CN219175321U - Prefabricated assembled comprehensive pipe rack - Google Patents

Prefabricated assembled comprehensive pipe rack Download PDF

Info

Publication number
CN219175321U
CN219175321U CN202320350904.1U CN202320350904U CN219175321U CN 219175321 U CN219175321 U CN 219175321U CN 202320350904 U CN202320350904 U CN 202320350904U CN 219175321 U CN219175321 U CN 219175321U
Authority
CN
China
Prior art keywords
close
groove
pressing
pipe gallery
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320350904.1U
Other languages
Chinese (zh)
Inventor
卢长炯
张福军
朱子龙
王彬
王安童
陈雷
孟德顺
赵子豪
杜宇颢
赵文源
蒲秀全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Beijing No 6 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Beijing No 6 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd, Beijing No 6 Municipal Construction Engineering Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN202320350904.1U priority Critical patent/CN219175321U/en
Application granted granted Critical
Publication of CN219175321U publication Critical patent/CN219175321U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/20—Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the field of pipe galleries, in particular to a prefabricated assembled comprehensive pipe gallery, which comprises a fixed rod; the front end of the fixed rod is provided with a lifting hole close to the top, the bottom of the fixed rod is provided with a sliding groove, the outer part of the lifting hole is provided with a pressing groove close to the center, two groups of pressing grooves are symmetrically arranged on the outer part of the fixed rod and close to the left side and the right side, the pressing grooves are communicated with the sliding groove, the inner part of the pressing groove is sleeved with a pressing block outer part, and one side of the pressing block close to the inner part of the pressing groove is fixedly connected with a displacement block outer part close to the top; the fixed slot is seted up through the top and the inside cover of draw-in groove is established spring fixture block top dead lever and is offered the structural design of hanging hole, has been realized through the fixed function of lifting by crane the pipe rack of draw-in groove cooperation that the dead lever cooperation pipe rack top was offered, has solved in the past and has adopted the steel wire to alternate the pipe rack groove to lift by crane the problem that causes the damage to the pipe rack inner wall, has improved the convenience of lifting by crane the installation.

Description

Prefabricated assembled comprehensive pipe rack
Technical Field
The utility model relates to the field of pipe galleries, in particular to a prefabricated assembled comprehensive pipe gallery.
Background
The utility tunnel is an underground urban pipeline utility tunnel, namely a tunnel space is built underground in the city, various engineering pipelines such as electric power, communication, fuel gas, heat supply, water supply and drainage are integrated, a special access opening, a lifting opening and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility tunnel is a life line of an important infrastructure for guaranteeing urban operation.
The utility tunnel is assembled to current prefabrication adopts and will lifts by crane the steel wire and pass the pipe corridor groove and bind when lifting by crane the pipe corridor, and the rethread is adjusted and is binded the department and make to lift by crane power department in the center department, with pipe corridor hoist and mount to assemble the department, insert the fixed pipe corridor rethread of carrying out the concatenation inside the socket and take out the mode that leaves with the steel wire from pipe corridor inslot portion.
The prior prefabricated assembled comprehensive pipe rack is characterized in that when the assembled pipe rack is lifted, the lifting force is positioned at the center by adjusting the binding position, the pipe rack is lifted to the assembled position, the insert block is inserted into the socket to splice and fix the pipe rack, and the steel wire is pulled out from the inside of the pipe rack through a pulling-out mode, but when the assembled comprehensive pipe rack is lifted, the adjusting angle is complex, and the steel wire passes through the pipe rack to easily cause damage to the inside of the pipe rack; therefore, a prefabricated assembled utility tunnel is provided for the above problems.
Disclosure of Invention
In order to make up the defects of the prior art, the prior prefabricated assembled comprehensive pipe rack is lifted and assembled by adjusting the binding position to ensure that the lifting force is at the center, the pipe rack is lifted and assembled, the insert block is inserted into the socket to splice and fix the pipe rack, and the steel wire is pulled out from the inside of the pipe rack through a pulling-out mode, but the angle of adjustment is complex when the steel wire is lifted and the steel wire passes through the pipe rack to easily cause damage to the inside of the pipe rack.
The technical scheme adopted for solving the technical problems is as follows: the utility model relates to a prefabricated assembled comprehensive pipe rack, which comprises a fixed rod; the front end of the fixed rod is provided with a lifting hole near the top, the bottom of the fixed rod is provided with a sliding groove, the outer part of the lifting hole near the center is provided with a pressing groove, two groups of pressing grooves are symmetrically arranged on the outer part of the fixed rod near the left side and the right side, the pressing grooves are communicated with the sliding groove, the inner part of the pressing groove is sleeved with a pressing block outer part, one side of the pressing block near the inner part of the pressing groove is fixedly connected with a displacement block outer part near the top, and the inner part of the displacement block near the top is sleeved with a sliding rod outer part near the left end and the right end;
the left side and the right side of the sliding rod are fixed at the position close to the top inside the sliding groove, a spring is sleeved outside the sliding rod, one side of a clamping block is fixedly connected to the position close to the bottom outside the displacement block, and two groups of clamping blocks are fixed at the left side and the right side of the displacement block.
Preferably, the displacement block is sleeved inside a first fixing hole, the first fixing hole is formed in the top of the pipe gallery main body, and four groups of the first fixing holes are arranged in the top of the pipe gallery main body in a rectangular array.
Preferably, clamping grooves are formed in the first fixing hole and close to the left side and the right side, and clamping blocks are sleeved outside the clamping grooves.
Preferably, the front end of the pipe gallery main body is fixedly connected with the rear end of the insertion block, and the top of the insertion block is close to the center position and provided with a third fixing hole.
Preferably, the slot is arranged at the position, close to the center, of the rear end of the pipe gallery main body, and the second fixing hole is arranged at the position, close to the rear end, of the top of the pipe gallery main body.
Preferably, the second fixing hole is communicated with the slot, and the front end of the pipe gallery main body is close to the central position and provided with a pipe gallery groove, and the pipe gallery groove penetrates through the pipe gallery main body.
The utility model has the advantages that:
1. according to the utility model, through the structural design that the fixing groove is formed in the top and the lifting hole is formed in the clamping groove by clamping the spring clamping block top fixing rod, the function of fixing the lifting pipe gallery by matching the fixing rod with the clamping groove formed in the top of the pipe gallery is realized, the problem that the inner wall of the pipe gallery is damaged by lifting by penetrating the pipe gallery through the steel wire is solved, and the convenience of lifting and mounting is improved.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic cross-sectional view of a piping lane according to the present utility model;
FIG. 3 is a schematic view of the overall cross-sectional structure of the present utility model;
FIG. 4 is a schematic view of a lifting mechanism according to the present utility model;
fig. 5 is a schematic cross-sectional view of a hoisting mechanism according to the present utility model.
In the figure: 1. a fixed rod; 2. a piping lane body; 11. lifting holes; 12. a sliding groove; 13. a pressing groove; 14. pressing the blocks; 15. a displacement block; 16. a clamping block; 17. a slide bar; 18. a spring; 21. a first fixing hole; 22. a clamping groove; 23. a slot; 24. a second fixing hole; 25. inserting blocks; 26. a third fixing hole; 27. tube lane groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, a prefabricated assembled utility tunnel includes a fixing rod 1; the front end of the fixed rod 1 is provided with a lifting hole 11 near the top, the bottom of the fixed rod 1 is provided with a sliding groove 12, the outer part of the lifting hole 11 is provided with a pressing groove 13 near the center, the two groups of pressing grooves 13 are symmetrically arranged on the outer part of the fixed rod 1 near the left and right sides, the pressing grooves 13 are communicated with the sliding groove 12, the inner part of the pressing groove 13 is sleeved with a pressing block 14, one side of the pressing block 14 near the inner part of the pressing groove 13 is fixedly connected with a position of the outer part of a displacement block 15 near the top, and the inner part of the displacement block 15 near the top is sleeved with two ends of a sliding rod 17 near the outer part of the sliding rod 17;
