CN218892729U - Power harness positioning and bundling tool - Google Patents
Power harness positioning and bundling tool Download PDFInfo
- Publication number
- CN218892729U CN218892729U CN202223263472.5U CN202223263472U CN218892729U CN 218892729 U CN218892729 U CN 218892729U CN 202223263472 U CN202223263472 U CN 202223263472U CN 218892729 U CN218892729 U CN 218892729U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- plate
- motor
- screw
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000007246 mechanism Effects 0.000 claims description 12
- 230000006978 adaptation Effects 0.000 claims 2
- 238000000034 method Methods 0.000 description 4
- 239000004020 conductor Substances 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Basic Packing Technique (AREA)
Abstract
本实用新型公开了一种电源线束定位捆扎工装,包括底板,其特征在于,所述底板一侧固定连接有竖板,所述竖板顶端一侧水平固定连接有横板,所述竖板上开设有两个滑槽一,所述竖板一侧滑动连接有两个连接杆,所述连接杆与滑槽一相适配,两个所述连接杆滑动于两个滑槽一内,两个所述连接杆另一端水平固定连接有同一个滑板,所述滑板上固定有丝杆螺母,所述滑板顶端转动连接有丝杆一,所述丝杆一与丝杆螺母相适配,所述丝杆一贯穿滑板,所述横板底端竖直固定连接有电机四,所述电机四的输出端同轴心固定连接于丝杆一顶端。本实用新型无需人工进行捆扎,避免了捆扎不紧造成的电源线束在运输过程中发生脱落造成损失。
The utility model discloses a positioning and binding tool for power wire harnesses, which comprises a bottom plate, and is characterized in that a vertical plate is fixedly connected to one side of the bottom plate, and a horizontal plate is fixedly connected horizontally to the top side of the vertical plate, and the vertical plate There are two chute 1s, two connecting rods are slidably connected to one side of the riser, the connecting rods are matched with the chute 1, the two connecting rods slide in the two chute 1, and the two connecting rods The other ends of the two connecting rods are horizontally and fixedly connected with the same slide plate, the slide plate is fixed with a screw nut, and the top of the slide plate is rotatably connected with a screw rod one, and the screw rod one is matched with the screw rod nut, so The screw rod one runs through the slide plate, and the bottom end of the horizontal plate is vertically fixedly connected with a motor four, and the output end of the motor four is fixedly connected to the top end of the screw rod one coaxially. The utility model does not need to be bundled manually, and avoids losses caused by the shedding of the power supply wire harness during transportation caused by loose binding.
Description
技术领域technical field
本实用新型涉及捆扎工装技术领域,尤其涉及一种电源线束定位捆扎工装。The utility model relates to the technical field of binding tooling, in particular to a positioning and binding tooling for power wire harnesses.
背景技术Background technique
电源线是传输电流的电线,电源线的结构主要要外护套、内护套、导体,常见的传输导体有铜、铝材质的金属丝,电源线对于家电来说,虽然只是配件,但是对家电的使用却起着至关重要的作用,如果电源线坏掉,那整个电器也就不能用。The power cord is a wire that transmits current. The structure of the power cord mainly includes an outer sheath, an inner sheath, and a conductor. The common transmission conductors are copper and aluminum wires. The use of home appliances plays a vital role. If the power cord is broken, the entire appliance will not work.
