CN219060791U - Suspended ceiling device of large-size suspended ceiling material - Google Patents

Suspended ceiling device of large-size suspended ceiling material Download PDF

Info

Publication number
CN219060791U
CN219060791U CN202223469528.2U CN202223469528U CN219060791U CN 219060791 U CN219060791 U CN 219060791U CN 202223469528 U CN202223469528 U CN 202223469528U CN 219060791 U CN219060791 U CN 219060791U
Authority
CN
China
Prior art keywords
top frame
support
ceiling
main body
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223469528.2U
Other languages
Chinese (zh)
Inventor
徐彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinglong Construction Group Co ltd
Original Assignee
Guangdong Jinglong Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jinglong Construction Group Co ltd filed Critical Guangdong Jinglong Construction Group Co ltd
Priority to CN202223469528.2U priority Critical patent/CN219060791U/en
Application granted granted Critical
Publication of CN219060791U publication Critical patent/CN219060791U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型提供的一种大规格天花板材的吊顶装置,包括:底座组件;升降组件,升降组件与底座组件连接;顶架组件,顶架组件用于顶升天花板材,包括顶架主体、第一支撑结构和第二支撑结构,顶架主体与升降组件连接,以通过升降组件使顶架主体上升或下降,第一支撑结构与顶架主体滑动连接并能够相对顶架主体沿第一方向伸出,第二支撑结构与顶架主体滑动连接并能够相对顶架主体沿第二方向伸出,第一方向与第二方向成夹角。本实用新型提供的一种大规格天花板材的吊顶装置能够满足大规格天花板材的吊装,同时能够在保证施工质量的前提下,降低现场施工难度,缩短施工时间。

Figure 202223469528

The utility model provides a ceiling device for a large-size ceiling material, which includes: a base assembly; a lifting assembly connected to the base assembly; A support structure and a second support structure, the main body of the top frame is connected with the lifting assembly, so that the main body of the top frame can be raised or lowered by the lifting assembly, the first support structure is slidably connected with the main body of the top frame and can extend along the first direction relative to the main body of the top frame It can be seen that the second support structure is slidably connected with the main body of the top frame and can protrude relative to the main body of the top frame along a second direction, and the first direction and the second direction form an included angle. The utility model provides a ceiling device for a large-size ceiling material, which can meet the hoisting requirements of the large-size ceiling material, and can reduce the difficulty of on-site construction and shorten the construction time under the premise of ensuring the construction quality.

Figure 202223469528

Description

一种大规格天花板材的吊顶装置A ceiling device for large-scale ceiling materials

技术领域technical field

本实用新型涉及天花板材吊顶装置领域,尤其涉及一种大规格天花板材的吊顶装置。The utility model relates to the field of ceiling material suspension devices, in particular to a large-size ceiling material suspension device.

背景技术Background technique

吊顶在整个居室装饰中占有重要地位,对居室顶面作适当装饰,不仅能美化室内环境,还能营造出丰富多彩的室内空间艺术形象。大规格天花板材吊顶安装通常需要多人合力配合才能将大规格材料固定到天花上,不仅费时费力费人工,而且效率也不高,严重拖慢了工程进度。在现有装修施工现场也有用到吊顶装置,比如公开号为CN215055023U的专利公开了一种装修用的吊顶起吊装置,其能够通过提升托板实现吊装,但是通常托板较小,基本不能用于大规格天花板材的吊装。此外,比如公开号为CN215484465U的专利公开了一种可移动辅助安装天花板吊顶装置,其能够起到顶升和支撑的作用,但是在实际施工时,尤其是大规格天花板材吊顶安装时,该可移动辅助安装天花板吊顶装置存在支撑不足的缺陷。The suspended ceiling occupies an important position in the decoration of the whole room. Appropriate decoration of the top surface of the room can not only beautify the indoor environment, but also create a rich and colorful artistic image of the indoor space. The installation of large-size ceiling materials usually requires the cooperation of multiple people to fix large-size materials to the ceiling, which is not only time-consuming and labor-intensive, but also inefficient, which seriously slows down the progress of the project. Ceiling devices are also useful in existing decoration construction sites. For example, the patent with the publication number CN215055023U discloses a ceiling lifting device for decoration, which can be hoisted by lifting the pallet, but the pallet is usually small and cannot be used basically. Hoisting of large size ceiling materials. In addition, for example, the patent with the publication number CN215484465U discloses a movable auxiliary installation ceiling device, which can play the role of lifting and supporting, but in actual construction, especially when installing large-scale ceiling materials, the movable Auxiliary installation ceiling fixtures have the disadvantage of insufficient support.

实用新型内容Utility model content

本实用新型实施例公开了一种大规格天花板材的吊顶装置,该大规格天花板材的吊顶装置能够满足大规格天花板材的吊装,同时能够在保证施工质量的前提下,降低现场施工难度,缩短施工时间。The embodiment of the utility model discloses a ceiling device for large-size ceiling materials. The ceiling device for large-size ceiling materials can meet the hoisting requirements for large-size ceiling materials. At the same time, it can reduce the difficulty of on-site construction and shorten Construction time.

本实用新型公开了一种大规格天花板材的吊顶装置,该大规格天花板材的吊顶装置包括:The utility model discloses a ceiling device for large-size ceiling materials. The ceiling device for large-size ceiling materials includes:

底座组件;base assembly;

升降组件,所述升降组件与所述底座组件连接;a lifting assembly, the lifting assembly is connected to the base assembly;

顶架组件,所述顶架组件用于顶升天花板材,包括顶架主体、第一支撑结构和第二支撑结构,所述顶架主体与所述升降组件连接,以通过所述升降组件使所述顶架主体上升或下降,所述第一支撑结构与所述顶架主体滑动连接并能够相对所述顶架主体沿第一方向伸出,所述第二支撑结构与所述顶架主体滑动连接并能够相对所述顶架主体沿第二方向伸出,所述第一方向与所述第二方向成夹角。The top frame assembly, which is used to lift the ceiling material, includes a top frame main body, a first support structure and a second support structure, the top frame main body is connected with the lifting assembly, so that The main body of the top frame rises or falls, the first support structure is slidably connected with the main body of the top frame and can protrude in a first direction relative to the main body of the top frame, and the second support structure is connected with the main body of the top frame Slidingly connected and capable of protruding relative to the top frame body along a second direction, the first direction forms an included angle with the second direction.

