CN219217384U - An indoor high-clearance steel beam installation device - Google Patents

An indoor high-clearance steel beam installation device Download PDF

Info

Publication number
CN219217384U
CN219217384U CN202320108001.2U CN202320108001U CN219217384U CN 219217384 U CN219217384 U CN 219217384U CN 202320108001 U CN202320108001 U CN 202320108001U CN 219217384 U CN219217384 U CN 219217384U
Authority
CN
China
Prior art keywords
vertical
horizontal
iron plate
steel beam
embedded iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320108001.2U
Other languages
Chinese (zh)
Inventor
杨宏正
陶志红
奚邦凤
王帅
王波
冯友雄
吴克洋
冯文康
江炼文
罗丰
谢帆
张新亮
杜光谦
杨天东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Construction Engineering Co Ltd
Original Assignee
Wuhan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Construction Engineering Co Ltd filed Critical Wuhan Construction Engineering Co Ltd
Priority to CN202320108001.2U priority Critical patent/CN219217384U/en
Application granted granted Critical
Publication of CN219217384U publication Critical patent/CN219217384U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种室内高净空钢梁安装装置,包括预埋在混凝土牛腿的水平面上的水平预埋铁板、预埋在所述混凝土牛腿所在的墙面上的竖直预埋铁板,所述竖直预埋铁板的底部位于水平预埋铁板的平面上;所述竖直预埋铁板上焊接有竖直连接件,所述竖直连接件的顶部固定连接有位于水平预埋铁板上方的水平连接件,所述竖直连接件的底部紧贴水平预埋铁板并与其焊接连接;所述水平连接件在水平方向上超出混凝土牛腿的端部安装有竖向受力电动葫芦,用于向上提拉将待吊装的钢梁;所述竖直连接件上安装有水平受力电动葫芦。本实用新型的室内高净空钢梁安装装置可较好的控制超高钢梁安装施工的操作难度,保证施工便利,可操作性强,能够控制施工成本。

Figure 202320108001

The utility model discloses an installation device for an indoor high clearance steel beam, which comprises a horizontal pre-embedded iron plate pre-buried on the horizontal surface of the concrete corbel and a vertical pre-buried iron plate pre-buried on the wall where the concrete corbel is located. Iron plate, the bottom of the vertical embedded iron plate is located on the plane of the horizontal embedded iron plate; a vertical connector is welded on the vertical embedded iron plate, and the top of the vertical connector is fixedly connected with The horizontal connecting piece located above the horizontal embedded iron plate, the bottom of the vertical connecting piece is close to the horizontal embedded iron plate and welded to it; the end of the horizontal connecting piece beyond the concrete corbel in the horizontal direction is installed with The vertical force electric hoist is used to lift up the steel beam to be hoisted; the horizontal force electric hoist is installed on the vertical connector. The installation device of the indoor high-clearance steel beam of the utility model can better control the operation difficulty of installation and construction of the ultra-high steel beam, ensure convenient construction, strong operability, and control the construction cost.

Figure 202320108001

Description

一种室内高净空钢梁安装装置An indoor high-clearance steel beam installation device

技术领域technical field

本实用新型涉及建筑工程施工的技术领域,尤其涉及一种室内高净空钢梁安装装置。The utility model relates to the technical field of building engineering construction, in particular to an installation device for indoor high clearance steel beams.

背景技术Background technique

随着社会技术的进步,由于建筑能力的提升和城市规划的需要,越来越多的超高层建筑逐渐出现在人们眼帘;在超高层钢结构施工过程中,安装钢梁是最重要的步骤之一,由于钢梁的体积和重量较大,往往采用吊装的方式进行施工。With the advancement of social technology, due to the improvement of construction capabilities and the needs of urban planning, more and more super high-rise buildings gradually appear in people's eyes; in the construction process of super high-rise steel structures, the installation of steel beams is one of the most important steps First, due to the large volume and weight of steel beams, construction is often carried out by hoisting.

目前的吊装机具设备一般采用塔吊及吊车,虽能够满足一定的施工需求,但是在室内封闭空间等苛刻环境时根本无法施工或装配对位较为困难,需要不断调整位置后方能准确安装,施工技术难度大,对操作人员有较高的要求。The current hoisting equipment generally adopts tower cranes and cranes. Although it can meet certain construction requirements, it cannot be constructed at all in harsh environments such as indoor closed spaces, or assembly alignment is difficult. It needs to be adjusted continuously before it can be installed accurately, and the construction technology is difficult. It is large and has high requirements for operators.

实用新型内容Utility model content

为了克服现有技术的不足,本实用新型所要解决的技术问题在于提供一种室内高净空钢梁安装装置,可较好的控制超高钢梁安装施工的操作难度,保证施工便利,可操作性强,能够控制施工成本。In order to overcome the deficiencies of the existing technology, the technical problem to be solved by the utility model is to provide an indoor high-clearance steel beam installation device, which can better control the operation difficulty of super-high steel beam installation and construction, and ensure convenient construction and operability. Strong, able to control construction costs.

为实现上述目的,本实用新型提供了一种室内高净空钢梁安装装置,包括预埋在混凝土牛腿的水平面上的水平预埋铁板、预埋在所述混凝土牛腿所在的墙面上的竖直预埋铁板,所述竖直预埋铁板的底部位于所述水平预埋铁板的平面上;所述竖直预埋铁板上焊接有竖直连接件,所述竖直连接件的顶部固定连接有位于水平预埋铁板上方的水平连接件,所述竖直连接件的底部紧贴所述水平预埋铁板并与其焊接连接;所述水平连接件在水平方向上超出混凝土牛腿的端部安装有竖向受力电动葫芦,用于向上提拉将待吊装的钢梁;所述竖直连接件上安装有水平受力电动葫芦,用于当待吊装的钢梁被所述竖向受力电动葫芦拉至混凝土牛腿的水平面时,对待吊装的钢梁施加向竖直预埋铁板的方向的拉力,通过所述竖向受力电动葫芦与水平受力电动葫芦同时互相牵拉,将待吊装的钢梁安装在所述混凝土牛腿上;所述混凝土牛腿所在的墙面的外侧于所述混凝土牛腿的周围搭设有上人操作脚手架,用于辅助待吊装的钢梁的吊装。In order to achieve the above purpose, the utility model provides an installation device for indoor high-clearance steel beams, which includes a horizontal pre-embedded iron plate pre-buried on the horizontal surface of the concrete corbel, and a pre-buried on the wall where the concrete corbel is located. The vertical pre-embedded iron plate, the bottom of the vertical pre-embedded iron plate is located on the plane of the horizontal pre-embedded iron plate; the vertical pre-embedded iron plate is welded with vertical connectors, and the vertical The top of the connecting piece is fixedly connected with a horizontal connecting piece above the horizontal embedded iron plate, and the bottom of the vertical connecting piece is close to the horizontal embedded iron plate and welded to it; the horizontal connecting piece is in the horizontal direction A vertical stressed electric hoist is installed at the end beyond the concrete corbel for pulling up the steel beam to be hoisted; a horizontal stressed electric hoist is installed on the vertical connector for lifting the steel beam to be hoisted. When the beam is pulled to the level of the concrete corbel by the vertically stressed electric hoist, the steel beam to be hoisted applies a pulling force in the direction of the vertical pre-embedded iron plate, and the vertically stressed electric hoist and the horizontally stressed The electric hoist pulls each other at the same time, and the steel beam to be hoisted is installed on the concrete corbel; the outer side of the wall where the concrete corbel is located is set up with a master-operated scaffold around the concrete corbel for Aids in the hoisting of steel beams to be hoisted.

优选的,所述竖直连接件和水平连接件的连接阴角处的双面焊接有加腋钢板。Preferably, the double-sided welding of the inner corner of the vertical connector and the horizontal connector is welded with a haunched steel plate.

进一步的,所述竖直预埋铁板的顶部焊接固定有竖向搭接板,螺栓穿入所述竖向搭接板与水平连接件靠近所述竖直预埋铁板的一端上的预留孔,所述螺栓的另一端采用与之配套的螺母拧紧,将所述水平连接件与竖向搭接板固定连接。Further, the top of the vertical pre-embedded iron plate is welded and fixed with a vertical lap plate, and the bolt penetrates the pre-installed joint between the vertical lap plate and the horizontal connector close to the end of the vertical pre-embedded iron plate. Holes are reserved, and the other end of the bolt is tightened with a matching nut, and the horizontal connecting piece is fixedly connected with the vertical lap plate.

优选的,所述竖直连接件和水平连接件均为工字钢。Preferably, both the vertical connectors and the horizontal connectors are I-beams.

进一步的,所述待吊装的钢梁的翼缘板及腹板的中部焊接有吊耳,所述竖向受力电动葫芦和水平受力电动葫芦的挂钩挂住所述吊耳。Further, the middle part of the flange plate and the web of the steel beam to be hoisted is welded with lifting lugs, and the hooks of the vertical force electric hoist and the horizontal force electric hoist hang on the lifting lugs.

进一步的,所述上人操作脚手架包括竖向钢管和水平钢管,所述竖向钢管的底部设有木制垫块,所述水平钢管通过连墙件与剪力墙连接。Further, the scaffolding for the master operation includes a vertical steel pipe and a horizontal steel pipe, the bottom of the vertical steel pipe is provided with a wooden spacer, and the horizontal steel pipe is connected to the shear wall through a wall connecting piece.

优选的,所述连墙件包括打入剪力墙内的膨胀锚栓,所述膨胀锚栓外裸露的一段穿入中部设置有孔洞的铁板,通过拧紧与膨胀锚栓相配合的螺母将所述铁板与膨胀锚栓固定连接;所述水平钢管与所述铁板焊接固定。Preferably, the wall connecting piece includes an expansion anchor bolt driven into the shear wall, and a section of the expansion anchor bolt exposed outside penetrates an iron plate with a hole in the middle, and the expansion anchor bolt is tightened by tightening the nut matched with the expansion anchor bolt. The iron plate is fixedly connected to the expansion anchor bolt; the horizontal steel pipe is welded and fixed to the iron plate.

与现有技术相比,本实用新型的室内高净空钢梁安装装置的有益效果如下:Compared with the prior art, the beneficial effects of the installation device for indoor high clearance steel beams of the utility model are as follows:

本实用新型通过与混凝土牛腿整体浇筑的预埋铁板作为受力面,并在竖向预埋铁板上焊接竖直连接件,采用螺栓连接附加加腋钢板焊接固定水平连接件,由此在混凝土牛腿上安装好吊装支架;在水平连接件的自由端的端部及竖直连接件的中部分别安装竖向受力电动葫芦和水平受力电动葫芦,通过竖向受力电动葫芦与水平受力电动葫芦同时互相牵拉,将待吊装的钢梁安装在混凝土牛腿上,本实用新型的装置能够在室内封闭空间等苛刻环境下对钢梁进行吊装施工,施工简单,可较好的控制超高钢梁安装施工的操作难度,保证施工便利,可操作性强,进而也较好的控制施工成本。The utility model uses the pre-embedded iron plate integrally poured with the concrete corbel as the force-bearing surface, and welds the vertical connectors on the vertical pre-embedded iron plate, and uses bolts to connect the additional armpit steel plates to weld and fix the horizontal connectors. Install the hoisting bracket on the concrete corbel; install a vertical force electric hoist and a horizontal force electric hoist at the end of the free end of the horizontal connector and the middle of the vertical connector respectively, through the vertical force electric hoist and the horizontal The stressed electric hoist pulls each other at the same time, and the steel beam to be hoisted is installed on the concrete corbel. The device of the utility model can hoist the steel beam in harsh environments such as indoor closed spaces. The construction is simple and can be better. Control the difficulty of installation and construction of ultra-high steel beams, ensure convenient construction, strong operability, and better control construction costs.

附图说明Description of drawings

为了更清楚地说明本实用新型的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它附图。In order to illustrate the technical solution of the utility model more clearly, the accompanying drawings that need to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some of the utility models. Embodiments, for those skilled in the art, other drawings can also be obtained according to these drawings without creative work.

图1为本实用新型的室内高净空钢梁安装装置的结构示意图;Fig. 1 is the structural representation of the indoor high clearance steel beam installation device of the present utility model;

图2为本实用新型的室内高净空钢梁安装装置的上部剖面示意图;Fig. 2 is the upper section schematic diagram of the indoor high clearance steel beam installation device of the present utility model;

图3为本实用新型的室内高净空钢梁安装装置的下部侧面示意图;Fig. 3 is the lower side schematic diagram of the indoor high clearance steel beam installation device of the present invention;

图4为本实用新型的螺栓、螺母与竖向搭接板的紧固示意图;Fig. 4 is the fastening sketch map of bolt, nut and vertical lap plate of the utility model;

图5为本实用新型的水平连接件和竖直连接件的连接示意图。Fig. 5 is a connection diagram of the horizontal connector and the vertical connector of the present invention.

其中,1-水平连接件、2-竖直连接件、3-竖向受力电动葫芦、4-水平受力电动葫芦、5-待吊装的钢梁、6-竖直预埋铁板、7-铁板、8-膨胀锚栓、9-加腋钢板、10-上人操作脚手架、11-混凝土牛腿、12-竖向搭接板、13-螺栓、14-螺母。Among them, 1-horizontal connector, 2-vertical connector, 3-vertical force electric hoist, 4-horizontal force electric hoist, 5-steel beam to be hoisted, 6-vertical embedded iron plate, 7 -iron plate, 8-expansion anchor bolt, 9-armpit steel plate, 10-man-operated scaffold, 11-concrete corbel, 12-vertical lap plate, 13-bolt, 14-nut.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

下面参见图1~图5对本实用新型的室内高净空钢梁安装装置进行详细说明。Referring to Fig. 1 to Fig. 5, the indoor high-clearance steel beam installation device of the present utility model will be described in detail below.

本实用新型的室内高净空钢梁安装装置包括预埋在混凝土牛腿11的水平面上的水平预埋铁板、预埋在混凝土牛腿11所在的墙面上的竖直预埋铁板6,竖直预埋铁板6的底部位于水平预埋铁板的平面上。The installation device for indoor high clearance steel beams of the present utility model includes a horizontal pre-embedded iron plate pre-buried on the horizontal surface of the concrete corbel 11, a vertical pre-embedded iron plate 6 pre-buried on the wall where the concrete corbel 11 is located, The bottom of the vertical embedded iron plate 6 is positioned on the plane of the horizontal embedded iron plate.

竖直预埋铁板6上焊接有竖直连接件2,竖直连接件2的顶部固定连接有位于水平预埋铁板上方的水平连接件1,竖直连接件2的底部紧贴水平预埋铁板并与其焊接连接。The vertical connector 2 is welded on the vertical pre-embedded iron plate 6, the top of the vertical connector 2 is fixedly connected with the horizontal connector 1 above the horizontal pre-embedded iron plate, and the bottom of the vertical connector 2 is close to the horizontal pre-embedded iron plate. Buried iron plate and welded to it.

水平连接件1在水平方向上超出混凝土牛腿11的端部安装有竖向受力电动葫芦3,用于向上提拉将待吊装的钢梁5。竖直连接件2上安装有水平受力电动葫芦4,用于当待吊装的钢梁5被竖向受力电动葫芦3拉至混凝土牛腿11的水平面时,对待吊装的钢梁5施加向竖直预埋铁板6的方向的拉力,通过竖向受力电动葫芦3与水平受力电动葫芦4同时互相牵拉,将待吊装的钢梁5安装在混凝土牛腿11上。The end of the horizontal connector 1 that exceeds the concrete corbel 11 in the horizontal direction is equipped with a vertically stressed electric hoist 3 for pulling up the steel beam 5 to be hoisted. A horizontal stressed electric hoist 4 is installed on the vertical connector 2, which is used to apply a force to the steel beam 5 to be hoisted when it is pulled to the level of the concrete corbel 11 by the vertical stressed electric hoist 3. The tension in the direction of the vertical pre-embedded iron plate 6 is pulled by the vertical force electric hoist 3 and the horizontal force electric hoist 4 simultaneously, and the steel beam 5 to be hoisted is installed on the concrete corbel 11.

其中,本实用新型的竖直连接件2和水平连接件1均为16#工字钢,竖直连接件2采用竖向16#工字钢,水平连接件1采用水平向16#工字钢。Among them, the vertical connector 2 and the horizontal connector 1 of the present utility model are both 16# I-beam, the vertical connector 2 adopts the vertical 16# I-beam, and the horizontal connector 1 adopts the horizontal 16# I-beam .

20mm厚的水平预埋铁板及20mm厚的竖向预埋铁板6提前预埋进混凝土,与混凝土接触面均有钢锚钉,与混凝土牛腿11整体浇筑,混凝土与预埋铁板之间握裹连接。水平预埋铁板的作用是在待吊装的钢梁5调整好位置坐落完成后,将水平预埋铁板与钢梁的下翼缘板焊接,固定住待吊装的钢梁5。竖向预埋铁板6的作用是将其与竖向16#工字钢焊接,给予竖向16#工字钢抗拉受力固定面。The 20mm thick horizontal pre-embedded iron plate and the 20mm thick vertical pre-embedded iron plate 6 are pre-embedded into the concrete, and the contact surface with the concrete has steel anchors, which are integrally poured with the concrete corbel 11. Hold the connection between. The function of the horizontal pre-embedded iron plate is to weld the horizontal pre-embedded iron plate to the lower flange plate of the steel girder to fix the steel girder 5 to be hoisted after the steel beam 5 to be hoisted has been adjusted and positioned. The effect of the vertical pre-embedded iron plate 6 is to weld it with the vertical 16# I-beam to provide a fixed surface for the vertical 16# I-beam to resist tension.

混凝土牛腿11所在的墙面的外侧设于混凝土牛腿11的周围搭设有上人操作脚手架10,用于辅助待吊装的钢梁5的吊装。The outside of the wall where the concrete corbel 11 is located is provided with a scaffolding 10 operated by a master around the concrete corbel 11 for assisting the hoisting of the steel beam 5 to be hoisted.

