CN218894377U - A kind of construction safety hanging basket - Google Patents

A kind of construction safety hanging basket Download PDF

Info

Publication number
CN218894377U
CN218894377U CN202223380494.XU CN202223380494U CN218894377U CN 218894377 U CN218894377 U CN 218894377U CN 202223380494 U CN202223380494 U CN 202223380494U CN 218894377 U CN218894377 U CN 218894377U
Authority
CN
China
Prior art keywords
hanging basket
main frame
frame body
folding frame
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223380494.XU
Other languages
Chinese (zh)
Inventor
李军
张彦军
宋众毅
张磊
刘金全
王文晖
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Wuhuan Road Engineering Co ltd
Original Assignee
Gansu Wuhuan Road Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Wuhuan Road Engineering Co ltd filed Critical Gansu Wuhuan Road Engineering Co ltd
Priority to CN202223380494.XU priority Critical patent/CN218894377U/en
Application granted granted Critical
Publication of CN218894377U publication Critical patent/CN218894377U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型涉及建筑施工技术领域,尤其涉及一种建筑施工安全挂篮。其技术方案包括:主架体,主架体的外侧活动安装有多组连接杆,且连接杆的内侧活动安装有折叠架,主架体和折叠架内侧的底部活动安装有站立台,主架体内侧等距离固定安装有多组爬杆,折叠架的内侧设置有滑槽,且滑槽的内部滑动安装有滑板,主架体和折叠架的顶部固定安装有吊杆,且吊杆的两侧固定安装有固定座。本实用新型通过各种结构的组合使得本安全挂篮可以通过折叠的方式进行安装与移动、收纳,提高了工作人员对挂篮放置安装时的便捷性,且本安全挂篮在使用时可以对支撑面的情况对支撑安装进行调节,避免了支撑面平整度不高导致挂篮在使用时出现晃动不稳的情况。

Figure 202223380494

The utility model relates to the technical field of building construction, in particular to a safety hanging basket for building construction. Its technical scheme includes: main frame body, multiple sets of connecting rods are movably installed on the outside of the main frame body, and folding frames are movably installed on the inside of the connecting rods, standing platforms are movably installed on the bottom of the main frame body and the inner side of the folding frame, and the main frame Multiple sets of climbing poles are fixedly installed on the inner side of the body at equidistant distances. There is a chute on the inner side of the folding frame, and a sliding plate is installed inside the chute. Suspender rods are fixedly installed on the top of the main frame body and the folding frame. The side is fixedly installed with a fixing seat. Through the combination of various structures, the utility model enables the safety hanging basket to be installed, moved, and stored in a folded manner, which improves the convenience of the staff when placing and installing the hanging basket, and the safety hanging basket can be used when in use. The condition of the support surface adjusts the support installation to avoid the situation that the support surface is not flat enough to cause the hanging basket to shake and become unstable during use.

Figure 202223380494

Description

一种建筑施工安全挂篮A kind of construction safety hanging basket

技术领域technical field

本实用新型涉及建筑施工技术领域,具体为一种建筑施工安全挂篮。The utility model relates to the technical field of building construction, in particular to a safety hanging basket for building construction.

背景技术Background technique

预制箱梁中隔板湿接缝施工属于高空作业,作业上下通道受箱梁顶板钢筋的影响,通道狭窄,上下困难,因此需要用到安全挂篮,其中申请号为:“CN213626586U”所公开的“一种建筑工程施工用安全挂篮”,其已经解决了挂篮的重量过高与使用时的风阻较大的技术弊端,再经进一步检索发现,其申请号为“CN206769352U”所公开的“一种建筑用高安全性施工挂篮”,其中通过及具体的技术结构设置,切实解决了在使用时出现脱落的缺点,但在实际使用时类似结构的装置还存在诸多缺陷,如,体积较大,在安装或是移动运输时因体积较大造成不便,后期不用时的收纳放置占用的空间较大;同时在放置使用时不具备根据地形原因对支撑结构进行调节的功能,导致在使用时易出现晃动不稳的情况,所以需要设计一种建筑施工安全挂篮。The wet joint construction of the middle partition of the prefabricated box girder belongs to high-altitude operation. The upper and lower passages of the operation are affected by the steel bars of the box girder roof. The passage is narrow and difficult to go up and down. Therefore, a safety hanging basket is required. "A safety hanging basket for construction engineering", which has solved the technical disadvantages of the heavy weight of the hanging basket and the large wind resistance during use, and after further searching, it was found that its application number is "CN206769352U" disclosed " A high-safety construction hanging basket for buildings", which effectively solves the disadvantage of falling off during use through specific technical structure settings, but there are still many defects in devices with similar structures in actual use, such as relatively large volume Large, it is inconvenient due to its large volume during installation or mobile transportation, and it takes up a lot of space for storage and placement when not in use later; at the same time, it does not have the function of adjusting the support structure according to terrain reasons when it is placed and used, resulting in It is prone to shaking and instability, so it is necessary to design a construction safety hanging basket.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑施工安全挂篮,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a construction safety hanging basket to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑施工安全挂篮,包括主架体,所述主架体的外侧活动安装有多组连接杆,且连接杆的内侧活动安装有折叠架,所述主架体和折叠架内侧的底部活动安装有站立台,所述主架体内侧等距离固定安装有多组爬杆,所述折叠架的内侧设置有滑槽,且滑槽的内部滑动安装有滑板,所述主架体和折叠架的顶部固定安装有吊杆,且吊杆的两侧固定安装有固定座,所述固定座的内部转动安装有螺纹杆,且螺纹杆的底部转动安装有支撑座,所述螺纹杆的顶部固定安装有操作杆。In order to achieve the above purpose, the utility model provides the following technical solutions: a construction safety hanging basket, including a main frame body, a plurality of sets of connecting rods are movably installed on the outside of the main frame body, and folding frame, the bottom of the main frame body and the inner side of the folding frame is movably installed with a standing platform, the inner side of the main frame body is equidistantly fixed with multiple groups of climbing poles, the inner side of the folding frame is provided with a chute, and the chute Sliding boards are installed inside, suspenders are fixedly installed on the top of the main frame body and the folding frame, and fixed seats are fixedly installed on both sides of the suspenders, and threaded rods are installed on the inside of the fixed seats, and the threaded rods The bottom is rotatably installed with a support base, and the top of the threaded rod is fixedly installed with an operating rod.