作为一种可选的实施方式,所述顶架主体包括第一顶架部和第二顶架部,所述第一顶架部与所述升降组件连接,所述第二顶架部与所述第一顶架部成夹角连接,所述第一支撑结构与所述第一顶架部连接,所述第二支撑结构与所述第二顶架部连接。As an optional implementation manner, the top frame body includes a first top frame part and a second top frame part, the first top frame part is connected to the lifting assembly, and the second top frame part is connected to the The first top frame part is connected at an angle, the first support structure is connected with the first top frame part, and the second support structure is connected with the second top frame part.

作为一种可选的实施方式,所述第一顶架部设有沿所述第一方向延伸的第一调节滑槽,所述第一支撑结构可滑动地安装于所述第一调节滑槽内;和/或,所述第二顶架部设有沿所述第二方向延伸的第二调节滑槽,所述第二支撑结构可滑动地安装于所述第二调节滑槽内。As an optional implementation manner, the first top frame part is provided with a first adjustment sliding slot extending along the first direction, and the first support structure is slidably mounted on the first adjustment sliding slot and/or, the second top frame part is provided with a second adjustment slide slot extending along the second direction, and the second support structure is slidably installed in the second adjustment slide slot.

作为一种可选的实施方式,所述顶架主体还包括结构加强部,所述结构加强部与所述第一顶架部连接并靠近所述升降组件。As an optional implementation manner, the top frame main body further includes a structural reinforcement part connected to the first top frame part and close to the lifting assembly.

作为一种可选的实施方式,所述第一支撑结构包括两个,并分别与所述第一顶架部的两端连接;所述第二顶架部包括四个,并两两位于所述第一顶架部的两端,所述第二支撑结构包括四个,四个所述第二支撑结构与四个所述第二顶架部对应连接。As an optional implementation manner, the first supporting structure includes two, and is respectively connected to both ends of the first top frame part; the second top frame part includes four, and two by two are located on the The two ends of the first top frame part, the second support structure includes four, and the four second support structures are correspondingly connected to the four second top frame parts.

作为一种可选的实施方式,所述顶架主体与所述升降组件转动连接,以使所述顶架主体能够相对所述升降组件转动,且在转动时所述顶架主体的高度不变。As an optional embodiment, the top frame main body is rotatably connected with the lifting assembly, so that the top frame main body can rotate relative to the lifting assembly, and the height of the top frame main body remains unchanged during rotation .

作为一种可选的实施方式,所述升降组件包括安装座和升降支撑件,所述安装座与所述底座组件固定,所述升降支撑件与所述安装座连接并形成丝杠螺母副,以带动所述升降支撑件上升或下降。As an optional implementation, the lifting assembly includes a mounting base and a lifting support, the mounting base is fixed to the base assembly, the lifting support is connected to the mounting base and forms a screw nut pair, To drive the lifting support to rise or fall.

作为一种可选的实施方式,所述安装座包括丝杠轴承,所述升降支撑件与所述丝杠轴承传动连接并形成丝杠螺母副,所述安装座设有驱动件插槽,所述驱动件插槽用于使驱动件插入,以通过所述驱动件带动所述丝杠轴承旋转。As an optional implementation, the mounting seat includes a screw bearing, and the lifting support is connected to the screw bearing to form a screw nut pair, and the mounting seat is provided with a drive slot, so The driving part slot is used for inserting the driving part so as to drive the screw bearing to rotate through the driving part.

作为一种可选的实施方式,所述底座组件包括支撑座和多个支撑杆,所述安装座与所述支撑座固定连接,所述支撑座设有容纳腔,所述升降支撑件能够部分容纳于所述容纳腔内,所述多个支撑杆与所述支撑座转动连接,以使所述支撑杆能够折叠于支撑座上。As an optional implementation, the base assembly includes a support base and a plurality of support rods, the installation base is fixedly connected to the support base, the support base is provided with an accommodation cavity, and the lifting support can be partially Accommodated in the accommodating cavity, the plurality of support rods are rotatably connected with the support base, so that the support rods can be folded on the support base.

作为一种可选的实施方式,所述底座组件还包括多个万向轮,所述多个万向轮对应地安装在所述多个支撑杆上。As an optional implementation manner, the base assembly further includes a plurality of universal wheels, and the plurality of universal wheels are correspondingly installed on the plurality of support rods.

与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the utility model has the beneficial effects of:

本实用新型实施例提供的一种大规格天花板材的吊顶装置,底座组件用于提供支持和底部的稳定,升降组件用于实现顶架组件的上升或下降,顶架组件用于吊顶天花板材,本实用新型实施例可以通过升降组件可以实现顶架组件以及放置于顶架组件上的天花板材的升降吊顶。顶架组件包括顶架主体以及相对顶架主体分别沿第一方向和第二方向伸出的第一支撑结构和第二支撑结构,且第一方向与第二方向成夹角。在第一支撑结构相对支架主体伸出时,顶架组件的支撑面积增大,可以适用于更大尺寸的天花板材吊顶。第一支撑结构和第二支撑结构能够相对支架主体伸缩以调节顶架组件的支撑面积,使得本实用新型实施例提供的吊顶装置不仅能够根据天花板材的大小尺寸调节与之适应的支撑面积,而且由于第一支撑结构和第二支撑结构可以增加顶架组件的支撑面积,还可以使顶架组件能够吊顶大规格天花板材,从而使大规格天花板材的吊顶更节省人工,降低现场施工难度,有利于缩短施工时间。The embodiment of the utility model provides a ceiling device for large-size ceiling materials. The base assembly is used to provide support and bottom stability, the lifting assembly is used to realize the rise or fall of the top frame assembly, and the top frame assembly is used to suspend the ceiling material. In the embodiment of the present invention, the lifting and lowering of the top frame assembly and the ceiling material placed on the top frame assembly can be realized through the lifting assembly. The top frame assembly includes a top frame body and a first support structure and a second support structure protruding relative to the top frame body along a first direction and a second direction, and the first direction and the second direction form an included angle. When the first supporting structure protrudes relative to the main body of the bracket, the supporting area of the top frame assembly increases, which can be applied to larger-sized ceiling materials. The first support structure and the second support structure can be expanded and contracted relative to the bracket main body to adjust the support area of the top frame assembly, so that the ceiling device provided by the embodiment of the utility model can not only adjust the support area adapted to it according to the size of the ceiling material, but also Since the first supporting structure and the second supporting structure can increase the supporting area of the top frame assembly, the top frame assembly can also be used to suspend large-size ceiling materials, so that the ceiling of large-size ceiling materials can save labor and reduce the difficulty of on-site construction. It is beneficial to shorten the construction time.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例中所需要的使用的附图做简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员而言,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solution in the embodiment of the utility model more clearly, the accompanying drawings required in the embodiment will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the utility model For example, those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1是本实用新型实施例公开的大规格天花板材的吊顶装置的结构示意图;Fig. 1 is a structural schematic diagram of a ceiling device for a large-size ceiling material disclosed in an embodiment of the present invention;

