CN219195654U - Temporary support for steel box girder - Google Patents

Temporary support for steel box girder Download PDF

Info

Publication number
CN219195654U
CN219195654U CN202223400230.6U CN202223400230U CN219195654U CN 219195654 U CN219195654 U CN 219195654U CN 202223400230 U CN202223400230 U CN 202223400230U CN 219195654 U CN219195654 U CN 219195654U
Authority
CN
China
Prior art keywords
steel box
support
box girder
pier
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223400230.6U
Other languages
Chinese (zh)
Inventor
邹长康
毛荣英
陈建华
杜帆
艾加星
郭宇锋
郭震繁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Science and Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Industry Corp Ltd filed Critical China Construction Science and Industry Corp Ltd
Priority to CN202223400230.6U priority Critical patent/CN219195654U/en
Application granted granted Critical
Publication of CN219195654U publication Critical patent/CN219195654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/50—Photovoltaic [PV] energy

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种钢箱梁临时支撑,包括支架。支架沿竖向延伸设置,所述支架的上侧设置有用于承托钢箱梁的钢箱梁承托部,所述支架的下侧设置有用于放置在桥墩承台的承台放置部。将支架下端的承台放置部放置在桥墩承台上,支架上端具有可以支撑钢箱梁的钢箱梁承托部,钢箱梁架设时放置在支架的上方,利用桥墩承台放置钢箱梁临时支撑,无需对桥墩之间的地面进行前置的地基处理,提高施工效率。

Figure 202223400230

The utility model discloses a temporary support for a steel box girder, which comprises a bracket. The support is vertically extended, the upper side of the support is provided with a steel box girder supporting part for supporting the steel box girder, and the lower side of the support is provided with a cap placement part for placing on the pier cap. Place the cap placement part at the lower end of the bracket on the pier cap, and the upper end of the bracket has a steel box girder supporting part that can support the steel box girder. When the steel box girder is erected, place it above the bracket, and use the pier cap to place the steel box girder Temporary support eliminates the need for pre-foundation treatment on the ground between bridge piers, improving construction efficiency.

Figure 202223400230

Description

钢箱梁临时支撑Steel box girder temporary support

技术领域technical field

本实用新型涉及钢箱梁建筑领域,特别涉及一种钢箱梁临时支撑。The utility model relates to the field of steel box girder construction, in particular to a temporary support for a steel box girder.

背景技术Background technique

跨线桥具有多个排列设置的桥墩和跨设在桥墩上方的桥面,桥墩是建筑在桥墩承台上的。城市建设过程中有时需要将旧跨线桥提升改造成钢箱梁式跨线桥,钢箱梁架设前,需要设置钢箱梁临时支撑。改造时,需要拆除旧桥面,保留桥墩和桥墩承台,并对桥墩之间的地面进行一系列的地基处理工序,经过地基处理的地面上才可以设置钢箱梁临时支撑,将钢箱梁临时支撑设置在需要地基处理的地面上的过程,包括换填、强夯、浇筑临时基础等,再将钢箱梁临时支撑设置在临时基础上。拆除钢箱梁临时支撑后,还需要复原地面。整体流程耗时长,对周边居民生活影响较大,不利于提升施工效率。The flyover bridge has a plurality of pier arranged in a row and a bridge deck spanning above the pier, and the pier is built on the pier cap. In the process of urban construction, it is sometimes necessary to upgrade the old flyover bridge into a steel box girder type flyover bridge. Before the erection of the steel box girder, it is necessary to set up a temporary support of the steel box girder. During reconstruction, it is necessary to remove the old bridge deck, retain the bridge piers and bridge pier caps, and carry out a series of foundation treatment procedures on the ground between the bridge piers. Only after foundation treatment can the steel box girder be temporarily supported on the ground, and the steel box girder The process of setting temporary supports on the ground that needs foundation treatment, including replacement, dynamic compaction, pouring of temporary foundations, etc., and then setting the temporary supports of steel box girders on the temporary foundations. After the temporary support of the steel box girder is removed, the ground needs to be restored. The overall process takes a long time and has a great impact on the lives of surrounding residents, which is not conducive to improving construction efficiency.

实用新型内容Utility model content

本实用新型旨在至少解决现有技术中存在的技术问题之一。为此,本实用新型提出一种钢箱梁临时支撑,能够提高施工效率。The utility model aims at at least solving one of the technical problems existing in the prior art. For this reason, the utility model proposes a steel box girder temporary support, which can improve construction efficiency.

