CN218881532U - Pull-type shear rib operation trolley - Google Patents

Pull-type shear rib operation trolley Download PDF

Info

Publication number
CN218881532U
CN218881532U CN202222681235.4U CN202222681235U CN218881532U CN 218881532 U CN218881532 U CN 218881532U CN 202222681235 U CN202222681235 U CN 202222681235U CN 218881532 U CN218881532 U CN 218881532U
Authority
CN
China
Prior art keywords
base
fixed mounting
channel
fixedly installed
channel steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222681235.4U
Other languages
Chinese (zh)
Inventor
刘东汉
王建民
王文晖
王晓东
梁宝山
宋众毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Wuhuan Road Engineering Co ltd
Original Assignee
Gansu Wuhuan Road Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Wuhuan Road Engineering Co ltd filed Critical Gansu Wuhuan Road Engineering Co ltd
Priority to CN202222681235.4U priority Critical patent/CN218881532U/en
Application granted granted Critical
Publication of CN218881532U publication Critical patent/CN218881532U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及建筑施工技术领域,尤其涉及牵引式剪力筋作业小车。其技术方案包括:牵引式剪力筋作业小车,包括槽钢车板、轮轨和底座,所述槽钢车板的底部两侧固定安装有两组轮梁,所述轮梁的底部固定安装有阻尼脚轮,所述槽钢车板的前端放置有底座,所述底座的顶部前端一侧固定安装有电机,所述底座的顶部前端另一侧固定安装有遥控器,且底座的顶部后端固定安装有慢速卷扬机。本实用新型通过在底座的顶部后端固定安装有慢速卷扬机,施工时工作可以通过遥控器远程控制装置进行滑移,由在槽钢车板顶部的施工人员进行控制移动,可保障槽钢车板移动时的精确性,无需与其他人员喊话沟通,能节省人力的同时也提高了工作效率。

Figure 202222681235

The utility model relates to the technical field of building construction, in particular to a traction type shear tendon operating trolley. Its technical solution includes: traction type shear tendon operation trolley, including channel steel vehicle plate, wheel rail and base, two sets of wheel beams are fixedly installed on both sides of the bottom of the channel steel vehicle plate, and the bottom of the wheel beam is fixedly installed There are damping casters, a base is placed on the front end of the channel steel vehicle plate, a motor is fixedly installed on one side of the top front end of the base, a remote controller is fixedly installed on the other side of the top front end of the base, and the top rear end of the base A slow hoist is fixedly installed. The utility model is fixedly installed with a slow hoist at the top rear end of the base, and can slide through the remote control device during construction. The accuracy of the plate movement does not need to communicate with other personnel, which can save manpower and improve work efficiency.

Figure 202222681235

Description

牵引式剪力筋作业小车Traction shear tendon trolley

技术领域technical field

本实用新型涉及建筑施工技术领域,具体为牵引式剪力筋作业小车。The utility model relates to the technical field of building construction, in particular to a traction type shear tendon operating trolley.

背景技术Background technique

剪力筋是指在结构中受剪力的钢筋,例如:箍筋以及吊筋,在建筑施工过程中需要施工人员对剪力筋进行施工加固,而剪力筋排列较为密集,不便工作人员进行走动,为了便于工作人员操作会用到能平移的作业小车,使工作人员能在小车上方对剪力筋进行施工,其中申请号为“CN210046130U”所公开的“一种剪力筋定位小车”,解决了在雨天环境下不便于施工人员进行作业的多种弊端,再经过进一步检索发现,申请号为“CN210996989U”所公开的“一种剪力筋定位小车”其通过具体的结构设置,切实解决了当前小车存在着不便于工作人员确保整体线型、高度、宽度和施工质量等技术弊端,但是在实际使用时类似结构的作业小车还存在诸多缺陷,如作业小车在工作人员使用过程中对剪力筋进行施工作业时,需要调整施工区域时,装置两边往往需要有人力推动,施工人员自己无法控制小车移动,导致每次需要移动时需要相互喊话,影响施工效率,所以需要设计牵引式剪力筋作业小车来解决现有的问题。Shear tendons refer to the steel bars subjected to shear force in the structure, such as stirrups and hanging bars. During the construction process, construction workers need to strengthen the shear bars, and the arrangement of the shear bars is relatively dense, which is inconvenient for the staff. Walking, in order to facilitate the operation of the staff, a work trolley that can translate can be used, so that the staff can construct the shear tendons above the trolley, wherein the application number is "a kind of shear tendon positioning trolley" disclosed by "CN210046130U", It solves the various disadvantages that are not convenient for construction personnel to carry out operations in rainy weather. After further searching, it is found that the "a kind of shear tendon positioning trolley" disclosed by the application number "CN210996989U" effectively solves the problem through specific structural settings. It shows that the current trolley has technical disadvantages such as it is not convenient for the staff to ensure the overall line shape, height, width and construction quality, but there are still many defects in the work trolley with similar structure in actual use. During the construction work of the force bar, when it is necessary to adjust the construction area, the two sides of the device often need to be pushed by manpower, and the construction personnel cannot control the movement of the trolley, which leads to the need to call each other every time they need to move, which affects the construction efficiency. Therefore, it is necessary to design a traction shear force Ribbon trolley to solve existing problems.

实用新型内容Utility model content

本实用新型的目的在于提供牵引式剪力筋作业小车,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a traction type shear tendon operating trolley to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:牵引式剪力筋作业小车,包括槽钢车板、轮轨和底座,所述槽钢车板的顶部固定安装有甲板,所述甲板的顶部两侧固定安装有两组控制按钮,所述槽钢车板的底部两侧固定安装有两组轮梁,所述轮梁的底部固定安装有阻尼脚轮,所述槽钢车板的底部两侧放置有两组轮轨,所述轮轨的底部固定安装有轨道架,所述槽钢车板的前端固定安装有连接架,所述连接架的前端固定安装有吊环,所述槽钢车板的前端放置有底座,所述底座的顶部前端一侧固定安装有电机,所述底座的顶部前端另一侧固定安装有遥控器,且底座的顶部后端固定安装有慢速卷扬机。In order to achieve the above object, the utility model provides the following technical solutions: traction type shear tendon operating trolley, including channel steel vehicle plate, wheel rail and base, the top of the channel steel vehicle plate is fixedly installed with a deck, the top of the deck Two sets of control buttons are fixedly installed on both sides, two sets of wheel beams are fixedly installed on both sides of the bottom of the channel steel vehicle plate, damping casters are fixedly installed on the bottom of the wheel beam, and the bottom sides of the channel steel vehicle plate Two sets of wheel rails are placed, the bottom of the wheel rails is fixedly installed with a track frame, the front end of the channel steel car plate is fixedly installed with a connecting frame, the front end of the connecting frame is fixedly installed with a lifting ring, and the channel steel car plate A base is placed on the front end of the base, a motor is fixedly installed on one side of the top front end of the base, a remote controller is fixedly installed on the other side of the top front end of the base, and a slow hoist is fixedly installed on the top rear end of the base.

使用时,将底座固定在指定位置,并通过轨道架与轮轨的配合将槽钢车板搭建在剪力筋上方,工作人员可登上甲板的顶部对剪力筋进行施工作业,当某一剪力筋片区施工外壁时,工作人员可通过按压控制按钮,通过控制按钮发送无线信号给遥控器,当遥控器接收到操作信号后可发送运行指令给电机,利用电机连接外部电源可带动慢速卷扬机旋转,通过慢速卷扬机的旋转可对槽钢车板进行牵引移动,使阻尼脚轮在轮轨的内部进行滚动,使槽钢车板滑移,而工作人员松开控制按钮时槽钢车板停止移动,方便工作人员依次对下方剪力筋进行施工作业,该控制方法只需一人即可完成,并且由在槽钢车板顶部的施工人员进行控制移动,可保障槽钢车板移动时的精确性,无需与其他人员喊话沟通,能节省人力的同时也提高了工作效率,并且改进后的装置使得工作人员能蹲坐在槽钢车板顶部进行作业,方便工作人员把钢筋的外漏高度、前后的线型都能控制好,不易弄断剪力筋,保障施工质量。When in use, the base is fixed at the designated position, and the channel steel car plate is built above the shear reinforcement through the cooperation of the track frame and the wheel rail. The staff can go to the top of the deck to carry out construction work on the shear reinforcement. When constructing the outer wall of the shear tendon area, the staff can press the control button and send a wireless signal to the remote control through the control button. When the remote control receives the operation signal, it can send the operation command to the motor, and the motor can be connected to the external power supply to drive the slow speed. The winch rotates, and the channel steel car plate can be pulled and moved through the rotation of the slow winch, so that the damping casters roll inside the wheel rail, so that the channel steel car plate slides, and when the staff releases the control button, the channel steel car plate Stop moving, it is convenient for the staff to carry out construction work on the lower shear bars in turn. This control method can be completed by only one person, and the construction personnel on the top of the channel steel car plate can control the movement, which can ensure the safety of the channel steel car plate when moving. Accurate, no need to communicate with other personnel, it can save manpower and improve work efficiency, and the improved device enables the staff to squat on the top of the channel steel car plate for work, which is convenient for the staff to adjust the leakage height of the steel bars , The front and rear line types can be well controlled, and it is not easy to break the shear tendons, ensuring the construction quality.

