatable around the base A. Preferably, the insertion rod is fixed inside the sleeve B, and the insertion rod can be fixed and loosened by a limit screw on the surface of the sleeve B. When the limit screw is fixed, the insertion rod cannot go up and down inside the sleeve B Move, the sleeve A can move left and right on the support rod A.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
本实用新型结构设计合理,通过在底板四周设置八个支撑杆,使其底板能够承受更大的重量,通过连杆连接八个支撑杆,使其八个支撑杆首尾连接形成支撑网,增加支撑杆强度,通过在支撑杆A上设置套筒A,使其通过连杆连接套筒A和支撑杆C,当支撑杆C向下运动时套筒A沿着支撑杆A向左运动,使其支撑杆C与支撑杆A之间夹角变小,达到将支撑杆C收起的目的,支撑杆C通过连杆带动支撑杆D沿着支撑杆E向下运动,使其支撑杆D向下收缩,达到将支撑杆D收起的目的,通过将支撑杆B和支撑杆D收起方便其底座的运输,通过设置连杆连接套筒A和支撑杆C,通过设置连杆连接支撑杆C和支撑杆D,使其推动支撑杆B让支撑杆B与支撑杆A之间夹角变小,达到连杆带动支撑杆D收缩的目的,使其塔式起重机底架回收和安装时更加方便快捷。The utility model has a reasonable structural design. By setting eight support rods around the base plate, the base plate can bear greater weight. The eight support rods are connected by connecting rods, so that the eight support rods are connected end to end to form a support network, which increases support. Rod strength, by setting the sleeve A on the support rod A to connect the sleeve A and the support rod C through the connecting rod, when the support rod C moves down, the sleeve A moves to the left along the support rod A, making it The angle between the support rod C and the support rod A becomes smaller to achieve the purpose of retracting the support rod C. The support rod C drives the support rod D to move down along the support rod E through the connecting rod, so that the support rod D moves downward. Shrink to achieve the purpose of retracting the support rod D, by stowing the support rod B and the support rod D to facilitate the transportation of its base, by setting the connecting rod to connect the sleeve A and the supporting rod C, and by setting the connecting rod to connect the supporting rod C and support rod D to push the support rod B so that the angle between the support rod B and the support rod A becomes smaller, so as to achieve the purpose of the connecting rod driving the support rod D to shrink, making it more convenient to recover and install the tower crane chassis fast.
附图说明Description of drawings
图1为本实用新型整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型俯视切面结构示意图;Fig. 2 is a schematic diagram of the structure of the utility model in a top view section;
图3为本实用新型支撑板整体结构示意图;Figure 3 is a schematic diagram of the overall structure of the utility model support plate;
图4为本实用新型支撑杆A整体结构示意图;Fig. 4 is a schematic diagram of the overall structure of the utility model support rod A;
图5为本实用新型支撑杆E整体结构示意图;Fig. 5 is a schematic diagram of the overall structure of the utility model support rod E;
图6为本实用新型支撑杆B整体结构示意图;Fig. 6 is a schematic diagram of the overall structure of the utility model support rod B;
图7为本实用新型连杆整体结构示意图。Fig. 7 is a schematic diagram of the overall structure of the connecting rod of the present invention.
图中:1、底板;2、底座;3、支撑板;4、支撑杆A;5、套筒A;6、固定柱A;7、通孔A;8、通孔B;9、插杆;10、支撑座;11、支撑杆B;12、支撑杆C;13、套筒B;14、连杆;15、套筒F;16、浇筑口;17、支撑杆D;18、支撑杆E;19、底柱A;20、底柱B;21、套筒C;22、套筒D;23、底柱C;24、套筒E。In the figure: 1. Bottom plate; 2. Base; 3. Support plate; 4. Support rod A; 5. Sleeve A; 6. Fixed column A; 7. Through hole A; 8. Through hole B; 9. Insert rod ;10, support seat; 11, support rod B; 12, support rod C; 13, sleeve B; 14, connecting rod; 15, sleeve F; 16, pouring port; 17, support rod D; 18, support rod E; 19. Bottom post A; 20. Bottom post B; 21. Sleeve C; 22. Sleeve D; 23. Bottom post C; 24. Sleeve E.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
实施例1:Example 1:
请参阅图1-7,本实用新型提供一种技术方案:塔式起重机底架支撑压重结构,包括底板1、支撑板3和连杆14,底板1中部设有底座2,底座2内部设有支撑板3,底板1表面设有四个浇筑口16,支撑板3表面上下两侧通过焊接固定底柱C23,支撑板3表面左右两侧通过焊接固定底柱B20,支撑板3表面四角均通过焊接固定有底柱A19,底柱A19上套有套筒C21,底柱B20上套有底柱B20,底柱C23上套有套筒E24,套筒C21左侧通过焊接固定支撑杆C12,支撑杆C12上下两面左侧均通过焊接固定有固定柱A6,支撑杆C12内部套有支撑杆B11,支撑杆B11左侧通过焊接固定套筒B13,套筒B13中部套有插杆9,插杆9下方通过焊接固定支撑座10,套筒D22左侧通过焊接固定支撑杆A4,支撑杆A4中部套有套筒A5,套筒A5上下两侧中部均通过焊接固定有固定柱A6,套筒A5左侧设有通孔B8,支撑杆A4上方左侧设有通孔A7,支撑杆A4左侧通过焊接固定套筒B13,套筒E24左侧通过焊接固定支撑杆E18,支撑杆E18左侧套在支撑杆D17内部,支撑杆D17右侧上下两面均通过焊接固定有固定柱A6,支撑杆D17左侧通过焊接固定套筒B13,连杆14两侧均通过焊接固定有套筒F15,通过在底板1四周设置八个支撑杆,使其底板1能够承受更大的重量,通过连杆14连接八个支撑杆,使其八个支撑杆首尾连接形成支撑网,增加支撑杆强度。Please refer to Figures 1-7, the utility model provides a technical solution: the tower crane chassis supports the weight structure, including the
实施例2:Example 2:
请参阅图1-7,本实用新型提供一种技术方案:塔式起重机底架支撑压重结构,包括套筒F15,套筒F15套在固定柱A6上,连杆14上的套筒F15套在固定柱A6上使其通过连杆14将两个固定柱A6进行连接,套筒A5通过连杆14连接支撑杆C12,支撑杆D17通过连杆14连接支撑杆C12,支撑杆C12分别通过连杆14连接套筒F15和支撑杆D17,支撑杆C12和支撑杆D17均为空心结构,支撑杆B11套在支撑杆C12内部,支撑杆E18套在支撑杆D17内部,套筒F15和固定柱A6之间的连接均为活动连接,套筒F15可围绕固定柱A6转动,底柱A19与套筒C21之间为活动连接,底柱B20与套筒D22之间为死连接,底柱C23与套筒E24之间为死连接,套筒C21可围绕底柱A19进行转动,插杆9固定在套筒B13内部,插杆9可通过套筒B13表面的限位螺丝进行固定和松开,限位螺丝固定时插杆9在套筒B13内部不可上下移动,套筒A5可在支撑杆A4上左右移动,通过在支撑杆A4上设置套筒A5,使其通过连杆14连接套筒A5和支撑杆C12,当支撑杆C12向下运动时套筒A5沿着支撑杆A4向左运动,使其支撑杆C12与支撑杆A4之间夹角变小,达到将支撑杆C12收起的目的,支撑杆C12通过连杆14带动支撑杆D17沿着支撑杆E18向下运动,使其支撑杆D17向下收缩,达到将支撑杆D17收起的目的,通过将支撑杆B11和支撑杆D17收起方便其底座的运输,通过设置连杆14连接套筒A5和支撑杆C12,通过设置连杆14连接支撑杆C12和支撑杆D17,使其推动支撑杆B11让支撑杆B11与支撑杆A4之间夹角变小,达到连杆14带动支撑杆D17收缩的目的,使其塔式起重机底架回收和安装时更加方便快捷。Please refer to Figures 1-7, the utility model provides a technical solution: the tower crane chassis supports the weight structure, including the sleeve F15, the sleeve F15 is set on the fixed column A6, and the sleeve F15 on the connecting
工作原理:使用时,打开支撑杆B11和支撑杆A4,推动支撑杆C12使其支撑杆C12与支撑杆A4之间的夹角变大,支撑杆C12拉动连杆14使其连杆14拉动套筒A5沿着支撑杆A4向右运动,支撑杆C12推动上方的连杆14,使其连杆14推动支撑杆D17沿着支撑杆E18向上运动,使其支撑杆D17从支撑杆E18上抽出,将支撑杆B11从支撑杆C12内部抽出固定,使其支撑杆C12、支撑杆E18和支撑杆A4之间形成多个三角形组成的承重网,上下移动套筒B13内部的插杆9,使其插杆9底部的支撑座10位于平整的地面,将支撑座10与地面放平后通过旋转套筒B13表面的限位螺丝将插杆9固定,底座固定完成,当底座要回收时,将支撑杆B11推入支撑杆C12内部,旋转套筒B13表面的限位螺丝将插杆9松动,之后收起插杆9,推动支撑杆C12使其支撑杆C12与支撑杆A4之间的夹角变小,直至支撑杆C12与支撑杆A4平行,支撑杆C12运动使其支撑杆C12带动下方的连杆14向下运动,连杆14向下运动推动套筒A5沿着支撑杆A4向左运动,直至套筒A5上的通孔B8与支撑杆A4上的通孔A7重合,支撑杆C12上方的连杆14会随着支撑杆C12运动向下运动,使其支撑杆C12上方的连杆14拉动支撑杆D17向下运动,使其支撑杆D17沿着支撑杆E18向下运动,将支撑杆D17收缩,之后用固定销插入通孔A7和通孔B8的内部即可完成回收。Working principle: When in use, open the support rod B11 and the support rod A4, push the support rod C12 to make the angle between the support rod C12 and the support rod A4 larger, and the support rod C12 pulls the connecting
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223187809.9U CN219239091U (en) | 2022-11-30 | 2022-11-30 | Tower crane underframe supporting weight structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223187809.9U CN219239091U (en) | 2022-11-30 | 2022-11-30 | Tower crane underframe supporting weight structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219239091U true CN219239091U (en) | 2023-06-23 |
Family
ID=86845011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223187809.9U Expired - Fee Related CN219239091U (en) | 2022-11-30 | 2022-11-30 | Tower crane underframe supporting weight structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219239091U (en) |
-
2022
- 2022-11-30 CN CN202223187809.9U patent/CN219239091U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108951651A (en) | Stabilize effectual excavation supporting | |
| CN211368423U (en) | Stay cable tower top lifting traction operation platform | |
| CN110182682A (en) | A kind of suspender for the lifting of big segment steel truss girder | |
| CN202745397U (en) | Lifting device for large-span space truss | |
| CN219239091U (en) | Tower crane underframe supporting weight structure | |
| CN210238296U (en) | A large-scale tower crane attached wall space steel truss foundation | |
| CN218786484U (en) | High stability construction site tower crane installation abutment | |
| CN212295588U (en) | Triangular truss for high-rise building construction | |
| CN209652957U (en) | A kind of cofferdam facilitating installation | |
| CN216866017U (en) | A concrete pouring device in a concrete-filled steel tube column | |
| CN205172139U (en) | Supplementary pole tumbler bearing of embracing of transmission line head of mast | |
| CN110468870A (en) | One kind can have enough to meet the need Tower Crane Foundation by Steel Lattice Column structure | |
| CN205530308U (en) | Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers | |
| CN211524174U (en) | Novel basement antidetonation reinforcing building structure | |
| CN203568661U (en) | Built-in tail-sliding lifting lug | |
| CN209184103U (en) | A kind of portable high-pressure line steel tower ground wire lead lifting device | |
| CN211256677U (en) | Anti-tilting device for large-scale steel member of bridge | |
| CN217679079U (en) | Rack for lowering reinforcing cage of large-diameter pile foundation | |
| CN219449130U (en) | Tower crane attachment structure | |
| CN111425062A (en) | Recyclable enclosure foundation structure and construction method thereof | |
| CN208023970U (en) | Construction discharging platform | |
| CN223281430U (en) | Integrated house with truss base | |
| CN223793605U (en) | Foundation pit supporting protection frame for hydraulic engineering construction | |
| CN221440085U (en) | Hanging bracket for hoisting steel structure cylinder | |
| CN217797523U (en) | Underground is word steel joint clearance brush wall device for continuous wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230623 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |