CN219023773U - Absorption tower of a thermal power plant - Google Patents

Absorption tower of a thermal power plant Download PDF

Info

Publication number
CN219023773U
CN219023773U CN202223011694.8U CN202223011694U CN219023773U CN 219023773 U CN219023773 U CN 219023773U CN 202223011694 U CN202223011694 U CN 202223011694U CN 219023773 U CN219023773 U CN 219023773U
Authority
CN
China
Prior art keywords
tower body
tower
wall
fixedly connected
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223011694.8U
Other languages
Chinese (zh)
Inventor
于庆洲
肖永国
曲直
李沅霖
许艺
于悦
宋德宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Dalian Thermal Power Co Ltd
Original Assignee
Huaneng Dalian Thermal Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Dalian Thermal Power Co Ltd filed Critical Huaneng Dalian Thermal Power Co Ltd
Priority to CN202223011694.8U priority Critical patent/CN219023773U/en
Application granted granted Critical
Publication of CN219023773U publication Critical patent/CN219023773U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

本实用新型提供一种火力发电厂的吸收塔,包括塔体,塔体顶部设有贯穿塔体内部的排气管,塔体内部顶端开设有安装槽,安装槽底部设有储液槽,安装槽底部设有贯穿储液槽且位于塔体内部的净化组件,净化组件两侧设有位于塔体内壁和储液槽底部的喷洒组件,净化组件下方设有分隔板,分隔板两端固定连接塔体内壁,分隔板下方且贯穿塔体外部设有过滤组件,过滤组件底部且位于塔体内部底端开设有进液槽,塔体外壁设有连接管,连接管一端连接进液槽另一端连接储液槽,连接管靠近进液槽一端安装有水泵,本实用新型通过喷洒组件和净化组件配合对废气进行快速净化,提高净化效率,通过储液槽对喷洒过后的液体进行收集循环使用,减少资源的浪费。

Figure 202223011694

The utility model provides an absorption tower of a thermal power plant, which comprises a tower body. The top of the tower body is provided with an exhaust pipe penetrating the inside of the tower body. At the bottom of the tank, there is a purification component that runs through the liquid storage tank and is located inside the tower body. On both sides of the purification component, there are spraying components located on the inner wall of the tower and the bottom of the liquid storage tank. There is a partition plate under the purification component, and the two ends of the partition plate Fixedly connected to the inner wall of the tower, a filter assembly is provided under the partition plate and runs through the outside of the tower body, a liquid inlet tank is provided at the bottom of the filter assembly and at the bottom inside the tower body, a connecting pipe is provided on the outer wall of the tower, and one end of the connecting pipe is connected to the liquid inlet The other end of the tank is connected to the liquid storage tank, and a water pump is installed at the end of the connecting pipe close to the liquid inlet tank. The utility model quickly purifies the exhaust gas through the cooperation of the spraying component and the purification component, improves the purification efficiency, and collects the sprayed liquid through the liquid storage tank Recycle to reduce waste of resources.

Figure 202223011694

Description

一种火力发电厂的吸收塔Absorption tower of a thermal power plant

技术领域technical field

本实用新型涉及吸收塔技术领域,特别涉及一种火力发电厂的吸收塔。The utility model relates to the technical field of absorption towers, in particular to an absorption tower of a thermal power plant.

背景技术Background technique

吸收塔是实现吸收操作的设备。The absorption tower is the equipment that realizes the absorption operation.

根据申请号为号CN202220080639.5的专利文献所提供的一种废气吸收塔,涉及废气处理设备技术领域,包括塔体以及设置在塔体内的喷淋装置,所述塔体侧壁下部设有进气口,塔体侧壁上部设有出气口,塔体底部设有排液口,塔体顶部固定安装有水泵,所述水泵通过引流管向所述喷淋装置供液,塔体内水平设有阻流板,所述阻流板位于进气口与出气口之间,阻流板上竖直开设有若干S型孔,喷淋装置包括水平转动卡接在塔体内壁上的喷淋部、固定安装在塔体顶部内壁上的驱动部以及连接在驱动部与喷淋部之间的传动部,喷淋部位于出气口上方,所述引流管穿入塔体内与喷淋部转动相连;先启动水泵向喷淋部供给喷淋液,然后启动驱动部,并通过传动部带动喷淋部转动进行喷淋,废气从若干S型孔内穿过与喷淋液充分接触反应。According to the patent literature with the application number CN202220080639.5, an exhaust gas absorption tower is provided, which relates to the technical field of exhaust gas treatment equipment, including a tower body and a spray device arranged in the tower body. Air port, the upper part of the side wall of the tower body is provided with an air outlet, the bottom of the tower body is provided with a liquid discharge port, and a water pump is fixedly installed on the top of the tower body, and the water pump supplies liquid to the spray device through a drainage pipe. A baffle, the baffle is located between the air inlet and the air outlet, a number of S-shaped holes are vertically opened on the baffle, and the spraying device includes a spraying part that is horizontally rotated and clamped on the inner wall of the tower, The driving part fixedly installed on the inner wall of the top of the tower body and the transmission part connected between the driving part and the spraying part, the spraying part is located above the air outlet, and the drainage pipe penetrates into the tower body and is connected with the spraying part in rotation; first Start the water pump to supply spray liquid to the spray part, then start the driving part, and drive the spray part to rotate through the transmission part to spray, and the exhaust gas passes through several S-shaped holes to fully contact with the spray liquid.

以上专利虽然解决了背景技术中的问题,但是还是存在以下缺陷,喷头与第一搅拌叶和第二搅拌叶接触面小,吸收液与废气接触不充分,净化效率变得低,同时持续的喷淋吸收液容易造成浪费,提高工业成本。Although the above patents have solved the problems in the background technology, there are still the following defects. The contact surface between the nozzle and the first stirring blade and the second stirring blade is small, the contact between the absorption liquid and the exhaust gas is insufficient, and the purification efficiency becomes low. The leaching of the absorbing liquid is easy to cause waste and increase the industrial cost.

实用新型内容Utility model content

本实用新型主要提供了一种火力发电厂的吸收塔,用以解决上述背景技术中提出的技术问题。The utility model mainly provides an absorption tower of a thermal power plant, which is used to solve the technical problems raised in the above-mentioned background technology.

本实用新型解决上述技术问题采用的技术方案为:The technical solution adopted by the utility model to solve the problems of the technologies described above is:

一种火力发电厂的吸收塔,包括塔体所述塔体顶部设有贯穿塔体内部的排气管,所述塔体内部顶端开设有安装槽,所述安装槽底部设有储液槽,所述安装槽底部设有贯穿储液槽且位于塔体内部的净化组件,所述净化组件两侧设有位于塔体内壁和储液槽底部的喷洒组件,所述净化组件下方设有分隔板,所述分隔板两端固定连接塔体内壁,所述分隔板下方且贯穿塔体外部设有过滤组件,所述过滤组件底部且位于塔体内部底端开设有进液槽,所述塔体外壁设有连接管,所述连接管一端连接进液槽另一端连接储液槽,所述连接管靠近进液槽一端安装有水泵。An absorption tower of a thermal power plant, comprising a tower body, the top of the tower body is provided with an exhaust pipe penetrating the interior of the tower body, the top of the tower body is provided with an installation groove, and the bottom of the installation groove is provided with a liquid storage tank, The bottom of the installation tank is provided with a purification assembly that runs through the liquid storage tank and is located inside the tower body. The two sides of the purification assembly are provided with spray assemblies located on the inner wall of the tower and the bottom of the liquid storage tank. There is a partition below the purification assembly. plate, the two ends of the partition plate are fixedly connected to the inner wall of the tower, a filter assembly is provided under the partition plate and runs through the outside of the tower body, and a liquid inlet tank is provided at the bottom of the filter assembly and at the bottom of the interior of the tower body. A connecting pipe is provided on the outer wall of the tower, one end of the connecting pipe is connected to the liquid inlet tank and the other end is connected to the liquid storage tank, and a water pump is installed on the end of the connecting pipe near the liquid inlet tank.

优选的,所述净化组件包括设置在安装槽内部底端的电机,所述电机执行端连接转动杆,所述转动杆的表面固定连接有多个混合杆。在本优选的实施例中,通过净化组件中电机带动转动杆上的混合杆便于快速对废气进行净化。Preferably, the purification assembly includes a motor disposed at the bottom end of the installation groove, the execution end of the motor is connected to a rotating rod, and a plurality of mixing rods are fixedly connected to the surface of the rotating rod. In this preferred embodiment, the motor in the purification assembly drives the mixing rod on the rotating rod to facilitate rapid purification of the exhaust gas.

优选的,所述喷洒组件包括设置在储液槽底部固定连接第一导水板,所述第一导水板底部连接多个第一喷洒头,所述塔体内壁固定连接圆形电动滑轨,所述圆形电动滑轨上设有电动滑块,所述电动滑块侧壁固定连接第二导水板,所述第二导水板侧壁连接多个第二喷洒头。在本优选的实施例中,通过喷洒组件中第一喷洒头和通过电动滑块带动第二喷洒头在圆形电动滑轨旋转配合混合杆,便于提高净化效率。Preferably, the spraying assembly includes a first water guide plate fixedly connected to the bottom of the liquid storage tank, the bottom of the first water guide plate is connected to a plurality of first sprinkler heads, and the inner wall of the tower is fixedly connected to a circular electric slide rail , the circular electric slide rail is provided with an electric slider, the side wall of the electric slider is fixedly connected to the second water guide plate, and the side wall of the second water guide plate is connected to a plurality of second spray heads. In this preferred embodiment, the first spray head in the spray assembly and the second spray head are driven by the electric slider to rotate on the circular electric slide rail to cooperate with the mixing rod, so as to improve the purification efficiency.

优选的,所述圆形电动滑轨环绕在混合杆周围,所述第二喷洒头通过活动软管连接储液槽。在本优选的实施例中,通过圆形电动滑轨环绕在混合杆周围便于第二喷洒头配合混合杆提高净化效率。Preferably, the circular electric slide rail surrounds the mixing rod, and the second spray head is connected to the liquid storage tank through an active hose. In this preferred embodiment, the circular electric slide rail surrounds the mixing rod so that the second spray head cooperates with the mixing rod to improve purification efficiency.

优选的,所述过滤组件包括固定在塔体外壁的压力泵,所述压力泵连接贯穿塔体内部的导气管,所述导气管一端固定连接塔体内壁另一端远离塔体外壁且靠近压力泵,所述导气管面对分隔板的侧壁设有多个出气头,所述塔体内部导气管底部设有梯形板,所述梯形板底部开设有水孔。在本优选的实施例中,通过压力泵便于将废气通过进气管吸入主体的内部。Preferably, the filter assembly includes a pressure pump fixed on the outer wall of the tower, the pressure pump is connected to an air guide pipe running through the inside of the tower body, one end of the air guide pipe is fixedly connected to the inner wall of the tower, and the other end is away from the outer wall of the tower and close to the pressure pump , the side wall of the air guide pipe facing the partition plate is provided with a plurality of air outlet heads, the bottom of the air guide pipe inside the tower body is provided with a trapezoidal plate, and the bottom of the trapezoidal plate is provided with water holes. In this preferred embodiment, the exhaust gas is sucked into the main body through the intake pipe by means of a pressure pump.

优选的,所述导气管靠近压力泵一端固定连接过滤盒侧壁,所述过滤盒内部底端中心固定连接一组限位条,所述限位条与过滤盒内部高度相同,所述限位条内卡接有滤网,所述过滤盒的顶部开设有密封门,所述过滤盒另一侧壁固定连接进气管。在本优选的实施例中,当废气通过过滤盒内部时,经过过滤网便于对废气中的颗粒进行过滤,后期通过打开密封门将卡合的过滤网抽取进行更换。Preferably, one end of the air guide tube close to the pressure pump is fixedly connected to the side wall of the filter box, and the center of the inner bottom of the filter box is fixedly connected to a set of limit bars, the limit bar is the same height as the inside of the filter box, and the limit bar A filter screen is clamped inside the bar, a sealed door is opened on the top of the filter box, and the other side wall of the filter box is fixedly connected to an air intake pipe. In this preferred embodiment, when the exhaust gas passes through the inside of the filter box, the particles in the exhaust gas can be filtered through the filter screen, and the engaged filter screen is extracted and replaced by opening the airtight door later.