使用本技术方案的一种建筑施工安全挂篮,主架体的外侧活动安装有多组连接杆,且连接杆的内侧活动安装有折叠架,主架体和折叠架内侧的底部活动安装有站立台,通过站立台便于工作人员站立在挂篮内对预制箱梁中隔板湿接缝进行施工作业,折叠架通过连接杆可以进行折叠与展开,折叠架通过收缩便于工作人员将挂篮安装在预制箱梁中隔板湿接缝处,同时通过对挂篮的折叠便于工作人员进行携带与后期不用时的收纳,提高了挂篮的便捷性,降低了收纳时占用的空间,主架体的内侧固定安装有多组爬杆,通过爬杆便于工作人员攀爬到挂篮的内部与后期攀爬出挂篮,折叠架的内侧设置有滑槽,且滑槽的内部滑动安装有滑板,滑板可以在滑槽的内部上下滑动,通过滑板可以对挂篮的正面进行闭合,从而增加了工作人员在挂篮上施工时的安全性,主架体和折叠架的顶部固定安装有吊杆,吊杆可以对挂篮使用时的顶部进行支撑,吊杆的两侧固定安装有固定座,且固定座的内部转动安装有螺纹杆,螺纹杆的底部转动安装有支撑座,螺纹杆通过转动可以对支撑座的高度进行调节,从而通过支撑座与螺纹杆配合可以对吊杆对挂篮支撑时的高度进行调节,同时避免了支撑面因不平导致挂篮在使用时出现晃动不稳的情况,螺纹杆的顶部固定安装操作杆,操作杆便于工人员对螺纹杆进行转动调节。Using a construction safety hanging basket according to the technical solution, multiple groups of connecting rods are movably installed on the outside of the main frame body, and a folding frame is movably installed on the inside of the connecting rods, and a standing Platform, through the standing platform, it is convenient for the staff to stand in the hanging basket to carry out construction work on the wet joints of the middle partition of the prefabricated box girder. The folding frame can be folded and unfolded through the connecting rod, and the folding frame is convenient for the staff to install the hanging basket on At the wet joints of the partition in the prefabricated box girder, at the same time, by folding the hanging basket, it is convenient for the staff to carry it and store it when not in use later, which improves the convenience of the hanging basket and reduces the space occupied by the storage. There are multiple sets of climbing poles fixedly installed on the inner side. Through the climbing poles, it is convenient for the staff to climb to the inside of the hanging basket and climb out of the hanging basket later. It can slide up and down inside the chute, and the front of the hanging basket can be closed through the sliding plate, thereby increasing the safety of the staff when working on the hanging basket. The top of the main frame body and the folding frame are fixedly installed with suspenders. The rod can support the top of the hanging basket when it is in use. The two sides of the boom are fixedly installed with fixed seats, and the inside of the fixed seat is rotated with a threaded rod, and the bottom of the threaded rod is rotated with a support seat. The threaded rod can be rotated to The height of the support seat is adjusted, so that the height of the suspension rod supporting the hanging basket can be adjusted through the cooperation of the support seat and the threaded rod. An operating rod is fixedly installed on the top of the rod, and the operating rod is convenient for workers to rotate and adjust the threaded rod.

优选的,所述站立台的内部固定安装有多组防滑杆,且折叠架内侧的下方固定安装有挡板。防滑杆增加了站立台顶部的摩擦力,提高了工作人员踩踏时的稳定性,挡板可以对折叠架正面的下方进行防护。Preferably, multiple sets of anti-skid bars are fixedly installed inside the standing platform, and a baffle is fixedly installed below the inner side of the folding frame. The anti-slip bar increases the friction on the top of the stand and improves the stability when the staff step on it, and the baffle can protect the lower part of the front of the folding frame.

优选的,所述滑板一侧的上方固定安装有定位板,且定位板的正面活动安装有定位杆,折叠架正面的一侧设置有两组定位孔。定位板的正面活动安装有定位杆,折叠架正面的一侧设置有两组定位孔,定位杆安插到定位孔内可以对滑板上下移动后进行定位。Preferably, a positioning plate is fixedly installed above one side of the slide plate, and a positioning rod is movably installed on the front of the positioning plate, and two sets of positioning holes are provided on one side of the front of the folding frame. The front side of the positioning plate is equipped with positioning rods, and one side of the front of the folding frame is provided with two sets of positioning holes, and the positioning rods are inserted into the positioning holes to position the slide plate after moving up and down.

优选的,所述滑板正面的上方固定安装有拉板,且拉板的正面设置有凹槽。拉板的正面设置有凹槽,通过拉板与凹槽配合便于工作人员对滑板上下移动时的操作。Preferably, a pull plate is fixedly installed above the front of the slide plate, and a groove is provided on the front of the pull plate. The front of the pull plate is provided with a groove, and the cooperation between the pull plate and the groove is convenient for the staff to operate when the slide plate moves up and down.

优选的,所述操作杆外部的两侧套设有握持套,且握持套外壁的外侧设置有定位环。握持套增加了工作人员通过操作杆对螺纹杆转动操作握持时的舒适性,定位环可以对工作人员握持时的位置进行定位。Preferably, grip sleeves are sheathed on both sides of the outside of the operating rod, and positioning rings are provided on the outside of the outer wall of the grip sleeve. The grip sleeve increases the staff's comfort when holding the threaded rod through the operating rod, and the positioning ring can position the staff when holding it.

优选的,所述爬杆的顶部固定安装有防护垫,且防护垫的顶部设置有防滑凸起。防护垫可以对爬杆的顶部进行防护,避免了长时间使用时表面出现磨损的情况,同时防滑凸起增加了防护垫顶部的摩擦力,提高了人员攀爬时的稳固性。Preferably, a protective pad is fixedly installed on the top of the climbing pole, and an anti-slip protrusion is provided on the top of the protective pad. The protective pad can protect the top of the climbing pole, avoiding surface wear during long-term use, and the anti-slip protrusions increase the friction on the top of the protective pad and improve the stability of personnel when climbing.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

1、通过设置主架体与连接杆、折叠架、攀爬杆、挡板、滑板配合,连接杆可以对主架体与折叠架之间进行活动连接,通过折叠架的展开与主架体便于工作人员通过挂篮对预制箱梁中隔板湿接缝进行施工作业,同时攀爬杆便于工作人员攀爬到挂篮的内部与后期的排出,挡板与滑板可以对工作人员在挂篮的内部进行防护,通过折叠架的收缩可以对挂篮进行折叠,从而便于工作人员对挂篮使用时的安装与移动、收纳。1. By setting the main frame body to cooperate with the connecting rod, folding frame, climbing rod, baffle plate, and sliding plate, the connecting rod can connect the main frame body and the folding frame flexibly, and the unfolding of the folding frame and the main frame body are convenient The staff use the hanging basket to carry out construction work on the wet joints of the prefabricated box girder middle partition. At the same time, the climbing rod is convenient for the staff to climb to the inside of the hanging basket and discharge in the later stage. The interior is protected, and the hanging basket can be folded through the contraction of the folding frame, so that it is convenient for the staff to install, move and store the hanging basket when using it.

2、通过设置吊杆与固定座、螺纹杆、支撑座、操作杆配合,吊杆可以对挂篮使用时的顶部进行支撑挂持,从而便于工作人员在挂篮内对预制箱梁中隔板湿接缝进行施工作业,螺纹杆通过转动固定座的内部转动安装可以对底部的支撑座进行上下调节,从而通过螺纹杆与支撑座可以对吊钩对挂篮支撑时进行调节,避免了支撑面平整度不高导致挂篮在使用时出现晃动不稳的情况,操作杆便于工作人员对螺纹杆进行转动操作。2. By setting the suspender to cooperate with the fixing seat, threaded rod, support seat and operating rod, the suspender can support and hold the top of the hanging basket when it is in use, so that it is convenient for the staff to install the prefabricated box girder middle partition in the hanging basket Wet joints are used for construction work. The threaded rod can adjust the support seat at the bottom up and down through the internal rotation installation of the rotating fixed seat, so that the hook can be adjusted when supporting the hanging basket through the threaded rod and the support seat, avoiding the support surface The low flatness causes the hanging basket to shake and become unstable when in use, and the operating rod is convenient for the staff to rotate the threaded rod.

附图说明Description of drawings

图1为本实用新型的立体图;Fig. 1 is the perspective view of the utility model;

图2为本实用新型的背部结构示意图;Fig. 2 is a schematic diagram of the back structure of the utility model;

图3为本实用新型的折叠架结构示意图;Fig. 3 is a structural schematic diagram of the folding frame of the present invention;

图4为本实用新型的滑板结构示意图。Fig. 4 is a schematic diagram of the structure of the skateboard of the present invention.

图中:1、站立台;101、防滑杆;2、主架体;201、爬杆;202、防护垫;203、防滑凸起;3、折叠架;301、挡板;302、滑槽;303、定位孔;4、连接杆;5、滑板;501、拉板;502、凹槽;6、定位板;601、定位杆;7、吊杆;701、固定座;8、螺纹杆;801、支撑座;802、操作杆;9、握持套;901、定位环。In the figure: 1, standing platform; 101, anti-slip rod; 2, main frame body; 201, climbing rod; 202, protective pad; 203, anti-slip protrusion; 3, folding frame; 301, baffle plate; 302, chute; 303, positioning hole; 4, connecting rod; 5, slide plate; 501, pull plate; 502, groove; 6, positioning plate; 601, positioning rod; 7, suspension rod; 701, fixed seat; 8, threaded rod; , a support seat; 802, an operating rod; 9, a holding sleeve; 901, a positioning ring.

具体实施方式Detailed ways

下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical scheme of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

实施例一Embodiment one

如图1、图2、图3和图4所示,本实用新型提出的一种建筑施工安全挂篮,包括主架体2,主架体2的外侧活动安装有多组连接杆4,且连接杆4的内侧活动安装有折叠架3,主架体2和折叠架3内侧的底部活动安装有站立台1,主架体2内侧等距离固定安装有多组爬杆201,折叠架3的内侧设置有滑槽302,且滑槽302的内部滑动安装有滑板5,主架体2和折叠架3的顶部固定安装有吊杆7,且吊杆7的两侧固定安装有固定座701,固定座701的内部转动安装有螺纹杆8,且螺纹杆8的底部转动安装有支撑座801,螺纹杆8的顶部固定安装有操作杆802。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of building construction safety hanging basket proposed by the utility model comprises a main frame body 2, and a plurality of groups of connecting rods 4 are movable installed on the outside of the main frame body 2, and The inboard of connecting rod 4 is movably installed with folding frame 3, and the bottom of main frame body 2 and folding frame 3 inboards is movably installed with standing platform 1, and the inboard of main frame body 2 equidistantly is fixedly installed many groups of climbing rods 201, and the folding frame 3 The inner side is provided with a chute 302, and the inside of the chute 302 is slidably installed with a slide plate 5, the top of the main frame body 2 and the folding frame 3 are fixedly installed with a suspender 7, and both sides of the suspender 7 are fixedly installed with a fixed seat 701, A threaded rod 8 is mounted on the inside of the fixed seat 701 for rotation, and a support seat 801 is mounted for rotation at the bottom of the threaded rod 8 , and an operating rod 802 is fixedly mounted on the top of the threaded rod 8 .

基于实施例1的建筑施工安全挂篮工作原理是:主架体2的外侧活动安装有多组连接杆4,且连接杆4的内侧活动安装有折叠架3,主架体2和折叠架3内侧的底部活动安装有站立台1,通过站立台1便于工作人员站立在挂篮内对预制箱梁中隔板湿接缝进行施工作业,折叠架3通过连接杆4可以进行折叠与展开,折叠架3通过收缩便于工作人员将挂篮安装在预制箱梁中隔板湿接缝处,同时通过对挂篮的折叠便于工作人员进行携带与后期不用时的收纳,提高了挂篮的便捷性,降低了收纳时占用的空间,主架体2的内侧固定安装有多组爬杆201,通过爬杆201便于工作人员攀爬到挂篮的内部与后期攀爬出挂篮,折叠架3的内侧设置有滑槽302,且滑槽302的内部滑动安装有滑板5,滑板5可以在滑槽302的内部上下滑动,通过滑板5可以对挂篮的正面进行闭合,从而增加了工作人员在挂篮上施工时的安全性,主架体2和折叠架3的顶部固定安装有吊杆7,吊杆7可以对挂篮使用时的顶部进行支撑,吊杆7的两侧固定安装有固定座701,且固定座701的内部转动安装有螺纹杆8,螺纹杆8的底部转动安装有支撑座801,螺纹杆8通过转动可以对支撑座801的高度进行调节,从而通过支撑座801与螺纹杆8配合可以对吊杆7对挂篮支撑时的高度进行调节,同时避免了支撑面因不平导致挂篮在使用时出现晃动不稳的情况,螺纹杆8的顶部固定安装操作杆802,操作杆802便于工人员对螺纹杆8进行转动调节。The working principle of the construction safety hanging basket based on Example 1 is: the outer side of the main frame body 2 is movably installed with multiple sets of connecting rods 4, and the inner side of the connecting rods 4 is movably installed with a folding frame 3, the main frame body 2 and the folding frame 3 The bottom of the inner side is movable with a standing platform 1, through which it is convenient for the staff to stand in the hanging basket and carry out construction work on the wet joints of the middle partition of the prefabricated box girder. The folding frame 3 can be folded and unfolded through the connecting rod 4, and the folding Frame 3 facilitates the staff to install the hanging basket on the wet joint of the prefabricated box girder middle partition through shrinkage, and at the same time, by folding the hanging basket, it is convenient for the staff to carry and store when not in use later, which improves the convenience of the hanging basket. The space occupied during storage is reduced. Multiple sets of climbing poles 201 are fixedly installed on the inner side of the main frame body 2. Through the climbing poles 201, it is convenient for the staff to climb to the inside of the hanging basket and later climb out of the hanging basket. The inner side of the folding frame 3 A chute 302 is provided, and a slide plate 5 is slidably installed inside the chute 302. The slide plate 5 can slide up and down inside the chute 302, and the front of the hanging basket can be closed by the slide plate 5, thereby increasing the staff’s ability to work in the hanging basket. For safety during construction, the top of the main frame body 2 and the folding frame 3 are fixedly installed with a suspender 7, the suspender 7 can support the top of the hanging basket when in use, and the two sides of the suspender 7 are fixedly installed with fixing seats 701 , and the internal rotation of the fixed seat 701 is equipped with a threaded rod 8, and the bottom of the threaded rod 8 is rotated with a support seat 801. The height of the support seat 801 can be adjusted by the threaded rod 8 through rotation, so that The cooperation can adjust the height of the suspension rod 7 when supporting the hanging basket, and at the same time avoid the situation that the hanging basket is shaken and unstable due to the unevenness of the support surface. It is convenient for workers to rotate and adjust the threaded rod 8.

实施例二Embodiment two

如图1、图2、图3和图4所示,本实用新型提出的一种建筑施工安全挂篮,相较于实施例一,本实施例还包括:站立台1的内部固定安装有多组防滑杆101,且折叠架3内侧的下方固定安装有挡板301,滑板5一侧的上方固定安装有定位板6,且定位板6的正面活动安装有定位杆601,折叠架3正面的一侧设置有两组定位孔303,滑板5正面的上方固定安装有拉板501,且拉板501的正面设置有凹槽502,操作杆802外部的两侧套设有握持套9,且握持套9外壁的外侧设置有定位环901,爬杆201的顶部固定安装有防护垫202,且防护垫202的顶部设置有防滑凸起203。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of construction safety hanging basket proposed by the utility model, compared with Embodiment 1, this embodiment also includes: the internal fixed installation of standing platform 1 has multiple Group anti-skid bar 101, and the bottom of folding frame 3 insides is fixedly installed with baffle plate 301, and the top of slide plate 5 one side is fixedly installed with positioning plate 6, and the front of positioning plate 6 is movable and installed with positioning bar 601, and the front of folding frame 3 One side is provided with two sets of positioning holes 303, and the top of the front of the slide plate 5 is fixedly equipped with a pull plate 501, and the front of the pull plate 501 is provided with a groove 502, and the two sides of the operation rod 802 are provided with grip sleeves 9, and A positioning ring 901 is arranged on the outside of the outer wall of the gripping sleeve 9 , and a protective pad 202 is fixedly installed on the top of the climbing rod 201 , and an anti-slip protrusion 203 is provided on the top of the protective pad 202 .