the left side and the right side of the sliding rod 17 are fixed at the position, close to the top, inside the sliding groove 12, a spring 18 is sleeved outside the sliding rod 17, one side of a clamping block 16 is fixedly connected to the position, close to the bottom, outside the displacement block 15, and the clamping block 16 is fixed at the left side and the right side of the displacement block 15 in two groups;
during operation, the fixed slot is offered at the top and the inside card of draw-in groove establishes the structural design of lifting hole is offered to spring fixture block top dead lever, the fixed function of lifting by crane the piping lane of draw-in groove cooperation that sets up through dead lever cooperation piping lane top has been realized, the problem that adopts steel wire interlude piping lane groove to lift by crane the piping lane inner wall in the past causes the damage, the convenience of lifting by crane the installation has been improved, current prefabricated formula is assembled utility tunnel makes the lifting force be in center department through adjusting the department of binding when lifting by crane and is assembled the piping lane, hoist and mount the piping lane to assemble the department, insert the fixed piping lane rethread mode of taking out of inside the socket with the inserted block, but adjust angle is comparatively complicated and the steel wire passes the piping lane inslot portion and appear damaging when lifting by crane, the sliding groove 12 that the dead lever 1 set up is for lifting hole bottom is controlled inside the sliding groove 12 that sets up and is pressed down 13, displacement block 15 drives fixture block 16 and sets up inside clamping groove 22, the spring 18 that the outside cover that the slide bar 17 outside that displacement block 15 was established is equipped with is set up to fixture block 16 and is reset.
Further, the displacement block 15 is sleeved inside a first fixing hole 21, the first fixing hole 21 is formed in the top of the pipe gallery main body 2, and four groups of the first fixing holes 21 are arranged in a rectangular array on the top of the pipe gallery main body 2;
during operation, the displacement block 15 is sleeved inside the first fixing hole 21 for inserting, fixing and lifting, and the first fixing hole 21 is provided with four groups of holes which are formed in the top of the pipe gallery main body 2 and are convenient to lift and can be used for sealing cement in the later stage.
Further, a clamping groove 22 is formed in the first fixing hole 21 and close to the left side and the right side, and a clamping block 16 is sleeved in the clamping groove 22;
in operation, the clamping groove 22 arranged in the first fixing hole 21 is used for sleeving the clamping block 16 for fixing and conveniently lifting.
Further, the front end of the pipe gallery main body 2 is fixedly connected with the rear end of an insertion block 25, and a third fixing hole 26 is formed in the top of the insertion block 25 near the center;
in operation, the third fixing hole 26 formed at the top of the insert block 25 fixed at the front end of the pipe gallery main body 2 is used for fixing cement after insertion.
Further, a slot 23 is formed in the position, close to the center, of the rear end of the pipe gallery main body 2, and a second fixing hole 24 is formed in the position, close to the rear end, of the top of the pipe gallery main body 2;
in operation, the slot 23 formed in the rear end of the pipe gallery main body 2 is formed by inserting the insert block 25 for connection, and the second fixing hole 24 formed in the top of the pipe gallery main body 2 is communicated with the slot 23 for fixing the pipe gallery main body 2.
Further, the second fixing hole 24 is communicated with the slot 23, a pipe gallery 27 is formed in the front end of the pipe gallery main body 2 near the center, and the pipe gallery 27 penetrates through the pipe gallery main body 2;
in operation, the second fixing hole 24 is communicated with the slot 23 to facilitate the fixing of the cement seal to the interior, and the pipe gallery 27 formed by the pipe gallery main body 2 is provided for the operation or cable placement.
Working principle: the structural design that the lifting hole is formed by arranging the fixing groove at the top and the spring clamping block top fixing rod in the clamping groove is clamped inside, the function that the lifting pipe gallery is fixedly lifted by the clamping groove matched with the pipe gallery top is realized, the problem that the inner wall of the pipe gallery is damaged by lifting by penetrating the pipe gallery groove through steel wires is solved, the convenience of lifting installation is improved, the traditional prefabricated assembled pipe gallery is in the center by adjusting the binding position when the assembled pipe gallery is lifted, the pipe gallery is lifted to the assembling position, the steel wires are pulled out from the pipe gallery groove in a manner that the inserting block is inserted inside the inserting hole to splice the fixed pipe gallery and then pulled out by the pulling method, but when the lifting is performed, the adjusting angle is more complicated and the steel wires pass through the pipe gallery groove to easily cause the damage to the inside of the pipe gallery groove, the lifting hole 11 formed by the fixing rod 1 is formed by arranging a sliding groove 12 formed at the bottom of the lifting hole and a pressing groove 13 to control a pressing block 14 sleeved inside, a displacement block 15 drives a clamping block 16 to be formed inside a clamping groove 22, the clamping block 16 is arranged by a spring 18 sleeved outside a sliding rod 17 sleeved by the displacement block 15 in a spring clamping reset mode, the displacement block 15 is sleeved inside a first fixing hole 21 to be inserted and fixed in a lifting mode, the first fixing hole 21 is provided with four groups of fixing holes which are formed at the top of a pipe gallery main body 2 and are convenient to carry out cement sealing in the later stage of lifting, the clamping groove 22 formed inside the first fixing hole 21 is arranged by sleeving the clamping block 16 to be fixed conveniently in the lifting mode, a third fixing hole 26 formed at the top of an inserting block 25 fixed at the front end of the pipe gallery main body 2 is formed by connecting the inserting block 25, the cement is filled after inserting and fixed more firmly, a slot 23 formed at the rear end of the pipe gallery main body 2 is formed by connecting the inserting block 25, the second fixing hole 24 is communicated with the slot 23 for facilitating the fixing of the cementing seal to the inside, and the pipe gallery 27 formed by the pipe gallery main body 2 is provided for the operation or cable placement inside.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.