竖向受力电动葫芦3和水平受力电动葫芦4与待吊装的钢梁5的连接采用吊耳连接的方式,将吊耳与待吊装的钢梁5的翼缘板及腹板的中部临时焊接,电动葫芦的挂钩再穿入吊耳中挂住,竖向受力电动葫芦3将待吊装的钢梁5拉至预定的高度,收紧水平受力电动葫芦4可调节待吊装的钢梁5的水平位置,待钢梁达到设计要求位置时,即可切除临时焊接的吊耳。The connection between the vertical force electric hoist 3 and the horizontal force electric hoist 4 and the steel beam 5 to be hoisted is connected by lifting lugs. Welding, the hook of the electric hoist is then inserted into the lifting lug to hang, the vertical force electric hoist 3 pulls the steel beam 5 to be hoisted to a predetermined height, and the horizontal force electric hoist 4 can adjust the steel beam to be hoisted 5, when the steel beam reaches the position required by the design, the temporarily welded lugs can be removed.

上人操作脚手架10主要由竖向钢管和φ50*2.5mm的水平钢管组成,搭设间距一步按照1500mm搭设,一跨按照1500mm搭设,竖向钢管的底部均有木制垫块。为防止上人操作脚手架10倾覆,须设置连墙件,连墙件将上人操作脚手架10与剪力墙稳固连接后,可大大加强上人操作脚手架10稳定性,达到防止上人操作脚手架10倾覆的安全施工需求。连墙件按照两步三跨设置,外部满设剪刀撑。连墙件与剪力墙的连接点采用M16的膨胀锚栓8与60*60*20mm的铁板7连接设置,即M16的膨胀锚栓8打入剪力墙,再将事先留好洞眼的60*60*20mm的铁板7穿入M16的膨胀锚栓8,最后将φ50*2.5mm的水平钢管与60*60*20mm的铁板7焊接固定。The scaffolding 10 operated by the master is mainly composed of vertical steel pipes and horizontal steel pipes of φ50*2.5mm. The erection distance is set up according to 1500mm for one step and 1500mm for one span. The bottom of the vertical steel pipes has wooden pads. In order to prevent the master-operated scaffold 10 from overturning, it is necessary to set up connecting wall parts. After the wall-connecting parts firmly connect the master-operated scaffold 10 and the shear wall, the stability of the master-operated scaffold 10 can be greatly enhanced to prevent the master-operated scaffold 10 Overturning safety construction requirements. The wall parts are arranged in two steps and three spans, and the exterior is fully equipped with scissors. The connection point between the wall parts and the shear wall is set by connecting the M16 expansion anchor bolt 8 and the 60*60*20mm iron plate 7, that is, the M16 expansion anchor bolt 8 is driven into the shear wall, and then the hole is left in advance. The 60*60*20mm iron plate 7 is penetrated into the M16 expansion anchor bolt 8, and finally the φ50*2.5mm horizontal steel pipe and the 60*60*20mm iron plate 7 are welded and fixed.

在吊装待吊装的钢梁5的过程中,为避免连墙件影响钢梁的吊装,又要保证操作架体的稳定性,钢梁安装从一侧向另一侧依次进行,在最先要进行钢梁吊装的竖向空间范围内先不设置连墙件,旁边未安装钢梁区域正常布置连墙件,待钢梁吊装完成后迅速补上,相邻吊装区域在吊装前临时拆除影响吊装施工的连墙件,在附近区域做补强措施,即随拆随补,吊装完钢梁迅速补上连墙件。In the process of hoisting the steel beam 5 to be hoisted, in order to avoid the influence of the wall parts on the hoisting of the steel beam and to ensure the stability of the operating frame, the installation of the steel beam is carried out sequentially from one side to the other. In the vertical space where steel beams are hoisted, no wall fittings are installed, and wall fittings are normally arranged in the area where steel beams are not installed next to them. After the steel beams are hoisted, they are quickly added. The adjacent hoisting areas are temporarily removed before hoisting, which will affect the hoisting For the connecting wall parts under construction, reinforcement measures shall be taken in the nearby area, that is, repairs shall be made as they are dismantled, and the wall connecting parts shall be quickly repaired after the steel beams are hoisted.