图2是本实用新型实施例公开的顶架组件的结构示意图;Fig. 2 is a schematic structural view of the top frame assembly disclosed in the embodiment of the present invention;

图3是本实用新型实施例公开的顶架组件的俯视结构示意图;Fig. 3 is a top structural schematic diagram of the top frame assembly disclosed in the embodiment of the present invention;

图4是本实用新型实施例公开的升降组件的结构示意图;Fig. 4 is a schematic structural view of the lifting assembly disclosed in the embodiment of the present invention;

图5是本实用新型实施例公开的底座组件的结构示意图。Fig. 5 is a schematic structural view of the base assembly disclosed in the embodiment of the present invention.

图标:100、大规格天花板材的吊顶装置;101、第一方向;102、第二方向;110、底座组件;111、支撑座;112、支撑杆;113、万向轮;120、升降组件;121、安装座;1211、丝杠轴承;1212、驱动件插槽;122、升降支撑件;130、顶架组件;131、顶架主体;1311、第一顶架部;1312、第二顶架部;1313、结构加强部;132、第一支撑结构;133、第二支撑结构。Icons: 100, ceiling device for large-size ceiling materials; 101, first direction; 102, second direction; 110, base assembly; 111, support seat; 112, support rod; 113, universal wheel; 120, lifting assembly; 121. Mounting seat; 1211. Lead screw bearing; 1212. Driver slot; 122. Lifting support; 130. Top frame assembly; 131. Top frame main body; 1311. First top frame part; 1312. Second top frame 1313, the structural strengthening part; 132, the first support structure; 133, the second support structure.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

在本实用新型中,术语“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“底”、“内”、“外”、“中”、“竖直”、“水平”、“横向”、“纵向”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本实用新型及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In the present invention, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle" The orientations or positional relationships indicated by , "vertical", "horizontal", "horizontal" and "longitudinal" are based on the orientations or positional relationships shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not used to limit that the indicated devices, elements or components must have a specific orientation, or be constructed and operated in a specific orientation.

并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本实用新型中的具体含义。Moreover, some of the above terms may be used to indicate other meanings besides orientation or positional relationship, for example, the term "upper" may also be used to indicate a certain attachment relationship or connection relationship in some cases. Those of ordinary skill in the art can understand the specific meanings of these terms in the present invention according to specific situations.

此外,术语“安装”、“设置”、“设有”、“连接”、“相连”应做广义理解。例如,可以是固定连接,可拆卸连接,或整体式构造;可以是机械连接,或电连接;可以是直接相连,或者是通过中间媒介间接相连,又或者是两个装置、元件或组成部分之间内部的连通。对于本领域普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。Furthermore, the terms "installed", "disposed", "provided", "connected", "connected" are to be interpreted broadly. For example, it may be a fixed connection, a detachable connection, or an integral structure; it may be a mechanical connection or an electrical connection; it may be a direct connection or an indirect connection through an intermediary; internal connectivity. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

此外,术语“第一”、“第二”等主要是用于区分不同的装置、元件或组成部分(具体的种类和构造可能相同也可能不同),并非用于表明或暗示所指示装置、元件或组成部分的相对重要性和数量。除非另有说明,“多个”的含义为两个或两个以上。In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, elements or components (the specific types and structures may be the same or different), and are not used to indicate or imply that the indicated devices, elements Or the relative importance and number of components. Unless otherwise specified, "plurality" means two or more.

下面将结合实施例和附图对本实用新型的技术方案作进一步的说明。The technical scheme of the utility model will be further described below in conjunction with the embodiments and the accompanying drawings.

请参阅图1至图5,本实用新型实施例提供了一种大规格天花板材的吊顶装置100。该大规格天花板材的吊顶装置100能够满足大规格天花板材的吊装,同时能够在保证施工质量的前提下,降低现场施工难度,缩短施工时间。Please refer to FIG. 1 to FIG. 5 , the embodiment of the present invention provides a ceiling device 100 for large-size ceiling materials. The ceiling device 100 for large-size ceiling materials can meet the hoisting requirements of large-size ceiling materials, and at the same time can reduce the difficulty of on-site construction and shorten the construction time under the premise of ensuring the construction quality.

应该说明的是,该大规格天花板材是指尺寸大于或等于600mm*600mm的天花板材,例如,600mm*1200mm,或者是800mm*800mm等。It should be noted that the large-size ceiling material refers to a ceiling material with a size greater than or equal to 600mm*600mm, for example, 600mm*1200mm, or 800mm*800mm.