与现有技术相比,本实用新型的有益效果为:Compared with the prior art, the beneficial effects of the utility model are:

此实用新型中通过分隔板与通孔的设置,滴落的吸收液对废气进行第一次接触吸收,通过净化组件中电机带动转动杆上的混合杆便于快速对废气进行净化,通过喷洒组件中第一喷洒头和通过电动滑块带动第二喷洒头在圆形电动滑轨旋转配合混合杆,便于提高净化效率,通过储液槽对喷洒过后的液体进行收集循环使用,减少资源的浪费,通过压力泵便于将废气通过进气管吸入主体的内部,当废气通过过滤盒内部时,经过过滤网便于对废气中的颗粒进行过滤,后期通过打开密封门将卡合的过滤网抽取进行更换。In this utility model, through the setting of the partition plate and the through hole, the dripping absorption liquid can contact and absorb the waste gas for the first time, and the motor in the purification component drives the mixing rod on the rotating rod to facilitate the rapid purification of the waste gas. The first sprinkler head and the second sprinkler head are driven by the electric slider to rotate on the circular electric slide rail to cooperate with the mixing rod, which is convenient to improve the purification efficiency. The sprayed liquid is collected and recycled through the liquid storage tank to reduce the waste of resources. The exhaust gas is easily sucked into the interior of the main body through the intake pipe through the pressure pump. When the exhaust gas passes through the filter box, the particles in the exhaust gas can be filtered through the filter screen. Later, the engaged filter screen is extracted by opening the airtight door for replacement.

以下将结合附图与具体的实施例对本实用新型进行详细的解释说明。The utility model will be explained in detail below in conjunction with the accompanying drawings and specific embodiments.

附图说明Description of drawings

图1为本实用新型的整体结构轴侧图;Fig. 1 is the overall structure axonometric view of the present utility model;

图2为本实用新型的整体结构侧视图;Fig. 2 is the overall structure side view of the utility model;

图3为本实用新型的过滤组件放大图。Fig. 3 is an enlarged view of the filter assembly of the present invention.

图中:10、塔体;101、排气管;102、安装槽;103、储液槽;104、分隔板;105、进液槽;106、连接管;107、水泵;21、净化组件;211、电机;212、转动杆;213、混合杆;31、喷洒组件;311、第一导水板;312、第一喷洒头;313、圆形电动滑轨;314、电动滑块;315、第二导水板;316、第二喷洒头;317、活动软管;41、过滤组件;411、压力泵;412、导气管;413、出气头;414、梯形板;415、水孔;416、过滤盒;417、限位条;418、滤网;419、密封门;410、进气管。In the figure: 10, tower body; 101, exhaust pipe; 102, installation tank; 103, liquid storage tank; 104, partition plate; 105, liquid inlet tank; 106, connecting pipe; 107, water pump; 21, purification component ; , the second water guide plate; 316, the second sprinkler head; 317, the movable hose; 41, the filter assembly; 411, the pressure pump; 412, the air guide pipe; 413, the air outlet head; 414, the trapezoidal plate; 416, filter box; 417, limit strip; 418, filter screen; 419, airtight door; 410, intake pipe.

具体实施方式Detailed ways

为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更加全面的描述,附图中给出了本实用新型的若干实施例,但是本实用新型可以通过不同的形式来实现,并不限于文本所描述的实施例,相反的,提供这些实施例是为了使对本实用新型公开的内容更加透彻全面。In order to facilitate understanding of the utility model, the utility model will be described more comprehensively below with reference to the accompanying drawings. Several embodiments of the utility model are shown in the accompanying drawings, but the utility model can be realized in different forms, and does not It is limited to the embodiments described in the text, on the contrary, these embodiments are provided to make the disclosure of the utility model more thorough and comprehensive.

需要说明的是,当元件被称为“固设于”另一个元件,它可以直接在另一个元件上也可以存在居中的元件,当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件,本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的。It should be noted that when an element is said to be "fixed on" another element, it can be directly on the other element or there can be an intervening element, and when an element is said to be "connected" to another element, it can be Directly connected to another element or possibly intervening elements at the same time, the terms "vertical," "horizontal," "left," "right," and similar expressions are used herein for purposes of illustration only.

除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同,本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型,本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field of the present invention, and the terms used in the description of the present invention herein are only to describe specific The purpose of the embodiment is not intended to limit the utility model, and the term "and/or" used herein includes any and all combinations of one or more related listed items.

请着重参照附图1、2所示,一种火力发电厂的吸收塔,包括塔体10,所述塔体10顶部设有贯穿塔体10内部的排气管101,所述塔体10内部顶端开设有安装槽102,所述安装槽102底部设有储液槽103,所述安装槽102底部设有贯穿储液槽103且位于塔体10内部的净化组件21,所述净化组件21包括设置在安装槽102内部底端的电机211,所述电机211执行端连接转动杆212,所述转动杆212的表面固定连接有多个混合杆213,所述净化组件21包括设置在安装槽102内部底端的电机211,所述电机211执行端连接转动杆212,所述转动杆212的表面固定连接有多个混合杆213,通过电机211带动固定连接的转动杆212上的混合杆213旋转。Please emphatically refer to the accompanying drawings 1 and 2, an absorption tower of a thermal power plant includes a tower body 10, the top of the tower body 10 is provided with an exhaust pipe 101 that runs through the inside of the tower body 10, and the inside of the tower body 10 is The top is provided with an installation groove 102, the bottom of the installation groove 102 is provided with a liquid storage tank 103, and the bottom of the installation groove 102 is provided with a purification assembly 21 that penetrates the liquid storage tank 103 and is located inside the tower body 10. The purification assembly 21 includes The motor 211 arranged at the bottom end of the installation groove 102, the execution end of the motor 211 is connected to the rotating rod 212, the surface of the rotating rod 212 is fixedly connected with a plurality of mixing rods 213, and the purification assembly 21 includes a The motor 211 at the bottom, the execution end of the motor 211 is connected to the rotating rod 212, the surface of the rotating rod 212 is fixedly connected with a plurality of mixing rods 213, and the motor 211 drives the rotating rod 213 on the fixedly connected rotating rod 212 to rotate.

请着重参照附图1、2所示,所所述净化组件21两侧设有位于塔体10内壁和储液槽103底部的喷洒组件31,所述净化组件21下方设有分隔板104,所述分隔板104两端固定连接塔体10内壁,所述喷洒组件31包括设置在储液槽103底部固定连接第一导水板311,所述第一导水板311底部连接多个第一喷洒头312,所述塔体10内壁固定连接圆形电动滑轨313,所述圆形电动滑轨313上设有电动滑块314,所述电动滑块314侧壁固定连接第二导水板315,所述第二导水板315侧壁连接多个第二喷洒头316,所述圆形电动滑轨313环绕在混合杆213周围,所述第二喷洒头316通过活动软管317连接储液槽103,在废气进入塔体10的内部时,启动第一喷洒头312和第二喷洒头316,通过电动滑块314在圆形电动滑轨313旋转带动第二喷洒头316,第一喷洒头312对储液槽103内部吸收液抽取,第二喷洒头316通过活动软管317对储液槽103内部吸收液抽取,然后向下喷淋。Please emphatically refer to the accompanying drawings 1 and 2, the two sides of the purification assembly 21 are provided with a spray assembly 31 located on the inner wall of the tower body 10 and the bottom of the liquid storage tank 103, and a partition plate 104 is provided below the purification assembly 21. Both ends of the partition plate 104 are fixedly connected to the inner wall of the tower body 10, and the spray assembly 31 includes a first water guide plate 311 fixedly connected to the bottom of the liquid storage tank 103, and the bottom of the first water guide plate 311 is connected to a plurality of first water guide plates. A sprinkler head 312, the inner wall of the tower body 10 is fixedly connected to a circular electric slide rail 313, the circular electric slide rail 313 is provided with an electric slider 314, and the side wall of the electric slider 314 is fixedly connected to the second water guide plate 315, the side wall of the second water guiding plate 315 is connected with a plurality of second sprinkler heads 316, the circular electric slide rail 313 surrounds the mixing rod 213, and the second sprinkler heads 316 are connected by flexible hoses 317 The liquid storage tank 103 starts the first sprinkler head 312 and the second sprinkler head 316 when the exhaust gas enters the interior of the tower body 10, and the second sprinkler head 316 is driven by the rotation of the electric slider 314 on the circular electric slide rail 313. The spray head 312 draws the absorption liquid inside the liquid storage tank 103 , and the second spray head 316 draws the absorption liquid inside the liquid storage tank 103 through the movable hose 317 , and then sprays downward.

请着重参照附图1、2、3所示,所述分隔板104下方且贯穿塔体10外部设有过滤组件41,所述过滤组件41底部且位于塔体10内部底端开设有进液槽105,所述塔体10外壁设有连接管106,所述连接管106一端连接进液槽105另一端连接储液槽103,所述连接管106靠近进液槽105一端安装有水泵107,所述过滤组件41包括固定在塔体10外壁的压力泵411,所述压力泵411连接贯穿塔体10内部的导气管412,所述导气管412一端固定连接塔体10内壁另一端远离塔体10外壁且靠近压力泵411,所述导气管412面对分隔板104的侧壁设有多个出气头413,所述塔体10内部导气管412底部设有梯形板414,所述梯形板414底部开设有水孔415,所述导气管412靠近压力泵411一端固定连接过滤盒416侧壁,所述过滤盒416内部底端中心固定连接一组限位条417,所述限位条417与过滤盒416内部高度相同,所述限位条417内卡接有滤网418,所述过滤盒416的顶部开设有密封门419,所述过滤盒416另一侧壁固定连接进气管410,启动压力泵411,通过进气管410将废气吸入塔体10的内部,废气经过过滤盒416的内部时,滤网418对废气中的颗粒进行过滤,后期通过打开密封门419将卡合的滤网418抽取进行更换。Please refer to attached drawings 1, 2, and 3, a filter assembly 41 is provided below the partition plate 104 and runs through the outside of the tower body 10, and a liquid inlet is provided at the bottom of the filter assembly 41 and at the bottom end of the tower body 10. Tank 105, the outer wall of the tower body 10 is provided with a connecting pipe 106, one end of the connecting pipe 106 is connected to the liquid inlet tank 105 and the other end is connected to the liquid storage tank 103, and the end of the connecting pipe 106 near the liquid inlet tank 105 is equipped with a water pump 107, The filter assembly 41 includes a pressure pump 411 fixed on the outer wall of the tower body 10. The pressure pump 411 is connected to an air guide pipe 412 that runs through the inside of the tower body 10. One end of the air guide pipe 412 is fixedly connected to the inner wall of the tower body 10 and the other end is away from the tower body. 10 outer wall and close to the pressure pump 411, the side wall of the air guide pipe 412 facing the partition plate 104 is provided with a plurality of outlet heads 413, and the bottom of the air guide pipe 412 inside the tower body 10 is provided with a trapezoidal plate 414, and the trapezoidal plate There is a water hole 415 at the bottom of 414, and the end of the air guide tube 412 close to the pressure pump 411 is fixedly connected to the side wall of the filter box 416, and the center of the inner bottom of the filter box 416 is fixedly connected to a group of limit bars 417, and the limit bar 417 The same height as the inside of the filter box 416, the limit bar 417 is clamped with a filter screen 418, the top of the filter box 416 is provided with a sealed door 419, and the other side wall of the filter box 416 is fixedly connected to the intake pipe 410, Start the pressure pump 411, suck the exhaust gas into the interior of the tower body 10 through the intake pipe 410, and when the exhaust gas passes through the interior of the filter box 416, the filter screen 418 filters the particles in the exhaust gas, and later opens the sealing door 419 to remove the engaged filter screen. 418 drawn for replacement.

本实用新型的具体操作方式如下:The concrete mode of operation of the present utility model is as follows:

首先启动压力泵411,通过进气管410将废气吸入塔体10的内部,废气经过过滤盒416的内部时,滤网418对废气中的颗粒进行过滤,在废气进入塔体10内部时,启动第一喷洒头312和第二喷洒头316,通过电动滑块314在圆形电动滑轨313旋转带动第二喷洒头316,第一喷洒头312对储液槽103内部吸收液抽取,第二喷洒头316通过活动软管317对储液槽103内部吸收液抽取,然后向下喷淋,同时启动电机211带动固定连接的转动杆212上的混合杆213旋转,当废气进入分隔板104的上方时,第一喷洒头312和第二喷洒头316喷淋的吸收液与混合杆213的旋转混合,进一步对废气进行净化,提高净化效率,同时喷洒后液体滴落到梯形板414上,通过水孔415流至进液槽105的内部,再启动水泵107,通过连接管106将吸收液抽取至储液槽103中进行循环使用,减少资源的浪费,后期通过打开密封门419将卡合的滤网418抽取进行更换。First start the pressure pump 411, suck the waste gas into the inside of the tower body 10 through the intake pipe 410, when the waste gas passes through the inside of the filter box 416, the filter screen 418 filters the particles in the waste gas, and when the waste gas enters the inside of the tower body 10, start the first One sprinkler head 312 and the second sprinkler head 316, the second sprinkler head 316 is driven by the rotation of the electric slider 314 on the circular electric slide rail 313, the first sprinkler head 312 absorbs the liquid inside the liquid storage tank 103, and the second sprinkler head 316 draws the absorption liquid inside the liquid storage tank 103 through the movable hose 317, and then sprays it downwards. At the same time, the motor 211 is started to drive the mixing rod 213 on the fixedly connected rotating rod 212 to rotate. When the waste gas enters the upper part of the partition plate 104 The absorption liquid sprayed by the first spray head 312 and the second spray head 316 is mixed with the rotation of the mixing rod 213 to further purify the exhaust gas and improve the purification efficiency. At the same time, the sprayed liquid drops onto the trapezoidal plate 414 and passes through the water hole 415 flows to the inside of the liquid inlet tank 105, and then starts the water pump 107, and the absorption liquid is pumped into the liquid storage tank 103 through the connecting pipe 106 for recycling, reducing the waste of resources. 418 drawn for replacement.

上述结合附图对本实用新型进行了示例性描述,显然本实用新型具体实现并不受上述方式的限制,只要采用了本实用新型的方法构思和技术方案进行的这种非实质改进,或未经改进将本实用新型的构思和技术方案直接应用于其他场合的,均在本实用新型的保护范围之内。The utility model has been described as an example in conjunction with the accompanying drawings above. Obviously, the specific implementation of the utility model is not limited by the above method, as long as the method concept and technical solution of the utility model are used for this insubstantial improvement, or without Improvements that directly apply the ideas and technical solutions of the utility model to other occasions are within the protection scope of the utility model.

Claims (6)

1. The utility model provides an absorption tower of thermal power factory, includes tower body (10), its characterized in that, tower body (10) top is equipped with blast pipe (101) that runs through tower body (10) inside, mounting groove (102) have been seted up on tower body (10) inside top, mounting groove (102) bottom is equipped with reservoir (103), mounting groove (102) bottom is equipped with and runs through reservoir (103) and be located inside purification module (21) of tower body (10), purification module (21) both sides are equipped with spray module (31) that are located tower body (10) inner wall and reservoir (103) bottom, purification module (21) below is equipped with division board (104), division board (104) both ends fixed connection tower body (10) inner wall, division board (104) below just runs through tower body (10) outside and is equipped with filter module (41), filter module (41) bottom just is located tower body (10) inside bottom and has been seted up into reservoir (105), tower body (10) outer wall is equipped with (106), connecting pipe (106) one end connection reservoir (103) are connected with reservoir (105) and are close to connecting pipe (106) reservoir (107).
2. The absorption tower of a thermal power plant according to claim 1, wherein the purifying assembly (21) comprises a motor (211) arranged at the bottom end inside the installation groove (102), the executing end of the motor (211) is connected with a rotating rod (212), and the surface of the rotating rod (212) is fixedly connected with a plurality of mixing rods (213).
3. The absorption tower of a thermal power plant according to claim 1, wherein the spraying assembly (31) comprises a first water guide plate (311) fixedly connected to the bottom of the liquid storage tank (103), the bottom of the first water guide plate (311) is connected with a plurality of first spraying heads (312), the inner wall of the tower body (10) is fixedly connected with a circular electric sliding rail (313), the circular electric sliding rail (313) is provided with an electric sliding block (314), the side wall of the electric sliding block (314) is fixedly connected with a second water guide plate (315), and the side wall of the second water guide plate (315) is connected with a plurality of second spraying heads (316).
4. A tower according to claim 3, characterized in that the circular electric rail (313) surrounds the mixing rod (213) and the second spray head (316) is connected to the tank (103) by means of a flexible hose (317).
5. The absorption tower of a thermal power plant according to claim 1, wherein the filtering component (41) comprises a pressure pump (411) fixed on the outer wall of the tower body (10), the pressure pump (411) is connected with an air duct (412) penetrating through the tower body (10), one end of the air duct (412) is fixedly connected with the inner wall of the tower body (10), the other end of the air duct (412) is far away from the outer wall of the tower body (10) and is close to the pressure pump (411), a plurality of air outlet heads (413) are arranged on the side wall, facing the partition plate (104), of the air duct (412), a trapezoid plate (414) is arranged at the bottom of the air duct (412) inside the tower body (10), and water holes (415) are formed in the bottom of the trapezoid plate (414).
6. The absorber of a thermal power plant according to claim 5, wherein the air duct (412) is fixedly connected with a side wall of the filter box (416) near one end of the pressure pump (411), a group of limiting strips (417) are fixedly connected with the center of the bottom end inside the filter box (416), the height of the limiting strips (417) is the same as that of the inside of the filter box (416), a filter screen (418) is clamped in the limiting strips (417), a sealing door (419) is arranged at the top of the filter box (416), and the other side wall of the filter box (416) is fixedly connected with the air inlet pipe (410).
CN202223011694.8U 2022-11-11 2022-11-11 Absorption tower of a thermal power plant Expired - Fee Related CN219023773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223011694.8U CN219023773U (en) 2022-11-11 2022-11-11 Absorption tower of a thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223011694.8U CN219023773U (en) 2022-11-11 2022-11-11 Absorption tower of a thermal power plant

Publications (1)

Publication Number Publication Date
CN219023773U true CN219023773U (en) 2023-05-16

Family

ID=86288722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223011694.8U Expired - Fee Related CN219023773U (en) 2022-11-11 2022-11-11 Absorption tower of a thermal power plant

Country Status (1)

Country Link
CN (1) CN219023773U (en)

Similar Documents

Publication Publication Date Title
CN205412644U (en) Painting workshop waste gas treatment system
CN219023773U (en) Absorption tower of a thermal power plant
CN115837205A (en) Absorption tower of a thermal power plant
CN219964364U (en) Waste gas treatment spray set
CN215027624U (en) Desulphurization unit for industrial waste gas
CN217247819U (en) Harmful substance detection and filtration device for waste gas purification
CN212855204U (en) Organic waste gas treatment equipment
CN210097333U (en) Air exhaust device for anhydride curing agent production workshop
CN110159334B (en) Tunnel working face dirty wind cyclic utilization device
CN221015029U (en) High-efficient environmental protection electroplating exhaust treatment device
CN213049977U (en) Energy-saving circulation purifying tower device
CN221471432U (en) Lime gypsum method desulfurization sprays layer water treatment facilities
CN220834928U (en) Waste gas purifying treatment device
CN222567211U (en) A dust removal device for construction engineering
CN211302621U (en) Industrial desulfurization residue treatment device
CN113877343A (en) Self-cleaning type waste gas treatment device for chemical industry and environmental protection
CN219836328U (en) Long service life's waste gas absorption tower
CN219764936U (en) An industrial waste gas spray absorption tower
CN223454023U (en) Desulfurizing absorption tower
CN221492034U (en) Waste gas treatment equipment for solid color film processing
CN220047634U (en) Acid mist purifying tower for galvanized acid washing room
CN212348310U (en) A kind of hydroxyl radical civil air purifier
CN214812020U (en) Novel paint spray booth abandonment processing device
CN216778299U (en) Dust device is used in coal mining construction
CN218924083U (en) Waste gas absorbing device for waste gas treatment of spray tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230516