本实施例中,如图1所示,防滑杆101增加了站立台1顶部的摩擦力,提高了工作人员踩踏时的稳定性,挡板301可以对折叠架3正面的下方进行防护;如图3和图4所示,定位板6的正面活动安装有定位杆601,折叠架3正面的一侧设置有两组定位孔303,定位杆601安插到定位孔303内可以对滑板5上下移动后进行定位;如图3和图4所示,拉板501的正面设置有凹槽502,通过拉板501与凹槽502配合便于工作人员对滑板5上下移动时的操作;如图1和图2所示,握持套9增加了工作人员通过操作杆802对螺纹杆8转动操作握持时的舒适性,定位环901可以对工作人员握持时的位置进行定位;如图1和图2所示,防护垫202可以对爬杆201的顶部进行防护,避免了长时间使用时表面出现磨损的情况,同时防滑凸起203增加了防护垫202顶部的摩擦力,提高了人员攀爬时的稳固性。In this embodiment, as shown in Figure 1, the anti-skid bar 101 increases the frictional force on the top of the standing platform 1, and improves the stability when the staff step on it, and the baffle plate 301 can protect the lower side of the front of the folding frame 3; 3 and Figure 4, the front of the positioning plate 6 is movable with a positioning rod 601, and one side of the front of the folding frame 3 is provided with two sets of positioning holes 303. Positioning; as shown in Figure 3 and Figure 4, the front of the pull plate 501 is provided with a groove 502, through the cooperation of the pull plate 501 and the groove 502, it is convenient for the staff to operate when the slide plate 5 moves up and down; as shown in Figure 1 and Figure 2 As shown, the grip sleeve 9 increases the comfort of the staff when holding the threaded rod 8 through the operating rod 802, and the positioning ring 901 can locate the position when the staff is holding it; as shown in Figures 1 and 2 As shown, the protective pad 202 can protect the top of the climbing pole 201, avoiding the wear and tear of the surface when used for a long time, and the anti-slip protrusion 203 increases the friction on the top of the protective pad 202, and improves the stability of the personnel when climbing. sex.

上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the related inspirations of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combinations.

Claims (6)

1.一种建筑施工安全挂篮,包括主架体(2),其特征在于:所述主架体(2)的外侧活动安装有多组连接杆(4),且连接杆(4)的内侧活动安装有折叠架(3),所述主架体(2)和折叠架(3)内侧的底部活动安装有站立台(1),所述主架体(2)内侧等距离固定安装有多组爬杆(201),所述折叠架(3)的内侧设置有滑槽(302),且滑槽(302)的内部滑动安装有滑板(5),所述主架体(2)和折叠架(3)的顶部固定安装有吊杆(7),且吊杆(7)的两侧固定安装有固定座(701),所述固定座(701)的内部转动安装有螺纹杆(8),且螺纹杆(8)的底部转动安装有支撑座(801),所述螺纹杆(8)的顶部固定安装有操作杆(802)。1. A construction safety hanging basket, comprising a main frame body (2), characterized in that: the outside of the main frame body (2) is movably equipped with multiple groups of connecting rods (4), and the connecting rods (4) A folding frame (3) is installed on the inner side, a standing platform (1) is installed on the bottom of the main frame body (2) and the inner side of the folding frame (3), and a fixed equidistant installation is installed on the inside of the main frame body (2). A plurality of groups of climbing poles (201), the inside of the folding frame (3) is provided with a chute (302), and the inside of the chute (302) is slidably equipped with a slide plate (5), the main frame body (2) and The top of the folding frame (3) is fixedly equipped with a suspender (7), and both sides of the suspender (7) are fixedly equipped with a fixed seat (701), and the inner rotation of the said fixed seat (701) is installed with a threaded rod (8 ), and the bottom of the threaded rod (8) is rotatably mounted with a support seat (801), and the top of the threaded rod (8) is fixedly mounted with an operating rod (802). 2.根据权利要求1所述的一种建筑施工安全挂篮,其特征在于:所述站立台(1)的内部固定安装有多组防滑杆(101),且折叠架(3)内侧的下方固定安装有挡板(301)。2. A construction safety hanging basket according to claim 1, characterized in that: the inside of the stand (1) is fixedly equipped with multiple groups of anti-skid bars (101), and the inside of the folding frame (3) is A baffle plate (301) is fixedly installed. 3.根据权利要求1所述的一种建筑施工安全挂篮,其特征在于:所述滑板(5)一侧的上方固定安装有定位板(6),且定位板(6)的正面活动安装有定位杆(601),折叠架(3)正面的一侧设置有两组定位孔(303)。3. A construction safety hanging basket according to claim 1, characterized in that: a positioning plate (6) is fixedly installed above one side of the sliding plate (5), and the front side of the positioning plate (6) is movable There are positioning rods (601), and two groups of positioning holes (303) are arranged on one side of the front of the folding frame (3). 4.根据权利要求1所述的一种建筑施工安全挂篮,其特征在于:所述滑板(5)正面的上方固定安装有拉板(501),且拉板(501)的正面设置有凹槽(502)。4. A construction safety hanging basket according to claim 1, characterized in that: a pull plate (501) is fixedly installed above the front of the slide plate (5), and the front of the pull plate (501) is provided with a concave slot (502). 5.根据权利要求1所述的一种建筑施工安全挂篮,其特征在于:所述操作杆(802)外部的两侧套设有握持套(9),且握持套(9)外壁的外侧设置有定位环(901)。5. A building construction safety hanging basket according to claim 1, characterized in that: the two sides of the outside of the operating rod (802) are provided with a gripping sleeve (9), and the outer wall of the gripping sleeve (9) A locating ring (901) is provided on the outside. 6.根据权利要求1所述的一种建筑施工安全挂篮,其特征在于:所述爬杆(201)的顶部固定安装有防护垫(202),且防护垫(202)的顶部设置有防滑凸起(203)。6. A construction safety hanging basket according to claim 1, characterized in that: a protective pad (202) is fixedly installed on the top of the climbing pole (201), and an anti-skid pad is provided on the top of the protective pad (202). Raised (203).
CN202223380494.XU 2022-12-16 2022-12-16 A kind of construction safety hanging basket Expired - Fee Related CN218894377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223380494.XU CN218894377U (en) 2022-12-16 2022-12-16 A kind of construction safety hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223380494.XU CN218894377U (en) 2022-12-16 2022-12-16 A kind of construction safety hanging basket

