CN219060131U - Telecom engineering well - Google Patents
Telecom engineering well Download PDFInfo
- Publication number
- CN219060131U CN219060131U CN202320248122.7U CN202320248122U CN219060131U CN 219060131 U CN219060131 U CN 219060131U CN 202320248122 U CN202320248122 U CN 202320248122U CN 219060131 U CN219060131 U CN 219060131U
- Authority
- CN
- China
- Prior art keywords
- base
- groups
- engineering
- sliding
- blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及地下管线工作井技术领域,特别是涉及一种电信工程井道。The utility model relates to the technical field of underground pipeline working wells, in particular to a telecommunication engineering well.
背景技术Background technique
电信工程,即利用无线电、有线电、光等电磁系统传递符号、文字、图像或语言等信息的工程,随着我国现代化的发展,很多地区的建设在不断壮大和完善,要求其相应的电信工程建设也在不断的扩大和重组,电线电缆的规模和电缆铺设的路线也需要有所改变,为了保护电信电缆,一般会先埋设电信井道,电信电缆需要设置在井道中。Telecommunication engineering, that is, the engineering of transmitting information such as symbols, characters, images or languages by using electromagnetic systems such as radio, cable, and light. The construction is also constantly expanding and reorganizing. The scale of wires and cables and the route of cable laying also need to be changed. In order to protect the telecommunication cables, the telecommunication shafts are generally buried first, and the telecommunication cables need to be installed in the shafts.
但现有的电信工程井道内大多缺少固定结构,铺设在井道中的电缆一般是无序的堆叠在一起,当遇到问题需要更换维修时,不能及时的发现问题电缆,会影响正常工作。However, most of the existing telecommunications engineering wells lack fixed structures, and the cables laid in the well are generally stacked together in disorder. When problems need to be replaced and repaired, the problematic cables cannot be found in time, which will affect normal work.
实用新型内容Utility model content
为了克服现有技术的不足,本实用新型提供一种电信工程井道。In order to overcome the deficiencies of the prior art, the utility model provides a telecommunication engineering hoistway.
为解决上述技术问题,本实用新型提供如下技术方案:一种电信工程井道,包括工程井道本体,所述工程井道本体上端部设置有井盖,所述工程井道本体内侧壁上对称开设有第一滑槽,所述工程井道本体内部设置有下基座和上基座,所述上基座位于下基座上方,所述下基座和上基座的两侧侧壁上均对称固定安装有第一滑块,两组所述第一滑块分别滑动内设在两组第一滑槽中,两组所述第一滑块侧壁上均固定安装有第一弹簧。In order to solve the above technical problems, the utility model provides the following technical solutions: a telecommunication engineering well, including the engineering well body, the upper end of the engineering well body is provided with a manhole cover, and the inner side wall of the engineering well body is symmetrically provided with first slides. A lower base and an upper base are arranged inside the engineering hoistway body, the upper base is located above the lower base, and the side walls on both sides of the lower base and the upper base are symmetrically fixed with the second base. A slider, the first sliders of the two groups are respectively slidably arranged in the first slide grooves of the two groups, and the first springs are fixedly installed on the side walls of the first sliders of the two groups.
作为本实用新型的一种优选技术方案,每个所述第一弹簧远离第一滑块的一端均与第一滑槽内壁固定连接,所述下基座和上基座内壁中均对称开设有第二滑槽。As a preferred technical solution of the present utility model, the end of each first spring away from the first slider is fixedly connected to the inner wall of the first chute, and the inner walls of the lower base and the upper base are symmetrically opened with Second chute.
作为本实用新型的一种优选技术方案,所述下基座和上基座内部均对称设置有基块,两阻所述基块下端部均固定安装有第二滑块,两组所述第二滑块分别滑动内设在两组第二滑槽中。As a preferred technical solution of the present utility model, base blocks are symmetrically arranged inside the lower base and the upper base, and second sliders are fixedly installed on the lower ends of the two base blocks, and the second sliders of the two groups The two sliders slide respectively and are arranged in two groups of second slide grooves.
作为本实用新型的一种优选技术方案,两组所述第二滑块侧壁上均固定安装有第二弹簧,两组所述第二弹簧远离第二滑块的一端均与第二滑槽内壁固定连接。As a preferred technical solution of the present utility model, second springs are fixedly installed on the side walls of the second sliders of the two groups, and the ends of the second springs of the two groups far away from the second sliders are connected with the second chute. The inner wall is fixedly connected.
作为本实用新型的一种优选技术方案,两组所述基块侧壁上均固定安装有弧形条,两组所述弧形条内部均螺纹安装有紧固螺栓。As a preferred technical solution of the present invention, arc-shaped strips are fixedly installed on the side walls of the base blocks of the two groups, and fastening bolts are threaded inside the arc-shaped strips of the two groups.
作为本实用新型的一种优选技术方案,两组所述弧形条相对的侧壁上均设置有缓冲片,两组所述缓冲片与弧形条之间通过紧固螺栓连接在一起。As a preferred technical solution of the present invention, buffer sheets are provided on the opposite side walls of the two groups of arc-shaped bars, and the two groups of buffer sheets and the arc-shaped bars are connected together by fastening bolts.
与现有技术相比,本实用新型能达到的有益效果是:Compared with the prior art, the beneficial effects that the utility model can achieve are:
其一,在第二滑块的滑动下将带动第二弹簧随之发生压缩,此时在第二弹簧和第一弹簧回弹力的作用下将完成对电缆的固定作业,使得该设备在使用时对电缆的固定效果更好,且适用于任意规格的电缆,适用范围更广,放置更加有序稳定;Firstly, under the sliding of the second slider, the second spring will be driven to be compressed. At this time, under the action of the second spring and the resilience force of the first spring, the fixing operation of the cable will be completed, so that when the device is in use The fixing effect on the cable is better, and it is suitable for cables of any specification, the application range is wider, and the placement is more orderly and stable;
其二,通过弧形条、紧固螺栓和缓冲片的设计,当设备对电缆进行固定时缓冲片将与电缆接触,使其不易对电缆造成损伤,且当缓冲片发生损坏时可通过紧固螺栓完成拆卸,使得缓冲片的更换更便捷。Second, through the design of arc-shaped strips, fastening bolts and buffer sheets, when the equipment fixes the cable, the buffer sheet will contact the cable, making it difficult to damage the cable, and when the buffer sheet is damaged, it can be fastened The bolts are completely disassembled, making the replacement of the shock absorber easier.
附图说明Description of drawings
图1为本实用新型的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present utility model;
图2为本实用新型的立体爆炸结构示意图;Fig. 2 is the three-dimensional explosion structure schematic diagram of the present utility model;
图3为本实用新型的下基座连接结构示意图;Fig. 3 is a schematic diagram of the connection structure of the lower base of the present invention;
图4为本实用新型的基块连接爆炸结构示意图。Fig. 4 is a schematic diagram of the exploded structure of the base block connection of the present invention.
其中:11、工程井道本体;12、井盖;13、第一滑槽;14、下基座;15、上基座;16、第一滑块;17、第一弹簧;18、第二滑槽;21、基块;22、第二滑块;23、第二弹簧;24、弧形条;25、紧固螺栓;26、缓冲片。Among them: 11. Engineering shaft body; 12. Manhole cover; 13. First chute; 14. Lower base; 15. Upper base; 16. First slider; 17. First spring; 18. Second chute ; 21, the base block; 22, the second slider; 23, the second spring; 24, the arc bar; 25, the fastening bolt; 26, the buffer sheet.
具体实施方式Detailed ways
为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例,进一步阐述本实用新型,但下述实施例仅仅为本实用新型的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其它实施例,都属于本实用新型的保护范围。下述实施例中的实验方法,如无特殊说明,均为常规方法,下述实施例中所用的材料、试剂等,如无特殊说明,均可从商业途径得到。In order to make the technical means, creative features, goals and effects of the utility model realized easy to understand, the utility model will be further elaborated below in conjunction with specific examples, but the following examples are only preferred embodiments of the utility model, not all . Based on the examples in the implementation manners, other examples obtained by those skilled in the art without making creative efforts all belong to the protection scope of the present utility model. The experimental methods in the following examples, unless otherwise specified, are conventional methods, and the materials, reagents, etc. used in the following examples, unless otherwise specified, can be obtained from commercial sources.
实施例:Example:
如图1、图2、图3和图4所示,一种电信工程井道,包括工程井道本体11,工程井道本体11上端部设置有井盖12,工程井道本体11内侧壁上对称开设有第一滑槽13,工程井道本体11内部设置有下基座14和上基座15,上基座15位于下基座14上方,下基座14和上基座15的两侧侧壁上均对称固定安装有第一滑块16,两组第一滑块16分别滑动内设在两组第一滑槽13中,两组第一滑块16侧壁上均固定安装有第一弹簧17,每个第一弹簧17远离第一滑块16的一端均与第一滑槽13内壁固定连接,下基座14和上基座15内壁中均对称开设有第二滑槽18。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of telecommunication engineering hoistway comprises
下基座14和上基座15内部均对称设置有基块21,两阻基块21下端部均固定安装有第二滑块22,两组第二滑块22分别滑动内设在两组第二滑槽18中,两组第二滑块22侧壁上均固定安装有第二弹簧23,两组第二弹簧23远离第二滑块22的一端均与第二滑槽18内壁固定连接,两组基块21侧壁上均固定安装有弧形条24,两组弧形条24内部均螺纹安装有紧固螺栓25,两组弧形条24相对的侧壁上均设置有缓冲片26,两组缓冲片26与弧形条24之间通过紧固螺栓25连接在一起,使用时可先向两端分别移动下基座14和上基座15,在下基座14和上基座15的移动下将带动与之固定的第一滑块16随之在第一滑槽13内部发生滑动,而在第一滑块16的移动下将带动与之固定的第一弹簧17随之发生压缩,此时可将电缆放置在缓冲片26内部,此时在挤压力的作用下将带动与之固定的缓冲片26和弧形条24随之发生扩张,此时弧形条24将带动基块21随之发生滑动,而在基块21的滑动下将带动与之固定的第二滑块22随之在第二滑槽18内部发生滑动,在第二滑块22的滑动下将带动第二弹簧23随之发生压缩,此时在第二弹簧23和第一弹簧17回弹力的作用下将完成对电缆的固定作业,使得该设备在使用时对电缆的固定效果更好,且适用于任意规格的电缆,适用范围更广;通过弧形条24、紧固螺栓25和缓冲片26的设计,当设备对电缆进行固定时缓冲片26将与电缆接触,使其不易对电缆造成损伤,且当缓冲片26发生损坏时可通过紧固螺栓25完成拆卸,使得缓冲片26的更换更便捷。Base blocks 21 are symmetrically arranged inside the
工作原理:working principle:
第一步:使用时可先向两端分别移动下基座14和上基座15,在下基座14和上基座15的移动下将带动与之固定的第一滑块16随之在第一滑槽13内部发生滑动,而在第一滑块16的移动下将带动与之固定的第一弹簧17随之发生压缩,此时可将电缆放置在缓冲片26内部,此时在挤压力的作用下将带动与之固定的缓冲片26和弧形条24随之发生扩张,此时弧形条24将带动基块21随之发生滑动,而在基块21的滑动下将带动与之固定的第二滑块22随之在第二滑槽18内部发生滑动,在第二滑块22的滑动下将带动第二弹簧23随之发生压缩,此时在第二弹簧23和第一弹簧17回弹力的作用下将完成对电缆的固定作业,使得该设备在使用时对电缆的固定效果更好,且适用于任意规格的电缆,适用范围更广;The first step: during use, the
第二步:通过弧形条24、紧固螺栓25和缓冲片26的设计,当设备对电缆进行固定时缓冲片26将与电缆接触,使其不易对电缆造成损伤,且当缓冲片26发生损坏时可通过紧固螺栓25完成拆卸,使得缓冲片26的更换更便捷。Step 2: Through the design of the
上面结合附图对本实用新型的实施方式作了详细说明,但是本实用新型并不限于此,在所属技术领域的技术人员所具备的知识范围内,在不脱离本实用新型宗旨的前提下还可以作出各种变化。Above, the embodiment of the present utility model has been described in detail in conjunction with the accompanying drawings, but the present utility model is not limited thereto. Make various changes.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320248122.7U CN219060131U (en) | 2023-02-17 | 2023-02-17 | Telecom engineering well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320248122.7U CN219060131U (en) | 2023-02-17 | 2023-02-17 | Telecom engineering well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219060131U true CN219060131U (en) | 2023-05-23 |
Family
ID=86376345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320248122.7U Active CN219060131U (en) | 2023-02-17 | 2023-02-17 | Telecom engineering well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219060131U (en) |
-
2023
- 2023-02-17 CN CN202320248122.7U patent/CN219060131U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211266319U (en) | Electric power construction engineering cable laying support | |
| CN219060131U (en) | Telecom engineering well | |
| CN101605437A (en) | Sliding lid construction | |
| CN110601103A (en) | Cable fixing support assembly | |
| CN220492569U (en) | Auxiliary device for power well wiring | |
| CN209818918U (en) | Building engineering water and electricity mounting structure | |
| CN212968879U (en) | Automatic change equipment cable constraint device | |
| CN211293927U (en) | Automatic testing arrangement of cell-phone software | |
| CN217607011U (en) | Base station antenna support | |
| CN210867134U (en) | A kind of construction engineering cable protection structure | |
| CN207074836U (en) | A kind of building chase | |
| CN215772484U (en) | Pipe laying support frame for building electromechanical installation | |
| CN214850214U (en) | Photovoltaic power plant data access device | |
| CN213211466U (en) | Experimental device for simulating various walking and sliding effects | |
| CN211830026U (en) | Pipe for laying electric wires and cables | |
| CN210156000U (en) | Eye-splice type circular signboard | |
| CN207967877U (en) | A kind of EHV transmission cable connection structure | |
| CN210779922U (en) | Cable fixing device for communication | |
| CN209561719U (en) | Data Protection Devices for Physical Isolation | |
| CN221669454U (en) | Machine room wiring structure | |
| CN209478140U (en) | A kind of ready-package hydralic hose component storing unit | |
| CN209993481U (en) | A three-phase capacitor core group insulation positioning device | |
| CN219420185U (en) | Line protection device for communication | |
| CN219888903U (en) | Partition wall pipeline positioning mechanism | |
| CN221743346U (en) | A municipal pipeline protection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250815 Address after: 102488 Beijing Fangshan District Liangxiang Kaixuan Street Jian she Road 18 - D12072 Patentee after: Beijing Hanyuan Information Technology Co.,Ltd. Country or region after: China Patentee after: Liu Xiaoying Patentee after: Zhang Guojing Address before: Room 401, Unit 2, Building C141, Hailiang Century New Town, Liuwu New District, Lhasa, Tibet Autonomous Region Patentee before: Tibet Hanzhi Information Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250828 Address after: 102488 Beijing Fangshan District Liangxiang KaiXuan Street JianShe Road No. 18 - D12073 Patentee after: Beijing Hanyuan Zhihe Information Technology Co.,Ltd. Country or region after: China Address before: 102488 Beijing Fangshan District Liangxiang Kaixuan Street Jian she Road 18 - D12072 Patentee before: Beijing Hanyuan Information Technology Co.,Ltd. Country or region before: China Patentee before: Liu Xiaoying Patentee before: Zhang Guojing |