下面,参照图1和图5并结合上述结构特征的描述,对本实用新型的室内高净空钢梁安装装置的使用方法进行简单描述:Below, with reference to Figure 1 and Figure 5 and in combination with the description of the above-mentioned structural features, the method of using the indoor high-clearance steel beam installation device of the present invention is briefly described:

(1)搭设上人操作脚手架10时,在竖向钢管的底部设置木质垫块,两步三跨设置连墙件,连墙件与剪力墙固定牢靠,在连墙件设置点的外剪力墙布置M16的膨胀锚栓8,M16的膨胀锚栓8外裸露的一段穿入中部设置有孔洞的60*60*20mm的铁板7,再将与M16的膨胀锚栓8相配合的螺母拧紧,固定好60*60*20mm的铁板7。将φ50*2.5mm的水平钢管与固定好的60*60*20mm的铁板7焊接固定。连墙件的设置要注意避开安装钢梁的吊装施工,可随拆随补,在拆除的连墙件周边区域加密设置连墙件的补强措施。(1) When setting up the scaffolding 10 operated by the master, set up wooden pads at the bottom of the vertical steel pipe, set up the connecting wall parts in two steps and three spans, and fix the connecting wall parts and the shear wall firmly. M16 expansion anchor bolt 8 is arranged on the force wall, and the exposed section of the M16 expansion anchor bolt 8 penetrates the 60*60*20mm iron plate 7 with a hole in the middle, and then the nut that matches the M16 expansion anchor bolt 8 Tighten and fix the iron plate 7 of 60*60*20mm. The horizontal steel pipe of φ50*2.5mm is welded and fixed with the fixed iron plate 7 of 60*60*20mm. The setting of the connecting wall parts should pay attention to avoid the hoisting construction of installing steel beams, and it can be repaired as it is removed, and the reinforcement measures of the connecting wall parts should be densely set in the surrounding area of the removed wall connecting parts.

(2)竖向16#工字钢垂直设置于牛腿竖向中轴线投影剪力墙位置处,且竖向16#工字钢的底部紧贴水平预埋铁板并与其焊接,竖向16#工字钢的翼缘板紧贴竖向预埋铁板6,竖向16#工字钢的翼缘板与竖向预埋铁板6沿接触面一圈满焊焊接牢靠。竖向16#工字钢和水平向16#工字钢之间采用螺栓连接附加加腋钢板9焊接,在竖向焊接好的竖向16#工字钢的翼缘板顶部焊接固定竖向搭接板12,竖向搭接板12的高度与水平向16#工字钢的腹板高度一致,中间用螺栓13穿入竖向搭接板12与水平向16#工字钢的腹板上的预留孔,螺栓13的另一端用与之配套的螺母14拧紧,这样就能将水平向16#工字钢与竖向搭接板12固定连接。另外,水平向16#工字钢与竖向的16#工字钢的阴角处设置20mm的加腋钢板9,加腋钢板9与两个16#工字钢采用双面焊接的方式连接。竖向受力电动葫芦3安装在水平向16#工字钢的端部,水平受力电动葫芦4安装在竖向16#工字钢的适当高度(高度恰好在安装后的钢梁的高度中部)。这样即完成了混凝土牛腿11上的简易吊装支架安装。(2) The vertical 16# I-beam is vertically set at the position of the projection shear wall of the vertical central axis of the corbel, and the bottom of the vertical 16# I-beam is close to the horizontal pre-embedded iron plate and welded to it, and the vertical 16# The flange plate of #I-beam is close to the vertical pre-embedded iron plate 6, and the flange plate of vertical 16# I-beam and the vertical pre-embedded iron plate 6 are fully welded and welded firmly along the contact surface. The vertical 16# I-beam and the horizontal 16# I-beam are connected by bolts and an additional armpit steel plate 9 is welded, and the vertical lap is welded and fixed on the top of the flange plate of the vertically welded vertical 16# I-beam The connecting plate 12, the height of the vertical lapping plate 12 is consistent with the web plate height of the horizontal 16# I-beam, and the bolt 13 is penetrated into the web plate of the vertical lapping plate 12 and the horizontal 16# I-beam in the middle The reserved hole, the other end of bolt 13 is tightened with the nut 14 that matches with it, so just can be fixedly connected horizontally to 16# I-beam and vertical lap plate 12. In addition, a 20mm haunched steel plate 9 is set at the inner corner of the horizontal 16# I-beam and the vertical 16# I-beam, and the haunched steel plate 9 is connected to two 16# I-beams by double-sided welding. The vertical force electric hoist 3 is installed at the end of the horizontal 16# I-beam, and the horizontal force electric hoist 4 is installed at the appropriate height of the vertical 16# I-beam (the height is just in the middle of the height of the installed steel beam ). The installation of the simple and easy hoisting bracket on the concrete corbel 11 has been completed like this.

(3)通过竖向受力电动葫芦3向上提拉将待吊装的钢梁5提升至设计安装高度,将水平受力电动葫芦4勾住钢梁的腹板中部缓慢向内侧挪拉,通过竖向受力电动葫芦3与水平受力电动葫芦4同时互相牵拉受力平衡,将待吊装的钢梁5平稳坐落在设计安装位置。(3) Lift the steel beam 5 to be hoisted to the design installation height by pulling upwards on the vertically stressed electric hoist 3, hook the horizontally stressed electric hoist 4 to the middle of the web of the steel beam and slowly move it inward, The electric hoist 3 with axial force and the electric hoist 4 with horizontal force pull each other to balance the force at the same time, so that the steel beam 5 to be hoisted is stably located at the designed installation position.

