CN218911776U - Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure - Google Patents

Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure Download PDF

Info

Publication number
CN218911776U
CN218911776U CN202320161576.0U CN202320161576U CN218911776U CN 218911776 U CN218911776 U CN 218911776U CN 202320161576 U CN202320161576 U CN 202320161576U CN 218911776 U CN218911776 U CN 218911776U
Authority
CN
China
Prior art keywords
corrugated steel
double
gasket
top plate
shear connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320161576.0U
Other languages
Chinese (zh)
Inventor
余展
刘发起
王玉银
吴占明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Original Assignee
Harbin Institute of Technology Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen filed Critical Harbin Institute of Technology Shenzhen
Priority to CN202320161576.0U priority Critical patent/CN218911776U/en
Application granted granted Critical
Publication of CN218911776U publication Critical patent/CN218911776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

本实用新型提供一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件,属于波纹钢组合构件技术领域。为解决现有双层波纹钢构件的连接件或需要在底板上开口,造成漏浆或破坏波纹钢结构;或人工焊接无法保证焊接质量;或预制焊接占地大,增加运输成本的问题。包括固定在波纹钢底板上的内螺纹螺帽,双头螺丝贯穿波纹钢顶板后与内螺纹螺帽通过螺纹连接,位于波纹钢顶板两侧的双头螺丝均通过紧固螺母连接,紧固螺母与波纹钢顶板之间设有一端与波纹钢顶板形状相匹配的垫片。不会破坏波纹钢底板,避免发生漏浆;设有垫片可在紧固时避免破坏波纹钢顶板的弧形结构;便于调节两层波纹钢板的间距;不会大幅度增加叠放的波纹钢板占地面积。

Figure 202320161576

The utility model provides a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure, which belongs to the technical field of corrugated steel composite components. In order to solve the problem that the connectors of the existing double-layer corrugated steel members may need openings on the bottom plate, resulting in slurry leakage or damage to the corrugated steel structure; or manual welding cannot guarantee the welding quality; or prefabricated welding occupies a large area and increases transportation costs. Including the internal thread nut fixed on the corrugated steel bottom plate, the double-headed screw penetrates the corrugated steel top plate and is threadedly connected with the internal thread nut, and the double-headed screws on both sides of the corrugated steel top plate are connected by fastening nuts, and the fastening nuts A gasket with one end matching the shape of the corrugated steel top plate is provided between the corrugated steel top plate. It will not damage the corrugated steel bottom plate to avoid slurry leakage; there is a gasket to avoid damage to the arc structure of the corrugated steel top plate when tightening; it is convenient to adjust the distance between two layers of corrugated steel plates; it will not greatly increase the stacked corrugated steel plates footprint.

Figure 202320161576

Description

应用于装配式双层波纹钢组合结构的快速安装剪力连接件Quick-installation shear connectors applied to prefabricated double-layer corrugated steel composite structures

技术领域technical field

本实用新型涉及波纹钢组合构件技术领域,具体而言,涉及一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件。The utility model relates to the technical field of corrugated steel composite components, in particular to a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure.

背景技术Background technique

装配式双层波纹钢组合结构中波纹钢板和灌浆料层之间在受力过程中存在纵向滑移和竖向掀起的可能,一旦波纹钢与混凝土的粘结作用丧失,构件将失去组合效应,其极限承载力会急剧降低,结构可能立即失效。剪力连接件不仅可以抵抗波纹钢-混组合界面滑移,提供波纹钢板-灌浆料界面受剪承载力,而且可以抵抗波纹钢板与核心灌浆料层分离、提高受压波纹钢抗压强度;因此采用一个合理有效的剪力连接件连接措施是必要的。In the prefabricated double-layer corrugated steel composite structure, there is a possibility of longitudinal slippage and vertical lifting between the corrugated steel plate and the grouting material layer during the stress process. Once the bond between the corrugated steel and concrete is lost, the component will lose the composite effect. Its ultimate load-bearing capacity will be drastically reduced and the structure may fail immediately. The shear connector can not only resist the slippage of the corrugated steel-concrete composite interface, provide the shear bearing capacity of the corrugated steel plate-grouting material interface, but also resist the separation of the corrugated steel plate and the core grouting material layer, and improve the compressive strength of the corrugated steel; therefore It is necessary to adopt a reasonable and effective shear connector connection measure.

目前已有的应用于装配式双层波纹钢组合结构的剪力连接件连接形式主要分为两种,一种为螺栓连接,该方法需要对波纹钢底板进行开孔,而波纹钢底部出现孔洞则容易造成漏浆现象,且螺栓拧紧时易将连接处波纹钢板弯折。另一种为栓钉焊接,如果在现场焊接,焊接质量无法保证;如果在加工厂焊接,虽保证焊接质量,但焊接后波纹钢板叠放占用空间成倍增加,增加了运输成本。At present, there are two types of shear connectors used in prefabricated double-layer corrugated steel composite structures. One is bolt connection. This method requires opening holes in the corrugated steel bottom plate, and holes appear at the bottom It is easy to cause slurry leakage, and it is easy to bend the corrugated steel plate at the joint when the bolt is tightened. The other is stud welding. If it is welded on site, the welding quality cannot be guaranteed; if it is welded in a processing factory, although the welding quality is guaranteed, the space occupied by the stacked corrugated steel plates will double after welding, which will increase the transportation cost.

实用新型内容Utility model content

本实用新型要解决的技术问题是:The technical problem to be solved in the utility model is:

为了解决现有双层波纹钢构件的连接件或需要在底板上开口,造成漏浆或破坏波纹钢结构;或人工焊接无法保证焊接质量;或预制焊接占地大,增加运输成本的问题。In order to solve the problem that the connectors of the existing double-layer corrugated steel members may need openings on the bottom plate, causing slurry leakage or destroying the corrugated steel structure; or manual welding cannot guarantee the welding quality; or prefabricated welding occupies a large area and increases transportation costs.

本实用新型为解决上述技术问题所采用的技术方案:The utility model is the technical solution adopted for solving the above-mentioned technical problems:

本实用新型提供了一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件,两层波纹钢板包括波纹钢顶板和波纹钢底板,两层波纹钢板之间通过若干个剪力连接件连接,所述剪力连接件包括固定在波纹钢底板上的内螺纹螺帽,所述波纹钢顶板上与内螺纹螺帽相对应的位置开设有限位孔,通过双头螺丝贯穿限位孔后与内螺纹螺帽通过螺纹连接,位于波纹钢顶板两侧的双头螺丝均通过紧固螺母连接,所述紧固螺母与波纹钢顶板之间设有一端与波纹钢顶板形状相匹配的垫片。The utility model provides a fast-installation shear connector applied to an assembled double-layer corrugated steel composite structure. The two-layer corrugated steel plates include a corrugated steel top plate and a corrugated steel bottom plate, and the two layers of corrugated steel plates are connected by several shear forces. The shear connector includes an internally threaded nut fixed on the corrugated steel bottom plate, and a limited hole is opened on the corresponding position of the corrugated steel top plate to the internally threaded nut, and the limited hole is penetrated by a double-headed screw Afterwards, it is connected with the internal threaded nut through threads, and the double-headed screws located on both sides of the corrugated steel top plate are connected through fastening nuts, and a pad with one end matching the shape of the corrugated steel top plate is provided between the fastening nuts and the corrugated steel top plate piece.

进一步地,所述剪力连接件均设置在波纹钢顶板和波纹钢底板的波峰或波谷位置。Further, the shear connectors are arranged at the crests or troughs of the corrugated steel top plate and the corrugated steel bottom plate.

进一步地,所述波纹钢底板上开设有螺丝限位槽,用于进一步对双头螺丝进行限位。Further, the corrugated steel bottom plate is provided with screw limiting grooves, which are used to further limit the double-headed screws.

进一步地,所述垫片包括外凸弧形垫片和内凹弧形垫片,所述外凸弧形垫片位于波纹钢顶板的上端凹陷处,所述内凹弧形垫片位于波纹钢顶板的下端凸出处,所述外凸弧形垫片和内凹弧形垫片均为一侧端面的形状与波纹钢顶板的形状相匹配,另一侧端面为水平端面。Further, the gasket includes an outer convex arc gasket and an inner concave arc gasket, the outer convex arc gasket is located at the upper depression of the corrugated steel top plate, and the inner concave arc gasket is located The protruding part of the lower end of the top plate, the convex arc-shaped gasket and the concave arc-shaped gasket all have the shape of one end face matching the shape of the corrugated steel top plate, and the other end face is a horizontal end face.