根据本实用新型第一方面实施例的钢箱梁临时支撑,包括支架。支架沿竖向延伸设置,所述支架的上侧设置有用于承托钢箱梁的钢箱梁承托部,所述支架的下侧设置有用于放置在桥墩承台的承台放置部。The temporary support of the steel box girder according to the embodiment of the first aspect of the utility model includes a bracket. The support is vertically extended, the upper side of the support is provided with a steel box girder supporting part for supporting the steel box girder, and the lower side of the support is provided with a cap placement part for placing on the pier cap.

根据本实用新型第一方面实施例的钢箱梁临时支撑,至少具有以下有益效果:将支架下端的承台放置部放置在桥墩承台上,支架上端具有可以支撑钢箱梁的钢箱梁承托部,钢箱梁架设时放置在支架的上方,利用桥墩承台放置钢箱梁临时支撑,无需对桥墩之间的地面进行前置的地基处理,提高施工效率。The steel box girder temporary support according to the embodiment of the first aspect of the utility model has at least the following beneficial effects: the cap placement part at the lower end of the bracket is placed on the pier cap, and the upper end of the bracket has a steel box girder bearing capable of supporting a steel box girder. The supporting part, the steel box girder is placed above the bracket when erecting, and the bridge pier cap is used to place the steel box girder temporary support, without pre-foundation treatment on the ground between the bridge piers, improving construction efficiency.

根据本实用新型的一些实施例,所述支架设置有桥墩让位腔,所述支架包括至少三根沿竖向设置的支撑杆,所述支撑杆环绕所述桥墩让位腔间隔分布,沿环绕所述桥墩让位腔的方向上,相邻两个所述支撑杆之间设置有第一连接结构,所述第一连接结构的相对两端分别与相邻两所述支撑杆连接。According to some embodiments of the present utility model, the support is provided with a pier relief chamber, and the support includes at least three support rods arranged vertically, the support rods are distributed around the pier relief chamber at intervals, and In the direction of the pier relief cavity, a first connection structure is provided between two adjacent support rods, and opposite ends of the first connection structure are respectively connected to two adjacent support rods.

根据本实用新型的一些实施例,所述第一连接结构包括两根水平连接条和两根斜连接条,两所述水平连接条相互平行且上下布置,两根所述斜连接条交叉设置且两者中部连接,所述水平连接条的两端分别与相邻两个所述支撑杆连接,所述斜连接条的两端分别与相邻两个所述支撑杆连接,所述斜连接条位于两所述水平连接条之间。According to some embodiments of the present invention, the first connecting structure includes two horizontal connecting bars and two oblique connecting bars, the two horizontal connecting bars are parallel to each other and arranged up and down, and the two oblique connecting bars are arranged crosswise and The middle parts of the two are connected, the two ends of the horizontal connecting bar are respectively connected with the two adjacent support bars, the two ends of the oblique connecting bar are respectively connected with the two adjacent supporting bars, and the oblique connecting bar Located between the two horizontal connecting bars.

根据本实用新型的一些实施例,所述支撑杆设置有两排,每排所述支撑杆沿左右方向排列设置,两排所述支撑杆分置于所述桥墩让位腔的前后两侧,所述支架还包括两根沿左右方向延伸的上横梁,两根所述上横梁与两排所述支撑杆一一对应,每排所述支撑杆的上端连接对应的所述上横梁,所述钢箱梁承托部设置于所述上横梁。According to some embodiments of the present invention, the support rods are arranged in two rows, and each row of the support rods is arranged along the left and right directions, and the two rows of the support rods are respectively placed on the front and rear sides of the pier give way cavity, The bracket also includes two upper beams extending in the left and right directions, the two upper beams correspond to the two rows of support rods one by one, and the upper ends of each row of support rods are connected to the corresponding upper beams. The supporting part of the steel box girder is arranged on the upper beam.

根据本实用新型的一些实施例,两排所述支撑杆之间通过第二连接结构连接。According to some embodiments of the present invention, the two rows of support rods are connected through a second connection structure.

根据本实用新型的一些实施例,每排所述支撑杆中,至少部分的所述支撑杆的下端连接有下横杆,所述下横杆的两端分别用于支撑于左右相邻的两个所述桥墩承台。According to some embodiments of the present utility model, in each row of the support rods, the lower ends of at least part of the support rods are connected with lower cross bars, and the two ends of the lower cross bars are respectively used to support the left and right adjacent two a said pier cap.

根据本实用新型的一些实施例,所述承台放置部为设置于所述支撑杆下端的支撑板,所述支撑板水平设置。According to some embodiments of the present utility model, the platform placement part is a support plate arranged at the lower end of the support rod, and the support plate is arranged horizontally.

根据本实用新型的一些实施例,所述钢箱梁承托部为沿竖向设置的调平杆。According to some embodiments of the present utility model, the supporting part of the steel box girder is a leveling rod arranged vertically.

本实用新型的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本实用新型的实践了解到。Additional aspects and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.

附图说明Description of drawings

本实用新型的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:The above and/or additional aspects and advantages of the present utility model will become apparent and easy to understand from the description of the embodiments in conjunction with the following drawings, wherein:

图1为本实用新型实施例的钢箱梁桥和钢箱梁临时支撑的前视示意图;Fig. 1 is the front view schematic diagram of steel box girder bridge and steel box girder temporary support of the utility model embodiment;

图2为本实用新型实施例的钢箱梁临时支撑、桥墩和桥墩承台的俯视示意图;Fig. 2 is the top view schematic diagram of steel box girder temporary support, bridge pier and bridge pier cap of the utility model embodiment;

图3为本实用新型实施例的钢箱梁桥的侧视示意图;Fig. 3 is the schematic side view of the steel box girder bridge of the utility model embodiment;

图4为本实用新型实施例的钢箱梁桥的施工方法的流程图;Fig. 4 is the flowchart of the construction method of the steel box girder bridge of the utility model embodiment;

图5为本实用新型实施例的将至少两个的钢箱梁架设于钢箱梁临时支撑的上方的方法的流程图。Fig. 5 is a flowchart of a method for erecting at least two steel box girders above the temporary supports of the steel box girders according to an embodiment of the present invention.

附图标记:Reference signs:

支架100,钢箱梁承托部110,承台放置部120,桥墩让位腔130,支撑杆140,第一连接结构150,水平连接条151,斜连接条152,上横梁160,第二连接结构170,下横杆180;Bracket 100, steel box girder supporting part 110, cap placement part 120, pier relief cavity 130, support rod 140, first connection structure 150, horizontal connection bar 151, oblique connection bar 152, upper beam 160, second connection structure 170, lower crossbar 180;

钢箱梁桥200,钢箱梁210,桥墩承台220,桥墩230;Steel box girder bridge 200, steel box girder 210, pier cap 220, pier 230;

桥墩承台间地面300。The ground between the pier caps is 300.

具体实施方式Detailed ways

下面详细描述本实用新型的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本实用新型,而不能理解为对本实用新型的限制。Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals represent the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present utility model, but should not be construed as limiting the present utility model.

在本实用新型的描述中,需要理解的是,涉及到方位描述,例如上、下等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that when it comes to orientation descriptions, for example, the orientation or positional relationship indicated by up, down, etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and Simplified descriptions do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and thus should not be construed as limiting the invention.

在本实用新型的描述中,多个指的是两个以上。如果有描述到第一、第二只是用于区分技术特征为目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量或者隐含指明所指示的技术特征的先后关系。In the description of the present utility model, a plurality refers to more than two. If the description of the first and second is only for the purpose of distinguishing the technical features, it cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features relation.

本实用新型的描述中,除非另有明确的限定,设置、安装、连接等词语应做广义理解,所属技术领域技术人员可以结合技术方案的具体内容合理确定上述词语在本实用新型中的具体含义。In the description of the utility model, unless otherwise clearly defined, words such as setting, installation, and connection should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above-mentioned words in the utility model in combination with the specific content of the technical solution .

参照图1至图5,为本实用新型实施例的钢箱梁临时支撑,包括支架100。支架100沿竖向延伸设置,支架100的上侧设置有用于承托钢箱梁210的钢箱梁承托部110,支架100的下侧设置有用于放置在桥墩承台220的承台放置部120。将支架100下端的承台放置部120放置在桥墩承台220上,支架100上端具有可以支撑钢箱梁210的钢箱梁承托部110,钢箱梁210架设时放置在支架100的上方,利用桥墩承台220放置钢箱梁临时支撑,无需对桥墩230之间的地面进行前置的地基处理,提高施工效率。Referring to Fig. 1 to Fig. 5, it is the temporary support of the steel box girder of the embodiment of the present utility model, including the bracket 100. The bracket 100 is vertically extended, and the upper side of the bracket 100 is provided with a steel box girder supporting part 110 for supporting the steel box girder 210, and the lower side of the bracket 100 is provided with a cap placement part for placing on the pier cap 220 120. Place the cap placement part 120 at the lower end of the bracket 100 on the pier cap 220, the upper end of the bracket 100 has a steel box girder supporting part 110 that can support the steel box girder 210, and the steel box girder 210 is placed above the bracket 100 when erected, By using the pier cap 220 to place the temporary support of the steel box girder, there is no need to perform pre-foundation treatment on the ground between the pier 230, thereby improving construction efficiency.

在实施例中,支架100设置有桥墩让位腔130,支架100包括十根沿竖向设置的支撑杆140,支撑杆140环绕桥墩让位腔130间隔分布,沿环绕桥墩让位腔130的方向上,相邻两个支撑杆140之间设置有第一连接结构150,第一连接结构150的相对两端分别与相邻两支撑杆140连接。支架100形成桥墩让位腔130,支撑杆140环绕桥墩让位腔130,支撑杆140通过第一连接结构150牢固锁定位置,使得支架100受力时,对桥墩承台220的应力相对分布均匀,降低支架100设置在桥墩承台220时对桥墩230造成的不利影响。此时桥墩让位腔130可以供两个桥墩230穿过。In the embodiment, the support 100 is provided with a pier relief cavity 130, and the support 100 includes ten support rods 140 arranged vertically. Above, a first connection structure 150 is disposed between two adjacent support rods 140 , and opposite ends of the first connection structure 150 are respectively connected to two adjacent support rods 140 . The support 100 forms a pier relief cavity 130, and the support rod 140 surrounds the pier relief cavity 130. The support rod 140 is firmly locked in position through the first connection structure 150, so that when the support 100 is stressed, the stress on the pier cap 220 is relatively evenly distributed. The adverse effect on the bridge pier 230 caused when the bracket 100 is arranged on the bridge pier cap 220 is reduced. At this time, the bridge pier relief cavity 130 can allow two bridge piers 230 to pass through.

可以想象的是,支架100的支撑杆140的数量还可以是三根、四根或四根以上。It is conceivable that the number of support rods 140 of the bracket 100 may also be three, four or more than four.

具体的,支撑杆140为空心直管。可以想象的是,支撑杆140也可以是工字钢。Specifically, the support rod 140 is a hollow straight pipe. It is conceivable that the support rod 140 can also be I-beam.

可以想象的是,支架100可以为多块支撑板围成的筒体,筒体内具有桥墩让位腔130。It is conceivable that the bracket 100 may be a cylinder surrounded by a plurality of support plates, and the pier relief cavity 130 is provided in the cylinder.

在实施例中,第一连接结构150包括两根水平连接条151和两根斜连接条152,两水平连接条151相互平行且上下布置,两根斜连接条152交叉设置且两者中部连接,水平连接条151的两端分别与相邻两个支撑杆140连接,斜连接条152的两端分别与相邻两个支撑杆140连接,斜连接条152位于两水平连接条151之间。上述的第一连接结构150,能够相对牢固地固定相邻两个支撑杆140的位置,结构简单。具体的,水平连接条151和斜连接条152均为角钢,抗弯曲性能较好。可以想象的是,水平连接条151和斜连接条152也可以是空心直管。可以想象的是,第一连接结构150也可以是横杆,横杆两端连接两个支撑杆140。In the embodiment, the first connecting structure 150 includes two horizontal connecting bars 151 and two oblique connecting bars 152, the two horizontal connecting bars 151 are arranged parallel to each other and arranged up and down, and the two oblique connecting bars 152 are intersected and connected in the middle. Both ends of the horizontal connecting bar 151 are respectively connected to two adjacent support bars 140 , both ends of the oblique connecting bar 152 are respectively connected to two adjacent supporting bars 140 , and the oblique connecting bar 152 is located between the two horizontal connecting bars 151 . The above-mentioned first connection structure 150 can relatively firmly fix the positions of two adjacent support rods 140 , and has a simple structure. Specifically, the horizontal connection bar 151 and the oblique connection bar 152 are both angle steel, which have better bending resistance. It is conceivable that the horizontal connecting bar 151 and the oblique connecting bar 152 can also be hollow straight tubes. It is conceivable that the first connection structure 150 may also be a cross bar, and two supporting rods 140 are connected at both ends of the cross bar.

在实施例中,支撑杆140设置有两排,每排支撑杆140沿左右方向排列设置,两排支撑杆140分置于桥墩让位腔130的前后两侧,支架100还包括两根沿左右方向延伸的上横梁160,两根上横梁160与两排支撑杆140一一对应,每排支撑杆140的上端连接对应的上横梁160,钢箱梁承托部110设置于上横梁160。设置上横梁160,方便将钢箱梁承托部110设置在上横梁160的各个位置,使得对钢箱梁210的支撑更灵活。具体的,上横梁160为工字钢。可以想象的是,上横梁160也可以是方形钢管等。In the embodiment, there are two rows of support rods 140, and each row of support rods 140 is arranged along the left and right directions. Two upper beams 160 correspond to two rows of support rods 140 one by one. The upper end of each row of support rods 140 is connected to the corresponding upper beam 160 . The steel box girder supporting part 110 is arranged on the upper beam 160 . The upper beam 160 is provided to facilitate the installation of the steel box girder supporting portion 110 at various positions of the upper beam 160 , so that the support for the steel box girder 210 is more flexible. Specifically, the upper beam 160 is I-beam. It is conceivable that the upper beam 160 may also be a square steel pipe or the like.

在一些实施例中,两排支撑杆140之间通过第二连接结构170连接。通过第二连接结构170连接两排支撑杆140,两排支撑杆140之间的强度较好,结构简单,易于实施。具体的,第二连接结构170与第一连接结构150的构造相同,在此不做赘述。可以想象的是,第二连接结构170还可以是横杆,横杆的两端连接两排支撑杆140。In some embodiments, two rows of support rods 140 are connected through a second connection structure 170 . The two rows of support rods 140 are connected through the second connection structure 170 , the strength between the two rows of support rods 140 is better, the structure is simple, and it is easy to implement. Specifically, the structure of the second connection structure 170 is the same as that of the first connection structure 150 , which will not be repeated here. It is conceivable that the second connection structure 170 may also be a cross bar, and two ends of the cross bar are connected to two rows of support bars 140 .

对于左右方向上有两个或两个以上桥墩的情况,可以采用如下的设置:For the case where there are two or more piers in the left and right directions, the following settings can be used:

在一些实施例中,每排所述支撑杆140中,部分的所述支撑杆140的下端连接有下横杆180,所述下横杆180的两端分别用于支撑于左右相邻的两个所述桥墩承台220。上述结构的支架100,可以跨桥墩承台220设置,支撑效果较好,结构相对牢固。可以想象的是,还可以是每排的所有支撑杆140的下端均与下横杆180连接。由于支撑杆140设置有两排,因此下横杆180也具有两根。具体的,下横杆180为工字钢。可以想象的是,下横杆180也可以是方形管。In some embodiments, in each row of the support rods 140, the lower ends of some of the support rods 140 are connected with lower cross bars 180, and the two ends of the lower cross rods 180 are respectively used to support the left and right adjacent two. One of the pier caps 220. The bracket 100 of the above structure can be installed across the bridge pier cap 220, and the supporting effect is better, and the structure is relatively firm. It is also conceivable that the lower ends of all the support bars 140 in each row are connected to the lower cross bar 180 . Since there are two rows of support rods 140 , there are also two lower cross bars 180 . Specifically, the lower cross bar 180 is I-shaped steel. It is conceivable that the lower rail 180 can also be a square tube.

具体的,承台放置部120为设置于支撑杆140下端的支撑板,支撑板水平设置。使得支撑管放置更稳固。可以想象的是,承台放置部120还可以是支撑管的下端。Specifically, the bearing platform placement part 120 is a support plate arranged at the lower end of the support rod 140, and the support plate is arranged horizontally. Make the support tube more stable. It is conceivable that the platform placement part 120 may also be the lower end of the support tube.

在实施例中,钢箱梁承托部110为沿竖向设置的调平杆。设置调平杆,方便调平安装钢箱梁210。具体的,调平杆为沿竖向设置的直管。可以想象的是,调平杆还可以是其他结构,例如直棒。可以想象的是,钢箱梁承托部110还可以是上横梁160,直接采用上横梁160支撑钢箱梁210。In the embodiment, the steel box girder supporting part 110 is a leveling rod arranged vertically. A leveling bar is provided to facilitate the leveling and installation of the steel box girder 210. Specifically, the leveling rod is a straight pipe arranged vertically. It is conceivable that the leveling rod can also be of other structures, such as a straight rod. It is conceivable that the steel box girder supporting part 110 can also be the upper beam 160 , and the steel box girder 210 is directly supported by the upper beam 160 .

具体的,支撑杆140、第一连接结构150、上横梁160和第二连接结构170之间均是通过焊接的方式实现连接的。可以想象的是,还可以是通过螺钉连接的方式实现连接。Specifically, the support rod 140, the first connection structure 150, the upper beam 160 and the second connection structure 170 are all connected by welding. It is conceivable that the connection can also be realized by means of screw connection.