以上所述,仅为本实用新型中的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉该技术的人在本实用新型所揭露的技术范围内,可理解得到的变换或者替换,都应该涵盖在本实用新型的包含范围之内。The above is only a specific embodiment of the utility model, but the scope of protection of the utility model is not limited thereto, any person familiar with the technology can understand the conversion obtained within the technical scope disclosed in the utility model Or replacement, all should be covered within the scope of the present utility model.

Claims (7)

1.一种室内高净空钢梁安装装置,其特征在于,包括预埋在混凝土牛腿的水平面上的水平预埋铁板、预埋在所述混凝土牛腿所在的墙面上的竖直预埋铁板,所述竖直预埋铁板的底部位于所述水平预埋铁板的平面上;1. An indoor high clearance steel beam installation device is characterized in that it comprises a horizontal pre-embedded iron plate pre-embedded on the horizontal plane of the concrete corbel, a vertical pre-embedded iron plate pre-embedded on the wall where the concrete corbel is located Buried iron plate, the bottom of the vertical embedded iron plate is located on the plane of the horizontal embedded iron plate; 所述竖直预埋铁板上焊接有竖直连接件,所述竖直连接件的顶部固定连接有位于所述水平预埋铁板上方的水平连接件,所述竖直连接件的底部紧贴所述水平预埋铁板并与其焊接连接;The vertical embedded iron plate is welded with a vertical connector, the top of the vertical connector is fixedly connected with a horizontal connector located above the horizontal embedded iron plate, and the bottom of the vertical connector is tightly connected. Paste the horizontal pre-embedded iron plate and weld it; 所述水平连接件在水平方向上超出混凝土牛腿的端部安装有竖向受力电动葫芦,用于向上提拉将待吊装的钢梁;A vertically stressed electric hoist is installed on the end of the horizontal connector beyond the concrete corbel in the horizontal direction, which is used to lift up the steel beam to be hoisted; 所述竖直连接件上安装有水平受力电动葫芦,用于当待吊装的钢梁被所述竖向受力电动葫芦拉至混凝土牛腿的水平面时,对待吊装的钢梁施加向竖直预埋铁板的方向的拉力,通过所述竖向受力电动葫芦与水平受力电动葫芦同时互相牵拉,将待吊装的钢梁安装在所述混凝土牛腿上;A horizontal stressed electric hoist is installed on the vertical connector, which is used to apply a vertical force to the steel beam to be hoisted when the steel beam to be hoisted is pulled to the level of the concrete corbel by the vertical stressed electric hoist. The tension in the direction of the pre-embedded iron plate is pulled by the vertical force electric hoist and the horizontal force electric hoist at the same time, and the steel beam to be hoisted is installed on the concrete corbel; 所述混凝土牛腿所在的墙面的外侧于所述混凝土牛腿的周围搭设有上人操作脚手架,用于辅助待吊装的钢梁的吊装。On the outside of the wall where the concrete corbel is located, a master-operated scaffold is set up around the concrete corbel for assisting the hoisting of the steel beam to be hoisted. 2.根据权利要求1所述的室内高净空钢梁安装装置,其特征在于,所述竖直连接件和水平连接件的连接阴角处的双面焊接有加腋钢板。2. The indoor high-clearance steel beam installation device according to claim 1, characterized in that, the double-sided welding of the inner corners of the vertical connector and the horizontal connector is welded with a haunched steel plate. 3.根据权利要求1或2所述的室内高净空钢梁安装装置,其特征在于,所述竖直预埋铁板的顶部焊接固定有竖向搭接板,螺栓穿入所述竖向搭接板与水平连接件靠近所述竖直预埋铁板的一端上的预留孔,所述螺栓的另一端采用与之配套的螺母拧紧,将所述水平连接件与竖向搭接板固定连接。3. The indoor high-clearance steel beam installation device according to claim 1 or 2, characterized in that, the top of the vertical pre-embedded iron plate is welded and fixed with a vertical lap plate, and bolts penetrate into the vertical lap The connecting plate and the horizontal connecting piece are close to the reserved hole on one end of the vertical pre-embedded iron plate, and the other end of the bolt is tightened with the matching nut to fix the horizontal connecting piece and the vertical lapping plate connect. 4.根据权利要求3所述的室内高净空钢梁安装装置,其特征在于,所述竖直连接件和水平连接件均为工字钢。4. The installation device for indoor high-clearance steel beams according to claim 3, characterized in that, both the vertical connectors and the horizontal connectors are I-beams. 5.根据权利要求1所述的室内高净空钢梁安装装置,其特征在于,所述待吊装的钢梁的翼缘板及腹板的中部焊接有吊耳,所述竖向受力电动葫芦和水平受力电动葫芦的挂钩挂住所述吊耳。5. The indoor high-clearance steel beam installation device according to claim 1, characterized in that, the middle part of the flange plate and web plate of the steel beam to be hoisted is welded with lifting lugs, and the vertically stressed electric hoist and the hook of the electric hoist with horizontal force to hang the lifting lug. 6.根据权利要求1所述的室内高净空钢梁安装装置,其特征在于,所述上人操作脚手架包括竖向钢管和水平钢管,所述竖向钢管的底部设有木制垫块,所述水平钢管通过连墙件与剪力墙连接。6. The indoor high-clearance steel beam installation device according to claim 1, wherein the scaffolding operated by the master comprises a vertical steel pipe and a horizontal steel pipe, and the bottom of the vertical steel pipe is provided with a wooden spacer, so that The horizontal steel pipes are connected to the shear walls through connecting wall pieces. 7.根据权利要求6所述的室内高净空钢梁安装装置,其特征在于,所述连墙件包括打入剪力墙内的膨胀锚栓,所述膨胀锚栓外裸露的一段穿入中部设置有孔洞的铁板,通过拧紧与膨胀锚栓相配合的螺母将所述铁板与膨胀锚栓固定连接;所述水平钢管与所述铁板焊接固定。7. The installation device for indoor high-clearance steel beams according to claim 6, characterized in that, the wall-connecting piece includes an expansion anchor bolt driven into the shear wall, and the exposed section of the expansion anchor bolt penetrates into the middle An iron plate with a hole is fixedly connected to the expansion anchor bolt by tightening a nut matched with the expansion anchor bolt; the horizontal steel pipe is welded and fixed to the iron plate.
CN202320108001.2U 2023-02-03 2023-02-03 An indoor high-clearance steel beam installation device Active CN219217384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320108001.2U CN219217384U (en) 2023-02-03 2023-02-03 An indoor high-clearance steel beam installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320108001.2U CN219217384U (en) 2023-02-03 2023-02-03 An indoor high-clearance steel beam installation device

Publications (1)

Publication Number Publication Date
CN219217384U true CN219217384U (en) 2023-06-20

Family

ID=86759718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320108001.2U Active CN219217384U (en) 2023-02-03 2023-02-03 An indoor high-clearance steel beam installation device

Country Status (1)

Country Link
CN (1) CN219217384U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118128296A (en) * 2024-04-19 2024-06-04 中国十九冶集团有限公司 A cantilevered structure template support structure and construction method for high-altitude gable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118128296A (en) * 2024-04-19 2024-06-04 中国十九冶集团有限公司 A cantilevered structure template support structure and construction method for high-altitude gable

Similar Documents

Publication Publication Date Title
CN105298100B (en) A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform
CN112049235B (en) High-altitude large-span cantilever structure construction platform and method
CN111472530A (en) A flower basket tie rod I-beam cantilever bearing frame for construction engineering and its installation method
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN210798252U (en) Assembled outer protection frame system
CN215803243U (en) High altitude fire control vestibule construction support tripod of encorbelmenting and mounting structure
CN104989092B (en) A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN112960566B (en) Construction method of built-in tower crane of super high-rise building
CN115584863A (en) An attached unloading platform device
CN213806581U (en) Super high-rise high-altitude large-span cantilever concrete structure formwork support system
CN212224677U (en) Temporary fixing adjusting system for drop position of section steel beam
CN218990875U (en) Assembled triangular truss cantilever support frame system
CN219824920U (en) Temporary support structure for flange plates of reinforced concrete superposed beams
CN115182482B (en) Construction method of prefabricated hollow wall body without outer frame matching
CN116122426B (en) A modular elevator installation and connection system for existing buildings
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN218204403U (en) An arch dam surface hole arch door supporting girder support structure
CN117927017A (en) Construction technology of section steel combined triangular support formwork and outer protection scaffold
CN115897976A (en) An assembled triangular truss cantilevered support frame system and its installation method
CN117188760A (en) Upper suspension and lower bearing combined concrete formwork supporting structure and construction method
CN116816060A (en) Integral climbing type steel elevator shaft operation platform and construction method thereof
CN212101770U (en) Double-rail device convenient to install and detach quickly and used for hoisting curtain wall unit plate