进一步地,所述双头螺丝的两侧端部外壁上或全部外壁上均匀布设有若干个螺纹。Further, several screw threads are evenly distributed on the outer walls of both ends of the double-ended screw or on the entire outer walls.

进一步地,当双头螺丝的两侧端部外壁上设有螺纹时,一侧端部螺纹的长度为80mm-120mm,另一侧端部螺纹的长度为20mm-50mm。Further, when threads are provided on the outer walls of both ends of the double-ended screw, the length of the threads at one end is 80mm-120mm, and the length of the threads at the other end is 20mm-50mm.

进一步地,所述外凸弧形垫片和内凹弧形垫片与波纹钢顶板之间均设有环形防水垫。Further, a ring-shaped waterproof gasket is provided between the convex arc-shaped gasket and the concave arc-shaped gasket and the corrugated steel top plate.

进一步地,所述环形防水垫为环形橡胶垫。Further, the annular waterproof pad is an annular rubber pad.

进一步地,所述双头螺丝的长度为15cm-25cm。Further, the length of the double-headed screw is 15cm-25cm.

进一步地,所述双头螺丝为不锈钢双头螺丝,所述外凸弧形垫片为不锈钢外凸弧形垫片,所述内凹弧形垫片为不锈钢内凹弧形垫片,所述紧固螺母为不锈钢紧固螺母,所述内螺纹螺帽为不锈钢内螺纹螺帽。Further, the double-ended screw is a stainless steel double-ended screw, the outer convex arc gasket is a stainless steel outer convex arc gasket, and the inner concave arc gasket is a stainless steel inner concave arc gasket. The fastening nut is a stainless steel fastening nut, and the internally threaded nut is a stainless steel internally threaded nut.

相较于现有技术,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件,包括固定在波纹钢底板上的内螺纹螺帽,波纹钢顶板上与内螺纹螺帽相对应的开设有限位孔,双头螺丝贯穿限位孔后与内螺纹螺帽通过螺纹连接,位于波纹钢顶板两侧的双头螺丝均通过紧固螺母连接,紧固螺母与波纹钢顶板之间设有一端与波纹钢顶板形状相匹配的垫片;The utility model is a fast-installation shear connector applied to an assembled double-layer corrugated steel composite structure, which includes an internal thread nut fixed on the corrugated steel bottom plate, and the corrugated steel top plate has a limited opening corresponding to the internal thread nut. The double-headed screw penetrates the limit hole and is threadedly connected with the internal threaded nut. The double-headed screws on both sides of the corrugated steel top plate are connected by fastening nuts. There is an end between the fastening nut and the corrugated steel top plate. Gaskets matching the shape of the corrugated steel top plate;

双头螺栓并未贯穿波纹钢底板,保证了波纹钢底板的完整性,不会导致波纹钢底板产生漏浆现象;The stud bolts do not penetrate the corrugated steel bottom plate, which ensures the integrity of the corrugated steel bottom plate and will not cause slurry leakage on the corrugated steel bottom plate;

通过设置与波纹钢板形状相匹配的垫片,能够在固定波纹钢顶部一侧的双头螺栓时,不会对波纹钢顶板的形状造成变形,从而保护了波纹钢顶板的弧形;By arranging gaskets matching the shape of the corrugated steel plate, the shape of the corrugated steel top plate will not be deformed when fixing the stud bolts on the top side of the corrugated steel plate, thereby protecting the arc of the corrugated steel plate;

通过双头螺丝连接两层波纹钢板,可灵活调节两层波纹钢板之间的距离,能够提高灌浆时的质量;The two layers of corrugated steel plates are connected by double-headed screws, the distance between the two layers of corrugated steel plates can be flexibly adjusted, and the quality of grouting can be improved;

焊接有内螺纹螺帽的波纹钢板并不会大幅度增加叠放的两层波纹钢板的占地面积,方便叠放运输。The corrugated steel plate welded with the internal thread nut does not greatly increase the footprint of the stacked two-layer corrugated steel plate, which is convenient for stacking and transportation.

附图说明Description of drawings

图1为本实用新型实施例中一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件的立体图;Figure 1 is a perspective view of a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure in an embodiment of the present invention;

图2为本实用新型实施例中一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件的结构图一;Fig. 2 is a structural diagram 1 of a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure in an embodiment of the present invention;

图3为本实用新型实施例中顶部波纹钢板的结构图;Fig. 3 is the structural diagram of the top corrugated steel plate in the utility model embodiment;

图4为本实用新型实施例中一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件的结构图二。Fig. 4 is a second structural diagram of a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure in an embodiment of the utility model.

附图标记说明:Explanation of reference signs:

1、双头螺丝;2、外凸弧形垫片;3、内凹弧形垫片;4、紧固螺母;5、内螺纹螺帽;6、波纹钢顶板;7、波纹钢底板。1. Double-headed screw; 2. Outward convex arc gasket; 3. Inner concave arc gasket; 4. Fastening nut; 5. Internal thread nut; 6. Corrugated steel top plate; 7. Corrugated steel bottom plate.

具体实施方式Detailed ways

在本实用新型的描述中,应当说明的是,各实施例中的术语名词例如“上”、“下”、“前”、“后”、“左”、“右”等指示方位的词语,只是为了简化描述基于说明书附图的位置关系,并不代表所指的元件和装置等必须按照说明书中特定的方位和限定的操作及方法、构造进行操作,该类方位名词不构成对本实用新型的限制。In the description of the present utility model, it should be noted that the terms and nouns in each embodiment, such as "upper", "lower", "front", "back", "left", "right" and other words indicating orientation, It is just to simplify the description of the positional relationship based on the drawings in the specification, and it does not mean that the components and devices referred to must be operated in accordance with the specific orientation and limited operations, methods, and structures in the specification. limit.

为使本实用新型的上述目的、特征和优点能够更为明显易懂,下面结合附图对本实用新型的具体实施例做详细的说明。In order to make the above purpose, features and advantages of the utility model more obvious and easy to understand, specific embodiments of the utility model will be described in detail below in conjunction with the accompanying drawings.

具体实施方案一:结合图1至图4所示,本实用新型提供一种应用于装配式双层波纹钢组合结构的快速安装剪力连接件,两层波纹钢板包括波纹钢顶板6和波纹钢底板7,两层波纹钢板之间通过若干个剪力连接件连接,所述剪力连接件包括固定在波纹钢底板7上的内螺纹螺帽5,所述波纹钢顶板6上与内螺纹螺帽5相对应的开设有限位孔,通过双头螺丝1贯穿限位孔后与内螺纹螺帽5通过螺纹连接,位于波纹钢顶板6两侧的双头螺丝1均通过紧固螺母4连接,所述紧固螺母4与波纹钢顶板6之间设有一端与波纹钢顶板6形状相匹配的垫片。Specific embodiment 1: As shown in Figures 1 to 4, the utility model provides a quick-installation shear connector applied to an assembled double-layer corrugated steel composite structure. The two-layer corrugated steel plate includes a corrugated steel top plate 6 and a corrugated steel plate The bottom plate 7 is connected by several shear connectors between the two layers of corrugated steel plates. The shear connectors include internally threaded nuts 5 fixed on the corrugated steel bottom plate 7. The cap 5 is correspondingly provided with a limit hole, which is threaded with the internal thread nut 5 after the stud screw 1 penetrates the limit hole, and the stud screws 1 located on both sides of the corrugated steel top plate 6 are all connected by the fastening nut 4, A gasket with one end matching the shape of the corrugated steel top plate 6 is provided between the fastening nut 4 and the corrugated steel top plate 6 .

双头螺栓并未贯穿波纹钢底板7,保证了波纹钢底板7的完整性,不会导致波纹钢底板7产生漏浆现象;The stud bolts do not penetrate through the corrugated steel bottom plate 7, which ensures the integrity of the corrugated steel bottom plate 7 and will not cause the corrugated steel bottom plate 7 to produce slurry leakage;

通过设置与波纹钢板形状相匹配的垫片,能够在固定波纹钢顶部一侧的双头螺栓时,不会对波纹钢顶板6的形状造成变形,从而保护了波纹钢顶板6的弧形;By arranging a gasket matching the shape of the corrugated steel plate, the shape of the corrugated steel top plate 6 will not be deformed when fixing the stud bolts on one side of the corrugated steel top plate, thereby protecting the arc of the corrugated steel top plate 6;

通过双头螺丝1连接两层波纹钢板,可灵活调节两层波纹钢板之间的距离,能够提高灌浆时的质量;The two layers of corrugated steel plates are connected by double-headed screws 1, the distance between the two layers of corrugated steel plates can be flexibly adjusted, and the quality of grouting can be improved;

焊接有内螺纹螺帽5的波纹钢板并不会大幅度增加叠放的两层波纹钢板的占地面积,方便叠放运输。The corrugated steel plate welded with the internally threaded nut 5 does not greatly increase the footprint of the stacked two-layer corrugated steel plate, which is convenient for stacking and transportation.

优选地,所述内螺纹螺帽5与波纹钢底板7满焊。Preferably, the internally threaded nut 5 is fully welded to the corrugated steel bottom plate 7 .

具体实施方案二:结合图1至图4所示,所述剪力连接件均设置在波纹钢顶板6和波纹钢底板7的波峰或波谷位置。剪力连接件均设置在波纹钢板的波峰或波谷位置,便于对限位孔的位置进行确定并打孔。本实施方案的其他组合和连接关系与具体实施方案一相同。Embodiment 2: As shown in FIG. 1 to FIG. 4 , the shear connectors are arranged at the crests or troughs of the corrugated steel top plate 6 and the corrugated steel bottom plate 7 . The shear connectors are all arranged at the peak or trough position of the corrugated steel plate, which is convenient for determining the position of the limit hole and drilling. The other combinations and connections of this embodiment are the same as those of Embodiment 1.

优选地,所述波纹钢底板7上开设有螺丝限位槽,用于进一步对双头螺丝1进行限位,如图4所示。Preferably, the corrugated steel bottom plate 7 is provided with a screw limiting groove for further limiting the double-headed screw 1 , as shown in FIG. 4 .

优选地,所述垫片包括外凸弧形垫片2和内凹弧形垫片3,所述外凸弧形垫片2位于波纹钢顶板6的上端凹陷处,所述内凹弧形垫片3位于波纹钢顶板6的下端凸出处,所述外凸弧形垫片2和内凹弧形垫片3均为一侧端面与波纹钢顶板6的形状相匹配,另一侧端面为水平端面。Preferably, the gasket includes a convex arc gasket 2 and a concave arc gasket 3, the convex arc gasket 2 is located at the upper end depression of the corrugated steel roof 6, and the concave arc gasket The sheet 3 is located at the protruding part of the lower end of the corrugated steel top plate 6, and the convex arc-shaped gasket 2 and the concave arc-shaped gasket 3 are both end faces on one side matching the shape of the corrugated steel top plate 6, and the end faces on the other side are horizontal. end face.

优选地,所述双头螺丝1的两侧端部外壁上或全部外壁上均匀布设有若干个螺纹。Preferably, several threads are evenly distributed on the outer walls of both ends of the double-ended screw 1 or on the entire outer walls.

优选地,所述双头螺丝1为不锈钢双头螺丝,所述外凸弧形垫片2为不锈钢外凸弧形垫片,所述内凹弧形垫片3为不锈钢内凹弧形垫片,所述紧固螺母4为不锈钢紧固螺母,所述内螺纹螺帽5为不锈钢内螺纹螺帽。Preferably, the double-headed screw 1 is a stainless steel double-ended screw, the convex arc-shaped gasket 2 is a stainless steel convex arc-shaped gasket, and the concave arc-shaped gasket 3 is a stainless steel concave arc-shaped gasket , the fastening nut 4 is a stainless steel fastening nut, and the internally threaded nut 5 is a stainless steel internally threaded nut.

优选地,当双头螺丝1的两侧端部外壁上设有螺纹时,一侧端部螺纹长度为80mm-120mm,另一侧端部螺纹的长度为20mm-50mm。Preferably, when threads are provided on the outer walls of both ends of the double-headed screw 1 , the length of the thread at one end is 80mm-120mm, and the length of the thread at the other end is 20mm-50mm.

进一步地,双头螺丝1的上侧端部螺纹长度为80mm-120mm,下侧端部螺纹的长度为20mm-50mm。Further, the thread length of the upper end of the double-headed screw 1 is 80mm-120mm, and the length of the thread of the lower end is 20mm-50mm.

优选地,所述外凸弧形垫片2和内凹弧形垫片3与波纹钢顶板6之间设有环形防水垫。Preferably, a ring-shaped waterproof pad is provided between the convex arc-shaped gasket 2 and the concave arc-shaped gasket 3 and the corrugated steel top plate 6 .

优选地,所述环形防水垫为环形橡胶垫。Preferably, the annular waterproof pad is an annular rubber pad.

优选地,所述双头螺丝1的长度为15cm-25cm,可根据两层波纹钢板的间距选择相应长度的双头螺丝1。Preferably, the length of the double-ended screw 1 is 15cm-25cm, and the corresponding length of the double-ended screw 1 can be selected according to the distance between two layers of corrugated steel plates.

虽然本实用新型公开披露如上,但本实用新型公开的保护范围并非仅限于此。本实用新型领域技术人员在不脱离本实用新型公开的精神和范围的前提下,可进行各种变更与修改,这些变更与修改均将落入本实用新型的保护范围。Although the disclosure of the utility model is as above, the protection scope of the disclosure of the utility model is not limited thereto. Those skilled in the field of the utility model can make various changes and modifications without departing from the spirit and scope of the utility model, and these changes and modifications will all fall within the protection scope of the utility model.

装配方法:将全部双头螺丝1通过螺纹安装在波纹钢底板7的内螺纹螺帽5上,根据波纹钢顶板6和波纹钢底板7的间距将一个紧固螺栓安装在双头螺丝1上,固定好紧固螺栓的位置后将内凹弧形垫片3放置在紧固螺栓上,再将波纹钢顶板6上的限位孔与双头螺丝1的位置一一对应,将外凸弧形垫片2放置在波纹钢顶板6上,并通过另一个紧固螺栓将波纹钢顶板6进行固定。Assembly method: Install all the double-headed screws 1 on the internally threaded nut 5 of the corrugated steel bottom plate 7 through threads, and install a fastening bolt on the double-headed screw 1 according to the distance between the corrugated steel top plate 6 and the corrugated steel bottom plate 7, After fixing the position of the fastening bolt, place the concave arc-shaped gasket 3 on the fastening bolt, and then match the limit hole on the corrugated steel top plate 6 with the position of the double-headed screw 1 one by one, and place the convex arc-shaped gasket 3 on the fastening bolt. The gasket 2 is placed on the corrugated steel top plate 6, and the corrugated steel top plate 6 is fixed by another fastening bolt.

Claims (10)

1. Be applied to assembled double-deck ripple steel integrated configuration's quick installation shear force connecting piece, two-layer ripple steel sheet includes ripple steel roof (6) and ripple steel bottom plate (7), its characterized in that: connect through a plurality of shear force connecting piece between two-layer corrugated steel plate, the shear force connecting piece is including fixing internal thread nut (5) on corrugated steel bottom plate (7), spacing hole has been seted up with the corresponding position of internal thread nut (5) on corrugated steel roof (6), runs through spacing hole through threaded connection with internal thread nut (5) after passing through double-end screw (1), and double-end screw (1) that are located corrugated steel roof (6) both sides all are connected through fastening nut (4), be equipped with one end and corrugated steel roof (6) shape assorted gasket between fastening nut (4) and the corrugated steel roof (6).
2. The quick-install shear connector for use in a fabricated double-deck corrugated steel composite structure of claim 1, wherein: the shear connectors are arranged at the wave crest or wave trough positions of the corrugated steel top plate (6) and the corrugated steel bottom plate (7).
3. The quick-install shear connector for use in a fabricated double-deck corrugated steel composite structure of claim 2, wherein: the corrugated steel bottom plate (7) is provided with a screw limiting groove for further limiting the double-headed screw (1).
4. The quick install shear connector for use in a fabricated double deck corrugated steel composite structure of claim 3, wherein: the gasket comprises a convex arc gasket (2) and a concave arc gasket (3), wherein the convex arc gasket (2) is positioned at the concave position of the upper end of the corrugated steel top plate (6), the concave arc gasket (3) is positioned at the convex position of the lower end of the corrugated steel top plate (6), the convex arc gasket (2) and the concave arc gasket (3) are both in shape of one side end face and matched with the shape of the corrugated steel top plate (6), and the other side end face is a horizontal end face.
5. The quick install shear connector for use in a fabricated double deck corrugated steel composite structure of claim 4, wherein: a plurality of threads are uniformly distributed on the outer walls of the end parts of the two sides of the double-headed screw (1) or on all the outer walls.
6. The quick install shear connector for use in fabricated double deck corrugated steel composite structures of claim 5, wherein: when the outer walls of the two side end parts of the double-headed screw (1) are provided with threads, the length of the thread at one side end part is 80mm-120mm, and the length of the thread at the other side end part is 20mm-50mm.
7. The quick install shear connector for use in fabricated double deck corrugated steel composite structures of claim 5, wherein: annular waterproof pads are arranged between the convex arc-shaped gaskets (2) and the concave arc-shaped gaskets (3) and the corrugated steel top plate (6).
8. The quick install shear connector for use in a fabricated double deck corrugated steel composite structure of claim 7, wherein: the annular waterproof pad is an annular rubber pad.
9. The quick install shear connector for use in a fabricated double deck corrugated steel composite structure of claim 7, wherein: the length of the double-headed screw (1) is 15cm-25cm.
10. The quick install shear connector for use in a fabricated double deck corrugated steel composite structure of claim 9, wherein: the double-end screw (1) is a stainless steel double-end screw, the outer convex arc-shaped gasket (2) is a stainless steel outer convex arc-shaped gasket, the inner concave arc-shaped gasket (3) is a stainless steel inner concave arc-shaped gasket, the fastening nut (4) is a stainless steel fastening nut, and the internal thread nut (5) is a stainless steel internal thread nut.
CN202320161576.0U 2023-01-12 2023-01-12 Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure Expired - Fee Related CN218911776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320161576.0U CN218911776U (en) 2023-01-12 2023-01-12 Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320161576.0U CN218911776U (en) 2023-01-12 2023-01-12 Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure

Publications (1)

Publication Number Publication Date
CN218911776U true CN218911776U (en) 2023-04-25

Family

ID=86046642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320161576.0U Expired - Fee Related CN218911776U (en) 2023-01-12 2023-01-12 Quick-mounting shear connector applied to assembled double-layer corrugated steel composite structure

Country Status (1)

Country Link
CN (1) CN218911776U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116427614A (en) * 2023-04-27 2023-07-14 浙江中隧桥波形钢腹板有限公司 A double-layer metal cavity plate and its combined structure with openings extending inwardly and welding

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116427614A (en) * 2023-04-27 2023-07-14 浙江中隧桥波形钢腹板有限公司 A double-layer metal cavity plate and its combined structure with openings extending inwardly and welding

Similar Documents

Publication Publication Date Title
CN103614964B (en) Steel box beam orthotropic deck slab
CN108867939B (en) Buckling-restrained steel plate shear wall
RU2710694C1 (en) Device for fastening bolt with countersunk head
CN209654404U (en) A kind of stop nut structure
WO2020114032A1 (en) Prefabricated and assembled double-steel-plate concrete shear wall connection assembly and usage method therefor
CN106869385A (en) Full assembled steel prefabricated concrete floor combination beam
CN116752440B (en) A composite beam combined connection load-bearing structure
CN107558615A (en) Friction-type shaped steel shear connector and its construction method
CN103437429B (en) Corrugated sheet steel and plain plate bolt component and manufacturing process
JPS6236799Y2 (en)
CN209443589U (en) High-strength threaded bolt assembly type connecting node
CN210369448U (en) Fully-assembled type radiation-proof concrete enclosure system for superconducting proton system
CN212129625U (en) a composite floor
CN213597218U (en) Shear nail structural member for steel corrugated plate and concrete combined structure
CN219451161U (en) Building connection structure
CN207161918U (en) A kind of honeycomb double-walled drainage pipe material for building
CN218438419U (en) Reinforced structure of eccentric beam column node
CN104775549A (en) Steel frame infilled wood shear wall structure connected by embedded steel bars
CN112177328A (en) Building templates system of consolidating
CN222456538U (en) A corrugated steel plate
KR20210057456A (en) Pipe connector
CN222771619U (en) Connecting node for low-layer container body
CN204590329U (en) Steel frame filled wood shear wall structure connected by planting steel plates
LU508904B1 (en) High-strength pile splicing system
CN221119322U (en) Old building wall body strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230425