CN219006485U - Construction work platform for prefabricated box girder and T Liang Zhongge plate - Google Patents
Construction work platform for prefabricated box girder and T Liang Zhongge plate Download PDFInfo
- Publication number
- CN219006485U CN219006485U CN202223161932.3U CN202223161932U CN219006485U CN 219006485 U CN219006485 U CN 219006485U CN 202223161932 U CN202223161932 U CN 202223161932U CN 219006485 U CN219006485 U CN 219006485U
- Authority
- CN
- China
- Prior art keywords
- frame
- box girder
- zhongge
- liang
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 230000007246 mechanism Effects 0.000 claims abstract description 19
- 238000005192 partition Methods 0.000 claims abstract description 18
- 230000000149 penetrating effect Effects 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 4
- 239000000725 suspension Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of operation platforms, in particular to a prefabricated box girder and T Liang Zhongge board construction operation platform, which comprises a middle partition frame used as a support and supporting frames rotatably installed at two ends of the middle partition frame, wherein a hanging mechanism is arranged at the end part of each supporting frame, and a connecting piece is arranged between the two supporting frames; the hanging mechanism comprises an upper sleeve and a hanging ring welded at the end part of the upper sleeve, wherein the end part of the supporting frame is movably sleeved with the upper sleeve through a positioning piece, a cross beam is sleeved in the hanging ring, and the cross beam can be transversely placed above two box girders; the hanging mechanism is arranged at the end part of the supporting frame, the connecting piece is arranged between the two supporting frames, the supporting frames which are arranged at the two ends of the middle partition frame in a rotating mode are positioned through the connecting piece, and meanwhile, the hanging mechanism is arranged at the end part of the supporting frame, the supporting frames are convenient to hang on the box girder through the hanging mechanism, so that the supporting frames and the construction operation platform formed by the middle partition frame are convenient to hang, and workers can conveniently construct the junction of the box girder on the construction operation platform.
Description
Technical Field
The utility model belongs to the technical field of operation platforms, and particularly relates to a prefabricated box girder and T Liang Zhongge plate construction operation platform.
Background
The box girder and the T-shaped girder are one of girders in bridge engineering, the inside of the box girder is hollow, flanges are arranged on two sides of the upper part of the box girder, and the box girder is similar to a box, thus obtaining the name. Single box, multiple boxes, etc.; t-beam refers to a beam with a T-shaped cross section, the two side-selected portions are called flanges, and the middle portion is called a beam rib (or web). In the bridge construction process, the joints of the box girders and the T girders often need manual field high-altitude construction operation, in the high-altitude operation process, a construction operation platform is often adopted between the two box girders, and the traditional construction operation platform is mainly assembled in the later stage of steel pipes or hoisted through welded finished products, and assembled in the later stage of steel pipes, so that the time of workers in the high-altitude operation is increased, the risk coefficient of workers is increased, the difficulty of hoisting products between the two box girders is high, and the construction operation platform is inconvenient to adjust the height.
Therefore, the construction work platform convenient to assemble is designed, and meanwhile, the height adjustment is convenient to conduct.
Disclosure of Invention
To solve the problems set forth in the background art. The utility model provides a construction work platform for precast box girders and T Liang Zhongge plates.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the construction operation platform for the prefabricated box girder and the T Liang Zhongge plate comprises a middle partition frame used as a support and supporting frames rotatably installed at two ends of the middle partition frame, wherein a hanging mechanism is arranged at the end part of each supporting frame, and a connecting piece is arranged between the two supporting frames;
the hanging mechanism comprises an upper sleeve and a hanging ring welded at the end part of the upper sleeve, wherein the end part of the supporting frame is movably sleeved with the upper sleeve through a positioning piece, a cross beam is sleeved in the hanging ring, and the cross beam can be transversely placed above two box girders;
the connecting piece comprises clamping pins welded on the same side of the two supporting frames, the two supporting frames are connected with a pin penetrating cross rod through the clamping pins, vertical pins are uniformly formed at two ends of the pin penetrating cross rod, and the connecting piece further comprises a connecting rod rotatably installed between the two supporting frames;
the locating piece includes the locating pin hole that support frame and last sleeve pipe opposite surface were seted up to and install the locating pin in locating pin hole inside, weld the powerful magnet on locating pin surface, and powerful magnet adsorbs the surface at last sleeve pipe.
As the preferable technical scheme of the construction operation platform for the prefabricated box girder and the T Liang Zhongge plate, the positioning pin holes formed on the opposite surfaces of the support frame and the upper sleeve are distributed at equal intervals.
As the preferable technical scheme of the prefabricated box girder and T Liang Zhongge plate construction operation platform, the middle partition frame and the supporting frame are rectangular structures welded by square steel.
As the preferable technical scheme of the prefabricated box girder and T Liang Zhongge plate construction operation platform, the pin penetrating cross rod and the middle partition frame have the same length.
Compared with the prior art, the utility model has the beneficial effects that: the hanging mechanism is arranged at the end part of the support frame, and the connecting piece is arranged between the two support frames, the support frames which are arranged at the two ends of the middle partition frame conveniently are positioned through the connecting piece, and meanwhile, the hanging mechanism is arranged at the end part of the support frame, the support frames are hung on the box girder through the hanging mechanism, so that the support frames and the middle partition frame form a construction operation platform, workers can conveniently construct the box girder connecting part on the construction operation platform, the hanging mechanism comprises an upper sleeve pipe which is movably sleeved on the end part of the support frame through the positioning piece, and a lifting ring which is welded at the end part of the upper sleeve pipe, movably mounted on the cross beam inside the lifting ring, the construction operation platform is convenient to disassemble and assemble, the two support frames are connected through the connecting rod, meanwhile, the connecting piece comprises a clamping pin which is welded on the side surface of the support frame, and a pin penetrating cross rod which is used for connecting the two clamping pins on the surface of the two support frames, and the middle partition frame form the construction operation platform, and meanwhile, the positioning piece comprises a positioning pin hole, a positioning pin and a powerful magnet, so that the positioning pin is conveniently arranged inside the positioning pin, and the positioning pin is adsorbed on the surface of the upper sleeve pipe through the powerful magnet, so that the height of the construction operation platform is conveniently adjusted.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic perspective view of a construction work platform according to the present utility model;
FIG. 2 is a schematic diagram of a construction work platform according to the present utility model;
FIG. 3 is a schematic side view of the construction work platform of the present utility model;
FIG. 4 is an enlarged schematic view of the structure shown at A in FIG. 1;
FIG. 5 is a schematic view of a pin penetrating rail in the present utility model;
FIG. 6 is a schematic view of a beam structure in accordance with the present utility model;
FIG. 7 is a schematic view of a box girder installation structure of the present utility model;
FIG. 8 is a schematic view of a T-beam mounting structure of the present utility model;
FIG. 9 is a schematic view of the structure of the support frame, upper sleeve and lifting ring of the present utility model;
FIG. 10 is a schematic view of the installation sequence of the present utility model;
in the figure: 1. a support frame; 2. a septum shelf; 3. a bayonet lock; 4. a pin penetrating cross bar; 5. a sleeve is arranged; 6. a hanging ring; 7. a cross beam; 8. positioning pin holes; 9. positioning pins; 10. a strong magnet; 11. and (5) connecting a rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1-10, the present utility model provides a technical solution: the construction operation platform for the prefabricated box girder and the T Liang Zhongge plate comprises a middle partition frame 2 used as a support and supporting frames 1 rotatably installed at two ends of the middle partition frame 2, wherein a hanging mechanism is arranged at the end part of each supporting frame 1, and a connecting piece is arranged between the two supporting frames 1; through the suspension mechanism that support frame 1 tip set up to and the connecting piece that sets up between two support frames 1, the support frame 1 of the installation of being convenient for the rotation of septum frame 2 both ends passes through the connecting piece location, and the suspension mechanism that support frame 1 tip set up simultaneously, the support frame 1 of being convenient for hangs on the roof beam through suspension mechanism, thereby the construction work platform that support frame 1 and septum frame 2 are constituteed of being convenient for hangs, thereby the workman of being convenient for is under construction to the roof beam junction on the construction work platform.
The hanging mechanism comprises an upper sleeve 5 movably sleeved at the end part of a supporting frame 1 through a positioning piece and a hanging ring 6 welded at the end part of the upper sleeve 5, a cross beam 7 is sleeved in the hanging ring 6, and the cross beam 7 can be transversely placed above two box girders; the hanging mechanism comprises an upper sleeve 5 movably sleeved at the end part of the support frame 1 through a locating piece, a hanging ring 6 welded at the end part of the upper sleeve 5, and a cross beam 7 movably mounted in the hanging ring 6, so that the support frame 1 and the middle partition frame 2 can be conveniently assembled and disassembled, and the support frame and the middle partition frame 2 can be conveniently located after forming the construction work platform.
The connecting piece comprises clamping pins 3 welded on the same side of the two supporting frames 1, the two supporting frames 1 are connected with a pin penetrating cross rod 4 through the clamping pins 3, two ends of the pin penetrating cross rod 4 are integrally formed with vertical pins, and the connecting piece also comprises a connecting rod 11 rotatably installed between the two supporting frames 1; make connect through connecting rod 11 between two support frames 1, the connecting piece includes support frame 1 side surface welded bayonet lock 3 simultaneously to and be used for connecting two pin horizontal pole 4 of wearing of two bayonet locks 3 on two support frame 1 surfaces, thereby be convenient for fix a position behind support frame 1 and the median septum frame 2 constitution construction work platform.
The locating part includes the locating pin hole 8 that support frame 1 and last sleeve pipe 5 opposite surface were seted up to and install the locating pin 9 in locating pin hole 8 inside, welds the powerful magnet 10 on locating pin 9 surface, and powerful magnet 9 adsorbs the surface at last sleeve pipe 5, and the locating part includes locating pin hole 8, locating pin 9 and powerful magnet 10 simultaneously to be convenient for locating pin 9 installs when locating pin hole 8 inside, adsorb and fix a position at last sleeve pipe 5 surface through powerful magnet 10, thereby be convenient for adjust construction work platform's height.
Specifically, the locating pin holes 8 formed on the opposite surfaces of the support frame 1 and the upper sleeve 5 are distributed at equal intervals.
Specifically, the middle partition frame 2 and the supporting frame 1 are rectangular structures welded by square steel.
Specifically, the pin cross bar 4 is equal in length to the septum housing 2.
The working principle and the using flow of the utility model are as follows: when the box girder construction platform is used, the upper sleeve 5 is sleeved at the upper end of the support frame 1, a proper positioning pin 9 is inserted into a positioning pin hole 8 according to the position of a box girder to be constructed, a powerful magnet 10 is adsorbed on the surface of the upper sleeve 5 under the action of magnetic force, a cross beam 7 is inserted into the lifting ring 6, the support frame 1 is placed at the joint of two box girders, the cross beam 7 is transversely placed on the upper surfaces of the two box girders and then welded and fixed, and pins at two ends of a pin penetrating cross rod 4 are clamped in the box girder 3, so that the construction platform is kept stable.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (4)
1. Precast box girder, T Liang Zhongge board construction work platform, including being used as the septum frame (2) of support to and septum frame (2) both ends rotate support frame (1) of installation, its characterized in that: the end parts of the support frames (1) are provided with hanging mechanisms, and a connecting piece is arranged between the two support frames (1);
the hanging mechanism comprises an upper sleeve (5) movably sleeved at the end part of the supporting frame (1) through a positioning piece, a hanging ring (6) welded at the end part of the upper sleeve (5), a cross beam (7) is sleeved in the hanging ring (6), and the cross beam (7) can be transversely placed above two box girders;
the connecting piece comprises clamping pins (3) welded on the same side of the two supporting frames (1), the two supporting frames (1) are connected with a pin penetrating cross rod (4) through the clamping pins (3), two ends of the pin penetrating cross rod (4) are integrally formed with vertical pins, and the connecting piece further comprises a connecting rod (11) rotatably installed between the two supporting frames (1);
the locating piece includes locating pin hole (8) that support frame (1) and last sleeve pipe (5) opposite surface were seted up to and install locating pin (9) inside locating pin hole (8), welds powerful magnet (10) at locating pin (9) surface, and powerful magnet (10) adsorb the surface at last sleeve pipe (5).
2. The precast box girder, T Liang Zhongge panel construction work platform of claim 1, wherein: the locating pin holes (8) formed in the opposite surfaces of the supporting frame (1) and the upper sleeve (5) are distributed at equal intervals.
3. The precast box girder, T Liang Zhongge panel construction work platform of claim 1, wherein: the middle partition frame (2) and the supporting frame (1) are rectangular structures welded by square steel.
4. The precast box girder, T Liang Zhongge panel construction work platform of claim 1, wherein: the length of the pin penetrating cross rod (4) is equal to that of the middle partition frame (2).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223161932.3U CN219006485U (en) | 2022-11-28 | 2022-11-28 | Construction work platform for prefabricated box girder and T Liang Zhongge plate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223161932.3U CN219006485U (en) | 2022-11-28 | 2022-11-28 | Construction work platform for prefabricated box girder and T Liang Zhongge plate |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219006485U true CN219006485U (en) | 2023-05-12 |
Family
ID=86232692
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223161932.3U Active CN219006485U (en) | 2022-11-28 | 2022-11-28 | Construction work platform for prefabricated box girder and T Liang Zhongge plate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219006485U (en) |
-
2022
- 2022-11-28 CN CN202223161932.3U patent/CN219006485U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111453605B (en) | Incineration main plant steel structure hoisting structure | |
| CN210393402U (en) | Quick detachable fixture of H shaped steel girder steel hoist and mount | |
| CN219632904U (en) | A steel structure welding fixture | |
| CN214575721U (en) | Bailey truss lower chord lower hanging I-steel clamping seat type clamp | |
| CN216764114U (en) | A tower crane attached truss | |
| CN214402353U (en) | Three-hinge type steel structure curtain wall assembling and hoisting structure | |
| CN216951984U (en) | Channel steel fixing support and hanger for three-pipe heavy pipeline | |
| CN212775916U (en) | An adjustable steel beam lower end combined support and hanger | |
| CN213329975U (en) | Steel pull rod hanging and pulling overhanging bearing steel beam structure | |
| CN222295630U (en) | Double-slope type inclined roof hanging basket | |
| CN210032240U (en) | Grid curtain wall series connection system | |
| CN220477519U (en) | Truss structure inserted bar type window cleaning machine | |
| CN107916790B (en) | System and method for dismantling guide pipe of assembled construction steel bar of building block | |
| CN209260971U (en) | A kind of firm steel pipe bundle composite structure | |
| CN220815483U (en) | Mounting structure of building exterior window | |
| CN222511497U (en) | Adjustable circular tube welding platform | |
| CN222862518U (en) | A steel structure that is easy to install | |
| CN218968661U (en) | Lifting lug for steel structure frame construction | |
| CN224238156U (en) | Box girder reinforcement cage binding, supporting and positioning tool with good adaptability | |
| CN222847846U (en) | A positioning device for corridor super-high formwork construction | |
| CN222976096U (en) | Combined stainless steel square tube applied to constructional engineering | |
| CN219034083U (en) | Beam frame device easy to install | |
| CN220201124U (en) | Semi-self-propelled daylighting roof glass hoisting equipment | |
| CN105804389A (en) | Clamping groove type scaffold and manufacturing and mounting method thereof | |
| CN220790526U (en) | Adjustable pull rod type suspension scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |