CN218992039U - Flange reinforcement components for towers, towers and wind turbines - Google Patents
Flange reinforcement components for towers, towers and wind turbines Download PDFInfo
- Publication number
- CN218992039U CN218992039U CN202223528982.0U CN202223528982U CN218992039U CN 218992039 U CN218992039 U CN 218992039U CN 202223528982 U CN202223528982 U CN 202223528982U CN 218992039 U CN218992039 U CN 218992039U
- Authority
- CN
- China
- Prior art keywords
- flange
- clamping arm
- hole
- tower
- fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Abstract
本实用新型提供一种用于塔筒的法兰加强组件、塔筒和风力发电机组。塔筒至少包括第一塔筒段和安装在第一塔筒段上方的第二塔筒段,第一塔筒段具有位于其上端的第一法兰并且第二塔筒段具有位于其下端的第二法兰,第一法兰和第二法兰能够相互连接,法兰加强组件包括:第一夹持臂和第二夹持臂以及连接在第一夹持臂和第二夹持臂之间的连接臂,第一夹持臂用于抵靠第一法兰的下表面,第二夹持臂用于抵靠第二法兰的上表面,第一夹持臂上形成有第一通孔,第二夹持臂上形成第二通孔,紧固件能够穿过第一通孔和第二通孔并与第一法兰和第二法兰结合,将法兰加强组件连接到第一法兰和第二法兰。通过采用上述法兰加强组件,能够实现法兰的加强并防止法兰张口。
The utility model provides a flange strengthening assembly for a tower, a tower and a wind power generating set. The tower includes at least a first tower section and a second tower section installed above the first tower section, the first tower section has a first flange at its upper end and the second tower section has a flange at its lower end The second flange, the first flange and the second flange can be connected to each other, the flange strengthening assembly includes: the first clamping arm and the second clamping arm and the connection between the first clamping arm and the second clamping arm The connecting arm between them, the first clamping arm is used to abut against the lower surface of the first flange, the second clamping arm is used to abut against the upper surface of the second flange, and the first clamping arm is formed with a first through hole, a second through hole is formed on the second clamping arm, the fastener can pass through the first through hole and the second through hole and combine with the first flange and the second flange, and connect the flange reinforcement assembly to the first A flange and a second flange. By adopting the above-mentioned flange strengthening component, the flange can be strengthened and the flange can be prevented from opening.
Description
技术领域technical field
本实用新型涉及塔筒连接组件技术领域,更具体地,涉及一种用于塔筒的法兰加强组件、塔筒和风力发电机组。The utility model relates to the technical field of tower connection components, in particular to a flange reinforcement component for a tower, a tower and a wind power generator set.
背景技术Background technique
目前,现有塔筒的多个塔筒段采用法兰(L型法兰和T型法兰)连接。随着单机容量的增大,法兰的厚度不断增加,这导致法兰的制造难度增大(例如,端面铣平量大)。此外,在法兰较厚的情况下,法兰的力学性能也不易保证,存在法兰纵向撕裂、法兰承压面疲劳和/或法兰张口的问题,这会导致连接螺栓损失或断裂,后期需要频繁维护用于连接法兰的连接螺栓。此外,对于超高的塔筒而言,需要采用大规格的连接螺栓,制造难度大,质量难以保证,费用高昂。Currently, multiple tower sections of the existing tower are connected by flanges (L-shaped flange and T-shaped flange). With the increase of the unit capacity, the thickness of the flange increases continuously, which leads to an increase in the difficulty of manufacturing the flange (for example, a large amount of end face milling). In addition, in the case of a thicker flange, the mechanical properties of the flange are not easy to guarantee, and there are problems of longitudinal tearing of the flange, fatigue of the pressure bearing surface of the flange and/or opening of the flange, which will lead to loss or breakage of the connecting bolts , the connecting bolts used to connect the flanges need to be frequently maintained in the later stage. In addition, for an ultra-high tower tube, large-sized connecting bolts need to be used, which is difficult to manufacture, difficult to guarantee quality, and expensive.
实用新型内容Utility model content
因此,本实用新型的目的在于提供一种能够对法兰起到加强作用的法兰加强组件。Therefore, the purpose of this utility model is to provide a flange reinforcement assembly capable of reinforcing the flange.
根据本实用新型的一方面,提供一种用于塔筒的法兰加强组件,所述塔筒至少包括第一塔筒段和安装在所述第一塔筒段上方的第二塔筒段,所述第一塔筒段具有位于其上端的第一法兰并且所述第二塔筒段具有位于其下端的第二法兰,所述第一法兰和所述第二法兰能够相互连接,所述法兰加强组件包括:第一夹持臂和第二夹持臂以及连接在所述第一夹持臂和第二夹持臂之间的连接臂,所述第一夹持臂用于抵靠所述第一法兰的下表面,所述第二夹持臂用于抵靠所述第二法兰的上表面,所述第一夹持臂上形成有第一通孔,所述第二夹持臂上形成第二通孔,紧固件能够穿过所述第一通孔和第二通孔并与所述第一法兰和第二法兰结合,将所述法兰加强组件连接到所述第一法兰和所述第二法兰。According to an aspect of the present invention, there is provided a flange reinforcement assembly for a tower, the tower at least includes a first tower section and a second tower section installed above the first tower section, The first tower section has a first flange at its upper end and the second tower section has a second flange at its lower end, the first flange and the second flange being interconnectable , the flange reinforcement assembly includes: a first clamping arm and a second clamping arm and a connecting arm connected between the first clamping arm and the second clamping arm, the first clamping arm is used for For abutting against the lower surface of the first flange, the second clamping arm is used for abutting against the upper surface of the second flange, and a first through hole is formed on the first clamping arm, so A second through hole is formed on the second clamping arm, the fastener can pass through the first through hole and the second through hole and be combined with the first flange and the second flange, and the flange A reinforcement assembly is connected to the first flange and the second flange.
优选地,所述紧固件可包括连接螺栓和第一紧固螺母,所述第一法兰上设置有第一连接孔,所述第二法兰上设置有第二连接孔,所述第一通孔和第二通孔能够与所述第一连接孔和所述第二连接孔对准,所述连接螺栓能够同时穿过所述第一通孔、所述第一连接孔、所述第二连接孔和所述第二通孔并与所述第一紧固螺母结合,将所述法兰加强组件连接到所述第一法兰和第二法兰。Preferably, the fastener may include a connecting bolt and a first fastening nut, the first flange is provided with a first connection hole, the second flange is provided with a second connection hole, and the first flange is provided with a second connection hole. A through hole and a second through hole can be aligned with the first connecting hole and the second connecting hole, and the connecting bolt can simultaneously pass through the first through hole, the first connecting hole, the The second connection hole and the second through hole are combined with the first fastening nut to connect the flange reinforcement component to the first flange and the second flange.
优选地,所述紧固件可包括第一紧固螺栓和第二紧固螺栓,所述第一通孔和所述第二通孔分别为螺纹孔,所述第一紧固螺栓旋拧在所述第一通孔中并且所述第一紧固螺栓的端部结合至所述第一法兰,所述第二紧固螺栓旋拧在所述第二通孔中并且所述第二紧固螺栓的端部结合至所述第二法兰。Preferably, the fastener may include a first fastening bolt and a second fastening bolt, the first through hole and the second through hole are threaded holes respectively, and the first fastening bolt is screwed on In the first through hole and the end of the first fastening bolt is combined to the first flange, the second fastening bolt is screwed in the second through hole and the second fastening bolt is The ends of the fastening bolts are coupled to the second flange.
优选地,所述第一法兰上可设置有第一槽部,所述第二法兰上可设置有第二槽部,所述第一通孔和所述第二通孔分别与所述第一槽部和所述第二槽部对准,所述第一紧固螺栓的端部嵌入在所述第一槽部中,所述第二紧固螺栓的端部嵌入在所述第二槽部中。Preferably, the first flange may be provided with a first groove, the second flange may be provided with a second groove, and the first through hole and the second through hole are respectively connected to the The first groove is aligned with the second groove, the end of the first fastening bolt is embedded in the first groove, and the end of the second fastening bolt is embedded in the second in the groove.
优选地,所述第一法兰和所述第二法兰可通过法兰螺栓和第二紧固螺母相互连接,所述第一夹持臂和第二夹持臂分别与所述法兰螺栓和所述第二紧固螺母在水平方向上隔开预定距离。Preferably, the first flange and the second flange can be connected to each other through flange bolts and second fastening nuts, and the first clamping arm and the second clamping arm are respectively connected to the flange bolts It is separated from the second fastening nut by a predetermined distance in the horizontal direction.
优选地,所述第一夹持臂和第二夹持臂均可以为板状,所述第一通孔和所述第二通孔中的每者的数量可以为一个或多个,和/或,所述法兰加强组件可呈C型。Preferably, both the first clamping arm and the second clamping arm may be plate-shaped, and the number of each of the first through hole and the second through hole may be one or more, and/ Alternatively, the flange reinforcement component may be C-shaped.
优选地,从所述第一夹持臂的上表面到所述第二夹持臂的下表面的在所述塔筒的轴向方向上的尺寸可大于或等于所述第一法兰和所述第二法兰的在所述轴向方向上的尺寸。Preferably, the dimension in the axial direction of the tower from the upper surface of the first clamping arm to the lower surface of the second clamping arm may be greater than or equal to the first flange and the The dimension of the second flange in the axial direction.
根据本实用新型的另一方面,提供一种塔筒,所述塔筒具有如上所述的法兰加强组件。According to another aspect of the present invention, there is provided a tower having the above-mentioned flange reinforcement assembly.
优选地,所述法兰加强组件的静强度可等于或大于所述第一法兰和所述第二法兰中的每个的静强度,并且/或者所述法兰加强组件的疲劳强度可等于或大于所述第一法兰和所述第二法兰中的每个的疲劳强度。Preferably, the static strength of the flange reinforcement assembly may be equal to or greater than that of each of the first flange and the second flange, and/or the fatigue strength of the flange reinforcement assembly may be Equal to or greater than the fatigue strength of each of the first flange and the second flange.
优选地,所述第一夹持臂和所述第二夹持臂均可与所述塔筒的筒壁间隔开预定距离。Preferably, both the first clamping arm and the second clamping arm are spaced apart from the wall of the tower by a predetermined distance.
根据本实用新型的一方面,提供一种风力发电机组,所述风力发电机组包括如上所述的塔筒。According to an aspect of the present utility model, a wind power generating set is provided, and the wind power generating set includes the above-mentioned tower.
通过采用上述法兰加强组件对塔筒的法兰进行加强,不仅能够防止法兰出现撕裂或张口,而且能够解决法兰承压面的疲劳问题,同时减少用于连接法兰的连接螺栓的后期维护工作量并且能够通过小规格的连接螺栓实现法兰之间的连接。By using the above-mentioned flange strengthening components to strengthen the flange of the tower, it can not only prevent the flange from tearing or opening, but also solve the fatigue problem of the pressure bearing surface of the flange, and reduce the cost of the connecting bolts used to connect the flange. The post-maintenance workload is reduced and the connection between flanges can be realized through small-sized connecting bolts.
附图说明Description of drawings
当下面结合附图进行详细描述时,本实用新型的上述和其它目的、特征和优点将会被更清楚地理解,在附图中:When described in detail below in conjunction with the accompanying drawings, the above-mentioned and other purposes, features and advantages of the present utility model will be more clearly understood, in the accompanying drawings:
图1是根据本实用新型的第一实施例的用于塔筒的法兰加强组件安装在塔筒的法兰上的示意性截面图;1 is a schematic cross-sectional view of a flange reinforcement assembly for a tower installed on a flange of a tower according to a first embodiment of the present invention;
图2是图1中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有一个第二通孔;Fig. 2 is a schematic top view of the flange reinforcement assembly in Fig. 1 installed on the flange, wherein a second through hole is provided on each second clamping arm;
图3是图1中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有三个第二通孔;Fig. 3 is a schematic top view of the flange reinforcement assembly in Fig. 1 installed on the flange, wherein three second through holes are provided on each second clamping arm;
图4是根据本实用新型的第二实施例的用于塔筒的法兰加强组件安装在塔筒的法兰上的示意性截面图;Fig. 4 is a schematic cross-sectional view of a flange reinforcement assembly for a tower installed on a flange of a tower according to a second embodiment of the present invention;
图5是图4中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有一个第二通孔;Fig. 5 is a schematic top view of the flange reinforcement assembly in Fig. 4 installed on the flange, wherein each second clamping arm is provided with a second through hole;
图6是图4中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有三个第二通孔。Fig. 6 is a schematic top view of the flange reinforcement assembly in Fig. 4 installed on the flange, wherein each second clamping arm is provided with three second through holes.
具体实施方式Detailed ways
将参照附图详细地描述根据本实用新型的实施例,其示例在附图中示出,其中,相同的标号始终表示相同的组件。Embodiments according to the present invention will be described in detail with reference to the accompanying drawings, examples of which are shown in the accompanying drawings, wherein like reference numerals refer to like components throughout.
在下文中,将以法兰加强组件安装在风力发电机组的塔筒的法兰上的结构为例进行描述。然而,本实用新型的实施例不限于此,根据本实用新型的法兰加强组件还可用于对其他部件上的相互连接的法兰进行加强。In the following, the structure in which the flange reinforcement assembly is installed on the flange of the tower of the wind power generating set will be described as an example. However, the embodiments of the present invention are not limited thereto, and the flange strengthening assembly according to the present invention can also be used to strengthen interconnected flanges on other components.
下面将参照图1至图6详细描述根据本实用新型的用于塔筒的法兰加强组件的具体结构。The specific structure of the flange reinforcement assembly for the tower according to the present invention will be described in detail below with reference to FIGS. 1 to 6 .
图1是根据本实用新型的第一实施例的用于塔筒的法兰加强组件安装在塔筒的法兰上的示意性截面图。图2是图1中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有一个第二通孔并移除了连接螺栓和第一紧固螺母。图3是图1中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有三个第二通孔并移除了连接螺栓和第一紧固螺母。图4是根据本实用新型的第二实施例的用于塔筒的法兰加强组件安装在塔筒的法兰上的示意性截面图。图5是图4中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有一个第二通孔并移除了法兰螺栓、第二紧固螺母和第二紧固螺栓。图6是图4中的法兰加强组件安装在法兰上的示意性俯视图,其中,在每个第二夹持臂上设置有三个第二通孔并移除了法兰螺栓、第二紧固螺母和第二紧固螺栓。Fig. 1 is a schematic sectional view of a flange reinforcement assembly for a tower installed on a flange of a tower according to a first embodiment of the present invention. Fig. 2 is a schematic top view of the flange reinforcement assembly in Fig. 1 installed on the flange, wherein a second through hole is provided on each second clamping arm and the connecting bolts and the first fastening are removed nuts. Fig. 3 is a schematic top view of the flange reinforcement assembly in Fig. 1 installed on the flange, wherein three second through holes are provided on each second clamping arm and the connecting bolts and the first fastening are removed nuts. Fig. 4 is a schematic cross-sectional view of a flange reinforcement assembly for a tower installed on a flange of a tower according to a second embodiment of the present invention. Fig. 5 is a schematic top view of the flange reinforcement assembly in Fig. 4 installed on the flange, wherein a second through hole is provided on each second clamping arm and flange bolts, second tightening fastening nut and second fastening bolt. Fig. 6 is a schematic top view of the flange reinforcement assembly in Fig. 4 installed on the flange, wherein, three second through holes are provided on each second clamping arm and flange bolts, second clamping arms are removed fastening nut and second fastening bolt.
在本实用新型的实施例中,塔筒至少包括第一塔筒段10和安装在第一塔筒段10上方的第二塔筒段20,第一塔筒段10具有位于其上端的第一法兰11并且第二塔筒段20具有位于其下端的第二法兰21,第一法兰11和第二法兰21能够相互连接以将相邻的第一塔筒段10和第二塔筒段20连接到一起。根据本实用新型的法兰加强组件能够对第一法兰11和第二法兰21的相互连接进行加强。In an embodiment of the present invention, the tower at least includes a
参照图1和图4,根据本实用新型的用于塔筒的法兰加强组件包括:第一夹持臂31和第二夹持臂32以及连接在第一夹持臂31和第二夹持臂32之间的连接臂33,第一夹持臂31用于抵靠第一法兰11的下表面,第二夹持臂32用于抵靠第二法兰21的上表面,第一夹持臂31上形成有第一通孔311,第二夹持臂32上形成第二通孔321,紧固件能够穿过第一通孔311和第二通孔321并与第一法兰11和第二法兰21结合,将法兰加强组件连接到第一法兰11和第二法兰21。在本实用新型的实施例中,通过紧固件将法兰加强组件连接到第一法兰11和第二法兰21,不仅能够防止法兰出现撕裂或张口,而且能够解决法兰承压面的疲劳问题,同时减少用于连接法兰的连接螺栓的后期维护工作量并且能够通过小规格的连接螺栓实现法兰之间的连接。Referring to Fig. 1 and Fig. 4, the flange strengthening assembly for the tower according to the present invention includes: a
下面将描述根据本实用新型的两个实施例的法兰加强组件的具体结构。The specific structure of the flange reinforcement assembly according to the two embodiments of the present invention will be described below.
第一实施例first embodiment
在本实用新型的第一实施例中,如图1所示,紧固件包括连接螺栓41和第一紧固螺母42,第一法兰11上设置有第一连接孔111,第二法兰21上设置有第二连接孔211,第一通孔311和第二通孔321能够与第一连接孔111和第二连接孔211对准,连接螺栓41能够同时穿过第一通孔311、第一连接孔111、第二连接孔211和第二通孔321并与第一紧固螺母42结合,将法兰加强组件连接到第一法兰11和第二法兰21。In the first embodiment of the present utility model, as shown in Figure 1, the fastener includes a connecting
在上述第一实施例中,紧固件(即,连接螺栓41和第一紧固螺母42)不仅用于将法兰加强组件连接到第一法兰11和第二法兰21,而且用于将第一法兰11和第二法兰21连接到一起以实现相邻塔筒段之间的连接。也就是说,除了连接螺栓41和第一紧固螺母42之外,第一法兰11和第二法兰21不依靠其他的紧固件连接到一起。In the first embodiment described above, the fasteners (ie, the connecting
此外,在连接螺栓41的头部与第一夹持臂31的下表面之间以及在第一紧固螺母42与第二夹持臂32的上表面之间还可设置有垫圈,以降低夹持臂的承压面的压应力并防止夹持臂的承压面被划伤。In addition, washers can also be provided between the head of the connecting
根据第一实施例的法兰加强组件,通过在不改变原有法兰结构的基础上增加连接螺栓的长度,同时实现法兰之间的连接和对法兰的加强,而且能够改善连接螺栓的疲劳性能。此外,连接螺栓张拉施工时定位容易(连接螺栓穿入即可实现精准定位),不易出现错位,施工简单。另外,根据第一实施例的法兰加强组件可以应用于对现有的风力发电机组的法兰实施局部补强,可以应用在在役机组改造技术上。According to the flange strengthening assembly of the first embodiment, by increasing the length of the connecting bolts without changing the original flange structure, the connection between the flanges and the reinforcement of the flanges can be realized at the same time, and the strength of the connecting bolts can be improved. fatigue performance. In addition, the positioning of the connecting bolts is easy during tensioning construction (accurate positioning can be achieved when the connecting bolts are penetrated), and the misalignment is not easy to occur, and the construction is simple. In addition, the flange strengthening assembly according to the first embodiment can be applied to implement partial reinforcement of the flange of the existing wind power generating set, and can be applied to the transformation technology of the in-service generating set.
第二实施例second embodiment
在本实用新型的第二实施例中,如图4所示,紧固件包括第一紧固螺栓51和第二紧固螺栓52,第一通孔311和第二通孔321分别为螺纹孔,第一紧固螺栓51旋拧在第一通孔311中并且第一紧固螺栓51的端部结合至第一法兰11,第二紧固螺栓52旋拧在第二通孔321中并且第二紧固螺栓52的端部结合至第二法兰21。In the second embodiment of the present utility model, as shown in FIG. 4, the fastener includes a
此外,在第二实施例中,第一法兰11上设置有第一槽部112,第二法兰21上设置有第二槽部212,第一通孔311和第二通孔321分别与第一槽部112和第二槽部212对准。第一紧固螺栓51的端部嵌入或插入在第一槽部112中,第二紧固螺栓52的端部嵌入或插入在第二槽部212中,以分别将第一夹持臂31固定到第一法兰11并将第二夹持臂32固定到第二法兰21。通过使第一紧固螺栓51的端部和第二紧固螺栓52的端部分别嵌入或插入第一槽部112和第二槽部212中,能够避免法兰加强组件在机组运行振动时脱出法兰,从而确保法兰加强组件始终能够对法兰起到加强作用。In addition, in the second embodiment, the
此外,只要第一紧固螺栓51的端部和第二紧固螺栓52的端部分别进入第一槽部112和第二槽部212便可实现法兰加强组件的加强作用并防止法兰加强组件脱出。然而,本实用新型的实施例不限于此,例如,在第一槽部和第二槽部中还可形成有螺纹,并且第一紧固螺栓的端部和第二紧固螺栓的端部分别与第一槽部和第二槽部螺纹连接,以增强法兰加强组件与法兰之间的结合强度。In addition, as long as the ends of the
另外,第一法兰和第二法兰上可以不形成槽部。在这种情况下,第一紧固螺栓和第二紧固螺栓均可以是紧定螺栓。通过以紧定螺栓的末端紧压在第一法兰和第二法兰的表面上来将法兰加强组件结合到第一法兰和第二法兰。In addition, grooves may not be formed on the first flange and the second flange. In this case, both the first fastening bolt and the second fastening bolt may be set bolts. The flange reinforcement assembly is joined to the first and second flanges by pressing the ends of the set bolts against the surfaces of the first and second flanges.
在上述第二实施例中,第一法兰11和第二法兰21通过法兰螺栓61和第二紧固螺母62相互连接。具体地,法兰螺栓61穿过第一连接孔111和第二连接孔211并与第二紧固螺母62结合。此外,第一夹持臂31和第二夹持臂32分别与法兰螺栓61和第二紧固螺母62在水平方向上隔开预定距离,以防止法兰加强组件与用于连接第一法兰11和第二法兰21的紧固件之间发生干涉。In the above-mentioned second embodiment, the
此外,第二实施例中的法兰螺栓61和第二紧固螺母62分别与第一实施例中的连接螺栓41和第一紧固螺母42可以是相同的部件(例如,直径相同、螺纹螺距相同),不同之处在于法兰螺栓61的长度比连接螺栓41的长度略短。In addition, the
在法兰螺栓61的头部与第一法兰11的下表面之间、在第二紧固螺母62与第二法兰21的上表面之间、在第一紧固螺栓51的头部与第一夹持臂31的下表面之间以及在第二紧固螺栓52的头部与第二夹持臂32的上表面之间可设置有垫圈,以降低法兰和夹持臂的承压面的压应力并防止法兰和夹持臂的承压面被划伤。Between the head of the
虽然在上述第一实施例和第二实施例中,第一夹持臂31和第二夹持臂32通过不同的方式固定到第一法兰11和第二法兰21,但是根据本实用新型的第一实施例和第二实施例的法兰加强组件都能够对塔筒的法兰进行加强,提高法兰的强度;在连接螺栓或法兰螺栓紧固后在力矩的作用下能够消除法兰之间的间隙并防止法兰张口;能够避免在机组运行时法兰加强组件脱落,具有良好的工程实施性。Although in the above-mentioned first and second embodiments, the
此外,在本实用新型中,第一夹持臂31和第二夹持臂32均可以为板状,例如,呈矩形板状(如图2、图3、图5和图6所示,第二夹持臂32呈矩形板状)或者扇板状。连接臂33也可以为板状,例如,呈矩形板状或弧形板状。In addition, in the present utility model, both the
另外,如图2和图3所示,根据本实用新型的第一实施例的法兰加强组件的第二夹持臂32上设置有一个或三个第二通孔321,相应地,在第一夹持臂31上设置有一个或三个第一通孔311。另外,如图5和图6所示,根据本实用新型的第二实施例的法兰加强组件的第二夹持臂32上设置有一个或三个第二通孔321,相应地,在第一夹持臂31上设置有一个或三个第一通孔311。然而,本实用新型的实施例不限于此,形成在每个第一夹持臂31上的第一通孔311的数量和形成在每个第二夹持臂32上的第二通孔321的数量还可以是两个,或者多于三个。In addition, as shown in FIG. 2 and FIG. 3, one or three second through
另外,如图1和图4所示,法兰加强组件呈C型。也就是说,连接臂33连接在第一夹持臂31的远离塔筒筒壁的第一端和第二夹持臂32的远离塔筒筒壁的第一端之间。然而,本实用新型不限于此,连接臂33连接到第一夹持臂31和第二夹持臂32的位置与第一夹持臂31的第一端和第二夹持臂32的第一端间隔开一定距离,只要连接臂33与第一夹持臂31和第二夹持臂32能够形成用于夹持第一法兰11和第二法兰21的夹持空间即可。In addition, as shown in Fig. 1 and Fig. 4, the flange reinforcement component is C-shaped. That is to say, the connecting arm 33 is connected between the first end of the
为了便于法兰加强组件将第一法兰11和第二法兰21夹持在第一夹持臂31与第二夹持臂32之间,从第一夹持臂31的上表面到第二夹持臂32的下表面的在塔筒的轴向方向上的尺寸可大于或等于第一法兰11和第二法兰21的在轴向方向上的尺寸。此外,第一夹持臂31、第二夹持臂32和连接臂33中的每个的壁厚可根据螺栓强度计算来确定。第一夹持臂31、第二夹持臂32和连接臂33三者的壁厚可相同。In order to facilitate the flange strengthening assembly, the
本实用新型的实施例还提供了一种塔筒,塔筒包括如上所述的法兰加强组件。The embodiment of the utility model also provides a tower tube, the tower tube includes the above-mentioned flange reinforcement assembly.
此外,法兰加强组件的静强度等于或大于第一法兰11和第二法兰21中的每个的静强度,并且/或者法兰加强组件的疲劳强度等于或大于第一法兰11和第二法兰21中的每个的疲劳强度。这样的法兰加强组件能够为法兰提供足够的加强作用。In addition, the static strength of the flange reinforcement assembly is equal to or greater than that of each of the
另外,第一夹持臂31和第二夹持臂32均与塔筒的筒壁间隔开预定距离,以防止第一夹持臂31和第二夹持臂32与塔筒的筒壁发生干涉。In addition, both the
本实用新型的实施例还提供了一种风力发电机组,风力发电机组包括如上所述的塔筒。The embodiment of the utility model also provides a wind power generating set, the wind generating set includes the above-mentioned tower.
根据本实用新型的上述实施例的法兰加强组件具有以下优点:对法兰进行加强,提高法兰的强度,避免法兰厚度过厚力学性能不易保证;在连接螺栓(或法兰螺栓)紧固后,在力矩的作用下能够消除法兰之间的间隙并防止法兰张口导致连接螺栓损伤或断裂,防止法兰纵向撕裂的隐患,并且能够减少连接螺栓的维护工作量;能够避免在机组运行时法兰加强组件脱落,具有良好的工程实施性;解决连接螺栓和法兰承压面的疲劳问题;能够通过小规格尺寸的连接螺栓实现法兰之间的连接,避免大规格尺寸的连接螺栓的使用,降低成本;解决存量机组改造法兰部位强度计算无法通过的问题。The flange strengthening assembly according to the above-mentioned embodiment of the present invention has the following advantages: the flange is strengthened, the strength of the flange is improved, and the mechanical properties of the flange are prevented from being too thick; After solidification, under the action of torque, the gap between the flanges can be eliminated and the connecting bolts can be prevented from being damaged or broken by the opening of the flanges, the hidden danger of longitudinal tearing of the flanges can be prevented, and the maintenance workload of the connecting bolts can be reduced; When the unit is running, the flange reinforcement components fall off, which has good engineering implementation; it solves the fatigue problem of the connecting bolts and the pressure bearing surface of the flange; the connection between the flanges can be realized through small-sized connecting bolts, avoiding large-sized The use of connecting bolts reduces costs; it solves the problem that the strength calculation of the flange parts of the existing units cannot be passed.
虽然已表示和描述了本实用新型的一些实施例,但本领域技术人员应该理解,在不脱离由权利要求及其等同物限定其范围的本实用新型的原理和精神的情况下,可以对这些实施例进行修改。Although some embodiments of the present utility model have been shown and described, those skilled in the art should understand that, without departing from the principles and spirit of the utility model whose scope is defined by the claims and their equivalents, these can be modified. Examples are modified.
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223528982.0U CN218992039U (en) | 2022-12-28 | 2022-12-28 | Flange reinforcement components for towers, towers and wind turbines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223528982.0U CN218992039U (en) | 2022-12-28 | 2022-12-28 | Flange reinforcement components for towers, towers and wind turbines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218992039U true CN218992039U (en) | 2023-05-09 |
Family
ID=86191903
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223528982.0U Expired - Fee Related CN218992039U (en) | 2022-12-28 | 2022-12-28 | Flange reinforcement components for towers, towers and wind turbines |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218992039U (en) |
-
2022
- 2022-12-28 CN CN202223528982.0U patent/CN218992039U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN217400102U (en) | A steel-wood composite tension beam structure | |
| CN104832507B (en) | A composite material plate joint | |
| CN209654404U (en) | A kind of stop nut structure | |
| CN109881842A (en) | A kind of FRP sheet material change chucking power wave-shaped splint anchor | |
| CN115217217B (en) | Spherical multi-slot node device for connecting truss members and application method | |
| WO2023222073A1 (en) | Connecting assembly and photovoltaic support | |
| CN215256602U (en) | A prefabricated tower of wind power mixed tower connected by bolt U ring | |
| CN107642031A (en) | Friction-type peg shear connector and its construction method | |
| CN221401253U (en) | Photovoltaic main beam connection device | |
| CN107558615A (en) | Friction-type shaped steel shear connector and its construction method | |
| CN119061791A (en) | A variable angle progressive multi-stage cone anchor for CFRP tendon anchoring and anchoring method thereof | |
| CN112079226A (en) | Fixing structure of elevator component and elevator guide rail bracket | |
| CN218952439U (en) | A rod reinforcement device for grid structure | |
| CN205446341U (en) | Hexagon nut | |
| CN115326332A (en) | Anchor clamps suitable for cantilever type vibration test piece | |
| CN205669310U (en) | A kind of template pouring panel and composition thereof being easily installed | |
| CN217814423U (en) | Pull rod fastening assembly and electrolytic cell | |
| RU2855431C1 (en) | Threaded element of anchor rod coupling unit | |
| CN224135333U (en) | A fixing device for bridge pipelines | |
| CN223331366U (en) | An explosion-proof expansion joint pipe | |
| CN221762431U (en) | A clamp-assembled composite connecting rod | |
| CN221097110U (en) | Expansion connector for intelligent hotel cabin frame structure | |
| CN220884124U (en) | A boltless positioning wire clamp for sheet metal processing | |
| CN223785719U (en) | A cable anti-detachment fastening structure | |
| CN220659811U (en) | Coupler end cover repairing tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230509 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |