CN219219047U - A trench excavation support device - Google Patents
A trench excavation support device Download PDFInfo
- Publication number
- CN219219047U CN219219047U CN202320795843.XU CN202320795843U CN219219047U CN 219219047 U CN219219047 U CN 219219047U CN 202320795843 U CN202320795843 U CN 202320795843U CN 219219047 U CN219219047 U CN 219219047U
- Authority
- CN
- China
- Prior art keywords
- support
- fixed
- soil
- adhesive tape
- trench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
技术领域technical field
本实用新型属于沟槽支护技术领域,具体涉及一种沟槽开挖支护装置。The utility model belongs to the technical field of trench support, in particular to a trench excavation support device.
背景技术Background technique
近年来旧城更新改造成为为民解困、改善人居环境、提升城市品质的重要环节和热门话题,旧城改造工程的规模也以空前的规模与速度展开,其中雨污分流、架空线入地等沟槽开挖作业就是旧城更新改造提升工程的一项重要内容,沟槽开挖是土方工程中较为普遍的施工工序之一,在沟槽的开挖过程中和工期持续时间内,往往由于土质疏松导致沟槽壁上土壤坍塌,这使得沟槽被堵而影响工作,因此在沟槽开挖过程中要采取相应防护措施,以确保沟槽壁体上土壤的稳定,沟槽支护是为保证地下结构施工及沟槽周边环境的安全,对沟槽侧壁及周边环境采用的支挡、加固与保护措施,由于改造范围一般位于城镇密集区,周边基础设施众多,施工空间由于狭小,已建成的道路范围内都分布着电力电信、给排水、雨污水、热力燃气等地上地下,涉及雨污分流、架空线入地等沟槽开挖作业的道路改造工程一般无法采用放坡开挖方式。In recent years, the renewal and transformation of old cities has become an important link and hot topic for solving the difficulties of the people, improving the living environment, and improving the quality of the city. Trench excavation is an important part of the old city renewal and upgrading project. Trench excavation is one of the more common construction procedures in earthworks. During the trench excavation process and the duration of the construction period, often Due to the loose soil, the soil on the trench wall collapses, which makes the trench blocked and affects the work. Therefore, corresponding protective measures should be taken during the excavation of the trench to ensure the stability of the soil on the trench wall and the trench support. In order to ensure the safety of the underground structure construction and the surrounding environment of the trench, the support, reinforcement and protection measures are adopted for the side wall of the trench and the surrounding environment. Since the scope of transformation is generally located in densely populated urban areas, there are many surrounding infrastructures, and the construction space is narrow. The completed roads are distributed above and below ground for power and telecommunications, water supply and drainage, rainwater and sewage, heating gas, etc. Road renovation projects involving rain and sewage diversion, overhead lines entering the ground, and other trench excavation operations generally cannot use sloping excavation. Dig way.
现有技术的做法多为采用立板支护在沟槽内壁上以减少泥土掉落,但是在小宽距的沟槽中支护两侧挡土的立板较为繁琐,且挡土立板和支撑架大且重,于基坑中并不便于实施置入和取出支护结构的操作,多段挡土立板使得支护装置的转移及运输存在局限性。Most of the methods in the prior art are to use vertical boards to support the inner wall of the trench to reduce soil falling. However, it is cumbersome to support the vertical boards on both sides of the soil retaining in small-width trenches, and the soil retaining vertical boards and The support frame is large and heavy, and it is not convenient to insert and take out the support structure in the foundation pit. The multi-segment soil retaining vertical plate makes the transfer and transportation of the support device have limitations.
因此,需要一种沟槽开挖支护装置,解决现有技术中支护装置大且重导致使用不便及转移运输困难的问题。Therefore, there is a need for a trench excavation support device to solve the problems in the prior art that the support device is large and heavy, which leads to inconvenient use and difficult transfer and transportation.
实用新型内容Utility model content
本实用新型的目的在于提供一种沟槽开挖支护装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a trench excavation support device to solve the problems raised in the background technology above.
为实现上述目的,本实用新型提供如下技术方案:一种沟槽开挖支护装置,包括第一支座和第二支座,所述第二支座设置在第一支座的一侧,所述第一支座和所述第二支座的上部设置有挡土组件,所述挡土组件包括两个立起支柱、挡土胶布和加固压板,一个所述立起支柱固定在第一支座的上表面中心处,另一个所述立起支柱固定在第二支座的上表面中心处,所述挡土胶布固定在两个立起支柱之间,所述加固压板设置在挡土胶布的前侧,所述第一支座和所述第二支座的内部开设有收布转槽,所述第一支座和所述第二支座的收布转槽中均转动连接有转动块。In order to achieve the above object, the utility model provides the following technical solutions: a trench excavation support device, including a first support and a second support, the second support is arranged on one side of the first support, The upper part of the first bearing and the second bearing is provided with a soil retaining assembly, and the soil retaining assembly includes two erected pillars, soil retaining tape and a reinforced pressure plate, and one of the erected pillars is fixed on the first At the center of the upper surface of the support, another upright pillar is fixed at the center of the upper surface of the second support, the soil retaining adhesive tape is fixed between the two upright pillars, and the reinforcing plate is arranged on the soil retaining On the front side of the adhesive plaster, the inside of the first support and the second support is provided with a cloth receiving trough, and the cloth receiving troughs of the first support and the second support are rotatably connected with Turn the blocks.
方案中需要说明的是,所述立起支柱的下端固定在转动块的上端面圆心处,所述第一支座和所述第二支座的下表面四角位置均固定有插地桩体。What needs to be explained in the solution is that the lower end of the upright pillar is fixed at the center of the upper end surface of the rotating block, and the four corners of the lower surface of the first support and the second support are fixed with ground piles.
进一步值得说明的是,所述第一支座和所述第二支座的上表面均开设有导向滑槽,所述导向滑槽的内部滑动连接有导向支臂,所述导向支臂伸出第一支座的一端固定在加固压板的前表面。It is further worth noting that the upper surfaces of the first support and the second support are provided with guide chute, and the inside of the guide chute is slidably connected with a guide arm, and the guide arm protrudes One end of the first support is fixed on the front surface of the reinforcing plate.
更进一步需要说明的是,所述第一支座和所述第二支座的上表面前边缘处固定有转动支座,所述转动支座的后表面固定有旋进螺座,所述旋进螺座和所述转动支座的内部穿设有抵紧螺杆,所述抵紧螺杆远离导向支臂的一端固定有调节把手。Further, it should be noted that a rotating support is fixed on the front edge of the upper surface of the first support and the second support, and a screw seat is fixed on the rear surface of the rotating support. The inside of the screw seat and the rotating support is pierced with a pressing screw, and the end of the pressing screw away from the guide arm is fixed with an adjustment handle.
作为一种优选的实施方式,所述抵紧螺杆与旋进螺座螺纹连接,所述抵紧螺杆的一端抵合在导向支臂的前部。As a preferred embodiment, the pressing screw is threadedly connected with the screw seat, and one end of the pressing screw abuts against the front part of the guide arm.
作为一种优选的实施方式,所述加固压板位于挡土胶布的后侧对称设置有两组,所述加固压板的后表面贴合挡土胶布的前表面。As a preferred embodiment, two sets of the reinforcing platen are arranged symmetrically on the rear side of the soil-retaining adhesive tape, and the rear surface of the reinforcing platen is attached to the front surface of the soil-retaining adhesive tape.
与现有技术相比,本实用新型提供的一种沟槽开挖支护装置,至少包括如下有益效果:Compared with the prior art, the utility model provides a trench excavation support device, which at least includes the following beneficial effects:
通过设置的挡土组件,加固压板从前侧压紧挡土胶布使其贴紧沟槽壁,这样挡土胶布能够对沟槽壁进行泥土防坍塌处理,而采用的挡土胶布较传统挡土板有质量轻、方便人员独立拆装和便于转移的优点。Through the installed soil retaining components, the reinforcement plate presses the soil retaining tape from the front side to make it close to the trench wall, so that the soil retaining tape can prevent the soil from collapsing on the trench wall. It has the advantages of light weight, convenient disassembly and assembly by personnel and easy transfer.
通过设置的立起支柱和转动块,在使用后,挡土胶布收卷在一个立起支柱上,这样能够极大地缩小该支护装置的占用空间,从而方便支护装置在沟槽中转移和后续转场运输。Through the set of upright pillars and rotating blocks, after use, the soil retaining tape is rolled up on an upright pillar, which can greatly reduce the occupied space of the support device, thereby facilitating the transfer and installation of the support device in the trench. Subsequent transfer transportation.
附图说明Description of drawings
图1为本实用新型的整体结构立体图;Fig. 1 is a perspective view of the overall structure of the utility model;
图2为本实用新型的挡土胶布结构立体图;Fig. 2 is the perspective view of the structure of the soil retaining adhesive tape of the present utility model;
图3为本实用新型的抵紧螺杆结构立体图;Fig. 3 is a three-dimensional view of the screw rod structure of the utility model;
图4为本实用新型的第一支座剖面图。Fig. 4 is a sectional view of the first support of the present invention.
图中:1、第一支座;2、第二支座;3、插地桩体;4、立起支柱;5、挡土胶布;6、加固压板;7、导向支臂;8、转动支座;9、旋进螺座;10、抵紧螺杆;11、调节把手;12、导向滑槽;13、转动块;14、收布转槽。In the figure: 1. The first support; 2. The second support; 3. The pile body inserted into the ground; 4. The erected pillar; 5. The soil retaining tape; 9. Screw in the screw seat; 10. Tighten the screw rod; 11. Adjust the handle; 12. Guide chute; 13. Rotating block;
具体实施方式Detailed ways
下面结合实施例对本实用新型做进一步的描述。Below in conjunction with embodiment the utility model is described further.
请参阅图1-4,本实用新型提供一种沟槽开挖支护装置,包括第一支座1和第二支座2,第二支座2设置在第一支座1的一侧,第一支座1和第二支座2的上部设置有挡土组件,挡土组件包括两个立起支柱4、挡土胶布5和加固压板6,一个立起支柱4固定在第一支座1的上表面中心处,另一个立起支柱4固定在第二支座2的上表面中心处,挡土胶布5固定在两个立起支柱4之间,加固压板6设置在挡土胶布5的前侧,第一支座1和第二支座2的内部开设有收布转槽14,第一支座1和第二支座2的收布转槽14中均转动连接有转动块13,抵紧螺杆10沿着旋进螺座9向内旋进并推移导向支臂7,直至加固压板6从前侧压紧挡土胶布5使其贴紧沟槽壁。Please refer to Figures 1-4, the utility model provides a trench excavation support device, including a
进一步地如图1、图2和图3所示,值得具体说明的是,立起支柱4的下端固定在转动块13的上端面圆心处,第一支座1和第二支座2的下表面四角位置均固定有插地桩体3,通过设置的插地桩体3能够使得该装置稳定设置在沟槽中。Further as shown in Fig. 1, Fig. 2 and Fig. 3, it is worth explaining specifically that the lower end of the
进一步地如图3所示,值得具体说明的是,第一支座1和第二支座2的上表面均开设有导向滑槽12,导向滑槽12的内部滑动连接有导向支臂7,导向支臂7伸出第一支座1的一端固定在加固压板6的前表面。As further shown in Figure 3, it is worth explaining in detail that the upper surfaces of the
本方案具备以下工作过程:在使用时,第一支座1和第二支座2通过底部的插地桩体3固定在沟槽中,此时第一支座1与第二支座2分离,使得两个立起支柱4之间的挡土胶布5绷直展开,随后旋动调节把手11,带动抵紧螺杆10沿着旋进螺座9向内旋进并推移导向支臂7,直至加固压板6从前侧压紧挡土胶布5使其贴紧沟槽壁,这样挡土胶布5能够对沟槽壁进行泥土防坍塌处理,而采用的挡土胶布5较传统挡土板有质量轻、方便人员独立拆装和便于转移的优点。This scheme has the following working process: when in use, the
根据上述工作过程可知:加固压板6从前侧压紧挡土胶布5使其贴紧沟槽壁,这样挡土胶布5能够对沟槽壁进行泥土防坍塌处理,而采用的挡土胶布5较传统挡土板有质量轻、方便人员独立拆装和便于转移的优点。According to the above working process, it can be seen that the
进一步地如图1、图2和图4所示,值得具体说明的是,第一支座1和第二支座2的上表面前边缘处固定有转动支座8,转动支座8的后表面固定有旋进螺座9,旋进螺座9和转动支座8的内部穿设有抵紧螺杆10,抵紧螺杆10远离导向支臂7的一端固定有调节把手11,在使用后,转动块13在收布转槽14中转动能够控制立起支柱4旋转,使得挡土胶布5收卷在一个立起支柱4上,这样能够极大地缩小该支护装置的占用空间,从而方便支护装置在沟槽中转移和后续转场运输。As further shown in Fig. 1, Fig. 2 and Fig. 4, it is worth explaining in detail that a rotating support 8 is fixed at the front edge of the upper surface of the
进一步地如图3所示,值得具体说明的是,抵紧螺杆10与旋进螺座9螺纹连接,抵紧螺杆10的一端抵合在导向支臂7的前部。As further shown in FIG. 3 , it is worth mentioning that the
进一步地如图1所示,值得具体说明的是,加固压板6位于挡土胶布5的后侧对称设置有两组,加固压板6的后表面贴合挡土胶布5的前表面。As further shown in FIG. 1 , it is worth mentioning that two sets of reinforcing
综上:加固压板6从前侧压紧挡土胶布5使其贴紧沟槽壁,这样挡土胶布5能够对沟槽壁进行泥土防坍塌处理,而采用的挡土胶布5较传统挡土板有质量轻、方便人员独立拆装和便于转移的优点;在使用后,转动块13在收布转槽14中转动能够控制立起支柱4旋转,使得挡土胶布5收卷在一个立起支柱4上,这样能够极大地缩小该支护装置的占用空间,从而方便支护装置在沟槽中转移和后续转场运输。To sum up: the reinforced
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320795843.XU CN219219047U (en) | 2023-04-10 | 2023-04-10 | A trench excavation support device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320795843.XU CN219219047U (en) | 2023-04-10 | 2023-04-10 | A trench excavation support device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219219047U true CN219219047U (en) | 2023-06-20 |
Family
ID=86759708
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320795843.XU Active CN219219047U (en) | 2023-04-10 | 2023-04-10 | A trench excavation support device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219219047U (en) |
-
2023
- 2023-04-10 CN CN202320795843.XU patent/CN219219047U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209293048U (en) | Slope Support Structure for Slope Ecological Management | |
| CN210288412U (en) | Building foundation pit supporting structure | |
| CN207727589U (en) | Internal support of foundation pit device | |
| CN219825278U (en) | Supporting device for deep foundation pit of building | |
| CN218786844U (en) | Movable groove supporting device | |
| CN219219047U (en) | A trench excavation support device | |
| CN212477760U (en) | Pipeline groove supporting construction | |
| CN208251113U (en) | A kind of anti-collapse device of building foundation pit | |
| CN217601456U (en) | Deep foundation pit supporting beam frame structure for geotechnical engineering | |
| CN113482008B (en) | Foundation pit inner supporting device for transformer substation construction | |
| CN217480285U (en) | Construction equipment is seted up to building escape canal | |
| CN214401812U (en) | Steel sheet pile supporting construction | |
| CN216475053U (en) | Box culvert deep foundation pit supporting structure | |
| CN216428289U (en) | Pipeline supporting structure for urban water supply and drainage | |
| CN220080035U (en) | House building supporting structure | |
| CN108468860B (en) | A detachable multi-angle steel jacking pipe correcting device | |
| CN222797231U (en) | A kind of guardrail for municipal engineering | |
| CN222025056U (en) | Foundation pit support convenient to installation | |
| CN219118260U (en) | Drainage pipeline excavation and discharge device for transformation of old community | |
| CN222632266U (en) | U-shaped groove foundation pit supporting and reinforcing structure | |
| CN213858970U (en) | Novel pipeline positioner | |
| CN219343239U (en) | Pipe network groove protection support | |
| CN221255746U (en) | Civil engineering pre-buried component | |
| CN220789773U (en) | Earth and stone square support device | |
| CN223202446U (en) | Support device for cast-in-place formwork of strip drainage ditch |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250612 Address after: 434000 Hubei Province, Jingzhou City, Honghu City, Chaohe Town, Zhonghua Road 16 (self-declared) Patentee after: Hubei Dongbiao Construction Engineering Co.,Ltd. Country or region after: China Address before: 430000 room 2, floor 1, unit 1, building 6, Meiyuan phase II, Zhongnan road street, Wuchang District, Wuhan City, Hubei Province Patentee before: Hubei Tianyue Engineering Management Co.,Ltd. Country or region before: China |
|