现有的捆扎通常使用人工或简易的机器完成捆扎,往往在捆扎过程中由于捆扎的不够紧实,人工操作不能准确定位,捆扎位置经常出现误差,进而影响下工序生产,而且人工或简易的机器捆扎的效率较低,会导致运输过程中出现脱落的情况,可能会对电源线束造成损害,影响电源线束的正常功能,因此,亟需重新设计一种电源线束定位捆扎工装。The existing binding usually uses manual or simple machines to complete the binding. Often in the process of binding, because the binding is not tight enough, the manual operation cannot be accurately positioned, and errors often occur in the binding position, which in turn affects the production of the next process. The efficiency of bundling is low, which will lead to shedding during transportation, which may cause damage to the power wiring harness and affect the normal function of the power wiring harness. Therefore, it is urgent to redesign a power wiring harness positioning and binding tool.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种电源线束定位捆扎工装。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a power wire harness positioning and binding tool.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种电源线束定位捆扎工装,包括底板,所述底板一侧固定连接有竖板,所述竖板顶端一侧水平固定连接有横板,所述竖板上开设有两个滑槽一,所述竖板一侧滑动连接有两个连接杆,所述连接杆与滑槽一相适配,两个所述连接杆滑动于两个滑槽一内,两个所述连接杆另一端水平固定连接有同一个滑板,所述滑板上固定有丝杆螺母,所述滑板顶端转动连接有丝杆一,所述丝杆一与丝杆螺母相适配,所述丝杆一贯穿滑板,所述横板底端竖直固定连接有电机四,所述电机四的输出端同轴心固定连接于丝杆一顶端,所述横板底端竖直固定连接有限位杆,所述限位杆贯穿滑板,所述限位杆底部水平设有横杆,且横杆穿过限位杆底部。A positioning and bundling tool for power wire harnesses, comprising a bottom plate, a vertical plate is fixedly connected to one side of the bottom plate, a horizontal plate is fixedly connected to the top side of the vertical plate horizontally, and two slide slots are provided on the vertical plate. Two connecting rods are slidably connected to one side of the riser, the connecting rods are matched with the first chute, the two connecting rods slide in the two chute ones, and the other ends of the two connecting rods are fixed horizontally The same slide plate is connected, the screw nut is fixed on the slide plate, the top of the slide plate is connected with the
优选的,所述滑板底端竖直固定连接有电机一,所述电机一的输出端同轴心固定连接有圆盘,所述圆盘顶端竖直固定连接有两个固定杆,所述滑板底端开设有环形槽,且环形槽与固定杆相适配,所述固定杆滑动于环形槽内。Preferably, the bottom end of the skateboard is vertically and fixedly connected with a motor one, and the output end of the motor one is fixedly connected with a disc with the axis, and the top of the disc is vertically and fixedly connected with two fixing rods, and the skateboard The bottom end is provided with an annular groove, and the annular groove is adapted to the fixed rod, and the fixed rod slides in the annular groove.
优选的,所述圆盘底端竖直固定连接有两个安装板,两个所述安装板之间转动连接有两个机械臂,其中一个所述安装板一侧水平转动连接有固定柱一,所述固定柱一穿过安装板固定连接于其中一个机械臂,其中一个所述安装板一侧水平转动连接有固定柱二,所述固定柱二穿过安装板固定连接于另一个机械臂,其中一个所述安装板一侧水平固定连接有电机六,所述电机六的输出轴同轴心固定连接有皮带盘一,所述皮带盘一同轴心固定连接有皮带盘二,所述固定柱一远离机械臂一侧同轴心固定连接有另一个皮带盘一,两个所述皮带盘一之间绕有同一个皮带一,所述固定柱二机械臂一侧同轴心固定连接有另一个皮带盘二,两个所述皮带盘二之间绕有同一个皮带二。Preferably, two mounting plates are vertically and fixedly connected to the bottom end of the disc, and two mechanical arms are rotatably connected between the two mounting plates, and one side of the mounting plate is horizontally rotatably connected to a fixed column. , the fixed column one passes through the mounting plate and is fixedly connected to one of the mechanical arms, one side of the mounting plate is horizontally rotatably connected to the second fixed column, and the second fixed column passes through the mounting plate and is fixedly connected to the other mechanical arm One side of one of the mounting plates is horizontally fixedly connected with six motors, the output shaft of the six motors is fixedly connected with the first belt pulley, and the belt pulley is fixedly connected with the second belt pulley with the same axis. The side of column one away from the mechanical arm is fixedly connected with another belt pulley one, and the same belt one is wound between the two belt pulleys one, and the side of the fixed column two mechanical arms is fixedly connected with the axis center. Another belt pulley two, is wound with same belt two between two said pulley pulleys two.
优选的,两个所述机械臂底端均开设有直槽一,两个机械臂底部转动有两个丝杆二,两个所述机械臂底部均开设有圆孔,且圆孔内均开设有与丝杆二相适配的螺纹槽,两个所述丝杆二均穿过两个圆孔,两个所述丝杆二远离机械臂一端均固定连接有电机二,且两个电机二均同轴心固定连接于两个丝杆二,所述底板顶端设有两个夹紧机构。Preferably, the bottom ends of the two mechanical arms are provided with
优选的,所述夹紧机构包括侧板,所述侧板顶端转动有丝杆四,所述侧板顶端开设有圆孔,且圆孔内开设有与丝杆四相适配的螺纹槽,所述丝杆四均穿过两个圆孔,所述侧板底部开设有直槽二,所述丝杆四穿过直槽二顶部,所述丝杆四顶端竖直固定连接有电机五,所述电机五的输出端同轴心固定连接于丝杆四。Preferably, the clamping mechanism includes a side plate, the top of the side plate rotates with a screw rod four, the top of the side plate is provided with a round hole, and a threaded groove matching the screw rod four is opened in the round hole, The four screw rods pass through two round holes, the bottom of the side plate is provided with a straight groove two, the four screw rods pass through the top of the straight groove two, and the top ends of the four screw rods are vertically fixedly connected with the motor five, The output end of the motor five is fixedly connected to the screw rod four coaxially.
优选的,其中一个所述夹紧机构固定于底板顶端,另一个所述夹紧机构滑动于底板顶端,所述底板上开设有滑槽二,所述滑槽二靠近竖板一侧水平固定连接有电机三,所述电机三的输出端同轴心固定连接有丝杆三,其中一个所述侧板底部一侧开设有圆孔,且圆孔内开设有与丝杆三相适配的螺纹槽,所述丝杆三穿过圆孔,所述丝杆三贯穿侧板。Preferably, one of the clamping mechanisms is fixed on the top of the bottom plate, and the other clamping mechanism slides on the top of the bottom plate. There is a second chute on the bottom plate, and the second chute is fixed and connected horizontally to the side of the vertical plate. There is a
优选的,所述底板顶端远离竖板一侧竖直固定连接有固定板一,所述固定板一一侧水平固定连接有圆辊,所述圆辊上套设有扎线带卷,所述底板顶端竖直固定有两个固定板二,两个所述固定板二之间转动连接有同一个滑轮。Preferably, the top of the bottom plate is vertically and fixedly connected to the side away from the vertical plate with a fixed plate one, and one side of the fixed plate one is horizontally fixedly connected with a round roller, and the round roller is covered with a cable tie roll. The top of the bottom plate is vertically fixed with two fixed plates two, and the same pulley is rotatably connected between the two fixed plates two.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1.一种电源线束定位捆扎工装,在进行捆扎前,将扎线带卷21套到圆辊20上,然后将扎线带通过滑轮23,再将扎线带通过两个侧板24上的直槽二25后,打开靠近滑轮23的侧板24上的电机五26,将扎线带夹紧,然后通过打开电机三16,,此时关闭靠近滑轮23的侧板24上的电机五26,打开另一个电机五26,此时将扎线带和侧板24滑动到丝杆最末端,方便操作工作过程省时省力。1. A positioning and bundling tool for power wire harnesses. Before bundling, put the
2.一种电源线束定位捆扎工装,捆扎时,将需要捆扎的电源线束放置在底板1滑槽二15上方,然后剪下扎线带打开电机四18将滑板7降至最低处,然后打开机械臂11两侧的电机二13,将扎线带两端夹紧,然后再翻转电机四18将滑板7上移直至机械臂11底端与电源线束高度相同时关闭电机四18,然后打开电机六28,随着电机六28的开启带动两侧机械臂11向内部靠拢直至将电源线束向中间拉紧,然后打开电机一8,随着电机一8的开启带动圆盘10旋转完成对电源线束的捆扎,无需人工进行捆扎,避免了捆扎不紧造成的电源线束在运输过程中发生脱落造成损失。2. A positioning and bundling tool for the power harness. When bundling, place the power harness that needs to be bundled above the
附图说明Description of drawings
图1为本实用新型提出的一种电源线束定位捆扎工装的结构示意图;Fig. 1 is a structural schematic diagram of a power harness positioning and bundling tool proposed by the utility model;
图2为本实用新型提出的一种电源线束定位捆扎工装的A处结构放大图;Fig. 2 is an enlarged view of the structure at A of a power harness positioning and binding tool proposed by the utility model;
图3为本实用新型提出的一种电源线束定位捆扎工装的B处结构放大图;Fig. 3 is an enlarged view of the structure at B of a power harness positioning and binding tool proposed by the utility model;
图4为本实用新型提出的一种电源线束定位捆扎工装的仰视图;Fig. 4 is a bottom view of a power harness positioning and binding tool proposed by the utility model;
图5为本实用新型提出的一种电源线束定位捆扎工装的C处结构放大图;Fig. 5 is an enlarged view of the structure at C of a power harness positioning and binding tool proposed by the utility model;
图6为本实用新型提出的一种电源线束定位捆扎工装的内部结构俯视图;Fig. 6 is a top view of the internal structure of a power harness positioning and binding tool proposed by the utility model;
图7为本实用新型提出的一种电源线束定位捆扎工装的D处结构放大图。Fig. 7 is an enlarged view of the structure at D of a power harness positioning and binding tool proposed by the utility model.
图中:1、底板;2、竖板;3、滑槽一;4、连接杆;5、横板;6、丝杆一;7、滑板;8、电机一;9、固定杆;10、圆盘;11、机械臂;12、直槽一;13、电机二;14、丝杆二;15、滑槽二;16、电机三;17、丝杆三;18、电机四;19、固定板一;20、圆辊;21、扎线带卷;22、固定板二;23、滑轮;24、侧板;25、直槽二;26、电机五;27、丝杆四;28、电机六;29、皮带盘一;30、皮带一;31、固定柱一;32、皮带盘二;33、皮带二;34、固定柱二;35、安装板;36、限位杆;37、环形槽。In the figure: 1, bottom plate; 2, vertical plate; 3, chute one; 4, connecting rod; 5, horizontal plate; 6, screw rod one; 7, slide plate; 8, motor one; 9, fixed rod; Disc; 11, mechanical arm; 12, straight slot one; 13, motor two; 14, screw rod two; 15, chute two; 16, motor three; 17, screw rod three; 18, motor four; 19, fixed Plate one; 20, round roller; 21, cable tie roll; 22, fixed plate two; 23, pulley; 24, side plate; 25, straight groove two; 26, motor five; 27, screw rod four; 28, motor Six; 29, belt pulley one; 30, belt one; 31, fixed column one; 32, belt pulley two; 33, belt two; 34, fixed column two; 35, mounting plate; 36, limit rod; 37, ring groove.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
参照图1和图4,一种电源线束定位捆扎工装,包括底板1,其特征在于,底板1一侧固定连接有竖板2,竖板2顶端一侧水平固定连接有横板5,竖板2上开设有两个滑槽一3,竖板2一侧滑动连接有两个连接杆4,连接杆4与滑槽一3相适配,两个连接杆4滑动于两个滑槽一3内,两个连接杆4另一端水平固定连接有同一个滑板7,滑板7上固定有丝杆螺母,滑板7顶端转动连接有丝杆一6,丝杆一6与丝杆螺母相适配,丝杆一6贯穿滑板7,横板5底端竖直固定连接有电机四18,电机四18的输出端同轴心固定连接于丝杆一6顶端,横板5底端竖直固定连接有限位杆36,限位杆36贯穿滑板7,限位杆36底部水平设有横杆,且横杆穿过限位杆36底部。Referring to Fig. 1 and Fig. 4, a positioning and bundling tool for a power wire harness includes a
参照图4和图5,一种电源线束定位捆扎工装,滑板7底端竖直固定连接有电机一8,电机一8的输出端同轴心固定连接有圆盘10,圆盘10顶端竖直固定连接有两个固定杆9,滑板7底端开设有环形槽37,且环形槽37与固定杆9相适配,固定杆9滑动于环形槽37内。Referring to Fig. 4 and Fig. 5, a positioning and bundling tool for a power harness, the bottom end of the
参照图4和图5,一种电源线束定位捆扎工装,圆盘10底端竖直固定连接有两个安装板35,两个安装板35之间转动连接有两个机械臂11,其中一个安装板35一侧水平转动连接有固定柱一31,固定柱一31穿过安装板35固定连接于其中一个机械臂11,其中一个安装板35一侧水平转动连接有固定柱二34,固定柱二34穿过安装板35固定连接于另一个机械臂11,其中一个安装板35一侧水平固定连接有电机六28,电机六28的输出轴同轴心固定连接有皮带盘一29,皮带盘一29同轴心固定连接有皮带盘二32,固定柱一31远离机械臂11一侧同轴心固定连接有另一个皮带盘一29,两个皮带盘一29之间绕有同一个皮带一30,固定柱二34机械臂11一侧同轴心固定连接有另一个皮带盘二32,两个皮带盘二32之间绕有同一个皮带二33。Referring to Fig. 4 and Fig. 5 , a positioning and bundling tool for power wire harnesses, two mounting plates 35 are vertically and fixedly connected to the bottom of the
参照图1-3,一种电源线束定位捆扎工装,两个机械臂11底端均开设有直槽一12,两个机械臂11底部转动有两个丝杆二14,两个机械臂11底部均开设有圆孔,且圆孔内均开设有与丝杆二14相适配的螺纹槽,两个丝杆二14均穿过两个圆孔,两个丝杆二14远离机械臂11一端均固定连接有电机二13,且两个电机二13均同轴心固定连接于两个丝杆二14,底板1顶端设有两个夹紧机构。Referring to Fig. 1-3, a positioning and bundling tool for a power harness, the bottom ends of the two
参照图1-3,一种电源线束定位捆扎工装,夹紧机构包括侧板24,侧板24顶端转动有丝杆四27,侧板24顶端开设有圆孔,且圆孔内开设有与丝杆四27相适配的螺纹槽,丝杆四27均穿过两个圆孔,侧板24底部开设有直槽二25,丝杆四27穿过直槽二25顶部,丝杆四27顶端竖直固定连接有电机五26,电机五26的输出端同轴心固定连接于丝杆四27。Referring to Fig. 1-3, a power wire harness positioning and binding tool, the clamping mechanism includes a
参照图2-7,一种电源线束定位捆扎工装,其中一个夹紧机构固定于底板1顶端,另一个夹紧机构滑动于底板1顶端,底板1上开设有滑槽二15,滑槽二15靠近竖板2一侧水平固定连接有电机三16,电机三16的输出端同轴心固定连接有丝杆三17,其中一个侧板24底部一侧开设有圆孔,且圆孔内开设有与丝杆三17相适配的螺纹槽,丝杆三17穿过圆孔,丝杆三17贯穿侧板24。Referring to Figure 2-7, a positioning and bundling tool for power harnesses, one of the clamping mechanisms is fixed on the top of the
参照图1-4,一种电源线束定位捆扎工装,底板1顶端远离竖板2一侧竖直固定连接有固定板一19,固定板一19一侧水平固定连接有圆辊20,圆辊20上套设有扎线带卷21,底板1顶端竖直固定有两个固定板二22,两个固定板二22之间转动连接有同一个滑轮23。Referring to Figures 1-4, a positioning and bundling tool for power wire harnesses, the top of the
工作原理:一种电源线束定位捆扎工装,在进行捆扎前,将扎线带卷21套到圆辊20上,然后将扎线带通过滑轮23,再将扎线带通过两个侧板24上的直槽二25后,打开靠近滑轮23的侧板24上的电机五26,将扎线带夹紧,然后通过打开电机三16,此时关闭靠近滑轮23的侧板24上的电机五26,打开另一个电机五26,此时将扎线带和侧板24滑动到丝杆三17最末端,捆扎时,将需要捆扎的电源线束放置在底板1滑槽二15上方,然后剪下扎线带打开电机四18将滑板7降至最低处,然后打开机械臂11两侧的电机二13,将扎线带两端夹紧,然后再反转电机四18将滑板7上移直至机械臂11底端与电源线束高度相同时关闭电机四18,然后打开电机六28,随着电机六28的开启带动两侧机械臂11向内部靠拢直至将电源线束向中间拉紧,然后打开电机一8,随着电机一8的开启带动圆盘10旋转完成对电源线束的捆扎。Working principle: a positioning and bundling tool for power wire harnesses. Before bundling, put the cable tie roll 21 on the round roller 20, then pass the cable tie through the pulley 23, and then pass the cable tie through the two side plates 24 After the straight groove two 25, open the motor five 26 on the side plate 24 close to the pulley 23, the cable tie is clamped, then by opening the motor three 16, close the motor five 26 on the side plate 24 close to the pulley 23 at this time , turn on another motor 5 26, at this time, slide the cable tie and side plate 24 to the end of the screw rod 3 17, when bundling, place the power wire harness to be bundled above the bottom plate 1 chute 2 15, and then cut the tie Turn on the cable tie and turn on the motor 4 18 to lower the slide plate 7 to the lowest position, then turn on the motor 2 13 on both sides of the mechanical arm 11, clamp the two ends of the cable tie, and then reverse the motor 4 18 to move the slide plate 7 up to the mechanical arm 11 When the height of the bottom end is the same as that of the power harness, turn off motor 4 18, then turn on motor 6 28, and with the opening of motor 6 28, drive the mechanical arms 11 on both sides to move closer to the inside until the power harness is tightened toward the middle, then turn on motor 1 8 , along with the opening of the motor one 8 drives the disc 10 to rotate to complete the bundling of the power harness.
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223263472.5U CN218892729U (en) | 2022-12-06 | 2022-12-06 | Power harness positioning and bundling tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223263472.5U CN218892729U (en) | 2022-12-06 | 2022-12-06 | Power harness positioning and bundling tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218892729U true CN218892729U (en) | 2023-04-21 |
Family
ID=86002385
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223263472.5U Expired - Fee Related CN218892729U (en) | 2022-12-06 | 2022-12-06 | Power harness positioning and bundling tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218892729U (en) |
-
2022
- 2022-12-06 CN CN202223263472.5U patent/CN218892729U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110739818A (en) | A fully automatic coil winding method for motor rotor | |
| CN220985496U (en) | Automatic winding machine for motor stator | |
| CN105846613B (en) | Motor the end of a thread twists line apparatus with lead-out wire | |
| CN111403170A (en) | Double-rotation winding device for electronic element | |
| CN218892729U (en) | Power harness positioning and bundling tool | |
| CN208630918U (en) | A direct current wire binding device | |
| CN109193306A (en) | A kind of electric field wiring wire connection device | |
| CN112420376B (en) | Sleeve winding machine with rubber coating function | |
| CN118801259A (en) | Automatic wire stripping machine | |
| CN220107553U (en) | Insulating accessory part for connecting electrical appliances | |
| CN110481233B (en) | High-efficiency process silk ball machine | |
| CN119727270A (en) | A motor lead wire passing device | |
| CN221352548U (en) | Winding device of current transformer | |
| CN219959660U (en) | Junction tool and power plant thermal control equipment | |
| CN217807925U (en) | Data line wire winding and bundling machine | |
| CN219458864U (en) | Winding mechanism for motor stator processing | |
| CN213815817U (en) | Sleeve winding equipment | |
| CN213123964U (en) | A insulating heart yearn is around chartered plane equipment for wire and cable production | |
| CN216287757U (en) | Wire and cable frame winch with adjustable rotating speed | |
| CN213288502U (en) | Internal resistance performance optimization wire harness processing device | |
| CN208622506U (en) | Efficiently quick multi cord stranding machine | |
| CN211404293U (en) | Lead winding machine | |
| CN211265119U (en) | Stranding device for electric wire | |
| CN104065219B (en) | Non-equal groove motor stator slot paper once automatic paper-inserting machine | |
| CN223513706U (en) | A robotic assembly for paralleling copper conductor production |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230421 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
