CN218912287U - Hydraulic self-climbing spreader device in super high-rise hoistway - Google Patents
Hydraulic self-climbing spreader device in super high-rise hoistway Download PDFInfo
- Publication number
- CN218912287U CN218912287U CN202320043883.9U CN202320043883U CN218912287U CN 218912287 U CN218912287 U CN 218912287U CN 202320043883 U CN202320043883 U CN 202320043883U CN 218912287 U CN218912287 U CN 218912287U
- Authority
- CN
- China
- Prior art keywords
- lifting platform
- spreader
- guide rail
- fixedly connected
- climbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型提供了一种超高层井道内液压自爬升布料机装置,其包括设置于井道内的多个支撑节和提升平台导轨,多个支撑节与提升平台导轨固定连接;位于最高位置的支撑节的顶部设置有施工上桁架,多个支撑节内部设置有布料机立柱,布料机立柱的顶部设置有布料机布料臂;每个支撑节上设有防护翻板。本实用新型中超高层井道内液压自爬升布料机装置通过将整个布料机设置在井道内,无需在楼层中专门开设固定通道,也就避免了后续二次浇筑固定通道,同时布料机上设置有支撑节与井道之间空隙的防护翻板,不仅解决了传统布料机爬升在楼板上留洞,而且解决了留置洞口高处坠物的风险,方便快捷节约了人工成本,避免了施工过程中存在的安全隐患。
The utility model provides a hydraulic self-climbing material distributing machine device in a super high-rise shaft, which includes a plurality of support nodes and a guide rail of a lifting platform arranged in the shaft, and the plurality of support nodes are fixedly connected with the guide rail of the lifting platform; the support located at the highest position The top of the section is provided with a construction truss, the interior of multiple support sections is provided with a distribution machine column, and the top of the distribution machine column is provided with a distribution arm; each support section is provided with a protective flap. In the utility model, the hydraulic self-climbing distributing machine device in the super high-rise hoistway arranges the whole distributing machine in the hoistway, without setting up a special fixed channel in the floor, and avoids the subsequent secondary pouring of the fixed channel. At the same time, the distributing machine is equipped with a support The protective flap for the gap between the well and the hoistway not only solves the problem of leaving holes on the floor when the traditional distribution machine climbs, but also solves the risk of falling objects from high places in the hole, which is convenient and quick, saves labor costs, and avoids safety hazards in the construction process. Hidden danger.
Description
技术领域technical field
本实用新型涉及混凝土浇筑技术领域,特别涉及一种超高层井道内液压自爬升布料机装置。The utility model relates to the technical field of concrete pouring, in particular to a hydraulic self-climbing distributing machine device in a super high-rise shaft.
背景技术Background technique
布料机是砼布料设备,与砼泵配合使用完成建筑施工中的砼浇筑作业。在高层建筑施工过程中,布料机已经成为主要的输送砼的运输方式。The placing machine is a concrete distributing equipment, which is used in conjunction with the concrete pump to complete the concrete pouring operation in the building construction. In the process of high-rise building construction, the placing machine has become the main transportation mode for conveying concrete.
现有技术中的布料机的安装,需要在楼板中开设有固定通道安装布料机,如现有实用新型专利CN216109774U-一种自爬升布料机,在楼层中开设有固定通道用于固定安装布料机,而在主体结构施工完成后,需要拆除布料机,会导致后续二次浇筑楼板,后浇楼板难以保证混凝土的浇筑质量且工程量大,后补楼板对浇筑质量要求极高。布料机固定在楼板上留固定通道存在高处坠物风险,对保证施工人员的安全存在不利的影响。The installation of the distributing machine in the prior art requires a fixed channel to install the distributing machine in the floor, such as the existing utility model patent CN216109774U-a self-climbing distributing machine, which has a fixed channel in the floor for the fixed installation of the distributing machine , and after the construction of the main structure is completed, the distributing machine needs to be dismantled, which will lead to the subsequent secondary pouring of the floor slab. The placing machine is fixed on the floor to leave a fixed channel, which may cause the risk of falling objects from a height, which will have an adverse effect on ensuring the safety of construction personnel.
实用新型内容Utility model content
针对现有技术中的上述问题,本实用新型提供了一种超高层井道内液压自爬升布料机装置,解决了现有布料机在固定安装时,需要在楼板开设有固定通道,导致需要后续二次浇筑楼板和固定通道存在高处坠物风险的问题。Aiming at the above problems in the prior art, the utility model provides a hydraulic self-climbing distribution machine device in a super high-rise shaft, which solves the need for a fixed passage on the floor when the existing distribution machine is fixedly installed, resulting in the need for subsequent two There is a risk of falling objects from heights in secondary pouring slabs and fixed passages.
为了达到上述发明目的,本实用新型采用的技术方案如下:In order to achieve the above-mentioned purpose of the invention, the technical scheme that the utility model adopts is as follows:
提供了一种超高层井道内液压自爬升布料机装置,其包括设置于井道内的多个支撑节,多个支撑节相互拼接且沿井道的高度方向设置,井道设置有多道附墙,多道附墙上沿其高度方向设置有提升平台导轨,多个支撑节的侧壁均与提升平台导轨固定连接;Provided is a hydraulic self-climbing material distributing machine device in a super high-rise shaft, which includes a plurality of support sections arranged in the shaft, the plurality of support sections are spliced with each other and arranged along the height direction of the shaft, and the shaft is provided with multiple walls. The guide rail of the lifting platform is set along the height direction of the wall attached to the road, and the side walls of multiple support sections are fixedly connected with the guide rail of the lifting platform;
位于最高位置的支撑节的顶部设置有施工上桁架,施工上桁架高度高于附墙高度;The top of the support section at the highest position is provided with a construction truss, and the height of the construction truss is higher than the height of the attached wall;
多个支撑节内部设置有与提升平台导轨固定连接的布料机立柱,布料机立柱的顶部超出施工上桁架顶部,布料机立柱的顶部设置有布料机布料臂;The interior of multiple support sections is provided with a distribution machine column fixedly connected to the guide rail of the lifting platform, the top of the distribution machine column exceeds the top of the construction truss, and the top of the distribution machine column is provided with a distribution arm;
每个支撑节底部的侧壁上铰接设置有用于覆盖支撑节与井道之间空隙的防护翻板。本实用新型中超高层井道内液压自爬升布料机装置的基本原理为:通过将整个布料机设置在井道内,无需在楼层中专门开设固定通道,也就避免了后续二次浇筑固定通道,同时布料机上设置有覆盖支撑节与井道之间空隙的防护翻板,不仅解决了传统布料机爬升在楼板上留洞,而且解决了留置洞口高处坠物的风险,方便快捷节约了人工成本,避免了施工过程中存在的安全隐患。A protective flap for covering the gap between the support section and the hoistway is hingedly arranged on the side wall at the bottom of each support section. The basic principle of the hydraulic self-climbing distribution machine device in the super high-rise shaft of the utility model is: by setting the entire distribution machine in the shaft, there is no need to set up a fixed channel in the floor, and the subsequent secondary pouring of the fixed channel is avoided. The machine is equipped with a protective flap covering the gap between the support section and the hoistway, which not only solves the problem of leaving holes on the floor when the traditional distribution machine climbs up, but also solves the risk of falling objects from high places in the hole, which is convenient and quick, saves labor costs and avoids Potential safety hazards in the construction process.
进一步地,每个支撑节均包括构造立柱,构造立柱的两端均设置有布料机提升平台横梁,相邻两个支撑节共用一个布料机提升平台横梁,布料机提升平台横梁的两侧分别与构造立柱和提升平台导轨固定连接;Further, each support section includes a construction column, and both ends of the construction column are provided with a distribution machine lifting platform beam, and two adjacent support sections share a distribution machine lifting platform beam, and the two sides of the distribution machine lifting platform beam are respectively connected to The structure column and the guide rail of the lifting platform are fixedly connected;
布料机提升平台横梁和提升平台导轨之间还设置有斜撑杆,斜撑杆的两端分别与布料机提升平台横梁和提升平台导轨固定连接。Diagonal struts are also arranged between the lifting platform beams of the distribution machine and the guide rails of the lifting platform, and the two ends of the diagonal struts are respectively fixedly connected with the lifting platform beams of the distributing machine and the guide rails of the lifting platform.
进一步地,每个布料机提升平台横梁的顶部均设置有一个防护平台板,防护平台板底部设置有多个平台梁,多个平台梁与布料机提升平台横梁的顶部固定连接,防护平台板靠近井道临边均设置有防护翻板。Further, a protective platform plate is provided on the top of each distributing machine lifting platform beam, and a plurality of platform beams are arranged at the bottom of the protective platform plate, and the plurality of platform beams are fixedly connected to the top of the distributing machine lifting platform beam, and the protective platform plate is close to The sides of the hoistway are equipped with protective flaps.
进一步地,布料机立柱沿自身高度方向间隔均匀设置有多个附轨件和附墙件,布料机立柱分别通过多个附轨件和附墙件与提升平台导轨和剪力墙固定连接;每个附轨件和附墙件均包括连接杆和设置于连接杆端部的固定螺杆;连接杆与布料机立柱固定连接,固定螺杆与提升平台导轨或附墙件固定连接。Further, the vertical column of the distributing machine is evenly spaced with a plurality of attached rails and wall attachments along its height direction, and the vertical column of the distributing machine is fixedly connected to the guide rail of the lifting platform and the shear wall through a plurality of attached rails and wall attachments; Both the rail attachment and the wall attachment include a connecting rod and a fixing screw arranged at the end of the connecting rod; the connecting rod is fixedly connected to the upright column of the cloth machine, and the fixing screw is fixedly connected to the guide rail of the lifting platform or the wall attachment.
进一步地,提升平台导轨的侧壁上沿自身高度方向间隔均匀设置有多个附墙挂座,提升平台导轨通过多个附墙挂座与井道内的剪力墙固定连接。Further, the side wall of the guide rail of the lifting platform is evenly spaced with a plurality of wall mounts along its height direction, and the guide rail of the lifting platform is fixedly connected to the shear wall in the hoistway through the plurality of wall mounts.
进一步地,施工上桁架上设置有手拉葫芦,手拉葫芦用于吊挂铝模板。Further, chain hoists are arranged on the trusses during construction, and the chain hoists are used to hang the aluminum formwork.
进一步地,提升平台导轨底部设置有导轨吊杆,导轨吊杆的顶部与提升平台导轨底部固定连接,导轨吊杆的底部与防护平台板的顶部固定连接。Further, the bottom of the lifting platform guide rail is provided with a guide rail suspender, the top of the guide rail suspender is fixedly connected to the bottom of the lifting platform guide rail, and the bottom of the guide rail suspender is fixedly connected to the top of the protective platform plate.
进一步地,布料机立柱的顶部设置有操作平台。Further, an operating platform is provided on the top of the vertical column of the cloth machine.
本实用新型的有益效果为:通过将整个布料机设置在井道内,无需在楼层中专门开设固定通道,也就避免了后续二次浇筑固定通道,减少了布料机对楼板一次成型的影响,给建筑施工带来了良好的施工效益,同时也提高了施工质量,加快了施工进度;同时布料机上设置有覆盖支撑节与井道之间空隙的防护翻板,避免了高处坠物的风险,减少了施工过程中的安全。The beneficial effects of the utility model are as follows: by setting the whole distribution machine in the shaft, there is no need to set up a fixed passage in the floor, which avoids the subsequent secondary pouring of the fixed passage, reduces the influence of the distribution machine on the first forming of the floor, and provides The building construction has brought good construction benefits, but also improved the construction quality and accelerated the construction progress; at the same time, the protective flap covering the gap between the support joint and the hoistway is installed on the distributor, which avoids the risk of falling objects from high places and reduces the risk of falling objects. safety during construction.
附图说明Description of drawings
图1为一种超高层井道内液压自爬升布料机装置的结构示意图。Fig. 1 is a schematic structural diagram of a hydraulic self-climbing distributor device in a super high-rise shaft.
图2为单个支撑节的结构示意图。Figure 2 is a schematic diagram of the structure of a single support node.
图3~图6为布料机装置的浇筑流程图。Figures 3 to 6 are the pouring flow chart of the distributing machine device.
其中,1、支撑节;101、立柱;102、布料机提升平台横梁;103、斜撑杆;104、防护平台板;105、平台梁;2、附墙;3、提升平台导轨;4、施工上桁架;5、布料机立柱;6、布料机布料臂;7、防护翻板;8、附轨件;9、附墙件;10、附墙挂座;11、手拉葫芦;12、铝模板;13、导轨吊杆;14、操作平台。Among them, 1. Support section; 101. Upright column; 102. Lifting platform beam of distribution machine; 103. Diagonal brace; 104. Protective platform plate; 105. Platform beam; 2. Attached wall; 3. Lifting platform guide rail; 4. Construction Upper truss; 5. Upright column of cloth machine; 6. Cloth arm of cloth machine; 7. Protective flap; 8. Attached rail; 9. Attached wall; 10. Attached wall hanger; template; 13, guide rail suspender; 14, operating platform.
具体实施方式Detailed ways
下面对本实用新型的具体实施方式进行描述,以便于本技术领域的技术人员理解本实用新型,但应该清楚,本实用新型不限于具体实施方式的范围,对本技术领域的普通技术人员来讲,只要各种变化在所附的权利要求限定和确定的本实用新型的精神和范围内,这些变化是显而易见的,一切利用本实用新型构思的发明创造均在保护之列。The specific embodiment of the present utility model is described below, so that those skilled in the art understand the utility model, but should be clear, the utility model is not limited to the scope of specific embodiment, for those of ordinary skill in the art, as long as Various changes are within the spirit and scope of the utility model defined and determined by the appended claims, and these changes are obvious, and all inventions and creations utilizing the concept of the utility model are all included in the protection list.
如图1所示,本实用新型提供的一种超高层井道内液压自爬升布料机装置,其包括设置于井道内的多个支撑节1,多个支撑节1相互拼接且沿井道的高度方向设置,井道设置有多块附墙2,多块附墙2上沿其高度方向设置有提升平台导轨3,多个支撑节1的侧壁均与提升平台导轨3固定连接;As shown in Figure 1, the utility model provides a hydraulic self-climbing distributor device in a super high-rise shaft, which includes a plurality of
位于最高位置的支撑节1的顶部设置有施工上桁架4,施工上桁架4高度高于附墙2高度;The top of the
多个支撑节1内部设置有与提升平台导轨3固定连接的布料机立柱5,布料机立柱5的顶部超出施工上桁架4顶部,布料机立柱5的顶部设置有布料机布料臂6和操作平台14;布料机布料臂6用于泵送混凝土,实现浇筑附墙2;操作平台14为操作员提供支撑平台。A plurality of supporting
每个支撑节1底部的侧壁上铰接设置有用于覆盖支撑节1与井道之间空隙的防护翻板7。本实用新型中超高层井道内液压自爬升布料机装置的基本原理为:通过将整个布料机设置在井道内,无需在楼层中专门开设固定通道,也就避免了后续二次浇筑固定通道,同时布料机上设置有覆盖支撑节1与井道之间空隙的防护翻板7,不仅解决了传统布料机爬升在楼板上留洞,而且解决了留置洞口高处坠物的风险,方便快捷节约了人工成本,避免了施工过程中存在的安全隐患。A
如图2所示,作为支撑节1的具体实施方案,每个支撑节1均包括构造立柱101,构造立柱101的两端均设置有布料机提升平台横梁102,相邻两个支撑节1共用一个布料机提升平台横梁102,布料机提升平台横梁102的两侧分别与构造立柱101和提升平台导轨3固定连接;As shown in Figure 2, as a specific implementation of the
布料机提升平台横梁102和提升平台导轨3之间还设置有斜撑杆103,斜撑杆103的两端分别与布料机提升平台横梁102和提升平台导轨3固定连接。斜撑杆103用于加强支撑节1的结构强度。A
每个布料机提升平台横梁102的顶部均设置有一个防护平台板104,防护平台板104底部设置有多个平台梁105,多个平台梁105与布料机提升平台横梁102的顶部固定连接,防护平台板104的四周侧壁上均设置有一块防护翻板7。防护平台板104用于封堵井道且防护平台板104与每层楼板对齐,便于放置建筑材料。The top of each distributing machine
作为布料机立柱5的具体固定方式,布料机立柱5沿自身高度方向间隔均匀设置有多个附轨件8和附墙件9,布料机立柱5分别通过多个附轨件8和附墙件9与提升平台导轨3和附墙2固定连接;每个附轨件8和附墙件9均包括连接杆和设置于连接杆端部的固定螺杆;连接杆与布料机立柱5固定连接,固定螺杆与提升平台导轨3或附墙2固定连接。As the specific fixing method of the
作为提升平台导轨3的具体固定方式,提升平台导轨3的侧壁上沿自身高度方向间隔均匀设置有多个附墙挂座10,提升平台导轨3通过多个附墙挂座10与井道内的剪力墙固定连接。As a specific fixing method of the lifting platform guide rail 3, a plurality of wall hanging seats 10 are evenly spaced along the height direction of the lifting platform guide rail 3 on the side wall of the lifting platform guide rail 3, and the lifting platform guide rail 3 is connected to the hoistway through a plurality of wall hanging seats 10. Shear wall fixed connection.
施工上桁架4上设置有手拉葫芦11,手拉葫芦11用于吊装铝模板12。A chain hoist 11 is arranged on the
作为提升平台导轨3的具体安装方式,提升平台导轨3底部设置有导轨吊杆13,导轨吊杆13的顶部与提升平台导轨3底部固定连接,导轨吊杆13的底部与防护平台板104的顶部固定连接。As the specific installation method of the lifting platform guide rail 3, the bottom of the lifting platform guide rail 3 is provided with a
如图3~图6所示,本方案布料机装置的浇筑流程为:如图3所示,绑扎4楼的钢筋,合模,调整布料机布料臂6展开浇筑4楼混凝土;如图4所示,4楼混凝土浇筑完成后,通过布料臂油缸收合布料机布料臂6,绑扎5楼钢筋;如图5所示,待4楼混凝土达到强度后,退模,在4楼安装附墙挂座10,拆除1楼~3楼的附轨件8和附墙件9,安装液压系统,液压系统为液压油缸,拔出附墙挂座10上承重插销,收起防护翻板7准备爬升支撑节1;如图6所示,爬升井筒平台至4楼,就位后安装承重插销,复位翻板,在2楼~4楼安装布料机立柱5附墙2装置,合模,调整布料臂,准备浇筑5楼混凝土,进入下一施工流程。As shown in Figures 3 to 6, the pouring process of the distribution machine device in this plan is as follows: as shown in Figure 3, bind the steel bars on the 4th floor, close the mold, adjust the
综上所述,本实用新型中的一种超高层井道内液压自爬升布料机装置,通过将整个布料机设置在井道内,无需在楼层中专门开设固定通道,也就避免了后续二次浇筑固定通道,减少了布料机对楼板一次成型的影响,给建筑施工带来了良好的施工效益,同时也提高了施工质量,缩短了施工工序;同时布料机上设置有覆盖支撑节1与井道之间空隙的防护翻板7,避免了高处坠物的风险,减少了施工过程中的安全及质量隐患。In summary, a hydraulic self-climbing distribution machine device in a super high-rise shaft in the utility model, by setting the entire distribution machine in the shaft, there is no need to specially set up a fixed passage in the floor, which also avoids the subsequent secondary pouring The fixed channel reduces the influence of the placing machine on the one-time forming of the floor, which brings good construction benefits to the building construction, improves the construction quality, and shortens the construction process; The
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320043883.9U CN218912287U (en) | 2023-01-06 | 2023-01-06 | Hydraulic self-climbing spreader device in super high-rise hoistway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320043883.9U CN218912287U (en) | 2023-01-06 | 2023-01-06 | Hydraulic self-climbing spreader device in super high-rise hoistway |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218912287U true CN218912287U (en) | 2023-04-25 |
Family
ID=86038639
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320043883.9U Expired - Fee Related CN218912287U (en) | 2023-01-06 | 2023-01-06 | Hydraulic self-climbing spreader device in super high-rise hoistway |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218912287U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211524A (en) * | 2023-10-30 | 2023-12-12 | 中建三局集团有限公司 | Movable arm distributing machine elevator shaft climbing formwork integrated platform |
-
2023
- 2023-01-06 CN CN202320043883.9U patent/CN218912287U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211524A (en) * | 2023-10-30 | 2023-12-12 | 中建三局集团有限公司 | Movable arm distributing machine elevator shaft climbing formwork integrated platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
| CN205742991U (en) | A kind of truss-like hydraulic pressure integral steel platform jumping formwork | |
| AU2013212529B2 (en) | Automated formwork climbing system | |
| CN109898848B (en) | A climbing integral steel platform formwork system and its construction method | |
| CN105568870B (en) | For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction | |
| CN107246073A (en) | Core Walls Structure crossbar structure synchronous construction structure and method | |
| WO2022237482A1 (en) | Construction apparatus and method for hanging, integrally assembling, and integrally lifting building vertical formwork | |
| CN113931313B (en) | Construction method of super high-rise core tube horizontal structure | |
| CN106013781A (en) | Slab supporting construction method and construction device by reversely suspending template | |
| CN102912996B (en) | Steel tube concrete column high-altitude construction safety protection system | |
| CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
| CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
| CN115247498A (en) | Fixed bolster of prefabricated wallboard and contain braced system of this support | |
| CN107100361A (en) | Inner support aluminum dipping form device and its installation method are climbed outside a kind of | |
| CN117868453A (en) | A hanging system for the construction of super high-rise core tube inclined wall | |
| CN109137747B (en) | Elastic hanging bracket for large-span arch bridge girder construction | |
| CN106639303B (en) | Elevator dedicated hydraulic creeping formwork frame body | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN206174441U (en) | Elevator shaft operation platform | |
| CN207987749U (en) | Ride cable-styled erection crane | |
| CN113463900A (en) | Multifunctional slidable hanging rack for staircase and construction method thereof | |
| CN105386414B (en) | Lower-guide type main-truss-free hanging basket | |
| CN116607426B (en) | Arch bridge outsourcing concrete construction platform system and construction method | |
| CN209066293U (en) | Elastic hanging bracket for construction of large-span arch bridge girder | |
| CN217810545U (en) | Construction system for steel truss girder bridge |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230425 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
