CN219099923U - Temporary pile supporting construction structure for high pile wharf - Google Patents

Temporary pile supporting construction structure for high pile wharf Download PDF

Info

Publication number
CN219099923U
CN219099923U CN202222964884.5U CN202222964884U CN219099923U CN 219099923 U CN219099923 U CN 219099923U CN 202222964884 U CN202222964884 U CN 202222964884U CN 219099923 U CN219099923 U CN 219099923U
Authority
CN
China
Prior art keywords
fixedly connected
shock absorber
pile
support column
construction structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222964884.5U
Other languages
Chinese (zh)
Inventor
孙兴勇
刘洋
于浩
陈杨
颜辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222964884.5U priority Critical patent/CN219099923U/en
Application granted granted Critical
Publication of CN219099923U publication Critical patent/CN219099923U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种高桩码头临时支桩施工结构,包括支撑柱,所述支撑柱上端设置有减震缓冲机构,减震缓冲机构包括固定安装在支撑柱上端的凹槽块,凹槽块的内壁开设有滑槽,滑槽的内壁固定连接有第一阻尼减震器,第一阻尼减震器的表面套设有伸缩弹簧,第一阻尼减震器的一端固定连接有滑动块,滑动块的表面转动连接有支撑杆,支撑杆的一端转动连接有连杆。与现有技术相比,该高桩码头临时支桩施工结构通过设置第一阻尼减震器、伸缩弹簧、减震弹簧、U型板和剪切型减震器,第一阻尼减震器和剪切型减震器能够对上述弹性组件吸收的力进行消耗,从而可以对支撑柱起到耗能减震的作用,通过对冲击力进行吸收,进而可以冲击力对支撑柱造成的损伤。

Figure 202222964884

The utility model discloses a temporary pile support construction structure for a high-pile wharf, which comprises a support column. The upper end of the support column is provided with a shock-absorbing buffer mechanism. The inner wall of the block is provided with a chute, the inner wall of the chute is fixedly connected with a first damping shock absorber, the surface of the first damping shock absorber is provided with a telescopic spring, and one end of the first damping shock absorber is fixedly connected with a sliding block, The surface of the sliding block is rotatably connected with a support rod, and one end of the support rod is rotatably connected with a connecting rod. Compared with the prior art, the temporary pile support construction structure of the high pile wharf is provided with the first damping shock absorber, telescopic spring, shock absorbing spring, U-shaped plate and shear type shock absorber, the first damping shock absorber and The shear-type shock absorber can consume the force absorbed by the above-mentioned elastic components, so as to play the role of energy dissipation and shock absorption on the support column, and absorb the impact force, and then prevent the damage caused by the impact force to the support column.

Figure 202222964884

Description

一种高桩码头临时支桩施工结构Construction structure of temporary pile support for high-pile wharf

技术领域technical field

本实用新型涉及工程施工领域,更具体地说,本实用新型涉及一种高桩码头临时支桩施工结构。The utility model relates to the field of engineering construction, more specifically, the utility model relates to a temporary pile support construction structure of a high pile wharf.

背景技术Background technique

高桩码头,是指由上部结构(桩台或承台)、桩基、接岸结构、岸闸和码头设备等部分组成。High-piled wharf refers to the superstructure (pile platform or cap), pile foundation, shore structure, shore gate and wharf equipment.

经检索,现有专利(申请号:202220876344.9)公开了一种基于水运工程的高桩码头临时支桩施工结构,该申请通过设置高桩码头面、可动固定支座、支撑座、混凝土基座以及支桩底座,操作人员首先通过将本实用新型放入水中并通过调节伸缩杆直至该实用新型满足高度需要,再启动电机带动高桩码头面两侧设有的可动固定支座在螺纹伸缩杆的作用下相互靠近直至完成对高桩码头面的压紧固定操作,方便对高桩码头面进行临时支撑,但发明人在实现本实用新型的过程中发现现有技术存在如下问题:该申请虽然方便对高装码头面进行临时支撑,但运输车辆在通过高装码头时,由于该申请没有设置减震耗能组件,高装码头产生的震动会使得装置受损,很大程度上降低了装置的支撑效果。After searching, the existing patent (application number: 202220876344.9) discloses a construction structure of temporary pile support for high-pile wharf based on waterway engineering. As well as the pile base, the operator first puts the utility model into the water and adjusts the telescopic rod until the utility model meets the height requirement, and then starts the motor to drive the movable fixed support on both sides of the high pile wharf surface to expand and expand on the thread. Under the action of the rods, they approach each other until the pressing and fixing operation of the high-pile wharf surface is completed, which is convenient for temporarily supporting the high-pile wharf surface. However, the inventor found the following problems in the prior art in the process of realizing the utility model: the application Although it is convenient to provide temporary support for the high-loading dock, when the transport vehicles pass through the high-loading dock, since the application does not have a shock-absorbing energy-consuming component, the vibration generated by the high-loading dock will damage the device, which greatly reduces the The support effect of the device.

因此,针对上述问题提出一种高桩码头临时支桩施工结构。Therefore, in view of the above problems, a temporary pile support construction structure for high pile wharf is proposed.

实用新型内容Utility model content

为了克服现有技术的上述缺陷,本实用新型的实施例提供一种高桩码头临时支桩施工结构,以解决上述背景技术中提出的问题。In order to overcome the above-mentioned defects of the prior art, the embodiments of the present utility model provide a construction structure for temporary pile support of a high-pile wharf to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种高桩码头临时支桩施工结构,包括支撑柱,所述支撑柱上端设置有减震缓冲机构,减震缓冲机构包括固定安装在支撑柱上端的凹槽块,凹槽块的内壁开设有滑槽,滑槽的内壁固定连接有第一阻尼减震器,第一阻尼减震器的表面套设有伸缩弹簧,第一阻尼减震器的一端固定连接有滑动块,滑动块的表面转动连接有支撑杆,支撑杆的一端转动连接有连杆,连杆与凹槽块之间固定连接有减震弹簧,凹槽块的侧面固定连接有固定板,固定板的表面固定安装有U型板,U型板的内壁设置有剪切型减震器。In order to achieve the above purpose, the utility model provides the following technical solutions: a construction structure for temporary pile support of high-pile wharf, including a support column, the upper end of the support column is provided with a shock-absorbing buffer mechanism, and the shock-absorbing buffer mechanism includes a The groove block at the upper end, the inner wall of the groove block is provided with a chute, the inner wall of the chute is fixedly connected with a first damping shock absorber, the surface of the first damping shock absorber is provided with a telescopic spring, and the first damping shock absorber One end of the sliding block is fixedly connected with a sliding block, the surface of the sliding block is rotatably connected with a support rod, one end of the support rod is rotatably connected with a connecting rod, a shock absorbing spring is fixedly connected between the connecting rod and the groove block, and the side of the groove block is fixedly connected There is a fixed plate, a U-shaped plate is fixedly installed on the surface of the fixed plate, and a shear type shock absorber is arranged on the inner wall of the U-shaped plate.

优选的,所述支撑柱的下表面固定连接有安装板,安装板的表面分别设置有定位杆和限位机构,支撑柱的表面设置有正反转电机。Preferably, the lower surface of the support column is fixedly connected with a mounting plate, the surface of the mounting plate is respectively provided with a positioning rod and a limit mechanism, and the surface of the support column is provided with a forward and reverse motor.

优选的,所述限位机构包括转动连接在安装板的表面的限位板,限位板的下表面分别固定连接有配重块和锚杆。Preferably, the limiting mechanism includes a limiting plate rotatably connected to the surface of the mounting plate, and the lower surface of the limiting plate is respectively fixedly connected with a counterweight and an anchor rod.

