CN219219123U - A construction device for outer wall coils of open-cut tunnels - Google Patents
A construction device for outer wall coils of open-cut tunnels Download PDFInfo
- Publication number
- CN219219123U CN219219123U CN202223378443.3U CN202223378443U CN219219123U CN 219219123 U CN219219123 U CN 219219123U CN 202223378443 U CN202223378443 U CN 202223378443U CN 219219123 U CN219219123 U CN 219219123U
- Authority
- CN
- China
- Prior art keywords
- construction
- coiled material
- tunnel
- frame
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及隧道外墙防水卷材施工技术领域,特别是一种用于明挖隧道外墙卷材施工装置。The utility model relates to the technical field of waterproof coiled material construction for the outer wall of a tunnel, in particular to a coiled material construction device for the outer wall of an open-cut tunnel.
背景技术Background technique
在公路工程或城市道路工程的施工中,由于各工程的限制因素,部分路段需要从地下通行,部分地下通行工程的埋深不足,不能采用盾构法施工,需采用明挖隧道施工;明挖隧道在侧墙和顶板浇筑完毕后,为防止后期及运行过程中隧道主体渗水,影响道路交通安全,需在洞身外墙和顶部设置防水卷材;防水卷材施工属于隐蔽工程,也是隧道施工的关键工序之一;In the construction of highway engineering or urban road engineering, due to the restrictive factors of each project, some road sections need to be passed underground, and the buried depth of some underground traffic projects is insufficient, so the shield method cannot be used for construction, and open-cut tunnel construction is required; After the side walls and roof of the tunnel are poured, in order to prevent water seepage in the main body of the tunnel and affect road traffic safety in the later stage and during operation, it is necessary to install waterproof membranes on the outer walls and top of the tunnel body; waterproof membrane construction is a concealed project, and it is also a tunnel construction One of the key processes of
目前,防水卷材的铺设常采用搭设脚手架铺设或通过吊车吊运吊篮铺设;在搭设脚手铺设防水卷材的施工中,脚手架搭设准备周期长,施工强度高,拆卸组装脚手架频率大,防水卷材铺设效率低,安全风险高;在通过吊车吊运吊篮铺设防水卷材施工中,需频繁移动吊车,使防水卷材铺水平度及连续性不能保证,大大影响了施工进度及防水卷材铺设的粘贴质量,且施工成本高。因此,如何制作一种能够解决现有技术问题的用于明挖隧道外墙卷材施工装置就成为有待解决的技术问题。At present, the laying of waterproof membranes often adopts scaffolding or hanging baskets by cranes; in the construction of erecting scaffolds to lay waterproof membranes, the preparation period for scaffolding is long, the construction strength is high, and the frequency of disassembling and assembling scaffolding is high. Coil laying efficiency is low and safety risk is high; during the construction of laying waterproof membranes by cranes and hanging baskets, the crane needs to be moved frequently, so that the levelness and continuity of waterproof membrane laying cannot be guaranteed, which greatly affects the construction progress and waterproof rolls. The sticking quality of material laying is poor, and the construction cost is high. Therefore, how to make a coil construction device for the outer wall of an open-cut tunnel that can solve the problems of the prior art has become a technical problem to be solved.
实用新型内容Utility model content
本实用新型正是基于上述技术问题,提出了一种用于明挖隧道外墙卷材施工装置,以解决上述背景技术中存在的问题。Based on the above-mentioned technical problems, the utility model proposes a coil construction device for the external wall of open-cut tunnels to solve the problems in the above-mentioned background technology.
有鉴于此,本实用新型提出了一种用于明挖隧道外墙卷材施工装置,它包括:隧道,所述的隧道顶部设置有可行走装置,所述的可行走装置上设置有固定架,所述的固定架一端伸向所述的隧道的外墙面设置有工作架,所述的工作架内设置有可升降的作业平台。In view of this, the utility model proposes a coiled material construction device for the outer wall of an open-cut tunnel, which includes: a tunnel, the top of the tunnel is provided with a movable device, and the movable device is provided with a fixing frame , one end of the fixed frame extends toward the outer wall of the tunnel, and a working frame is provided, and a liftable working platform is arranged inside the working frame.