优选的,所述轮梁的顶部固定安装有四组三角加固筋,且三角加固筋与槽钢车板外侧焊接。利用三角加固筋与槽钢车板外侧进行焊接可提高槽钢车板与轮梁安装时的结构强度,以保障装置稳定运行。Preferably, four sets of triangular reinforcing ribs are fixedly installed on the top of the wheel beam, and the triangular reinforcing ribs are welded to the outside of the channel steel vehicle plate. Welding the outer side of the channel steel vehicle plate with the triangular reinforcement rib can improve the structural strength of the channel steel vehicle plate and the wheel beam during installation, so as to ensure the stable operation of the device.

优选的,所述轨道架的底部固定安装有固定架,且轨道架的内部固定安装有加固梁。利用加固梁可对轨道架的结构强度进行加固,利用固定架可便于稳定的将轨道架和轮轨固定在指定位置。Preferably, a fixing frame is fixedly installed at the bottom of the track frame, and a reinforcement beam is fixedly installed inside the track frame. The structural strength of the track frame can be reinforced by using the reinforcing beam, and the track frame and the wheel rail can be stably fixed at the specified position by using the fixing frame.

优选的,所述底座的底部固定安装有固定座,且固定座的顶部贯穿安装有螺栓。利用固定座与螺栓的配合可便于将底座固定在指定位置。Preferably, a fixing base is fixedly installed on the bottom of the base, and bolts are installed through the top of the fixing base. The cooperation between the fixing seat and the bolt can facilitate fixing the base at the specified position.

优选的,所述慢速卷扬机通过传动带与电机的输出端连接,且慢速卷扬机通过牵引绳与吊环连接。利用电机的通电运行可带动慢速卷扬机旋转,利用慢速卷扬机的旋转可使牵引绳拉动连接架从而使槽钢车板进行移动。Preferably, the slow hoist is connected to the output end of the motor through a transmission belt, and the slow hoist is connected to the suspension ring through a traction rope. The energized operation of the motor can drive the slow hoist to rotate, and the rotation of the slow hoist can make the traction rope pull the connecting frame so that the channel steel car plate can be moved.

优选的,所述槽钢车板的内部开设有矩形槽,所述槽钢车板的内部通过矩形槽等距固定安装有加强肋。利用矩形槽可提供加强肋的安装位置,利用加强肋可对槽钢车板的结构强度进行加固,可便于槽钢车板承重,便于工作人员稳定的在槽钢车板表面进行作业。Preferably, a rectangular groove is opened inside the channel steel vehicle panel, and reinforcing ribs are equidistantly fixed and installed inside the channel steel vehicle panel through the rectangular groove. The installation position of the reinforcement rib can be provided by using the rectangular groove, and the structural strength of the channel steel vehicle panel can be reinforced by using the reinforcement rib, which can facilitate the load bearing of the channel steel vehicle panel and facilitate the staff to work stably on the surface of the channel steel vehicle panel.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

1、本实用新型通过在底座的顶部后端固定安装有慢速卷扬机,施工时工作可以通过遥控器远程控制装置进行滑移,由在槽钢车板顶部的施工人员进行控制移动,可保障槽钢车板移动时的精确性,无需与其他人员喊话沟通,能节省人力的同时也提高了工作效率。1. The utility model fixedly installs a slow hoist at the top and rear end of the base. During construction, the remote control device can be used to slide, and the construction personnel on the top of the channel steel plate can control the movement, which can ensure the safety of the channel. The accuracy of the movement of the steel car plate does not need to communicate with other personnel, which can save manpower and improve work efficiency.