优选的,所述正反转电机的输出端设置有绕绳辊,绕绳辊的表面绕设有钢丝绳。Preferably, the output end of the reversing motor is provided with a rope winding roller, and a steel wire rope is wound on the surface of the rope winding roller.

优选的,所述连杆的上端通过安装螺栓与高装码头面固定连接,固定板的表面设置有吊绳,吊绳的一端与高装码头面固定连接。Preferably, the upper end of the connecting rod is fixedly connected to the high loading dock through mounting bolts, a hanging rope is arranged on the surface of the fixing plate, and one end of the hanging rope is fixedly connected to the high loading dock.

优选的,所述连杆的表面固定连接有限制杆,凹槽块的内壁开设有与限制杆相适配的限制槽。Preferably, the surface of the connecting rod is fixedly connected with a restriction rod, and the inner wall of the groove block is provided with a restriction groove matching the restriction rod.

本实用新型的技术效果和优点:Technical effect and advantage of the present utility model:

1、与现有技术相比,该高桩码头临时支桩施工结构通过设置第一阻尼减震器、伸缩弹簧、减震弹簧、U型板和剪切型减震器,当运输车辆通过高装码头时会向下挤压连杆和U型板,伸缩弹簧、减震弹簧和U型板能够对力进行吸收,第一阻尼减震器和剪切型减震器能够对上述弹性组件吸收的力进行消耗,从而可以对支撑柱起到耗能减震的作用,通过对冲击力进行吸收,进而可以冲击力对支撑柱造成的损伤。1. Compared with the existing technology, the construction structure of the temporary pile support of the high pile wharf is equipped with the first damping shock absorber, telescopic spring, shock absorbing spring, U-shaped plate and shear shock absorber, when the transport vehicle passes the high When the dock is loaded, the connecting rod and the U-shaped plate will be pressed downwards, the telescopic spring, the shock absorbing spring and the U-shaped plate can absorb the force, and the first damping shock absorber and the shear shock absorber can absorb the above elastic components The force is consumed, so that the support column can play the role of energy consumption and shock absorption, and by absorbing the impact force, the damage caused by the impact force to the support column can be eliminated.

2、与现有技术相比,该高桩码头临时支桩施工结构通过设置正反转电机、钢丝绳、限位板、配重块和锚杆,安装支撑柱时,正反转电机会带动绕绳辊转动,从而使限位板和配重块与地面接触、锚杆插入地面内,然后将吊绳安装到高装码头面上,最终完成支撑柱的安装,通过以上方式,能够牢牢的固定住支撑柱,防止支撑柱出现倒塌的情况。2. Compared with the existing technology, the temporary pile support construction structure of the high-pile wharf is equipped with forward and reverse motors, steel wire ropes, limit plates, counterweights and anchor rods. When the support column is installed, the forward and reverse motors will drive the winding The rope roller rotates, so that the limit plate and the counterweight are in contact with the ground, the anchor rod is inserted into the ground, and then the lifting rope is installed on the high loading dock, and the installation of the supporting column is finally completed. Through the above methods, the Secure the support column to prevent the support column from collapsing.

附图说明Description of drawings

图1为本实用新型正剖结构示意图;Fig. 1 is the schematic diagram of the front section structure of the utility model;

图2为本实用新型正视结构示意图;Fig. 2 is a schematic diagram of the front view structure of the utility model;

图3为限位板立体结构示意图;Fig. 3 is a schematic diagram of the three-dimensional structure of the limiting plate;

图4为图1中A处放大结构示意图。FIG. 4 is a schematic diagram of an enlarged structure at point A in FIG. 1 .

附图标记为:1、支撑柱;2、凹槽块;3、第一阻尼减震器;4、滑动块;5、支撑杆;6、连杆;7、减震弹簧;8、U型板;9、剪切型减震器;10、安装板;11、定位杆;12、正反转电机;13、限位板;14、配重块;15、锚杆;16、绕绳辊;17、钢丝绳;18、吊绳;19、限制杆;20、伸缩弹簧。The reference signs are: 1. supporting column; 2. groove block; 3. first damping shock absorber; 4. sliding block; 5. supporting rod; 6. connecting rod; 7. damping spring; 8. U-shaped Plate; 9. Shear shock absorber; 10. Mounting plate; 11. Positioning rod; 12. Forward and reverse motor; 13. Limit plate; 14. Counterweight; 15. Anchor rod; ; 17, wire rope; 18, sling; 19, limit rod; 20, telescopic spring.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例一Embodiment one

如附图1-图4所示的一种高桩码头临时支桩施工结构,包括支撑柱1,支撑柱1的下表面固定连接有安装板10,安装板10的表面分别设置有定位杆11和限位机构,定位杆11是插在地底的,可以对支撑柱1进行固定,支撑柱1的表面设置有正反转电机12,限位机构包括转动连接在安装板10的表面的限位板13,限位板13的下表面分别固定连接有配重块14和锚杆15,正反转电机12的输出端设置有绕绳辊16,绕绳辊16的表面绕设有钢丝绳17。As shown in accompanying drawings 1-4, a construction structure for temporary pile support of a high pile wharf comprises a support column 1, the lower surface of the support column 1 is fixedly connected with a mounting plate 10, and the surfaces of the mounting plate 10 are respectively provided with positioning rods 11 And the limit mechanism, the positioning rod 11 is inserted in the ground, and the support column 1 can be fixed. The surface of the support column 1 is provided with a forward and reverse motor 12. The limit mechanism includes a limit that is rotationally connected to the surface of the mounting plate 10 Plate 13, the lower surface of limit plate 13 is fixedly connected with counterweight 14 and anchor rod 15 respectively, the output end of reversing motor 12 is provided with winding roller 16, and the surface of winding roller 16 is provided with steel wire rope 17.

钢丝绳17的一端与限位板13固定连接,连杆6的上端通过安装螺栓与高装码头面固定连接,固定板的表面设置有吊绳18,吊绳18的一端与高装码头面固定连接。One end of the steel wire rope 17 is fixedly connected with the limit plate 13, and the upper end of the connecting rod 6 is fixedly connected with the high loading dock surface by means of mounting bolts. The surface of the fixed plate is provided with a lifting rope 18, and one end of the lifting rope 18 is fixedly connected with the high loading dock surface .

见图1,该高桩码头临时支桩施工结构通过设置正反转电机12、钢丝绳17、限位板13、配重块14和锚杆15,安装支撑柱1时,正反转电机12会带动绕绳辊16转动,从而使限位板13和配重块14与地面接触、锚杆15插入地面内,然后将吊绳18安装到高装码头面上,最终完成支撑柱1的安装,通过以上方式,能够牢牢的固定住支撑柱1,防止支撑柱1出现倒塌的情况。See Fig. 1, the temporary pile support construction structure of the high-pile wharf is provided with a forward and reverse motor 12, a steel wire rope 17, a limit plate 13, a counterweight 14 and an anchor rod 15. When the support column 1 is installed, the forward and reverse motor 12 will Drive the rope winding roller 16 to rotate, so that the limit plate 13 and the counterweight 14 are in contact with the ground, the anchor rod 15 is inserted into the ground, and then the lifting rope 18 is installed on the high loading dock surface, and finally the installation of the support column 1 is completed. Through the above method, the support column 1 can be firmly fixed to prevent the support column 1 from collapsing.

支撑柱1上端设置有减震缓冲机构,减震缓冲机构包括固定安装在支撑柱1上端的凹槽块2,凹槽块2的内壁开设有滑槽,滑槽的内壁固定连接有第一阻尼减震器3,第一阻尼减震器3的表面套设有伸缩弹簧20,第一阻尼减震器3的一端固定连接有滑动块4,滑动块4的表面转动连接有支撑杆5,支撑杆5的一端转动连接有连杆6。The upper end of the support column 1 is provided with a shock-absorbing buffer mechanism. The shock-absorbing buffer mechanism includes a groove block 2 fixedly installed on the upper end of the support column 1. The inner wall of the groove block 2 is provided with a chute, and the inner wall of the chute is fixedly connected with a first damper. Shock absorber 3, the surface of the first damping shock absorber 3 is covered with a telescopic spring 20, one end of the first damping shock absorber 3 is fixedly connected with a sliding block 4, and the surface of the sliding block 4 is rotatably connected with a support rod 5, supporting One end of the rod 5 is rotatably connected with a connecting rod 6 .

连杆6的表面固定连接有限制杆19,凹槽块2的内壁开设有与限制杆19相适配的限制槽,限制杆19能够保证连杆6笔直的上下运动,防止连杆6出现左右晃动的情况,连杆6与凹槽块2之间固定连接有减震弹簧7,凹槽块2的侧面固定连接有固定板,固定板的表面固定安装有U型板8,U型板8的内壁设置有剪切型减震器9。The surface of the connecting rod 6 is fixedly connected with a restricting rod 19, and the inner wall of the groove block 2 is provided with a restricting groove suitable for the restricting rod 19. The restricting rod 19 can ensure the straight up and down movement of the connecting rod 6 and prevent the connecting rod 6 from appearing left and right. In the case of shaking, a damping spring 7 is fixedly connected between the connecting rod 6 and the groove block 2, and a fixed plate is fixedly connected to the side of the groove block 2, and a U-shaped plate 8 is fixedly installed on the surface of the fixed plate, and a U-shaped plate 8 The inner wall is provided with a shear type shock absorber 9.

见图4,该高桩码头临时支桩施工结构通过设置第一阻尼减震器3、伸缩弹簧20、减震弹簧7、U型板8和剪切型减震器9,当运输车辆通过高装码头时会向下挤压连杆6和U型板8,连杆6会将力导到伸缩弹簧20、减震弹簧7和第一阻尼减震器3,U型板8会挤压内部的剪切型减震器9。As shown in Fig. 4, the temporary pile support construction structure of the high pile wharf is provided with the first damping shock absorber 3, telescopic spring 20, shock absorbing spring 7, U-shaped plate 8 and shear type shock absorber 9, when the transport vehicle passes the high When the dock is installed, the connecting rod 6 and the U-shaped plate 8 will be pressed downward, and the connecting rod 6 will guide the force to the telescopic spring 20, the damping spring 7 and the first damping shock absorber 3, and the U-shaped plate 8 will squeeze the inside The shear type shock absorber9.

伸缩弹簧20、减震弹簧7和U型板8能够对力进行吸收,第一阻尼减震器3和剪切型减震器9能够对上述弹性组件吸收的力进行消耗,从而可以对支撑柱1起到耗能减震的作用,通过对冲击力进行吸收,进而可以冲击力对支撑柱1造成的损伤。The telescopic spring 20, the damping spring 7 and the U-shaped plate 8 can absorb the force, and the first damping shock absorber 3 and the shear type shock absorber 9 can consume the force absorbed by the above-mentioned elastic components, so that the supporting column can be 1 plays the role of energy dissipation and shock absorption, by absorbing the impact force, the damage caused by the impact force to the support column 1 can be avoided.

本实用新型的工作过程如下:在使用该高桩码头临时支桩施工结构,前,启动正反转电机12,正反转电机12会带动绕绳辊16转动,从而使限位板13和配重块14与地面接触、锚杆15插入地面内,然后将吊绳18安装到高装码头面上,最终完成支撑柱1底部的安装,接着通过安装螺栓将连杆6固定到高装码头的表面,紧接着把吊绳18也固定到高装码头的表面,最终完成支撑柱1的安装,在遇到大型运输车辆时,高装码头时会向下挤压连杆6和U型板8,连杆6会分别下压伸缩弹簧20、减震弹簧7和第一阻尼减震器3,U型板8会挤压内部的剪切型减震器9,伸缩弹簧20、减震弹簧7和U型板8能够对力进行吸收,第一阻尼减震器3和剪切型减震器9能够对上述弹性组件吸收的力进行消耗,从而可以起到耗能减震的作用。The working process of the present utility model is as follows: before using the temporary pile support construction structure of the high-pile wharf, start the forward and reverse motor 12, and the forward and reverse motor 12 will drive the rope winding roller 16 to rotate, so that the limit plate 13 and the matching The weight 14 is in contact with the ground, the anchor rod 15 is inserted into the ground, and then the lifting rope 18 is installed on the surface of the high loading dock, and finally the installation of the bottom of the supporting column 1 is completed, and then the connecting rod 6 is fixed to the bottom of the high loading dock by the mounting bolts. Next, fix the sling 18 to the surface of the high-loading dock, and finally complete the installation of the support column 1. When encountering a large transport vehicle, the high-loading dock will squeeze the connecting rod 6 and the U-shaped plate 8 downward. , the connecting rod 6 will respectively press down the telescopic spring 20, the damping spring 7 and the first damping shock absorber 3, the U-shaped plate 8 will squeeze the internal shearing shock absorber 9, the telescopic spring 20, the shock absorbing spring 7 And the U-shaped plate 8 can absorb the force, and the first damping shock absorber 3 and the shearing shock absorber 9 can consume the force absorbed by the above-mentioned elastic component, so as to play the role of energy dissipation and shock absorption.

这就是该高桩码头临时支桩施工结构的工作原理。Here it is the working principle of the temporary pile support construction structure of this high pile wharf.

最后应说明的几点是:首先,在本申请的描述中,需要说明的是,除非另有规定和限定,术语“安装”、“相连”、“连接”应做广义理解,可以是机械连接或电连接,也可以是两个元件内部的连通,可以是直接相连,“上”、“下”、“左”、“右”等仅用于表示相对位置关系,当被描述对象的绝对位置改变,则相对位置关系可能发生改变;The last few points should be explained: First, in the description of this application, it should be explained that, unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, which can be mechanical connection Or electrical connection, it can also be the internal communication of two components, it can be directly connected, "up", "down", "left", "right", etc. are only used to indicate the relative positional relationship, when the absolute position of the object being described Change, the relative positional relationship may change;

其次:本实用新型公开实施例附图中,只涉及到与本公开实施例涉及到的结构,其他结构可参考通常设计,在不冲突情况下,本实用新型同一实施例及不同实施例可以相互组合;Secondly: in the accompanying drawings of the disclosed embodiments of the utility model, only the structures related to the disclosed embodiments are involved. Other structures can refer to the usual design. Under the condition of no conflict, the same embodiment of the utility model and different embodiments can be used mutually. combination;

最后:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the utility model shall include Within the protection scope of the present utility model.

Claims (6)

1. The utility model provides a temporary pile construction structure of high pile wharf, includes support column (1), its characterized in that: the utility model discloses a damping device, including support column (1), support column (1) upper end is provided with shock attenuation buffer gear, shock attenuation buffer gear includes recess piece (2) of fixed mounting in support column (1) upper end, the spout has been seted up to the inner wall of recess piece (2), the first damping bumper shock absorber (3) of inner wall fixedly connected with of spout, the surface cover of first damping bumper shock absorber (3) is equipped with telescopic spring (20), the one end fixedly connected with sliding block (4) of first damping bumper shock absorber (3), the surface rotation of sliding block (4) is connected with bracing piece (5), the one end rotation of bracing piece (5) is connected with connecting rod (6), fixedly connected with damping spring (7) between connecting rod (6) and the recess piece (2), the side fixedly connected with fixed plate of recess piece (2), the fixed plate's surface fixed mounting has U template (8), the inner wall of U template (8) is provided with shearing type bumper shock absorber (9).
2. The temporary pile-supporting construction structure for a high pile wharf according to claim 1, wherein: the lower surface of support column (1) fixedly connected with mounting panel (10), the surface of mounting panel (10) is provided with locating lever (11) and stop gear respectively, and the surface of support column (1) is provided with positive and negative motor (12).
3. The temporary pile-supporting construction structure for a high pile wharf according to claim 2, wherein: the limiting mechanism comprises a limiting plate (13) rotatably connected to the surface of the mounting plate (10), and a balancing weight (14) and an anchor rod (15) are fixedly connected to the lower surface of the limiting plate (13) respectively.
4. The temporary pile-supporting construction structure for a high pile wharf according to claim 2, wherein: the output end of the forward and reverse rotation motor (12) is provided with a rope winding roller (16), and a steel wire rope (17) is wound on the surface of the rope winding roller (16).
5. The temporary pile-supporting construction structure for a high pile wharf according to claim 1, wherein: the upper end of the connecting rod (6) is fixedly connected with the high code-loading head face through a mounting bolt, a lifting rope (18) is arranged on the surface of the fixing plate, and one end of the lifting rope (18) is fixedly connected with the high code-loading head face.
6. The temporary pile-supporting construction structure for a high pile wharf according to claim 1, wherein: the surface of the connecting rod (6) is fixedly connected with a limiting rod (19), and a limiting groove matched with the limiting rod (19) is formed in the inner wall of the groove block (2).
CN202222964884.5U 2022-11-04 2022-11-04 Temporary pile supporting construction structure for high pile wharf Expired - Fee Related CN219099923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222964884.5U CN219099923U (en) 2022-11-04 2022-11-04 Temporary pile supporting construction structure for high pile wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222964884.5U CN219099923U (en) 2022-11-04 2022-11-04 Temporary pile supporting construction structure for high pile wharf

Publications (1)

Publication Number Publication Date
CN219099923U true CN219099923U (en) 2023-05-30

Family

ID=86465550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222964884.5U Expired - Fee Related CN219099923U (en) 2022-11-04 2022-11-04 Temporary pile supporting construction structure for high pile wharf

Country Status (1)

Country Link
CN (1) CN219099923U (en)

Similar Documents

Publication Publication Date Title
CN218086895U (en) A steel cage positioning frame
CN111824990A (en) A construction tower crane anti-collision system
CN110562115A (en) beam transporting vehicle for roll-on and roll-off of segmental beam on ship
CN219099923U (en) Temporary pile supporting construction structure for high pile wharf
CN207760855U (en) A kind of highway structure construction ringing engine
CN114908674A (en) Deformable construction platform for highway bridge
CN112112392A (en) Assembled ground shock-absorbing structure
CN218261641U (en) Anti-swing device convenient for stable lifting for crane
CN215924106U (en) Energy-saving cargo elevator
CN210712530U (en) Bridge protector for municipal works
CN212101833U (en) Lifter for building
CN221295882U (en) Fan blade lifting device
CN220058737U (en) Building construction safety protection platform
CN220283405U (en) A vibration reduction device for the boom of a flat-top tower crane
CN215482242U (en) Anti-collision anti-seismic steel structure device on side face of bridge
CN208008374U (en) A kind of boom hoisting for building
CN220056135U (en) Wall-attached hoop structure of tower crane
CN215711584U (en) Moving mechanism for box-mounted automatic lifting equipment
CN223534687U (en) A hoisting device for installing prefabricated stairs
CN220241888U (en) Prestress tensioning damping protection device
CN214220481U (en) Assembled ground shock-absorbing structure
CN222989523U (en) A herringbone slope photovoltaic module hoisting device
CN212503745U (en) Winch with shock-absorbing function for road and bridge engineering
CN214166257U (en) Bucket elevator that building engineering used
CN217676550U (en) Electrically driven winch with damping base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230530