在本实用新型实施例中,该大规格天花板材的吊顶装置100包括底座组件110、升降组件120以及顶架组件130。升降组件120与底座组件110连接;顶架组件130用于顶升天花板材,如图2所示,顶架组件130包括顶架主体131、第一支撑结构132和第二支撑结构133,顶架主体131与升降组件120连接,以通过升降组件120使顶架主体131上升或下降,第一支撑结构132与顶架主体131滑动连接并能够相对顶架主体131沿第一方向101伸出,第二支撑结构133与顶架主体131滑动连接并能够相对顶架主体131沿第二方向102伸出,第一方向101与第二方向102成夹角。In the embodiment of the present invention, the ceiling device 100 for large-size ceiling materials includes a base assembly 110 , a lifting assembly 120 and a top frame assembly 130 . The lifting assembly 120 is connected with the base assembly 110; the top frame assembly 130 is used to lift the ceiling material. As shown in FIG. The main body 131 is connected with the lifting assembly 120 so that the top frame main body 131 can be raised or lowered through the lifting assembly 120. The first supporting structure 132 is slidably connected with the top frame main body 131 and can extend relative to the top frame main body 131 along the first direction 101. The two support structures 133 are slidably connected to the top frame body 131 and can protrude relative to the top frame body 131 along the second direction 102 , the first direction 101 and the second direction 102 form an included angle.

需要指出的是,在本实用新型实施例中,底座组件110用于提供支持和底部的稳定,升降组件120用于实现顶架组件130的上升或下降,顶架组件130用于吊顶天花板材,即可以通过升降组件120可以实现顶架组件130以及放置于顶架组件130上的天花板材的升降吊顶。在本实用新型实施例中,顶架组件130包括顶架主体131以及相对顶架主体131分别沿第一方向101和第二方向102伸出的第一支撑结构132和第二支撑结构133,且第一方向101与第二方向102成夹角。在第一支撑结构132相对支架主体伸出时,顶架组件130的支撑面积增大,可以适用于更大尺寸的天花板材吊顶。也就是说,第一支撑结构132和第二支撑结构133能够相对支架主体伸缩以调节顶架组件130的支撑面积,使得本实用新型实施例提供的吊顶装置不仅能够根据天花板材的大小尺寸调节与之适应的支撑面积,而且由于第一支撑结构132和第二支撑结构133可以增加顶架组件130的支撑面积,还可以使顶架组件130能够吊顶大规格天花板材,从而使大规格天花板材的吊顶更节省人工,降低现场施工难度,有利于缩短施工时间。It should be pointed out that, in the embodiment of the utility model, the base assembly 110 is used to provide support and bottom stability, the lifting assembly 120 is used to realize the rise or fall of the top frame assembly 130, and the top frame assembly 130 is used for the suspended ceiling material, That is, the ceiling assembly 130 and the ceiling materials placed on the ceiling assembly 130 can be lifted and suspended by the lifting assembly 120 . In the embodiment of the present invention, the top frame assembly 130 includes a top frame body 131 and a first support structure 132 and a second support structure 133 protruding from the top frame body 131 along the first direction 101 and the second direction 102 respectively, and The first direction 101 forms an angle with the second direction 102 . When the first supporting structure 132 protrudes relative to the main body of the bracket, the supporting area of the top frame assembly 130 increases, which can be applied to larger-sized ceiling materials. That is to say, the first support structure 132 and the second support structure 133 can expand and contract relative to the bracket main body to adjust the support area of the top frame assembly 130, so that the ceiling device provided by the embodiment of the present invention can not only be adjusted according to the size of the ceiling material and The supporting area adapted to it, and since the first supporting structure 132 and the second supporting structure 133 can increase the supporting area of the top frame assembly 130, the top frame assembly 130 can also suspend large-size ceiling materials, so that the large-size ceiling materials The suspended ceiling is more labor-saving, reduces the difficulty of on-site construction, and is conducive to shortening the construction time.

同时,也需要说明的是,对于第一支撑结构132和第二支撑结构133来说,两者共同与顶架主体131形成用于支撑天花板材的支撑面。也就是说,顶架主体131、第一支撑结构132以及第二支撑结构133的顶部表面大体在同一平面上。而就第一支撑结构132和第二支撑结构133相对支架主体分别伸出的第一方向101和第二方向102来说,两者均是在上述的“同一平面”上的伸出和缩回,即第一支撑结构132和第二支撑结构133的伸缩运动是在用于支撑天花板材的支撑面上进行的。可选地,在本实用新型实施例中,第一支撑结构132和第二支撑结构133具有多个伸出位置,以适应不同尺寸和形状的多种天花板材。At the same time, it should also be noted that, for the first supporting structure 132 and the second supporting structure 133 , they together form a supporting surface for supporting the ceiling material together with the top frame main body 131 . That is to say, top surfaces of the top frame body 131 , the first support structure 132 and the second support structure 133 are substantially on the same plane. In terms of the first direction 101 and the second direction 102 in which the first support structure 132 and the second support structure 133 respectively protrude relative to the main body of the bracket, they both extend and retract on the above-mentioned "same plane". , that is, the telescopic movement of the first support structure 132 and the second support structure 133 is performed on the support surface for supporting the ceiling material. Optionally, in this embodiment of the present invention, the first supporting structure 132 and the second supporting structure 133 have multiple protruding positions, so as to adapt to various ceiling materials of different sizes and shapes.

此外,还需要说明的是,本实用新型实施例通过设置底座组件110、升降组件120以及顶架组件130,使其不仅具有吊顶大规格天花板材的特点,而且顶架组件130的主吊顶支撑面积也可以根据实际使用场景进行调节。相较于背景技术中的现有技术来说,本实用新型实施例提供的吊顶装置适用性更广且能够满足大规格天花板材的吊顶作业,从而显著改善或基本克服了现有技术缺陷。In addition, it should be noted that the embodiment of the utility model not only has the characteristics of the large-size ceiling material of the suspended ceiling by setting the base assembly 110, the lifting assembly 120 and the top frame assembly 130, but also the main ceiling support area of the top frame assembly 130 It can also be adjusted according to the actual usage scenario. Compared with the prior art in the background art, the ceiling device provided by the embodiment of the utility model has wider applicability and can meet the ceiling operation of large-size ceiling materials, thereby significantly improving or basically overcoming the defects of the prior art.

请参阅图3,在本实用新型实施例中,上述的顶架主体131可以包括第一顶架部1311和第二顶架部1312,第一顶架部1311与升降组件120连接,第二顶架部1312与第一顶架部1311成夹角连接,第一支撑结构132与第一顶架部1311连接,第二支撑结构133与第二顶架部1312连接。Please refer to Fig. 3, in the embodiment of the present utility model, the above-mentioned top frame body 131 may include a first top frame part 1311 and a second top frame part 1312, the first top frame part 1311 is connected with the lifting assembly 120, and the second top frame part The frame part 1312 is connected to the first top frame part 1311 at an angle, the first support structure 132 is connected to the first top frame part 1311 , and the second support structure 133 is connected to the second top frame part 1312 .

需要指出的是,在本实用新型实施例中,对于顶架主体131来说,其包括第一顶架部1311和第二顶架部1312,第一顶架部1311和第二顶架部1312成夹角,分别用于与第一支撑结构132和第二支撑结构133连接,且第一支撑结构132和第二支撑结构133能够分别相对第一顶架部1311和第二顶架部1312伸出。可选地,第一顶架部1311设有沿第一方向101延伸的第一调节滑槽,第一支撑结构132可滑动地安装于第一调节滑槽内;和/或,第二顶架部1312设有沿第二方向102延伸的第二调节滑槽,第二支撑结构133可滑动地安装于第二调节滑槽内。当然并不仅限于此,在本实用新型的其他实施例中,第一支撑结构132与第一顶架部1311之间、第二支撑结构133与第二顶架部1312之间也可以以其他的连接方式实现伸缩连接,本实用新型实施例对此不作具体要求和限定。It should be pointed out that, in the embodiment of the present utility model, for the top frame main body 131, it includes a first top frame part 1311 and a second top frame part 1312, and the first top frame part 1311 and the second top frame part 1312 form an included angle, and are respectively used to connect with the first support structure 132 and the second support structure 133, and the first support structure 132 and the second support structure 133 can extend relative to the first top frame part 1311 and the second top frame part 1312 respectively. out. Optionally, the first top frame part 1311 is provided with a first adjustment chute extending along the first direction 101, and the first support structure 132 is slidably installed in the first adjustment chute; and/or, the second top frame The portion 1312 is provided with a second adjustment sliding slot extending along the second direction 102 , and the second support structure 133 is slidably installed in the second adjustment sliding slot. Of course it is not limited thereto. In other embodiments of the present utility model, other structures may be used between the first support structure 132 and the first top frame part 1311 and between the second support structure 133 and the second top frame part 1312. The connection method realizes telescopic connection, which is not specifically required or limited by the embodiments of the present utility model.

可选地,在本实施例中,第一支撑结构132和第二支撑结构133为杆状或柱状或块状结构。Optionally, in this embodiment, the first support structure 132 and the second support structure 133 are rod-shaped, column-shaped or block-shaped structures.

可选地,在本实施例中,顶架主体131还包括结构加强部1313,结构加强部1313与第一顶架部1311连接并靠近升降组件120。该结构加强部1313用于增加顶架主体131的结构强度,该结构加强部1313与升降组件120的位置相邻,用于提升顶架主体131的结构强度。Optionally, in this embodiment, the top frame main body 131 further includes a structural reinforcement part 1313 , and the structural reinforcement part 1313 is connected to the first top frame part 1311 and is close to the lifting assembly 120 . The structural reinforcement part 1313 is used to increase the structural strength of the top frame main body 131 , and the structural reinforcement part 1313 is adjacent to the lift assembly 120 , and is used to increase the structural strength of the top frame main body 131 .

如图3所示,在本实施例中,第一支撑结构132包括两个,并分别与第一顶架部1311的两端连接;第二顶架部1312包括四个,并两两位于第一顶架部1311的两端,第二支撑结构133包括四个,四个第二支撑结构133与四个第二顶架部1312对应连接。可选地,在本实施例中,顶架主体131大体成“工”字型,以对天花板材起到更好的支撑效果,确保吊顶作业安全。As shown in Figure 3, in this embodiment, the first support structure 132 includes two, and is respectively connected with the two ends of the first top frame part 1311; Two ends of a top frame part 1311 include four second support structures 133 , and the four second support structures 133 are correspondingly connected with the four second top frame parts 1312 . Optionally, in this embodiment, the top frame main body 131 is generally in the shape of an "I", so as to better support the ceiling material and ensure the safety of the ceiling operation.

在本实用新型实施例中,顶架主体131与升降组件120转动连接,以使顶架主体131能够相对升降组件120转动,且在转动时顶架主体131的高度不变。顶架主体131能够相对升降组件120转动,可以在作业时更好地对天花板材的角度进行调整,使装配更加方便,有利于进一步提升装配效率。In the embodiment of the present invention, the top frame main body 131 is rotatably connected with the lifting assembly 120, so that the top frame main body 131 can rotate relative to the lifting assembly 120, and the height of the top frame main body 131 remains unchanged during the rotation. The top frame main body 131 can rotate relative to the lifting assembly 120, which can better adjust the angle of the ceiling material during operation, making the assembly more convenient and helping to further improve the assembly efficiency.

请参阅图4,在本实用新型实施例中,上述的升降组件120可以包括安装座121和升降支撑件122,安装座121与底座组件110固定,升降支撑件122与安装座121连接并形成丝杠螺母副,以带动升降支撑件122上升或下降。Please refer to FIG. 4 , in the embodiment of the present utility model, the above-mentioned lifting assembly 120 may include a mounting base 121 and a lifting support 122, the mounting base 121 is fixed with the base assembly 110, and the lifting support 122 is connected with the mounting base 121 and forms a wire The lever nut pair is used to drive the lifting support member 122 to rise or fall.

也就是说,在本实用新型实施例中,升降组件120采用的是丝杠螺母副的方式实现升降支撑件122的上升或下降,丝杠螺母副具有结构稳定性高以及实现方便的特点。进一步地,在本实施例中,安装座121包括丝杠轴承1211,升降支撑件122与丝杠轴承1211传动连接并形成丝杠螺母副,安装座121设有驱动件插槽1212,驱动件插槽1212用于使驱动件插入,以通过驱动件带动丝杠轴承1211旋转。驱动件可以为电机转轴或者手动摇杆,即通过手动或自动实现升降组件120的升降。That is to say, in the embodiment of the present utility model, the lifting assembly 120 adopts a screw nut pair to realize the lifting or lowering of the lifting support 122, and the screw nut pair has the characteristics of high structural stability and convenient implementation. Further, in this embodiment, the mounting seat 121 includes a screw bearing 1211, and the lifting support 122 is connected to the screw bearing 1211 to form a screw nut pair. The mounting seat 121 is provided with a driver slot 1212, and the driver is inserted The slot 1212 is used for inserting the driving part to drive the screw bearing 1211 to rotate through the driving part. The driving part can be a motor shaft or a manual rocker, that is, the lifting assembly 120 can be lifted up and down manually or automatically.

需要指出的是,顶架主体131与升降支撑件122之间可以采用转动连接的方式,即第一顶架部1311与升降支撑件122之间采用转动连接的方式进行连接,转动连接的具体方式可以为枢轴连接、转轴连接或者其他的转动连接方式,本实用新型实施例对此不做具体要求和限定。It should be pointed out that the top frame main body 131 and the lifting support member 122 can be connected by rotation, that is, the first top frame part 1311 and the lifting support member 122 can be connected by rotation connection, the specific method of rotation connection It may be a pivotal connection, a rotating shaft connection or other rotational connection methods, which are not specifically required or limited by the embodiment of the present utility model.

可选地,升降支撑件122可以由方管、型材等结构组成,本实用新型实施例对升降支撑件122的结构形式和组成不做具体要求和限定。Optionally, the lifting support 122 can be composed of square pipes, profiles and other structures, and the embodiment of the utility model does not make specific requirements and limitations on the structural form and composition of the lifting support 122 .

请参阅图5,在本实用新型实施例中,上述的底座组件110可以包括支撑座111和多个支撑杆112,安装座121与支撑座111固定连接,支撑座111设有容纳腔,升降支撑件122能够部分容纳于容纳腔内,多个支撑杆112与支撑座111转动连接,以使支撑杆112能够折叠于支撑座111上。也就是说,升降支撑件122能够容纳在容纳腔内。在升降支撑件122通过丝杠螺母副上升时,升降支撑件122从容纳腔内伸出;在升降支撑件122通过丝杠螺母副下降时,升降支撑件122缩回到容纳腔内。多个支撑杆112可以增加与地面的接触面积,从而提升底座组件110在工作过程中的稳定和平衡,确保吊顶作业。Please refer to Fig. 5. In the embodiment of the present utility model, the above-mentioned base assembly 110 may include a support base 111 and a plurality of support rods 112, the mounting base 121 is fixedly connected with the support base 111, and the support base 111 is provided with an accommodation chamber for lifting support The member 122 can be partially accommodated in the receiving cavity, and the plurality of support rods 112 are rotatably connected to the support base 111 , so that the support rods 112 can be folded on the support base 111 . That is, the lifting support 122 can be accommodated in the accommodation cavity. When the lifting support member 122 is lifted by the lead screw nut pair, the lifting support member 122 protrudes from the accommodation chamber; when the lifting support member 122 is lowered by the lead screw nut pair, the lifting support member 122 retracts into the accommodation chamber. The plurality of support rods 112 can increase the contact area with the ground, thereby improving the stability and balance of the base assembly 110 during work, and ensuring the ceiling operation.

可选地,在本实施例中,支撑杆112与支撑座111之间采用转动连接的方式连接,以将支撑杆112收纳折叠到支撑座111上。转动连接的方式可以采用转轴等。Optionally, in this embodiment, the support rod 112 is connected to the support base 111 in a rotational manner, so that the support rod 112 is stored and folded on the support base 111 . The way of rotating connection can adopt rotating shaft or the like.

可选地,在本实施例中,底座组件110还可以包括多个万向轮113,多个万向轮113对应地安装在多个支撑杆112上。该万向轮113可以为带有刹车功能,以在吊顶时固定。Optionally, in this embodiment, the base assembly 110 may further include a plurality of universal wheels 113 , and the plurality of universal wheels 113 are correspondingly installed on the plurality of support rods 112 . This universal wheel 113 can be with brake function, to be fixed when suspending the ceiling.

请结合参阅图1至图5,本实用新型实施例提供的大规格天花板材的吊顶装置100:底座组件110用于提供支持和底部的稳定,升降组件120用于实现顶架组件130的上升或下降,顶架组件130用于吊顶天花板材,本实用新型实施例可以通过升降组件120可以实现顶架组件130以及放置于顶架组件130上的天花板材的升降吊顶。顶架组件130包括顶架主体131以及相对顶架主体131分别沿第一方向101和第二方向102伸出的第一支撑结构132和第二支撑结构133,且第一方向101与第二方向102成夹角。在第一支撑结构132相对支架主体伸出时,顶架组件130的支撑面积增大,可以适用于更大尺寸的天花板材吊顶。第一支撑结构132和第二支撑结构133能够相对支架主体伸缩以调节顶架组件130的支撑面积,使得本实用新型实施例提供的吊顶装置不仅能够根据天花板材的大小尺寸调节与之适应的支撑面积,而且由于第一支撑结构132和第二支撑结构133可以增加顶架组件130的支撑面积,还可以使顶架组件130能够吊顶大规格天花板材,从而使大规格天花板材的吊顶更节省人工,降低现场施工难度,有利于缩短施工时间。Please refer to Fig. 1 to Fig. 5, the ceiling device 100 of the large-size ceiling material provided by the embodiment of the present invention: the base assembly 110 is used to provide support and the stability of the bottom, and the lifting assembly 120 is used to realize the rise or fall of the top frame assembly 130 Down, the top frame assembly 130 is used to suspend the ceiling material. In the embodiment of the present invention, the lifting assembly 120 can realize the lifting and suspension of the top frame assembly 130 and the ceiling materials placed on the top frame assembly 130 . The top frame assembly 130 includes a top frame body 131 and a first support structure 132 and a second support structure 133 protruding from the top frame body 131 along a first direction 101 and a second direction 102 respectively, and the first direction 101 and the second direction 102 into an included angle. When the first supporting structure 132 protrudes relative to the main body of the bracket, the supporting area of the top frame assembly 130 increases, which can be applied to larger-sized ceiling materials. The first support structure 132 and the second support structure 133 can be stretched relative to the main body of the bracket to adjust the support area of the top frame assembly 130, so that the ceiling device provided by the embodiment of the present invention can not only adjust the support adapted to it according to the size of the ceiling material area, and since the first supporting structure 132 and the second supporting structure 133 can increase the supporting area of the top frame assembly 130, it can also enable the top frame assembly 130 to suspend large-size ceiling materials, thereby making the ceiling of large-size ceiling materials more labor-saving , reduce the difficulty of on-site construction, and help shorten the construction time.

以上对本实用新型实施例公开的一种大规格天花板材的吊顶装置进行了详细的介绍,本文中应用了具体个例对本实用新型的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本实用新型的一种大规格天花板材的吊顶装置及其核心思想:同时,对于本领域的一般技术人员,依据本实用新型的思想,在具体实施方式及应用范围上均会有改变之处,综上,本说明书内容不应理解为对本实用新型的限制。The above is a detailed introduction to the ceiling device of a large-size ceiling material disclosed in the embodiment of the present invention. In this paper, specific examples are used to illustrate the principle and implementation of the present invention. The description of the above embodiment is only for To help understand the ceiling device of a large-size ceiling material of the present invention and its core idea: At the same time, for those skilled in the art, there will be changes in the specific implementation and application range according to the idea of the present invention In summary, the contents of this specification should not be construed as limiting the utility model.

Claims (10)

1.一种大规格天花板材的吊顶装置,其特征在于,包括:1. A ceiling device for large-scale ceiling materials, characterized in that it comprises: 底座组件(110);base assembly (110); 升降组件(120),所述升降组件(120)与所述底座组件(110)连接;a lifting component (120), the lifting component (120) is connected to the base component (110); 顶架组件(130),所述顶架组件(130)用于顶升天花板材,包括顶架主体(131)、第一支撑结构(132)和第二支撑结构(133),所述顶架主体(131)与所述升降组件(120)连接,以通过所述升降组件(120)使所述顶架主体(131)上升或下降,所述第一支撑结构(132)与所述顶架主体(131)滑动连接并能够相对所述顶架主体(131)沿第一方向(101)伸出,所述第二支撑结构(133)与所述顶架主体(131)滑动连接并能够相对所述顶架主体(131)沿第二方向(102)伸出,所述第一方向(101)与所述第二方向(102)成夹角。The top frame assembly (130), the top frame assembly (130) is used to lift the ceiling material, including the top frame main body (131), the first support structure (132) and the second support structure (133), the top frame The main body (131) is connected with the lifting assembly (120), so that the top frame main body (131) can be raised or lowered through the lifting assembly (120), and the first support structure (132) is connected with the top frame The main body (131) is slidably connected and can extend relative to the top frame main body (131) along the first direction (101), and the second support structure (133) is slidably connected to the top frame main body (131) and can be relatively The top frame main body (131) protrudes along a second direction (102), and the first direction (101) forms an included angle with the second direction (102). 2.根据权利要求1所述的大规格天花板材的吊顶装置,其特征在于,所述顶架主体(131)包括第一顶架部(1311)和第二顶架部(1312),所述第一顶架部(1311)与所述升降组件(120)连接,所述第二顶架部(1312)与所述第一顶架部(1311)成夹角连接,所述第一支撑结构(132)与所述第一顶架部(1311)连接,所述第二支撑结构(133)与所述第二顶架部(1312)连接。2. The ceiling device for large-size ceiling materials according to claim 1, characterized in that, the top frame body (131) includes a first top frame part (1311) and a second top frame part (1312), the The first top frame part (1311) is connected to the lifting assembly (120), the second top frame part (1312) is connected to the first top frame part (1311) at an angle, and the first support structure (132) is connected to the first top frame part (1311), and the second support structure (133) is connected to the second top frame part (1312). 3.根据权利要求2所述的大规格天花板材的吊顶装置,其特征在于,所述第一顶架部(1311)设有沿所述第一方向(101)延伸的第一调节滑槽,所述第一支撑结构(132)可滑动地安装于所述第一调节滑槽内;和/或,所述第二顶架部(1312)设有沿所述第二方向(102)延伸的第二调节滑槽,所述第二支撑结构(133)可滑动地安装于所述第二调节滑槽内。3. The ceiling device for large-size ceiling materials according to claim 2, characterized in that, the first top frame part (1311) is provided with a first adjustment chute extending along the first direction (101), The first support structure (132) is slidably installed in the first adjustment chute; and/or, the second top frame part (1312) is provided with a In the second adjustment slide slot, the second support structure (133) is slidably installed in the second adjustment slide slot. 4.根据权利要求2所述的大规格天花板材的吊顶装置,其特征在于,所述顶架主体(131)还包括结构加强部(1313),所述结构加强部(1313)与所述第一顶架部(1311)连接并靠近所述升降组件(120)。4. The ceiling device for large-size ceiling materials according to claim 2, characterized in that, the top frame main body (131) further includes a structural reinforcement part (1313), and the structural reinforcement part (1313) is connected to the second A top frame part (1311) is connected to and close to the lift assembly (120). 5.根据权利要求2-4任一项所述的大规格天花板材的吊顶装置,其特征在于,所述第一支撑结构(132)包括两个,并分别与所述第一顶架部(1311)的两端连接;所述第二顶架部(1312)包括四个,并两两位于所述第一顶架部(1311)的两端,所述第二支撑结构(133)包括四个,四个所述第二支撑结构(133)与四个所述第二顶架部(1312)对应连接。5. The ceiling device for large-size ceiling materials according to any one of claims 2-4, characterized in that, the first supporting structure (132) includes two, and are connected to the first top frame part ( 1311) are connected at both ends; the second top frame part (1312) includes four, and two two are located at the two ends of the first top frame part (1311), and the second support structure (133) includes four The four second support structures (133) are correspondingly connected to the four second top frame parts (1312). 6.根据权利要求1-4任一项所述的大规格天花板材的吊顶装置,其特征在于,所述顶架主体(131)与所述升降组件(120)转动连接,以使所述顶架主体(131)能够相对所述升降组件(120)转动。6. The ceiling device for large-size ceiling materials according to any one of claims 1-4, characterized in that, the ceiling main body (131) is rotatably connected to the lifting assembly (120), so that the ceiling The frame main body (131) can rotate relative to the lifting assembly (120). 7.根据权利要求1-4任一项所述的大规格天花板材的吊顶装置,其特征在于,所述升降组件(120)包括安装座(121)和升降支撑件(122),所述安装座(121)与所述底座组件(110)固定,所述升降支撑件(122)与所述安装座(121)连接并形成丝杠螺母副,以带动所述升降支撑件(122)上升或下降。7. The ceiling device for large-size ceiling materials according to any one of claims 1-4, characterized in that, the lifting assembly (120) includes a mounting base (121) and a lifting support (122), and the mounting The seat (121) is fixed with the base assembly (110), and the lifting support (122) is connected with the installation seat (121) to form a screw nut pair, so as to drive the lifting support (122) to rise or decline. 8.根据权利要求7所述的大规格天花板材的吊顶装置,其特征在于,所述安装座(121)包括丝杠轴承(1211),所述升降支撑件(122)与所述丝杠轴承(1211)传动连接并形成丝杠螺母副,所述安装座(121)设有驱动件插槽(1212),所述驱动件插槽(1212)用于使驱动件插入,以通过所述驱动件带动所述丝杠轴承(1211)旋转。8. The ceiling device for large-size ceiling materials according to claim 7, characterized in that, the mounting seat (121) includes a screw bearing (1211), and the lifting support (122) is connected to the screw bearing (1211) transmission connection and form a lead screw nut pair, the mounting seat (121) is provided with a driver slot (1212), and the driver slot (1212) is used to insert the driver to pass through the drive Parts drive the screw bearing (1211) to rotate. 9.根据权利要求7所述的大规格天花板材的吊顶装置,其特征在于,所述底座组件(110)包括支撑座(111)和多个支撑杆(112),所述安装座(121)与所述支撑座(111)固定连接,所述支撑座(111)设有容纳腔,所述升降支撑件(122)能够部分容纳于所述容纳腔内,所述多个支撑杆(112)与所述支撑座(111)转动连接,以使所述支撑杆(112)能够折叠于支撑座(111)上。9. The ceiling device for large-size ceiling materials according to claim 7, characterized in that, the base assembly (110) includes a support base (111) and a plurality of support rods (112), and the installation base (121) It is fixedly connected with the support seat (111), the support seat (111) is provided with an accommodation cavity, the lifting support (122) can be partially accommodated in the accommodation cavity, and the plurality of support rods (112) It is rotatably connected with the support seat (111), so that the support rod (112) can be folded on the support seat (111). 10.根据权利要求9所述的大规格天花板材的吊顶装置,其特征在于,所述底座组件(110)还包括多个万向轮(113),所述多个万向轮(113)对应地安装在所述多个支撑杆(112)上。10. The ceiling device for large-size ceiling materials according to claim 9, characterized in that, the base assembly (110) further includes a plurality of universal wheels (113), and the plurality of universal wheels (113) correspond to ground mounted on the plurality of support rods (112).
CN202223469528.2U 2022-12-23 2022-12-23 Suspended ceiling device of large-size suspended ceiling material Active CN219060791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223469528.2U CN219060791U (en) 2022-12-23 2022-12-23 Suspended ceiling device of large-size suspended ceiling material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223469528.2U CN219060791U (en) 2022-12-23 2022-12-23 Suspended ceiling device of large-size suspended ceiling material

Publications (1)

Publication Number Publication Date
CN219060791U true CN219060791U (en) 2023-05-23

Family

ID=86345705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223469528.2U Active CN219060791U (en) 2022-12-23 2022-12-23 Suspended ceiling device of large-size suspended ceiling material

Country Status (1)

Country Link
CN (1) CN219060791U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118653722A (en) * 2024-06-25 2024-09-17 中国五冶集团有限公司 Support device for adhesive sheet ceiling construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118653722A (en) * 2024-06-25 2024-09-17 中国五冶集团有限公司 Support device for adhesive sheet ceiling construction

Similar Documents

Publication Publication Date Title
CN219470695U (en) A pier body top mold support device
CN219156417U (en) An auxiliary equipment for installation and construction support of decorative panels for building exterior walls
CN223687906U (en) Lifting device for curtain wall construction
CN112897406B (en) Fork truck driving type large glass calibrating and mounting semi-automatic device and using method thereof
CN213537051U (en) Gantry crane with electric hoist
CN218145277U (en) Hoisting device for mounting glass curtain wall
CN114635553A (en) A hanging basket that can move horizontally and adjust its height
CN217975460U (en) A construction equipment for the positioning and installation of the keel frame of a large-inclination glass curtain wall
CN217840939U (en) Turnover device for wallboard in small space
CN219548420U (en) Building curtain wall mounting structure
CN219217279U (en) Assembled building wallboard hoist device
CN117533938A (en) Prefabricated wallboard component overhead hoist
CN212562557U (en) Auxiliary installation device for glass curtain wall
CN220817655U (en) Auxiliary device for building construction
CN111137059B (en) Automatic mounting equipment for indoor decorative picture
CN220245372U (en) Lifting device
CN112320563A (en) Truss handling installation device for bridge construction
CN206814305U (en) A kind of new convenient type building construction hoisting machine
CN222374113U (en) A concrete prefabricated component hanging frame assembly
CN221622113U (en) Elevator transmission dolly assembly fixture
CN221051347U (en) A bridge hoisting device
CN223188763U (en) Glass curtain wall installation device
CN219365519U (en) House beam reinforcing and stabilizing device for building structure design
CN216766482U (en) Adjustable keel fixing structure for wood decorations
CN223468092U (en) Better arch structure multisection stand installation of stability is with unhook hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20251212

Granted publication date: 20230523