2、本实用新型在使用时能使得工作人员能蹲坐在槽钢车板顶部进行作业,方便工作人员把钢筋的外漏高度、前后的线型都能控制好,不易弄断剪力筋,保障施工质量。2. When the utility model is in use, the staff can squat on the top of the channel steel car plate to carry out work, which is convenient for the staff to control the leakage height of the steel bars and the front and rear line shapes, and it is not easy to break the shear tendons. Ensure construction quality.

附图说明Description of drawings

图1为本实用新型的主视图;Fig. 1 is the front view of the utility model;

图2为本实用新型的轮轨结构示意图;Fig. 2 is a schematic view of the wheel-rail structure of the present utility model;

图3为本实用新型的慢速卷扬机结构示意图;Fig. 3 is the structural representation of the slow winch of the present utility model;

图4为本实用新型的槽钢车板结构示意图。Fig. 4 is a structural schematic diagram of the channel steel vehicle plate of the present invention.

图中:1、槽钢车板;101、甲板;102、控制按钮;103、加强肋;2、轮梁;201、三角加固筋;202、阻尼脚轮;3、轮轨;301、轨道架;302、固定架;303、加固梁;4、连接架;401、吊环;5、底座;501、电机;502、慢速卷扬机;503、遥控器;504、固定座。In the figure: 1, channel steel vehicle plate; 101, deck; 102, control button; 103, reinforcing rib; 2, wheel beam; 201, triangular reinforcing rib; 202, damping caster; 302, fixed frame; 303, reinforced beam; 4, connecting frame; 401, suspension ring; 5, base; 501, motor; 502, slow winch; 503, remote controller;

具体实施方式Detailed ways

下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

实施例一Embodiment one

如图1、图2、图3和图4所示,本实用新型提出的牵引式剪力筋作业小车,包括槽钢车板1、轮轨3和底座5,槽钢车板1的顶部固定安装有甲板101,甲板101的顶部两侧固定安装有两组控制按钮102,槽钢车板1的底部两侧固定安装有两组轮梁2,轮梁2的底部固定安装有阻尼脚轮202,槽钢车板1的底部两侧放置有两组轮轨3,轮轨3的底部固定安装有轨道架301,槽钢车板1的前端固定安装有连接架4,连接架4的前端固定安装有吊环401,槽钢车板1的前端放置有底座5,底座5的顶部前端一侧固定安装有电机501,底座5的顶部前端另一侧固定安装有遥控器503,且底座5的顶部后端固定安装有慢速卷扬机502。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the traction type shear tendon operating trolley proposed by the utility model comprises a channel steel vehicle plate 1, a wheel rail 3 and a base 5, and the top of the channel steel vehicle plate 1 is fixed A deck 101 is installed, two sets of control buttons 102 are fixedly installed on both sides of the top of the deck 101, two sets of wheel beams 2 are fixedly installed on both sides of the bottom of the channel steel vehicle plate 1, damping casters 202 are fixedly installed on the bottom of the wheel beam 2, Two sets of wheel rails 3 are placed on both sides of the bottom of the channel steel vehicle plate 1, the bottom of the wheel rails 3 is fixedly installed with a track frame 301, the front end of the channel steel vehicle plate 1 is fixedly installed with a connecting frame 4, and the front end of the connecting frame 4 is fixedly installed There is a suspension ring 401, a base 5 is placed on the front end of the channel steel vehicle plate 1, a motor 501 is fixedly installed on one side of the top front end of the base 5, a remote controller 503 is fixedly installed on the other side of the top front end of the base 5, and the top rear of the base 5 The end is fixedly installed with slow hoisting machine 502.

基于实施例一的牵引式剪力筋作业小车工作原理是:使用时,将底座5固定在指定位置,并通过轨道架301与轮轨3的配合将槽钢车板1搭建在剪力筋上方,工作人员可登上甲板101的顶部对剪力筋进行施工作业,当某一剪力筋片区施工外壁时,工作人员可通过按压控制按钮102,通过控制按钮102发送无线信号给遥控器503,当遥控器503接收到操作信号后可发送运行指令给电机501,利用电机501连接外部电源可带动慢速卷扬机502旋转,通过慢速卷扬机502的旋转可对槽钢车板1进行牵引移动,使阻尼脚轮202在轮轨3的内部进行滚动,使槽钢车板1滑移,而工作人员松开控制按钮102时槽钢车板1停止移动,方便工作人员依次对下方剪力筋进行施工作业。The working principle of the traction type shear tendon operation trolley based on the first embodiment is: when in use, the base 5 is fixed at a designated position, and the channel steel car plate 1 is built above the shear tendons through the cooperation of the track frame 301 and the wheel rail 3 , the staff can go to the top of the deck 101 to carry out construction work on the shear tendons, when a certain shear tendon area is constructed on the outer wall, the staff can press the control button 102, and send a wireless signal to the remote controller 503 through the control button 102, After the remote control 503 receives the operation signal, it can send an operation command to the motor 501, and the motor 501 can be used to connect the external power supply to drive the slow winch 502 to rotate, and the channel steel car plate 1 can be pulled and moved by the rotation of the slow winch 502, so that The damping caster 202 rolls inside the wheel rail 3, so that the channel steel panel 1 slides, and when the staff releases the control button 102, the channel steel panel 1 stops moving, which is convenient for the staff to carry out construction work on the lower shear tendons in sequence .

实施例二Embodiment two

如图1、图2、图3、图4所示,本实用新型提出的牵引式剪力筋作业小车,相较于实施例一,本实施例还包括:轮梁2的顶部固定安装有四组三角加固筋201,且三角加固筋201与槽钢车板1外侧焊接,轨道架301的底部固定安装有固定架302,且轨道架301的内部固定安装有加固梁303,底座5的底部固定安装有固定座504,且固定座504的顶部贯穿安装有螺栓,慢速卷扬机502通过传动带与电机501的输出端连接,且慢速卷扬机502通过牵引绳与吊环401连接,槽钢车板1的内部开设有矩形槽,槽钢车板1的内部通过矩形槽等距固定安装有加强肋103。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, compared with Embodiment 1, the traction type shear tendon operating trolley proposed by the utility model also includes: the top of the wheel beam 2 is fixedly installed with four Set triangular reinforcing ribs 201, and the triangular reinforcing ribs 201 are welded to the outside of the channel steel plate 1, the bottom of the track frame 301 is fixedly installed with a fixed frame 302, and the inside of the track frame 301 is fixedly installed with a reinforcing beam 303, and the bottom of the base 5 is fixed. A fixed seat 504 is installed, and the top of the fixed seat 504 is penetrated with bolts installed, the slow hoist 502 is connected with the output end of the motor 501 through a transmission belt, and the slow hoist 502 is connected with the suspension ring 401 by a traction rope, and the channel steel car plate 1 Rectangular grooves are opened inside, and reinforcing ribs 103 are fixedly installed inside the channel steel vehicle plate 1 through the rectangular grooves at equal distances.

本实施例中,如图1、图4所示,利用三角加固筋201与槽钢车板1外侧进行焊接可提高槽钢车板1与轮梁2安装时的结构强度,以保障装置稳定运行;如图1、图2所示,利用加固梁303可对轨道架301的结构强度进行加固,利用固定架302可便于稳定的将轨道架301和轮轨3固定在指定位置;如图3所示,利用固定座504与螺栓的配合可便于将底座5固定在指定位置;如图3所示,利用电机501的通电运行可带动慢速卷扬机502旋转,利用慢速卷扬机502的旋转可使牵引绳拉动连接架4从而使槽钢车板1进行移动;如图1、图4所示,利用矩形槽可提供加强肋103的安装位置,利用加强肋103可对槽钢车板1的结构强度进行加固,可便于槽钢车板1承重,便于工作人员稳定的在槽钢车板1表面进行作业。In this embodiment, as shown in Figure 1 and Figure 4, the use of triangular reinforcing ribs 201 to weld the outside of the channel steel vehicle panel 1 can improve the structural strength of the channel steel vehicle panel 1 and the wheel beam 2 when they are installed, so as to ensure the stable operation of the device ; As shown in Fig. 1 and Fig. 2, the structural strength of the track frame 301 can be reinforced by using the reinforcement beam 303, and the track frame 301 and the wheel rail 3 can be fixed on the specified position stably by using the fixing frame 302; as shown in Fig. 3 As shown, the use of the fixing seat 504 and the bolt can facilitate fixing the base 5 at a designated position; The rope pulls the connecting frame 4 so that the channel steel vehicle panel 1 moves; Reinforcement can facilitate the load bearing of the channel steel vehicle panel 1, and facilitate the staff to work stably on the surface of the channel steel vehicle panel 1.

上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the related inspirations of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combinations.

Claims (6)

1. Towed shear bar operation dolly, including channel-section steel sweep (1), wheel rail (3) and base (5), its characterized in that: the top fixed mounting of channel-section steel sweep (1) has deck (101), the top both sides fixed mounting of deck (101) has two sets of control button (102), the bottom both sides fixed mounting of channel-section steel sweep (1) has two sets of wheel roof beams (2), the bottom fixed mounting of wheel roof beam (2) has damping truckle (202), two sets of wheel rail (3) have been placed to the bottom both sides of channel-section steel sweep (1), the bottom fixed mounting of wheel rail (3) has track frame (301), the front end fixed mounting of channel-section steel sweep (1) has link (4), the front end fixed mounting of link (4) has rings (401), base (5) have been placed to the front end of sweep (1), top front end one side fixed mounting of base (5) has motor (501), the top front end opposite side fixed mounting of base (5) has remote controller (503), and the top rear end fixed mounting of base (5) has slow-speed hoist engine (502).
2. The towed shear bar working trolley of claim 1, wherein: four groups of triangular reinforcing ribs (201) are fixedly mounted at the top of the wheel beam (2), and the triangular reinforcing ribs (201) are welded with the outer side of the channel steel vehicle plate (1).
3. The towed shear bar working trolley of claim 1, wherein: the bottom fixed mounting of track frame (301) has mount (302), and the inside fixed mounting of track frame (301) has reinforcing beam (303).
4. The towed shear bar working trolley of claim 1, wherein: the bottom fixed mounting of base (5) has fixing base (504), and the top through mounting of fixing base (504) has the bolt.
5. The towed shear bar working trolley of claim 1, wherein: the slow-speed winch (502) is connected with the output end of the motor (501) through a transmission belt, and the slow-speed winch (502) is connected with the lifting ring (401) through a traction rope.
6. The towed shear bar working trolley of claim 1, wherein: the rectangular channel has been seted up to the inside of channel-section steel sweep (1), there is stiffening rib (103) through rectangular channel equidistance fixed mounting in the inside of channel-section steel sweep (1).
CN202222681235.4U 2022-10-12 2022-10-12 Pull-type shear rib operation trolley Expired - Fee Related CN218881532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222681235.4U CN218881532U (en) 2022-10-12 2022-10-12 Pull-type shear rib operation trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222681235.4U CN218881532U (en) 2022-10-12 2022-10-12 Pull-type shear rib operation trolley

Publications (1)

Publication Number Publication Date
CN218881532U true CN218881532U (en) 2023-04-18

Family

ID=85976958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222681235.4U Expired - Fee Related CN218881532U (en) 2022-10-12 2022-10-12 Pull-type shear rib operation trolley

Country Status (1)

Country Link
CN (1) CN218881532U (en)

Similar Documents

Publication Publication Date Title
CN109236302B (en) Variable section excavation trolley in tunnel
CN201154877Y (en) Simple dismounting type cantilever sliding small crane
CN201474704U (en) Needle beam type hydraulic steel mould carrier
CN202323703U (en) Beam bottom checking trolley
CN201284462Y (en) Bridging machine for both highway and railway
CN214644551U (en) Side form device for precast beam
CN206901613U (en) A kind of section bar special mobile formula gantry
CN203602254U (en) Support frame for installing precast beam jack
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN218881532U (en) Pull-type shear rib operation trolley
CN201762035U (en) A simple driving movable arm
CN215208151U (en) Tower crane arm support
CN211924240U (en) Guide beam movable gantry crane for assisting shield disassembly
CN207646615U (en) A kind of New-Type Bridge Girder Erection Machine
CN216304712U (en) Assembly machine for rail transit station bottom layer structure
CN215798047U (en) Special crane for grinding roller
CN213679518U (en) Asynchronous cradle with gantry crane
CN111661768B (en) Method and system for hoisting multiple peripheral components of prefabricated building
CN212687392U (en) Cable crane hoisting device for bridge erection
CN212270675U (en) Trackless rotary pier-crossing bridge inspection trolley
CN211772912U (en) Steel box girder cantilever plate mobile installation trolley
CN211922303U (en) Ultralow bridge girder erection machine
CN207108292U (en) Novel U-shaped erection equipment
CN208327151U (en) A kind of ship lock large size template installing and dismounting Combined manual portal frame system
CN206767466U (en) Double girder crane dolly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230418

CF01 Termination of patent right due to non-payment of annual fee