在实施例中,还公开了一种采用上述钢箱梁临时支撑的钢箱梁桥200施工方法,包括以下步骤:In the embodiment, a construction method of a steel box girder bridge 200 temporarily supported by the above-mentioned steel box girder is also disclosed, including the following steps:

S1:在各个桥墩承台220设置钢箱梁临时支撑;S1: Temporary supports for steel box girders are set on the caps 220 of each pier;

S2:将至少两个的钢箱梁210架设于所述钢箱梁临时支撑的上方,固定所述钢箱梁210之间的连接处,使所述钢箱梁210首尾连接形成钢箱梁桥200;S2: erect at least two steel box girders 210 above the temporary support of the steel box girders, fix the joints between the steel box girders 210, and connect the steel box girders 210 end to end to form a steel box girder bridge 200;

S3:拆除所述桥墩承台220上的所述钢箱梁临时支撑。S3: Remove the temporary support of the steel box girder on the pier cap 220 .

由于采用了上述的钢箱梁临时支撑,无需进行复杂的桥墩承台220间的地面处理,能够提高施工效率。Due to the above-mentioned temporary support of the steel box girder, there is no need for complex ground treatment between the pier caps 220, which can improve construction efficiency.

具体的,钢箱梁桥200由两个、三个或以上的钢箱梁210拼接而成。Specifically, the steel box girder bridge 200 is formed by splicing two, three or more steel box girders 210 .

在实施例中,将至少两个的钢箱梁210架设于所述钢箱梁临时支撑的上方的方法,包括以下步骤:In an embodiment, the method for erecting at least two steel box girders 210 above the temporary support of the steel box girders includes the following steps:

将第一个钢箱梁210的前后两端架设在前后相邻的两个钢箱梁临时支撑上;Erection of the front and rear ends of the first steel box girder 210 on the temporary supports of the front and back adjacent two steel box girders;

将第二个钢箱梁210的后端架设在第三个钢箱梁临时支撑上,使第二个钢箱梁210的前端与第一个钢箱梁210的后端锁固;The rear end of the second steel box girder 210 is erected on the third steel box girder temporary support, so that the front end of the second steel box girder 210 is locked with the rear end of the first steel box girder 210;

如此类推,将第N个所述钢箱梁210的后端架设在第N+1个所述钢箱梁临时支撑上,使第N个所述钢箱梁210的前端与第N-1个所述钢箱梁210的后端锁固,直至将最后一个的所述钢箱梁210架设完成;其中,N不小于2。By analogy, the rear end of the Nth steel box girder 210 is erected on the N+1th steel box girder temporary support, so that the front end of the Nth steel box girder 210 is connected to the N-1th steel box girder. The rear end of the steel box girder 210 is locked until the erection of the last steel box girder 210 is completed; wherein, N is not less than 2.

具体的,钢箱梁210之间的锁固,可以在钢箱梁210的两端设置连接板,连接板设置通孔,当两个连接板抵接时,采用螺钉锁附两个连接板,对相邻两个钢箱梁210进行焊接前锁固;或者在前一个钢箱梁210的末端设置插接块,在相邻的钢箱梁210的前端设置插槽,插接块插接于插槽,实现两者焊接前锁固。上述的架设方式,充分利用前一段钢箱梁210的来辅助固定后一端钢箱梁210,方便钢箱梁210之间的焊接。Specifically, for the locking between the steel box girders 210, connection plates can be provided at both ends of the steel box girder 210, and the connection plates are provided with through holes. When the two connection plates abut, the two connection plates are locked with screws. Lock two adjacent steel box girders 210 before welding; or set a plug-in block at the end of the previous steel box girder 210, set a slot at the front end of the adjacent steel box girder 210, and insert the plug-in block into The slots are used to lock the two before welding. The above-mentioned erection method makes full use of the steel box girder 210 at the front section to assist in fixing the steel box girder 210 at the rear end, so as to facilitate the welding between the steel box girders 210 .

具体的,钢箱梁210的后端伸出并超过桥墩230。钢箱梁210的末端超过并伸出桥墩230外,使得临时支撑整体可以对钢箱梁210进行支撑,支撑效果较好,对桥墩承台220的压力相对均匀,也方便施工人员对钢箱梁210连接处进行焊接固定。Specifically, the rear end of the steel box girder 210 protrudes beyond the pier 230 . The end of the steel box girder 210 exceeds and extends out of the bridge pier 230, so that the temporary support can support the steel box girder 210 as a whole, the supporting effect is better, the pressure on the bridge pier cap 220 is relatively uniform, and it is also convenient for construction personnel to adjust the steel box girder. 210 joints are welded and fixed.

具体的,钢箱梁210的后端伸出桥墩230的距离优选为1m,使用效果最佳,可以理解的是,也可以是其他尺寸,例如0.5米至2米,本领域技术人员可以根据实际需要自行确定该伸出距离。Specifically, the distance from the rear end of the steel box girder 210 protruding from the pier 230 is preferably 1 m, which is the best for use. It is understood that it can also be other sizes, such as 0.5 meters to 2 meters. You need to determine this overhang yourself.

在本说明书的描述中,参考术语“一个实施例”、“一些实施例”、“示意性实施例”、“示例”、“具体示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, references to the terms "one embodiment," "some embodiments," "exemplary embodiments," "example," "specific examples," or "some examples" are intended to mean that the implementation Specific features, structures, materials or characteristics described in an embodiment or example are included in at least one embodiment or example of the present invention. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

尽管已经示出和描述了本实用新型的实施例,本领域的普通技术人员可以理解:在不脱离本实用新型的原理和宗旨的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications, substitutions and modifications, the scope of the present invention is defined by the claims and their equivalents.

Claims (8)

1.一种钢箱梁临时支撑,其特征在于,包括:1. A steel box girder temporary support, characterized in that it comprises: 支架(100),沿竖向延伸设置,所述支架(100)的上侧设置有用于承托钢箱梁(210)的钢箱梁承托部(110),所述支架(100)的下侧设置有用于放置在桥墩承台(220)的承台放置部(120)。The bracket (100) is vertically extended, the upper side of the bracket (100) is provided with a steel box girder supporting part (110) for supporting the steel box girder (210), and the lower side of the bracket (100) A cap placement part (120) for placing on the pier cap (220) is provided on the side. 2.根据权利要求1所述的钢箱梁临时支撑,其特征在于:所述支架(100)设置有桥墩让位腔(130),所述支架(100)包括至少三根沿竖向设置的支撑杆(140),所述支撑杆(140)环绕所述桥墩让位腔(130)间隔分布,沿环绕所述桥墩让位腔(130)的方向上,相邻两个所述支撑杆(140)之间设置有第一连接结构(150),所述第一连接结构(150)的相对两端分别与相邻两所述支撑杆(140)连接。2. The steel box girder temporary support according to claim 1, characterized in that: the support (100) is provided with a pier relief cavity (130), and the support (100) includes at least three vertically arranged supports Rods (140), the support rods (140) are distributed at intervals around the pier relief cavity (130), and along the direction surrounding the pier relief cavity (130), two adjacent support rods (140) ) is provided with a first connection structure (150), and opposite ends of the first connection structure (150) are respectively connected to two adjacent support rods (140). 3.根据权利要求2所述的钢箱梁临时支撑,其特征在于:所述第一连接结构(150)包括两根水平连接条(151)和两根斜连接条(152),两所述水平连接条(151)相互平行且上下布置,两根所述斜连接条(152)交叉设置且两者中部连接,所述水平连接条(151)的两端分别与相邻两个所述支撑杆(140)连接,所述斜连接条(152)的两端分别与相邻两个所述支撑杆(140)连接,所述斜连接条(152)位于两所述水平连接条(151)之间。3. The steel box girder temporary support according to claim 2, characterized in that: the first connecting structure (150) comprises two horizontal connecting bars (151) and two oblique connecting bars (152), the two The horizontal connecting bars (151) are parallel to each other and arranged up and down, and the two oblique connecting bars (152) are intersected and connected in the middle of the two. rods (140), the two ends of the oblique connecting bars (152) are respectively connected to two adjacent supporting rods (140), and the oblique connecting bars (152) are located between the two horizontal connecting bars (151) between. 4.根据权利要求3所述的钢箱梁临时支撑,其特征在于:所述支撑杆(140)设置有两排,每排所述支撑杆(140)沿左右方向排列设置,两排所述支撑杆(140)分置于所述桥墩让位腔(130)的前后两侧,所述支架(100)还包括两根沿左右方向延伸的上横梁(160),两根所述上横梁(160)与两排所述支撑杆(140)一一对应,每排所述支撑杆(140)的上端连接对应的所述上横梁(160),所述钢箱梁承托部(110)设置于所述上横梁(160)。4. The temporary support for steel box girder according to claim 3, characterized in that: said support rods (140) are arranged in two rows, each row of said support rods (140) is arranged in a left-right direction, and said two rows The support rods (140) are separately placed on the front and rear sides of the pier relief cavity (130), and the support (100) also includes two upper beams (160) extending in the left and right directions, and the two upper beams ( 160) corresponds to two rows of support rods (140) one by one, the upper end of each row of support rods (140) is connected to the corresponding upper beam (160), and the steel box girder supporting part (110) is set on the upper beam (160). 5.根据权利要求4所述的钢箱梁临时支撑,其特征在于:两排所述支撑杆(140)之间通过第二连接结构(170)连接。5. The temporary support of steel box girder according to claim 4, characterized in that: two rows of said support rods (140) are connected by a second connection structure (170). 6.根据权利要求4所述的钢箱梁临时支撑,其特征在于:每排所述支撑杆(140)中,至少部分的所述支撑杆(140)的下端连接有下横杆(180),所述下横杆(180)的两端分别用于支撑于左右相邻的两个所述桥墩承台(220)。6. The steel box girder temporary support according to claim 4, characterized in that: in each row of the support rods (140), at least part of the lower ends of the support rods (140) are connected with lower cross bars (180) , the two ends of the lower cross bar (180) are respectively used to support the two left and right adjacent pier caps (220). 7.根据权利要求4所述的钢箱梁临时支撑,其特征在于:所述承台放置部(120)为设置于所述支撑杆(140)下端的支撑板,所述支撑板水平设置。7. The temporary support of steel box girder according to claim 4, characterized in that: the cap placement part (120) is a support plate arranged at the lower end of the support rod (140), and the support plate is arranged horizontally. 8.根据权利要求1所述的钢箱梁临时支撑,其特征在于:所述钢箱梁承托部(110)为沿竖向设置的调平杆。8. The temporary support of the steel box girder according to claim 1, characterized in that: the supporting part (110) of the steel box girder is a leveling rod arranged vertically.
CN202223400230.6U 2022-12-16 2022-12-16 Temporary support for steel box girder Active CN219195654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223400230.6U CN219195654U (en) 2022-12-16 2022-12-16 Temporary support for steel box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223400230.6U CN219195654U (en) 2022-12-16 2022-12-16 Temporary support for steel box girder

Publications (1)

Publication Number Publication Date
CN219195654U true CN219195654U (en) 2023-06-16

Family

ID=86726188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223400230.6U Active CN219195654U (en) 2022-12-16 2022-12-16 Temporary support for steel box girder

Country Status (1)

Country Link
CN (1) CN219195654U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115748498A (en) * 2022-12-16 2023-03-07 中建科工集团有限公司 Temporary support for steel box girder and construction method for steel box girder bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115748498A (en) * 2022-12-16 2023-03-07 中建科工集团有限公司 Temporary support for steel box girder and construction method for steel box girder bridge

Similar Documents

Publication Publication Date Title
CN112324177B (en) Building reconstruction outer wall reinforcing device and method
CN112411391A (en) A single-column cover beam steel pipe column Bailey beam construction support system and construction method
CN205636496U (en) A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN218912324U (en) Reinforcing steel bar framework binding auxiliary frame
CN111119071A (en) Construction method for assembling precast concrete segment box girder
JP3635004B2 (en) Bridge cantilever construction method
CN114561865A (en) Prestressed concrete cover beam based on prefabricated prestressed UHPC shell and its construction technology
CN219261849U (en) Supporting system capable of being detachably mounted on non-hardened ground
CN215052133U (en) Steel case roof beam is alternately construction supporting structure from top to bottom
CN221219837U (en) Steel frame conversion supporting device and steel frame conversion supporting system
LU600833B1 (en) Arched tunnel structure and arched tunnel construction method
CN113585492A (en) Multi-component complex component intersection node system and construction method thereof
CN112523258A (en) Portable single-side formwork supporting system and construction method thereof
CN217782866U (en) Self-bearing type formwork support device for slope concrete pouring
CN214695213U (en) Arch ring formwork system of porous arch bridge
CN117513176A (en) A fully assembled tower and construction method
CN214033785U (en) A one-sided formwork support system
CN218911984U (en) Steel bar split heads shaped steel support
CN115748498A (en) Temporary support for steel box girder and construction method for steel box girder bridge
CN223103486U (en) A cap beam support
CN110952460A (en) A method for erecting large-span continuous steel box girder on a bridge erection frame
CN221256269U (en) Protective shed frame
CN220504665U (en) Ectopic assembled H-shaped steel tower
CN219908599U (en) Integral construction platform
CN221255236U (en) Bridge beam support template system

Legal Events