Claims (6)

1. A prefabricated assembled utility tunnel comprises a fixed rod (1); lifting holes (11) are formed in the front end of the fixing rod (1) close to the top, sliding grooves (12) are formed in the bottom of the fixing rod (1), and pressing grooves (13) are formed in the outer portion of the lifting holes (11) close to the center, and are characterized in that: the pressing grooves (13) are symmetrically arranged on the left side and the right side of the outer portion of the fixed rod (1), the pressing grooves (13) are communicated with the sliding grooves (12), pressing blocks (14) are sleeved inside the pressing grooves (13), one side, close to the inner portion of each pressing groove (13), of each pressing block (14) is fixedly connected with a position, close to the top, of the outer portion of each displacement block (15), and two ends, close to the left side and the right side, of each sliding rod (17) are sleeved inside the position, close to the top, of each displacement block (15);
the left side and the right side of the sliding rod (17) are fixed at the position, close to the top, inside the sliding groove (12), a spring (18) is sleeved outside the sliding rod (17), one side, close to the bottom, of a clamping block (16) is fixedly connected to the outside of the displacement block (15), and the two groups of clamping blocks (16) are fixed at the left side and the right side of the displacement block (15).
2. A prefabricated assembled utility tunnel according to claim 1, wherein: the displacement block (15) is sleeved inside a first fixing hole (21), the first fixing hole (21) is formed in the top of the pipe gallery main body (2), and four groups of the first fixing holes (21) are arranged on the top of the pipe gallery main body (2) in a rectangular array.
3. A prefabricated assembled utility tunnel according to claim 2, wherein: clamping grooves (22) are formed in the first fixing hole (21) and close to the left side and the right side, and clamping blocks (16) are sleeved in the clamping grooves (22).
4. A prefabricated assembled utility tunnel according to claim 3, wherein: the pipe gallery is characterized in that the front end of the pipe gallery main body (2) is fixedly connected with the rear end of the insertion block (25), and a third fixing hole (26) is formed in the top of the insertion block (25) close to the center.
5. The prefabricated assembled utility tunnel of claim 4, wherein: the utility model discloses a pipe rack, including pipe rack main part (2), slot (23) have been seted up near central point in pipe rack main part (2) rear end, no. two fixed orifices (24) have been seted up near rear end position in pipe rack main part (2) top.
6. The prefabricated assembled utility tunnel of claim 5, wherein: the second fixing hole (24) is communicated with the slot (23), a pipe gallery groove (27) is formed in the front end of the pipe gallery main body (2) close to the center, and the pipe gallery groove (27) penetrates through the pipe gallery main body (2).
CN202320350904.1U 2023-02-20 2023-02-20 Prefabricated assembled comprehensive pipe rack Active CN219175321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320350904.1U CN219175321U (en) 2023-02-20 2023-02-20 Prefabricated assembled comprehensive pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320350904.1U CN219175321U (en) 2023-02-20 2023-02-20 Prefabricated assembled comprehensive pipe rack

Publications (1)

Publication Number Publication Date
CN219175321U true CN219175321U (en) 2023-06-13

Family

ID=86672323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320350904.1U Active CN219175321U (en) 2023-02-20 2023-02-20 Prefabricated assembled comprehensive pipe rack

Country Status (1)

Country Link
CN (1) CN219175321U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN122304388A (en) * 2026-05-29 2026-06-30 黎明职业大学 A modular UHPC pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN122304388A (en) * 2026-05-29 2026-06-30 黎明职业大学 A modular UHPC pipe gallery

Similar Documents

Publication Publication Date Title
CN201226426Y (en) Suspension type cable bracket for downhole tunnel top
CN106906843A (en) Underground pipe gallery and its construction method
CN110676792B (en) A cable trench cable fixing device and working method thereof
CN207621483U (en) Jacking construction tooling
CN111519658A (en) Novel assembled underground pipe gallery
CN206784615U (en) Assembled architecture wallboard connection structure for splicing
CN207198420U (en) A kind of novel cell pipe connecting
CN211257107U (en) A installation device for bored concrete pile foundation pile warp measuring pipe
CN207742389U (en) A kind of plum tube for fiber optic cable
CN219973281U (en) Splicing structure and spliced concrete pipe gallery structure
CN215669664U (en) Connection structure of utility tunnel
CN216948428U (en) Can splice formula UHPC piping lane
CN111593763B (en) Fixing device for mounting underground pipe gallery and using method thereof
CN110056006B (en) Assembled underground pipe gallery
CN212358374U (en) Assembled steel sheet concrete combination utility tunnel
CN220565684U (en) Combined building splicing template
CN209816906U (en) A kind of straight bolt connection prefabricated comprehensive pipe gallery
CN210866965U (en) Pole tower type transformer
CN221253653U (en) Suspension fixing device for hoisting positioning pile
CN213448556U (en) Novel assembled underground pipe gallery
CN206625257U (en) Underground pipe gallery
CN221562836U (en) Portable domestic portable fills electric pile structure
CN219620545U (en) Underground cable pay-off rack power center
CN214626234U (en) Prefabricated electric power calandria and prefabricated electric power calandria group
CN219157762U (en) Prefabricated utility tunnel mosaic structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant