CN218928714U - Structure is collected to ball press incomplete material - Google Patents

Structure is collected to ball press incomplete material Download PDF

Info

Publication number
CN218928714U
CN218928714U CN202223608126.6U CN202223608126U CN218928714U CN 218928714 U CN218928714 U CN 218928714U CN 202223608126 U CN202223608126 U CN 202223608126U CN 218928714 U CN218928714 U CN 218928714U
Authority
CN
China
Prior art keywords
box
collection
box body
collection box
magnet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223608126.6U
Other languages
Chinese (zh)
Inventor
代伟
姜未
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongyang Qingfeng Science And Technology Co ltd
Original Assignee
Chongyang Qingfeng Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongyang Qingfeng Science And Technology Co ltd filed Critical Chongyang Qingfeng Science And Technology Co ltd
Priority to CN202223608126.6U priority Critical patent/CN218928714U/en
Application granted granted Critical
Publication of CN218928714U publication Critical patent/CN218928714U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

本实用新型属于压球机残料收集技术领域,具体的说是一种压球机残料收集结构,包括第一箱体;所述第一箱体顶部滑动连接有第二箱体;所述第二箱体中部滑动连接有第一收集箱;所述第二箱体和第一收集箱底部开设有多个小孔;所述第一箱体中部转动连接有两组转杆;所述转杆端部安装有电机;所述转杆中部固接有第一挡块;所述第二箱体端部固接有第二挡块;所述第一箱体端部安装有两组第一滑杆;此步骤可将球体可残料分开进行收集,降低压球机在工作时产生大量残渣,使得部分残渣掉落在地面,使得工作人员在收集残料时麻烦的问题,减少对材料的浪费,提升工作人员在收集残渣时的速度。

Figure 202223608126

The utility model belongs to the technical field of ball briquetting machine residual material collection, in particular to a ball briquetting machine residual material collection structure, comprising a first box body; the top of the first box body is slidably connected with a second box body; The middle part of the second box body is slidably connected with the first collection box; the bottom of the second box body and the first collection box are provided with a plurality of small holes; the middle part of the first box body is rotatably connected with two groups of rotating rods; A motor is installed at the end of the rod; a first block is fixedly connected to the middle of the rotating rod; a second stop is fixedly connected to the end of the second box; two sets of first blocks are installed at the end of the first box. Slider; this step can collect the sphere and the residue separately, reduce the large amount of residue generated by the ball press machine during work, and cause some residue to fall on the ground, making it troublesome for the staff to collect the residue and reduce the burden on the material. Waste, increases the speed of workers when collecting debris.

Figure 202223608126

Description

一种压球机残料收集结构A ball briquetting machine residue collection structure

技术领域technical field

本实用新型涉及压球机残料收集技术领域,具体是一种压球机残料收集结构。The utility model relates to the technical field of ball briquetting machine residual material collection, in particular to a ball briquetting machine residual material collection structure.

背景技术Background technique

压球机主要用于压制难以成型的粉状物料,其特点就是成型压力大、可以调节转数等特点。The ball press machine is mainly used to press powdery materials that are difficult to form. It is characterized by high forming pressure and adjustable rotation speed.

压球机主要是由经皮带、传至减速带和对开式齿轮构成,物体储料仓经定量设备均匀进入成型料斗,物料过该线后,成型压力迅速变小使物料进行脱球状态。The ball briquetting machine is mainly composed of a belt, transmission to the deceleration belt and split gears. The object storage bin enters the forming hopper evenly through the quantitative equipment. After the material passes through this line, the forming pressure decreases rapidly to make the material go out of the ball.

通过长时间的观察,物料成型后会和部分块状残料收集在一起,不利于工作人员后期对物料收集,并且会有部分残料掉落在地面上,对材料产生一定的浪费;因此,针对上述问题提出一种压球机残料收集结构。Through long-term observation, the material will be collected together with some massive residual materials after forming, which is not conducive to the later collection of materials by the staff, and some residual materials will fall on the ground, which will cause a certain waste of materials; therefore, In view of the above problems, a structure for collecting residual material of the ball briquetting machine is proposed.

实用新型内容Utility model content

为了弥补现有技术的不足,解决背景技术中所提出的至少一个技术问题,本实用新型提出一种压球机残料收集结构。In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background art, the utility model proposes a structure for collecting residues of a briquetting machine.

本实用新型解决其技术问题所采用的技术方案是:本实用新型所述的一种压球机残料收集结构,包括第一箱体;所述第一箱体顶部滑动连接有第二箱体;所述第二箱体中部滑动连接有第一收集箱;所述第二箱体和第一收集箱底部开设有多个小孔;所述第一箱体中部转动连接有两组转杆;所述转杆端部安装有电机;所述转杆中部固接有第一挡块;所述第二箱体端部固接有第二挡块;所述第一箱体端部安装有两组第一滑杆。The technical solution adopted by the utility model to solve the technical problem is: a structure for collecting residual material of a ball press according to the utility model, which includes a first box; the top of the first box is slidably connected to a second box The middle part of the second box body is slidably connected with a first collection box; the bottom of the second box body and the first collection box are provided with a plurality of small holes; the middle part of the first box body is rotatably connected with two groups of rotating rods; The end of the rotating rod is equipped with a motor; the middle part of the rotating rod is fixedly connected with a first block; the end of the second box is fixedly connected with a second block; the end of the first box is installed with two Group the first slider.

优选的,所述第一箱体中部滑动连接有第二收集箱;所述第二收集箱中部滑动连接有两组第二滑杆;所述第二滑杆端部固接有固定架;所述第二滑杆端部固接有拉板;所述固定架中部转动连接有压轮;所述第二收集箱端部开设有两组滑槽;所述滑槽中部滑动连接有限位块;所述限位块固接在固定架侧壁上。Preferably, the middle part of the first box body is slidably connected with a second collection box; the middle part of the second collection box is slidably connected with two sets of second sliding rods; the ends of the second sliding rods are fixedly connected with a fixing frame; The end of the second sliding rod is fixedly connected with a pull plate; the middle part of the fixed frame is rotatably connected with a pressure wheel; the end of the second collection box is provided with two sets of chute; the middle part of the chute is slidably connected with a limit block; The limiting block is fixedly connected to the side wall of the fixing frame.

优选的,所述第二收集箱内部固接有若干个第一弹簧;所述第一弹簧端部固接有第一磁铁;所述固定架端部固接有若干个第二磁铁;所述第二磁铁与第一磁铁为相吸设置。Preferably, a plurality of first springs are affixed inside the second collection box; a first magnet is affixed to the end of the first spring; a plurality of second magnets are affixed to the end of the fixing frame; The second magnet and the first magnet are arranged for mutual attraction.

优选的,所述第二收集箱端部转动连接有转轴;所述转轴中部固接有金属架;所述第二收集箱端部固接有第三磁铁;所述第三磁铁与金属架为相吸设置。Preferably, the end of the second collection box is rotatably connected with a rotating shaft; the middle part of the rotating shaft is fixedly connected with a metal frame; the end of the second collecting box is fixedly connected with a third magnet; the third magnet and the metal frame are Attract settings.

优选的,所述第一箱体内部固接有若干个固定件;所述固定件顶部固接有第二弹簧;所述第二弹簧顶部固接在第二箱体顶部。Preferably, several fixing pieces are affixed inside the first box; a second spring is affixed to the top of the fixing piece; and the top of the second spring is affixed to the top of the second box.

优选的,所述第一箱体顶部固接有橡胶垫。Preferably, a rubber pad is fixedly attached to the top of the first box.

本实用新型的有益之处在于:The utility model is beneficial in that:

1.本实用新型所述的一种压球机残料收集结构,通过工作时,通过将第一箱体放置在压球机传送到端部,然后传送带顶部的球体与残料掉落在第一收集箱内部后,工作人员打开电机开关,使转杆在第一箱体端部转动并带动中部设置的第一挡块,当第一挡块靠近第二挡块并发生碰撞后,因第一挡块和第二挡块端部为弧形设置,可将第二挡块和第二箱体顶起,并在第一滑杆中部滑动,然后第一挡块继续转动,同时第二箱体会呈下降局势,并带动第一收集箱内部的球体和残料进行震动,将第一收集箱内部的残料通过小孔在收集到第二收集箱内部进行收集,进而反复进行,此步骤可将球体可残料分开进行收集,降低压球机在工作时产生大量残渣,使得部分残渣掉落在地面,使得工作人员在收集残料时麻烦的问题,减少对材料的浪费,提升工作人员在收集残渣时的速度。1. According to the residual material collection structure of a ball pressing machine described in the utility model, when it is working, the first box is placed on the ball pressing machine to transfer to the end, and then the ball and residual material on the top of the conveyor belt fall to the second Once inside the collection box, the staff turns on the motor switch to make the rotating rod rotate at the end of the first box and drive the first stopper in the middle. When the first stopper approaches the second stopper and collides, the second stopper The ends of the first stopper and the second stopper are arc-shaped, the second stopper and the second box can be lifted up and slide in the middle of the first slide bar, then the first stopper continues to rotate, while the second box The experience shows a downward trend, and drives the sphere and residual material inside the first collection box to vibrate, and collects the residual material inside the first collection box into the second collection box through small holes, and then repeats this step. The spheres and residual materials can be collected separately, reducing the large amount of residue generated by the ball pressing machine during work, causing some of the residue to fall on the ground, making it troublesome for the staff to collect the residual material, reducing the waste of materials, and improving the efficiency of the staff. Speed while collecting debris.

2.本实用新型所述的一种压球机残料收集结构,通过工作时,当第二收集箱内部存放较多残料时,通过在第二收集箱内部设置有压轮,然后工作人员反复拉动拉板并带动压轮在第二收集箱内部进行滚动,然后将第二收集箱内部的块状残料进行碾压,使残料呈现粉状即可,同时碾压完成后需要将粉状残料取出时,只需将固定架拉倒第二收集箱的端部,然后向上拉动,使限位块在滑槽内部滑动,随后取出即可,此步骤可对部分残料直接进行加工,降低第一箱体内部存放较多块状残料,需要工作人员将残料取出进行加工的问题,提升第二收集箱内部可存放残料容量,提升工作人员对残料加工时的速度。2. According to the residual material collection structure of a briquette machine described in the utility model, when working, when more residual materials are stored in the second collection box, the second collection box is provided with a pressing wheel, and then the staff Repeatedly pull the pull plate and drive the pressure wheel to roll inside the second collection box, and then roll the massive residue inside the second collection box to make the residue appear powdery, and at the same time, the powder needs to be removed after the rolling is completed. When taking out the remnants, just pull the fixing frame down to the end of the second collection box, and then pull it up, so that the limit block slides inside the chute, and then take it out. This step can directly process part of the remnants. Reduce the problem that there are a lot of blocky residual materials stored in the first box, requiring the staff to take out the residual material for processing, increase the capacity of the residual material that can be stored in the second collection box, and increase the speed of the staff when processing the residual material.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the present utility model, and those skilled in the art can also obtain other drawings according to these drawings without any creative effort.

图1为实施例一的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of embodiment one;

图2为实施例一的立体剖视结构示意图;Fig. 2 is the three-dimensional sectional structure schematic diagram of embodiment one;

图3为实施例一的压轮结构示意图;Fig. 3 is the structural schematic diagram of the pinch wheel of embodiment one;

图4为实施例一的第一挡块结构示意图;Fig. 4 is the schematic structural diagram of the first block of embodiment one;

图5为实施例一的固定件结构示意图;Fig. 5 is a structural schematic diagram of a fixing member of Embodiment 1;

图6为实施例一的第一弹簧结构示意图;Fig. 6 is the schematic diagram of the first spring structure of embodiment one;

图7为图1的A处放大图;Figure 7 is an enlarged view of A in Figure 1;

图8为实施例二的立体结构示意图。Fig. 8 is a schematic diagram of the three-dimensional structure of the second embodiment.

图中:1、第一箱体;11、第二箱体;12、第一收集箱;13、小孔;14、转杆;15、电机;16、第一挡块;17、第二挡块;18、第一滑杆;2、第二收集箱;21、第二滑杆;22、固定架;23、拉板;24、压轮;25、滑槽;26、限位块;3、第一弹簧;31、第一磁铁;32、第二磁铁;4、转轴;41、金属架;42、第三磁铁;5、固定件;51、第二弹簧;6、橡胶垫;7、尖刺。In the figure: 1, the first box; 11, the second box; 12, the first collection box; 13, the small hole; 14, the rotating rod; 15, the motor; 16, the first block; 17, the second block 18, the first slide bar; 2, the second collection box; 21, the second slide bar; 22, the fixed frame; 23, the pull plate; 24, the pressure wheel; 25, the chute; , the first spring; 31, the first magnet; 32, the second magnet; 4, the rotating shaft; 41, the metal frame; 42, the third magnet; 5, the fixing piece; 51, the second spring; 6, the rubber pad; 7, spikes.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例一Embodiment one

请参阅图1-7所示,一种压球机残料收集结构,包括第一箱体1;所述第一箱体1顶部滑动连接有第二箱体11;所述第二箱体11中部滑动连接有第一收集箱12;所述第二箱体11和第一收集箱12底部开设有多个小孔13;所述第一箱体1中部转动连接有两组转杆14;所述转杆14端部安装有电机15;所述转杆14中部固接有第一挡块16;所述第二箱体11端部固接有第二挡块17;所述第一箱体1端部安装有两组第一滑杆18;工作时,通过将第一箱体1放置在压球机传送到端部,然后传送带顶部的球体与残料掉落在第一收集箱12内部后,工作人员打开电机15开关,使转杆14在第一箱体1端部转动并带动中部设置的第一挡块16,当第一挡块16靠近第二挡块17并发生碰撞后,因第一挡块16和第二挡块17端部为弧形设置,可将第二挡块17和第二箱体11顶起,并在第一滑杆18中部滑动,然后第一挡块16继续转动,同时第二箱体11会呈下降趋势,并带动第一收集箱12内部的球体和残料进行震动,将第一收集箱12内部的残料通过小孔13在收集到第二收集箱2内部进行收集,进而反复进行,此步骤可将球体可残料分开进行收集,降低压球机在工作时产生大量残渣,使得部分残渣掉落在地面,使得工作人员在收集残料时麻烦的问题,减少对材料的浪费,提升工作人员在收集残渣时的速度。Please refer to Fig. 1-7, a structure for collecting residual material of a ball press machine, including a first box body 1; the top of the first box body 1 is slidably connected with a second box body 11; the second box body 11 The middle part is slidingly connected with a first collection box 12; the bottom of the second box body 11 and the first collection box 12 are provided with a plurality of small holes 13; the middle part of the first box body 1 is rotatably connected with two groups of rotating rods 14; The end of the rotating rod 14 is equipped with a motor 15; the middle part of the rotating rod 14 is fixedly connected with a first stopper 16; the end of the second box 11 is fixedly connected with a second stopper 17; 1 There are two sets of first sliding rods 18 installed at the end; when working, the first box 1 is placed on the ball pressing machine to transfer to the end, and then the balls and residues on the top of the conveyor belt fall into the first collection box 12 Finally, the staff turns on the motor 15 switch to make the rotating rod 14 rotate at the end of the first box body 1 and drive the first stopper 16 arranged in the middle. When the first stopper 16 approaches the second stopper 17 and collides, Because the ends of the first stopper 16 and the second stopper 17 are arranged in an arc shape, the second stopper 17 and the second box body 11 can be lifted up and slide in the middle of the first slide bar 18, and then the first stopper 16 continues to rotate, while the second box body 11 will show a downward trend, and drive the sphere and residual material inside the first collection box 12 to vibrate, and collect the residual material inside the first collection box 12 through the small hole 13 to the second The collection box 2 is collected inside, and then repeated. This step can collect the spheres and the residues separately, reducing the large amount of residues generated by the ball pressing machine during work, so that some residues fall on the ground, so that the staff can collect the residues when collecting the residues. Troublesome problems, reduce waste of materials, and increase the speed of workers when collecting residues.

所述第一箱体1中部滑动连接有第二收集箱2;所述第二收集箱2中部滑动连接有两组第二滑杆21;所述第二滑杆21端部固接有固定架22;所述第二滑杆21端部固接有拉板23;所述固定架22中部转动连接有压轮24;所述第二收集箱2端部开设有两组滑槽25;所述滑槽25中部滑动连接有限位块26;所述限位块26固接在固定架22侧壁上;工作时,当第二收集箱2内部存放较多残料时,通过在第二收集箱2内部设置有压轮24,然后工作人员反复拉动拉板23并带动压轮24在第二收集箱2内部进行滚动,然后将第二收集箱2内部的块状残料进行碾压,使残料呈现粉状即可,同时碾压完成后需要将粉状残料取出时,只需将固定架22拉倒第二收集箱2的端部,然后向上拉动,使限位块26在滑槽25内部滑动,随后取出即可,此步骤可对部分残料直接进行加工,降低第一箱体1内部存放较多块状残料,需要工作人员将残料取出进行加工的问题,提升第二收集箱2内部可存放残料容量,提升工作人员对残料加工时的速度。The middle part of the first box body 1 is slidably connected with a second collection box 2; the middle part of the second collection box 2 is slidably connected with two sets of second sliding rods 21; the ends of the second sliding rods 21 are fixedly connected with a fixing frame 22; the end of the second sliding rod 21 is fixedly connected with a pull plate 23; the middle part of the fixed frame 22 is rotatably connected with a pressure wheel 24; the end of the second collection box 2 is provided with two sets of chute 25; The middle part of the chute 25 is slidably connected to the limit block 26; the limit block 26 is affixed to the side wall of the fixed frame 22; during work, when more residual materials are stored in the second collection box 2, the second collection box 2 passes through the 2 is provided with a pressure wheel 24 inside, and then the staff repeatedly pulls the pull plate 23 and drives the pressure wheel 24 to roll inside the second collection box 2, and then rolls the block-shaped residue inside the second collection box 2 to make the residue The material is powdery, and when the powdery residue needs to be taken out after the rolling is completed, it is only necessary to pull the fixing frame 22 down to the end of the second collection box 2, and then pull it upwards so that the stopper 26 is in the position of the chute 25 Slide the inside and then take it out. This step can directly process part of the residual material, reducing the problem that there are many massive residual materials stored in the first box 1, requiring the staff to take out the residual material for processing, and improving the second collection. The residual material capacity can be stored inside the box 2, and the speed of the staff when processing the residual material is improved.

所述第二收集箱2内部固接有若干个第一弹簧3;所述第一弹簧3端部固接有第一磁铁31;所述固定架22端部固接有若干个第二磁铁32;所述第二磁铁32与第一磁铁31为相吸设置;工作时,当第二滑杆21在第二收集箱2内部滑动时,通过在第二收集箱2中部设置有第二磁铁32,然后使第二磁铁32与第一磁铁31靠近产生相互吸引的力,吸附在一起,随后拉动拉板23时,第一弹簧3会呈现变形状,同时配合第一弹簧3产生的弹力,将固定架22向回拉,此步骤可提升工作人员在推动或拉动拉板23的速度,降低拉动或推动拉板23需要的力,减少工作人员工作的强度。A plurality of first springs 3 are affixed inside the second collection box 2; a first magnet 31 is affixed to the end of the first spring 3; a plurality of second magnets 32 are affixed to the end of the fixing frame 22 The second magnet 32 and the first magnet 31 are arranged for mutual attraction; during work, when the second slide bar 21 slides inside the second collection box 2, the second magnet 32 is arranged in the middle of the second collection box 2 , and then make the second magnet 32 and the first magnet 31 close together to generate mutual attraction force, and they are adsorbed together, and then when the pull plate 23 is pulled, the first spring 3 will present a deformed shape. The fixing frame 22 is pulled back. This step can increase the speed of the staff in pushing or pulling the draw plate 23, reduce the force required for pulling or pushing the draw plate 23, and reduce the intensity of the staff's work.

所述第二收集箱2端部转动连接有转轴4;所述转轴4中部固接有金属架41;所述第二收集箱2端部固接有第三磁铁42;所述第三磁铁42与金属架41为相吸设置;工作时,当第二滑杆21在滑动时上下晃动时,通过在第二收集箱2端部设置有金属架41,然后转动金属架41,当金属架41=靠近第三磁铁42时,产生相互吸引的力,将第二滑杆21固定在第二收集箱2内部,此步骤可减少第二滑杆21在工作时,因第二收集箱2内部堆积较多残渣,使得第二滑杆21在滑动时出现上下颠簸的问题,提升残料粉状的精度。The end of the second collection box 2 is rotatably connected with a rotating shaft 4; the middle part of the rotating shaft 4 is fixedly connected with a metal frame 41; the end of the second collecting box 2 is fixedly connected with a third magnet 42; the third magnet 42 Set with the metal frame 41 for mutual attraction; during work, when the second slide bar 21 is shaking up and down when sliding, by being provided with the metal frame 41 at the end of the second collecting box 2, then rotating the metal frame 41, when the metal frame 41 =When approaching the third magnet 42, the force of mutual attraction is generated, and the second slide bar 21 is fixed inside the second collection box 2. This step can reduce the accumulation of the second slide bar 21 inside the second collection box 2 when the second slide bar 21 is working. More residue makes the second slide bar 21 bump up and down when sliding, which improves the powdery precision of the residue.

所述第一箱体1内部固接有若干个固定件5;所述固定件5顶部固接有第二弹簧51;所述第二弹簧51顶部固接在第二箱体11顶部;工作时,当第二箱体11在第一箱体1顶部震动时,通过在第二箱体11底部设置有第二弹簧51,然后第二箱体11向上移动时会呈现拉伸状态,第一挡块16继续转动后,配合第二弹簧51向下的拉力,从而将第二箱体11向下拉动,此步骤可提升第二箱体11复位的速度,降低因转杆14转动速度过快,导致第二箱体11无法第一时间复位的问题,加快第二箱体11震动的频率。Several fixing parts 5 are affixed inside the first box 1; a second spring 51 is affixed to the top of the fixing part 5; the top of the second spring 51 is affixed to the top of the second box 11; , when the second box 11 vibrates on the top of the first box 1, the second spring 51 is provided at the bottom of the second box 11, and then the second box 11 will be in a stretched state when moving upwards, and the first stop After the block 16 continues to rotate, cooperate with the downward pulling force of the second spring 51 to pull the second box body 11 downwards. This step can improve the reset speed of the second box body 11 and reduce the excessive rotation speed of the rotating rod 14. This leads to the problem that the second box body 11 cannot be reset at the first time, and the vibration frequency of the second box body 11 is accelerated.

所述第一箱体1顶部固接有橡胶垫6;工作时,当第二箱体11向下撞击到第一箱体1顶部时,通过在第一箱体1顶部设置有橡胶垫6,然后使第二箱体11底部撞击到橡胶垫6的表面上,此步骤可缓冲部分撞击的力,降低第二箱体11长时间撞击在第一箱体1顶部,导致第一箱体1顶部和第二箱体11底部出现变形或崩边的问题,提升第一箱体1和第二箱体11的使用寿命。The top of the first box body 1 is fixed with a rubber pad 6; during operation, when the second box body 11 hits the top of the first box body 1 downward, the rubber pad 6 is arranged on the top of the first box body 1, Then the bottom of the second box 11 hits the surface of the rubber pad 6. This step can buffer part of the impact force and reduce the impact of the second box 11 on the top of the first box 1 for a long time, causing the top of the first box 1 to and the problem of deformation or chipping at the bottom of the second box body 11, which improves the service life of the first box body 1 and the second box body 11.

实施例二Embodiment two

请参阅图8所示,对比实施例一,作为本实用新型的另一种实施方式,所述第一箱体1底部固接有若干个尖刺7;工作时,当将第一箱体1固定在地面上时,通过在第一箱体1底部设置有尖刺7,然后配合整体向下的重力,使尖刺7尖锐面陷入地面内部,进行加固,此步骤可提升整体在工作时的稳定性,降低安装路面出现较多碎石,使得整体在工作时出现晃动的问题。Please refer to Fig. 8, comparative example one, as another embodiment of the present invention, the bottom of the first box 1 is fixed with several spikes 7; when working, when the first box 1 When it is fixed on the ground, by setting the spikes 7 at the bottom of the first box body 1, and then cooperating with the downward gravity of the whole, the sharp surface of the spikes 7 sinks into the inside of the ground for reinforcement. This step can improve the stability of the whole when it is working. Stability, reducing the installation of more gravel on the road surface, causing the whole to shake during work.

工作原理,通过将第一箱体1放置在压球机传送到端部,然后传送带顶部的球体与残料掉落在第一收集箱12内部后,工作人员打开电机15开关,使转杆14在第一箱体1端部转动并带动中部设置的第一挡块16,当第一挡块16靠近第二挡块17并发生碰撞后,因第一挡块16和第二挡块17端部为弧形设置,可将第二挡块17和第二箱体11顶起,并在第一滑杆18中部滑动,然后第一挡块16继续转动,同时第二箱体11会呈下降趋势,并带动第一收集箱12内部的球体和残料进行震动,将第一收集箱12内部的残料通过小孔13在收集到第二收集箱2内部进行收集,进而反复进行,通过在第二收集箱2内部设置有压轮24,然后工作人员反复拉动拉板23并带动压轮24在第二收集箱2内部进行滚动,然后将第二收集箱2内部的块状残料进行碾压,使残料呈现粉状即可,同时碾压完成后需要将粉状残料取出时,只需将固定架22拉倒第二收集箱2的端部,然后向上拉动,使限位块26在滑槽25内部滑动,随后取出即可,通过在第二收集箱2中部设置有第二磁铁32,然后使第二磁铁32与第一磁铁31靠近产生相互吸引的力,吸附在一起,随后拉动拉板23时,第一弹簧3会呈现变形状,同时配合第一弹簧3产生的弹力,将固定架22向回拉,通过在第二收集箱2端部设置有金属架41,然后转动金属架41,当金属架41=靠近第三磁铁42时,产生相互吸引的力,将第二滑杆21固定在第二收集箱2内部,通过在第二箱体11底部设置有第二弹簧51,然后第二箱体11向上移动时会呈现拉伸状态,第一挡块16继续转动后,配合第二弹簧51向下的拉力,从而将第二箱体11向下拉动,通过在第一箱体1顶部设置有橡胶垫6,然后使第二箱体11底部撞击到橡胶垫6的表面上。The working principle is that the first box 1 is placed in the ball pressing machine and sent to the end, and then the balls and residual materials on the top of the conveyor belt fall into the first collection box 12, and the staff turns on the switch of the motor 15 to make the rotating rod 14 Rotate at the end of the first box body 1 and drive the first stopper 16 arranged in the middle, when the first stopper 16 approaches the second stopper 17 and collides, due to the end of the first stopper 16 and the second stopper 17 The part is set in an arc, the second block 17 and the second box body 11 can be jacked up, and slide in the middle of the first slide bar 18, then the first block 16 continues to rotate, and the second box body 11 will descend at the same time trend, and drive the sphere and residue inside the first collection box 12 to vibrate, collect the residue inside the first collection box 12 into the second collection box 2 through the small hole 13, and then repeat it. The inside of the second collection box 2 is provided with a pressure wheel 24, and then the staff repeatedly pulls the pull plate 23 and drives the pressure wheel 24 to roll inside the second collection box 2, and then grinds the blocky residue inside the second collection box 2 Press it so that the residual material is powdery, and when the powdery residual material needs to be taken out after the rolling is completed, you only need to pull the fixing frame 22 down to the end of the second collection box 2, and then pull it upward to make the stopper 26 Slide inside the chute 25, then take it out, by setting the second magnet 32 in the middle of the second collection box 2, then make the second magnet 32 and the first magnet 31 close to generate mutual attraction force, adsorb together, then When the pull plate 23 is pulled, the first spring 3 will show a deformed shape, and at the same time cooperate with the elastic force produced by the first spring 3 to pull the fixed frame 22 back, and then rotate the metal frame 41 at the end of the second collection box 2. Metal frame 41, when metal frame 41=close to the 3rd magnet 42, produce the force of mutual attraction, the second slide bar 21 is fixed in the second collecting box 2 inside, by being provided with the second spring at the bottom of the second casing 11 51, then the second box body 11 will be in a stretched state when it moves upward, and after the first block 16 continues to rotate, it will cooperate with the downward pulling force of the second spring 51 to pull the second box body 11 downward. A rubber pad 6 is arranged on the top of one box body 1 , and then the bottom of the second box body 11 is hit against the surface of the rubber pad 6 .

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions referring to the terms "one embodiment", "example", "specific example" and the like mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in the description of the present invention. In at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model.

Claims (6)

1.一种压球机残料收集结构,包括第一箱体(1);所述第一箱体(1)顶部滑动连接有第二箱体(11);其特征在于:所述第二箱体(11)中部滑动连接有第一收集箱(12);所述第二箱体(11)和第一收集箱(12)底部开设有多个小孔(13);所述第一箱体(1)中部转动连接有两组转杆(14);所述转杆(14)端部安装有电机(15);所述转杆(14)中部固接有第一挡块(16);所述第二箱体(11)端部固接有第二挡块(17);所述第一箱体(1)端部安装有两组第一滑杆(18)。1. A ball briquetting machine residue collection structure, comprising a first box (1); the top of the first box (1) is slidingly connected with a second box (11); it is characterized in that: the second The middle part of the box body (11) is slidingly connected with a first collection box (12); the bottom of the second box body (11) and the first collection box (12) is provided with a plurality of small holes (13); The middle part of the body (1) is rotatably connected with two groups of rotating rods (14); the end of the rotating rod (14) is equipped with a motor (15); the middle part of the rotating rod (14) is fixedly connected with a first block (16) ; The end of the second box (11) is fixedly connected with a second block (17); the end of the first box (1) is installed with two groups of first slide bars (18). 2.根据权利要求1所述的一种压球机残料收集结构,其特征在于:所述第一箱体(1)中部滑动连接有第二收集箱(2);所述第二收集箱(2)中部滑动连接有两组第二滑杆(21);所述第二滑杆(21)端部固接有固定架(22);所述第二滑杆(21)端部固接有拉板(23);所述固定架(22)中部转动连接有压轮(24);所述第二收集箱(2)端部开设有两组滑槽(25);所述滑槽(25)中部滑动连接有限位块(26);所述限位块(26)固接在固定架(22)侧壁上。2. A ball briquetting machine residue collection structure according to claim 1, characterized in that: the middle part of the first box (1) is slidingly connected with a second collection box (2); the second collection box (2) Two groups of second sliding rods (21) are slidingly connected in the middle; the ends of the second sliding rods (21) are affixed with a fixing bracket (22); the ends of the second sliding rods (21) are affixed to There is a pull plate (23); the middle part of the fixed frame (22) is rotatably connected with a pressure wheel (24); the end of the second collection box (2) is provided with two sets of chute (25); the chute ( 25) The middle part is slidingly connected to the limiting block (26); the limiting block (26) is fixedly connected to the side wall of the fixing frame (22). 3.根据权利要求2所述的一种压球机残料收集结构,其特征在于:所述第二收集箱(2)内部固接有若干个第一弹簧(3);所述第一弹簧(3)端部固接有第一磁铁(31);所述固定架(22)端部固接有若干个第二磁铁(32);所述第二磁铁(32)与第一磁铁(31)为相吸设置。3. A ball briquetting machine residual material collection structure according to claim 2, characterized in that: several first springs (3) are fixed inside the second collection box (2); (3) the first magnet (31) is affixed to the end; several second magnets (32) are affixed to the end of the fixed frame (22); the second magnet (32) is connected to the first magnet (31) ) is set for mutual attraction. 4.根据权利要求3所述的一种压球机残料收集结构,其特征在于:所述第二收集箱(2)端部转动连接有转轴(4);所述转轴(4)中部固接有金属架(41);所述第二收集箱(2)端部固接有第三磁铁(42);所述第三磁铁(42)与金属架(41)为相吸设置。4. A ball briquetting machine residue collection structure according to claim 3, characterized in that: the end of the second collection box (2) is rotatably connected to a rotating shaft (4); the middle of the rotating shaft (4) is fixed A metal frame (41) is connected; a third magnet (42) is fixedly connected to the end of the second collection box (2); and the third magnet (42) and the metal frame (41) are mutually attracted. 5.根据权利要求4所述的一种压球机残料收集结构,其特征在于:所述第一箱体(1)内部固接有若干个固定件(5);所述固定件(5)顶部固接有第二弹簧(51);所述第二弹簧(51)顶部固接在第二箱体(11)顶部。5. A structure for collecting residual material of a ball pressing machine according to claim 4, characterized in that: several fixing pieces (5) are fixedly connected inside the first box body (1); the fixing pieces (5) ) top is affixed with a second spring (51); the top of the second spring (51) is affixed to the top of the second box (11). 6.根据权利要求5所述的一种压球机残料收集结构,其特征在于:所述第一箱体(1)顶部固接有橡胶垫(6)。6. A structure for collecting residual materials of a ball briquette machine according to claim 5, characterized in that a rubber pad (6) is fixedly attached to the top of the first box (1).
CN202223608126.6U 2022-12-30 2022-12-30 Structure is collected to ball press incomplete material Expired - Fee Related CN218928714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223608126.6U CN218928714U (en) 2022-12-30 2022-12-30 Structure is collected to ball press incomplete material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223608126.6U CN218928714U (en) 2022-12-30 2022-12-30 Structure is collected to ball press incomplete material

Publications (1)

Publication Number Publication Date
CN218928714U true CN218928714U (en) 2023-04-28

Family

ID=86083550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223608126.6U Expired - Fee Related CN218928714U (en) 2022-12-30 2022-12-30 Structure is collected to ball press incomplete material

Country Status (1)

Country Link
CN (1) CN218928714U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117324250A (en) * 2023-11-27 2024-01-02 大宁兆宁建筑装配科技有限公司 Sand screening device for cement concrete prefabricated part production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117324250A (en) * 2023-11-27 2024-01-02 大宁兆宁建筑装配科技有限公司 Sand screening device for cement concrete prefabricated part production
CN117324250B (en) * 2023-11-27 2024-01-30 大宁兆宁建筑装配科技有限公司 Sand screening device for cement concrete prefabricated part production

Similar Documents

Publication Publication Date Title
CN218928714U (en) Structure is collected to ball press incomplete material
CN106733153B (en) A kind of building waste picks retracting device
CN113289885A (en) Excellence sieving mechanism after fertilizer production
CN213855550U (en) Magnetite fixed size screening plant
CN211678724U (en) A spherical graphite screening device
CN220878999U (en) Geological assay ore smashing and grinding device
CN212092427U (en) Stone material processing powder recycling device
CN218133176U (en) A multi-stage screening device for medicinal gypsum particles
CN218132518U (en) Magnetic steel production waste screening device
CN213313696U (en) Environment-friendly domestic waste sorting facilities
CN113786892B (en) Adjustable reducing mechanism is used to tombarthite ore
CN223042874U (en) A kind of impurity removal equipment for iron powder production
CN206240534U (en) A kind of adjustable impact crusher
CN214023171U (en) Lower die waste blanking device of progressive die
CN221795867U (en) A new type of conveying device for steel nail production
CN112337610B (en) Ceramic material crushing and filtering device
CN217528234U (en) A kind of vibrating screen for removing impurities for processing lily
CN219785636U (en) A plastic refining device for the manufacturing and production of plastic products
CN219702255U (en) Novel strong magnetism recycling machine
CN223655486U (en) A gear shaft screen roller
CN221937272U (en) A plastic particle screening structure
CN224127873U (en) A screening mechanism for tailings treatment
CN218428188U (en) A kind of waste cleaning equipment convenient for valve processing
CN221868818U (en) An iron separation mechanism for composite powder production
CN219722235U (en) Vibrating cloth bag dust collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230428

CF01 Termination of patent right due to non-payment of annual fee