Publications (1)

Publication Number Publication Date
CN218894377U true CN218894377U (en) 2023-04-21

Family

ID=86003395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223380494.XU Expired - Fee Related CN218894377U (en) 2022-12-16 2022-12-16 A kind of construction safety hanging basket

Country Status (1)

Country Link
CN (1) CN218894377U (en)

Similar Documents

Publication Publication Date Title
CN209686836U (en) Frame body for attached lifting scaffolding
CN210857930U (en) Engineering construction scaffold
CN211647203U (en) A scaffolding for building construction
CN218894377U (en) A kind of construction safety hanging basket
CN209958708U (en) Scaffold for construction site construction
CN107487723B (en) Lifting device for substation maintenance
CN202072413U (en) Lifting frame
CN107165399B (en) A high-altitude building exterior wall repair device
CN103950872B (en) The vertical rod lifting multi-purpose tool of a kind of electric substation high-altitude equipment
CN213460978U (en) Metal pipeline bridge
CN214575506U (en) Construction scaffold
CN213941899U (en) Fire rescue tripod
CN208057031U (en) A kind of fire-fighting retractable herringbone ladder
CN211172989U (en) A general construction tripod platform for outdoor architecture and interior decoration
CN114876172A (en) Building external climbing type building construction operation platform
CN203833575U (en) Vertical rod hoisting multifunctional tool of substation high-altitude device
WO2019100180A1 (en) Improved support bracket structure for deploying-stowing type suspension apparatus
CN210622809U (en) Multifunctional rack for tunnel construction
CN210140393U (en) A curtain wall hanging cannon car
CN108436870B (en) Clothes hanger type safety device
CN221988034U (en) Counterweight self-adaptive type micro crane
TWM537095U (en) Foldable hanging device allowing movable installation on building roof floor
CN215190104U (en) Special supporter of building engineering
TWI656086B (en) Improved support frame structure for display-type hanging device
CN220487470U (en) Externally hung portable climbing ladder for aerial work

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230421