进一步的,所述的固定架包括间隔设置在所述的可行走装置底部的两组横杆和设置在两组所述的横杆端部之间纵杆,所述的横杆底部自外向内依次设置有两组行走轮、承重支座和两组挂钩,两组所述的横杆分别为前端横杆和后端横杆。Further, the fixed frame includes two sets of cross bars arranged at intervals on the bottom of the walkable device and longitudinal bars arranged between the ends of the two sets of cross bars, and the bottom of the cross bars is from outside to inside Two groups of traveling wheels, bearing supports and two groups of hooks are arranged in sequence, and the cross bars described in the two groups are respectively front end cross bars and rear end cross bars.
进一步的,所述的工作架包括由竖向槽钢、水平连接杆和横向连接杆组成的长方体工作架,所述的工作架顶部四角处分别设置有作业架吊环,所述的作业架吊环分别挂设在所述的挂钩上,所述的工作架下部向所述的墙面方向设置有支杆,所述的支杆端部设置有万向轮。Further, the work frame includes a cuboid work frame composed of vertical channel steel, horizontal connecting rods and transverse connecting rods, the four corners of the top of the work frame are respectively provided with work frame suspension rings, and the work frame suspension rings are respectively Hanging on the hook, the lower part of the work frame is provided with a pole towards the direction of the wall, and the end of the pole is provided with a universal wheel.
进一步的,所述的竖向槽钢在所述的工作架四角处且槽口横向相对设置,所述的作业平台四角处分别通过轴承杆设置有滑动轴承,所述的作业平台通过所述的滑动轴承可升降设置在四组所述的竖向槽钢之间,所述的作业平台一端设置有第一钢丝绳,所述的作业平台另一端设置有第二钢丝绳,所述的作业平台两端分别间隔设置有两组套筒,所述的套筒内插设有月牙钩,所述的月牙钩后部设置有销子。Further, the vertical channel steel is set at the four corners of the work frame and the slots are opposite to each other horizontally, the four corners of the work platform are respectively provided with sliding bearings through bearing rods, and the work platform passes through the The sliding bearing can be lifted and arranged between the four sets of vertical channel steels. One end of the operation platform is provided with a first wire rope, and the other end of the operation platform is provided with a second wire rope. Two sets of sleeves are respectively arranged at intervals, a crescent hook is inserted in the sleeve, and a pin is arranged at the rear of the crescent hook.
进一步的,所述的可行走装置上设置有卷扬机,所述的前端横杆上的两组所述的挂钩之间的设置有铰接式定滑轮,所述的后端横杆上的两组所述的挂钩之间外侧自上而下依次设置有导向轮和定滑轮,所述的第一钢丝绳上部分别通过所述的铰接式定滑轮、所述的定滑轮设置在所述的卷扬机的输出端,所述的第二钢丝绳上部通过所述的导向轮设置在所述的卷扬机的输出端。Further, the walkable device is provided with a hoist, the two groups of hooks on the front end cross bar are provided with articulated fixed pulleys, and the two groups of hooks on the rear end cross bar are The outer side between the above-mentioned hooks is provided with a guide wheel and a fixed pulley sequentially from top to bottom, and the upper part of the first steel wire rope is respectively arranged on the output end of the hoist through the articulated fixed pulley and the fixed pulley. , the upper part of the second wire rope is set at the output end of the hoist through the guide wheel.
进一步的,所述的承重支座包括连接件和伸缩式千斤顶,所述的工作架一侧设置有爬梯,所述的工作架外侧包覆有防护网,所述的作业平台顶部设置有所述的防护网。Further, the load-bearing support includes connectors and telescopic jacks, a ladder is provided on one side of the work frame, the outer side of the work frame is covered with a protective net, and the top of the work platform is provided with the protective net.
进一步的,所述的可行走装置包括平板电动三轮车,所述的平板电动三轮车与外侧的所述的纵杆之间间隔设置有多根支撑杆,所述的支撑杆与所述的平板电动三轮车上分别设置有配重件,所述的卷扬机为双桶卷扬机。Further, the walkable device includes a flat electric tricycle, and a plurality of support rods are arranged at intervals between the flat electric tricycle and the outer longitudinal bar, and the support rods and the flat electric tricycle Counterweights are arranged on the top respectively, and the hoist described above is a double-barrel hoist.
本实用新型提出了一种用于明挖隧道外墙卷材施工装置,与现有技术相比,本实用新型具有以下优点:The utility model proposes a coil construction device for the outer wall of an open-cut tunnel. Compared with the prior art, the utility model has the following advantages:
1、使用本装置铺设防水卷材与搭设脚手架铺设相比,减少了搭设脚手架的施工周期和施工强度,提高了防水卷材的铺设效率,降低了安全风险;1. Compared with the installation of scaffolding, the use of this device to lay waterproof membranes reduces the construction period and construction strength of scaffolding, improves the efficiency of laying waterproof membranes, and reduces safety risks;
2、使用本装置铺设防水卷材与吊车吊运吊篮铺设相比,避免了防水卷材水平度偏差造成的材料浪费,其施工投入少,对防水卷材铺水平度及连续性提供了保障,大大提高了施工进度及防水卷材铺设的粘贴质量;2. Compared with the laying of the waterproof membrane by the crane and the hanging basket, the use of this device to lay the waterproof membrane avoids the waste of materials caused by the level deviation of the waterproof membrane, and its construction investment is small, which provides a guarantee for the levelness and continuity of the waterproof membrane. , greatly improving the construction progress and the paste quality of waterproof membrane laying;
3、本装置的可行走装置运行到防水卷材待施工部位后启动伸缩式千斤顶,使横杆内侧轮体离开地面,伸缩式千斤顶做为支点在配重件的作用下形成稳定的支撑定位状态,保证下方作业架的稳定;3. The movable device of this device runs to the construction site of the waterproof membrane and starts the telescopic jack, so that the inner wheel body of the cross bar leaves the ground, and the telescopic jack acts as a fulcrum to form a stable support positioning state under the action of the counterweight , to ensure the stability of the lower working frame;
4、本装置在施工过程中,通过卷扬机对作业平台进行一次限位,通过月牙钩挂在工作架的横向连接杆上进行作业平台的二次限位,通过可行走装置水平移动,保证了作业平台在同一阶段铺设高度的水平铺设条件;4. During the construction process of this device, the hoist is used to limit the working platform once, and the crescent hook is hung on the horizontal connecting rod of the work frame to carry out the secondary limiting of the working platform, and the movable device moves horizontally to ensure the operation The horizontal laying conditions of the platform laying height at the same stage;
5、本装置在施工过程中,作业平台通过双重限位,使施工人员在作业平台铺设防水卷材的过程中不产生上下颤动,保证了作业平台的稳定性和施工安全性;5. During the construction of this device, the operating platform is double-limited, so that the construction personnel will not vibrate up and down during the process of laying waterproof membranes on the operating platform, ensuring the stability of the operating platform and construction safety;
6、工作架下部通过万向轮可滑动抵接墙面,防止在可行走装置移动的过程中,工作架的架体和外墙面或已粘贴好的防水卷材发生剐蹭,在施工中保护了墙体;6. The lower part of the working frame can slide against the wall through universal wheels to prevent the body of the working frame from being scratched by the outer wall or the pasted waterproof membrane during the movement of the walkable device, and protect it during construction. the wall;
7、本装置结构简单,施工便捷,简化了现有防水卷材的铺设流程,节省了设备投入,人工投入及材料投入,保证了防水卷材铺设施工中的连续性和整体性,提高了施工效率,加快了施工进度,节约了成本,节能环保。7. The device has a simple structure and convenient construction, which simplifies the laying process of the existing waterproof membrane, saves equipment investment, labor input and material input, ensures the continuity and integrity of the waterproof membrane laying construction, and improves the construction efficiency. Efficiency, speeding up the construction progress, saving costs, energy saving and environmental protection.
附图说明Description of drawings
图1示出了本实用新型的整体结构示意图;Fig. 1 shows the overall structural representation of the utility model;
图2示出了前端横杆结构侧视图;Fig. 2 shows the side view of the front cross bar structure;
图3示出了后端横杆结构侧视图;Figure 3 shows a side view of the rear cross bar structure;
图4示出了作业平台结构俯视图;Figure 4 shows a top view of the working platform structure;
图5示出了月牙钩结构示意图;Fig. 5 shows the schematic diagram of crescent hook structure;
图6示出了工作架和作业平台连接结构俯视图;Figure 6 shows a top view of the connection structure between the work frame and the work platform;
图7示出了工作架结构立体图;Figure 7 shows a perspective view of the work frame structure;
图中:1隧道顶部、2墙面、3可行走装置、4固定架、5工作架、6作业平台、7横杆、8纵杆、9横杆行走轮、10承重支座、11挂钩、12竖向槽钢、13水平连接杆、14横向连接杆、15作业架吊环、16支杆、17万向轮、18轴承杆、19滑动轴承、20钢丝绳、21吊环、22套筒、23月牙钩、24销子、25纵向承重杆、26横向支撑杆、27卷扬机、28导向轮、29定滑轮、30横杆万向轮、31第一钢丝绳、32第二钢丝绳、33爬梯、34防护网、35支撑杆、36配重件、37前端横杆、38后端横杆、39铰接式定滑轮。In the figure: 1 tunnel top, 2 wall, 3 walkable device, 4 fixed frame, 5 working frame, 6 working platform, 7 cross bar, 8 longitudinal bar, 9 cross bar walking wheel, 10 load-bearing support, 11 hook, 12 Vertical channel steel, 13 Horizontal connecting rod, 14 Horizontal connecting rod, 15 Working frame lifting ring, 16 Support rod, 17 Universal wheel, 18 Bearing rod, 19 Sliding bearing, 20 Steel wire rope, 21 Lifting ring, 22 Sleeve, 23 Crescent Hook, 24 pin, 25 longitudinal load-bearing rod, 26 horizontal support rod, 27 hoist, 28 guide wheel, 29 fixed pulley, 30 cross-bar universal wheel, 31 first wire rope, 32 second wire rope, 33 ladder, 34 protective net , 35 support rods, 36 counterweights, 37 front end cross bars, 38 rear end cross bars, 39 articulated fixed pulleys.
具体实施方式Detailed ways
为了能够更清楚地理解本实用新型的上述目的、特征和优点,下面结合附图和具体实施方式对本实用新型进行进一步的详细描述。In order to more clearly understand the above purpose, features and advantages of the utility model, the utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是,本实用新型还可以采用其他不同于在此描述的其他方式来实施,因此,本实用新型的保护范围并不受下面公开的内容的限制。In the following description, a lot of specific details have been set forth in order to fully understand the utility model, but the utility model can also be implemented in other ways different from those described here, therefore, the protection scope of the utility model is not limited by the following Restrictions on Disclosed Content.
以下结合图1至图7对本实用新型的技术方案作进一步说明。The technical solution of the present utility model will be further described below in conjunction with FIG. 1 to FIG. 7 .
第一实施例,如图1至图7所示:一种用于明挖隧道外墙卷材施工装置,它包括:隧道,所述的隧道顶部1设置有可行走装置3,所述的可行走装置3上设置有固定架4,所述的固定架4一端伸向所述的隧道的外墙面2设置有工作架5,所述的工作架5内设置有可升降的作业平台6。The first embodiment, as shown in Figures 1 to 7: a coil construction device for the outer wall of an open-cut tunnel, which includes: a tunnel, the tunnel top 1 is provided with a
所述的固定架4包括间隔设置在所述的可行走装置3底部的两组横杆7和设置在两组所述的横杆7端部之间纵杆8,所述的横杆7底部自外向内依次设置有两组行走轮、承重支座10和两组挂钩11,两组所述的横杆7分别为前端横杆37和后端横杆38,所述的行走轮包括设置在所述的前端横杆37上的横杆万向轮30和设置在所述的后端横杆38上的横杆行走轮9,两组所述的行走轮间隔设置在所述的横杆7外侧三分之二处,两组所述的挂钩11间隔设置在所述的横杆7内侧向外墙面2的伸出部上。The
所述的工作架5包括由竖向槽钢12、水平连接杆13和横向连接杆14等距离焊接组成的长方体工作架5,所述的工作架5顶部四角处分别设置有与所述的挂钩11适配的作业架吊环15,所述的作业架吊环15分别挂设在所述的挂钩11上,所述的工作架5下部向所述的墙面2方向设置有支杆16,所述的支杆16端部设置有万向轮17,防止在可行走装置3移动的过程中,工作架5架体和外墙面2或已粘贴好的防水卷材发生剐蹭。Described
所述的竖向槽钢12在所述的工作架5四角处且槽口横向相对设置,所述的作业平台6四角处分别通过轴承杆18设置有滑动轴承19,所述的作业平台6通过所述的滑动轴承19可升降设置在四组所述的竖向槽钢12之间,所述的作业平台6一端设置有第一钢丝绳31,所述的作业平台6另一端设置有第二钢丝绳32,所述的第一钢丝绳31与所述的第二钢丝绳32上分别设置有起吊环21,所述的作业平台6两端分别间隔设置有两组套筒22,所述的套筒22内插设有月牙钩23,所述的月牙钩23后部设置有销子24,所述的月牙钩23通过所述的销子24设置在所述的套筒22内,所述的作业平台6上设置有纵向承重杆25与横向支撑杆26。The
所述的可行走装置3上设置有卷扬机27,所述的前端横杆37上的两组所述的挂钩11之间的设置有铰接式定滑轮39,所述的后端横杆38上的两组所述的挂钩11之间外侧自上而下依次铰接设置有导向轮28和定滑轮29,所述的第一钢丝绳31上部分别通过所述的铰接式定滑轮39、所述的定滑轮29设置在所述的卷扬机27的输出端一侧,所述的第二钢丝绳32上部通过所述的导向轮28设置在所述的卷扬机27的输出端另一侧。The described
所述的承重支座10包括连接件和伸缩式千斤顶,所述的伸缩式千斤顶通过所述的连接件可伸缩设置在所述的横杆7底部,所述的工作架5一侧自上而下设置有爬梯33,所述的工作架5外侧即远离外墙面2的一面和两侧包覆有防护网34,所述的作业平台6顶部设置有所述的防护网34。The load-bearing
所述的可行走装置3包括平板电动三轮车,所述的平板电动三轮车与外侧的所述的纵杆8之间间隔设置有多根支撑杆35,所述的支撑杆35与所述的平板电动三轮车上分别设置有配重件36,所述的卷扬机27为双桶卷扬机27。The
横杆7外端的行走轮设置在末端,左侧的行走轮设置在距离横杆7内端130cm处,在距离横杆7内端120cm处下方设置承重支座10,在前横杆7内端及距离内端100cm处设置挂钩11,两个挂钩11中间位置设置滑轮或导向轮,前端横杆37与后端横杆38的间距为3m,所述的工作架5的厚度为1.5m;月牙钩23在作业平台6升降至粘贴防水卷材的高度后,外伸挂在工作架5的横向连接杆14上进行限位。The walking wheel at the outer end of the
一种用于明挖隧道外墙卷材施工装置的施工方法,其特征在于,包括如下步骤:A construction method for an external wall coil construction device of an open-cut tunnel, characterized in that it comprises the following steps:
步骤一,可行走装置3运行到防水卷材待施工部位后启动伸缩式千斤顶,使横杆7内侧轮体离开地面,伸缩式千斤顶做为支点在配重件36的作用下形成稳定的支撑定位状态,保证下方作业架的稳定;Step 1, the
步骤二,作业人员进入作业平台6,启动卷扬机27,在导向轮28和定滑轮的辅助下,第一钢丝绳31与第二钢丝绳32带动作业平台6在工作架5内上升或下降到防水卷材的第一阶段铺设高度,关闭卷扬机27,进行作业平台6的一次限位;
步骤三,将销子24插入套筒22内,将月牙钩23挂在工作架5的横向连接杆14上进行作业平台6的二次限位,保证施工人员在作业平台6铺设防水卷材的过程中不产生上下颤动;
步骤四,通过人工进行防水卷材的第一阶段局部铺设,局部铺设完成后,启动伸缩式千斤顶,使横杆7内侧轮体落到地面后重复步骤一进行防水卷材的第一阶段平行铺设;Step 4: Manually carry out the first stage partial laying of the waterproof membrane. After the partial laying is completed, start the telescopic jack so that the inner wheel body of the
步骤五,完成防水卷材的第一阶段平行铺设后,取下月牙钩23,驱动卷扬机27控制作业平台6下降到防水卷材的第二阶段铺设高度,重复步骤三和步骤四完成防水卷材第二阶段铺设;Step 5: After completing the first stage of parallel laying of the waterproof membrane, remove the
步骤六,重复步骤五,完成防水卷材的全阶段铺设。
本装置结构简单,施工便捷,简化了现有防水卷材的铺设流程,节省了设备投入,人工投入及材料投入,保证了防水卷材铺设施工中的连续性和整体性,提高了施工效率,加快了施工进度,节约了成本,节能环保。The device has a simple structure and convenient construction, simplifies the laying process of the existing waterproof membrane, saves equipment investment, labor input and material input, ensures the continuity and integrity of the waterproof membrane laying construction, and improves the construction efficiency. Speed up the construction progress, save costs, energy saving and environmental protection.
以上所述的仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. For those skilled in the art, the present utility model can have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223378443.3U CN219219123U (en) | 2022-12-16 | 2022-12-16 | A construction device for outer wall coils of open-cut tunnels |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223378443.3U CN219219123U (en) | 2022-12-16 | 2022-12-16 | A construction device for outer wall coils of open-cut tunnels |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219219123U true CN219219123U (en) | 2023-06-20 |
Family
ID=86746801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223378443.3U Active CN219219123U (en) | 2022-12-16 | 2022-12-16 | A construction device for outer wall coils of open-cut tunnels |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219219123U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116005727A (en) * | 2022-12-16 | 2023-04-25 | 中电建十一局工程有限公司 | Coiled material construction device and construction method for outer wall of open cut tunnel |
-
2022
- 2022-12-16 CN CN202223378443.3U patent/CN219219123U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116005727A (en) * | 2022-12-16 | 2023-04-25 | 中电建十一局工程有限公司 | Coiled material construction device and construction method for outer wall of open cut tunnel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107338727B (en) | Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof | |
| CN107201719A (en) | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method | |
| CN206971764U (en) | The purlin crane system of Steel Structure Installation | |
| CN219219123U (en) | A construction device for outer wall coils of open-cut tunnels | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN116853963B (en) | A hoisting device and hoisting method for main beam of cable-stayed bridge | |
| CN110924723A (en) | Construction method and hoisting device for earth-covered oil tank and using method | |
| CN111908320B (en) | Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall | |
| CN116005727A (en) | Coiled material construction device and construction method for outer wall of open cut tunnel | |
| CN216515141U (en) | Novel cantilever construction creeping formwork device | |
| CN116537071A (en) | A hydraulic jacking integral steel frame platform and its construction method for turning over formwork | |
| CN208870380U (en) | Mobile device and removable wall form for wall form | |
| CN115522473A (en) | A bridge pier making machine and its construction method | |
| CN103147401B (en) | Construction method of self-climbing portal frame | |
| CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
| CN109944164A (en) | Self-elevating hollow thin-wall pier roller die system and construction method thereof | |
| CN205152807U (en) | Downgoing movable formwork bridge construction machine is demolishd and is hoisted construction structures with girder | |
| CN206051351U (en) | Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form | |
| CN204983692U (en) | Concrete panel's hoist device | |
| CN103359625A (en) | Automatic construction equipment for building hoisting and platform elevating of new rural construction | |
| CN210341680U (en) | Door type corrugated steel web plate installation and overhanging type hanging bracket structure | |
| CN216515179U (en) | Movable trolley for mounting and dismounting bridge guardrail template | |
| CN112502431A (en) | Hydraulic reverse formwork construction method for light aluminum alloy formwork of square chimney | |
| CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
| CN205205675U (en) | Downgoing movable formwork bridge construction machine is demolishd with whole system of transferring |