CN218862612U - A slag removal device suitable for treating blasting residues in sloped tunnels - Google Patents
A slag removal device suitable for treating blasting residues in sloped tunnels Download PDFInfo
- Publication number
- CN218862612U CN218862612U CN202221810723.4U CN202221810723U CN218862612U CN 218862612 U CN218862612 U CN 218862612U CN 202221810723 U CN202221810723 U CN 202221810723U CN 218862612 U CN218862612 U CN 218862612U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- slag removal
- base
- brake
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及坡度斜井施工项目领域的一种隧道处理残留物的装置,尤其是涉及了一种适用于处理坡度隧道爆破残留物的扒渣装置。The utility model relates to a device for treating residues in tunnels in the field of inclined shaft construction projects, in particular to a slag removal device suitable for processing blasting residues in sloped tunnels.
背景技术Background technique
在铁路建设,公路建设,矿产采集,抽水蓄能等众多领域,会需要打隧道,斜井作业等。而这些作业往往有着极大的危险性,爆破后存在的碎石等不确定因素对矿洞的坍塌,隧道的打通,后期人员的二次作业都存在着极大的隐患。目前,碎石等爆破残留物基本都靠人工作业处理,这样就容易造成施工人员的人身安全问题,一不小心造成隧道坍塌一切都将功亏一篑。In many fields such as railway construction, highway construction, mineral collection, pumped storage, etc., tunneling and inclined shaft operations will be required. And these operations are often very dangerous. Uncertain factors such as gravel after blasting have great hidden dangers to the collapse of the mine, the opening of the tunnel, and the secondary operations of later personnel. At present, blasting residues such as gravel are basically handled manually, which will easily cause personal safety problems for construction workers, and if the tunnel collapses accidentally, everything will come to naught.
实用新型内容Utility model content
为了处理隧道爆破后存在的碎石等容易下落造成施工人员生命危险的问题,本实用新型提供了一种适用于处理坡度隧道爆破残留物的扒渣装置,该装置可以代替人工处理隧道前期存在的碎石等问题,帮助减少人员的安全隐患以及不必要的财产损失,并且保障施工的安全,具有多角度,多控制,安全系数高的优点。In order to deal with the problem that gravel etc. existing after tunnel blasting are easy to fall and cause danger to the lives of construction workers, the utility model provides a slag removal device suitable for processing blasting residues in sloped tunnels, which can replace manual processing of tunnel blasting residues It helps to reduce potential safety hazards of personnel and unnecessary property losses, and ensures the safety of construction. It has the advantages of multi-angle, multi-control, and high safety factor.
为实现上述目的,本实用新型采用的技术方案是:For realizing above-mentioned object, the technical scheme that the utility model adopts is:
本实用新型包括扒渣执行机构、机械臂主体、底座机构、导轨系统和卷扬机;所述扒渣执行机构与机械臂主体通过连接杆连接,机械臂主体安装在在所述底座机构上面,底座机构通过车轮在导轨系统上移动,所述特制的导轨系统铺设在坡度隧道内,所述卷扬机放置在坡度隧道以外的平地上通过牵引绳连接底座机构。The utility model comprises a slag-removing actuator, a main body of a mechanical arm, a base mechanism, a guide rail system and a hoist; The wheels move on the guide rail system, and the special guide rail system is laid in the slope tunnel, and the winch is placed on the flat ground outside the slope tunnel and connected to the base mechanism through a traction rope.
所述导轨系统主要由固定横板与固定在固定横板上的U型导轨组成,车轮位于U型导轨中进行运动,U型导轨沿自身导轨方向间隔均布地开设多个用于制动的制动限位孔。The guide rail system is mainly composed of a fixed horizontal plate and a U-shaped guide rail fixed on the fixed horizontal plate. The wheels move in the U-shaped guide rail, and the U-shaped guide rail is evenly spaced along the direction of its own guide rail. Movement limit hole.
所述底座机构主要由底座托盘、车轮连接架、底座连接架组成,环形的底座托盘布置导轨系统上,底座托盘沿导轨系统的两侧和前后侧均设有底座连接架;两侧的底座连接架上还安装有车轮连接架,车轮连接架上安装车轮,车轮位于导轨系统上;前后侧的底座连接架上还安装有制动装置,制动装置用于连接到导轨系统形成制动,制动装置处的底座连接架上安装限位孔识别器。The base mechanism is mainly composed of a base tray, a wheel connecting frame, and a base connecting frame. The annular base tray is arranged on the guide rail system, and the base tray is provided with base connecting frames along both sides and front and rear sides of the guide rail system; the bases on both sides are connected The frame is also equipped with a wheel connecting frame, and the wheel is installed on the wheel connecting frame. Install a limit hole recognizer on the base connecting frame at the moving device.
所述的制动装置主要由制动外壳、弹簧控制装置、弹簧和制动杆组成,制动外壳固定在底座连接架上,制动外壳内安装有弹簧,制动杆的内端经弹簧控制装置和弹簧连接,外端活动穿过底座连接架后用于插装到导轨系统的U型导轨的制动限位孔中。The brake device is mainly composed of a brake housing, a spring control device, a spring and a brake lever. The brake housing is fixed on the base connecting frame, a spring is installed in the brake housing, and the inner end of the brake lever is controlled by the spring. The device is connected with the spring, and the outer end moves through the base connecting frame to be inserted into the stopper hole of the U-shaped guide rail of the guide rail system.
所述的车轮包括“梅花”型制动控制连接器、控制电机和控制连接外槽轮盘轮盘;控制电机一端通过轴安装连接到车轮连接架,控制电机的输出轴经“梅花”型制动控制连接器和控制连接外槽轮盘轮盘同轴连接。The wheel includes a "plum blossom" type brake control connector, a control motor and a control connection outer groove wheel disc; The control connector is connected with the coaxial connection of the outer groove wheel wheel.
所述机械臂主体主要由转台、机械连接臂和支臂构成,转台位于底部,转台的中间安装有旋转电机,旋转电机输出轴和转台下方的机架连接;转台上安装有电机,转台之上铰接安装有支臂,电机输出轴经驱动转盘和支臂下端连接进而带动支臂旋转,支臂上端安装有步进电机,步进电机的输出轴经连接杆和机械连接臂的一端固接,同时机械连接臂的该端和液压推动杆的上端连接,液压推动杆的下端连接到转台,机械连接臂另一端与扒渣执行机构相连。The main body of the mechanical arm is mainly composed of a turntable, a mechanical connecting arm and a support arm. The turntable is located at the bottom, and a rotating motor is installed in the middle of the turntable. The output shaft of the rotating motor is connected to the frame below the turntable; A support arm is hingedly installed, and the output shaft of the motor is connected to the lower end of the support arm through a drive turntable to drive the support arm to rotate. A stepper motor is installed on the upper end of the support arm, and the output shaft of the stepper motor is fixedly connected to one end of the mechanical connection arm through a connecting rod. At the same time, the end of the mechanical connecting arm is connected to the upper end of the hydraulic push rod, the lower end of the hydraulic pushing rod is connected to the turntable, and the other end of the mechanical connecting arm is connected to the slag removal actuator.
所述的扒渣执行机构包括步进电机、连接杆、液压限位杆、限位孔、可拆卸托盘和扒渣铲;步进电机安装在机械臂主体的机械连接臂末端,步进电机的输出轴经连接杆和扒渣壳体固定连接,扒渣壳体内设有回转电机,扒渣壳体下部套设有环形的可拆卸托盘,回转电机和可拆卸托盘连接,可拆卸托盘通过回转电机带动下绕扒渣壳体外周旋转,可拆卸托盘下端和扒渣铲固定连接;扒渣壳体外壁安装有可伸缩移动的液压限位杆,可拆卸托盘沿圆周周向间隔开设多个限位孔,液压限位杆下端可伸缩移动地伸入或者伸出限位孔中。The slag removal actuator includes a stepper motor, a connecting rod, a hydraulic limit lever, a limit hole, a detachable tray and a slag removal shovel; the stepper motor is installed at the end of the mechanical connection arm of the main body of the mechanical arm, and the The output shaft is fixedly connected with the slag-removing shell through the connecting rod. There is a rotary motor inside the slag-removing shell. A ring-shaped detachable tray is set on the lower part of the slag-removing shell. The rotary motor is connected to the detachable tray. The detachable tray passes through the rotary motor Driven to rotate around the outer circumference of the slag-removing shell, the lower end of the detachable tray is fixedly connected to the slag-removing shovel; the outer wall of the slag-removing shell is equipped with a telescopic movable hydraulic limit rod, and the detachable tray is provided with multiple limit positions at intervals along the circumference The lower end of the hydraulic limit rod stretches into or out of the limit hole telescopically and movably.
本实用新型在坡度斜井施工时通常采用铺设轨道利用卷扬机牵引机械来进行施工作业,在处理爆破残留物时通常需要大量工人去进行处理爆破残留物,因此产生了严重的人身安全隐患,并且效率较低;或是存在爆炸残留物对施工机械造成损害产生了安全损失。The utility model usually adopts the laying track and uses the hoist traction machinery to carry out the construction work during the construction of the slope inclined shaft. When dealing with the blasting residues, a large number of workers are usually required to deal with the blasting residues, so serious personal safety hazards are generated, and the efficiency Low; or the existence of explosive residues caused damage to construction machinery and resulted in safety losses.
采用多步进电机进行机械控制,提高了机械臂运动速率,提高了机械效率,降低了人工操作容易产生得人身安全隐患;Using multi-stepping motors for mechanical control improves the movement speed of the mechanical arm, improves the mechanical efficiency, and reduces the personal safety hazards that are easily caused by manual operation;
采用转盘控制机械手臂,改变了传统机械臂自由度的限制,增加了活动范围,更加有效率的将爆炸残留物刨除;The turntable is used to control the mechanical arm, which changes the limitation of the degree of freedom of the traditional mechanical arm, increases the range of motion, and removes the explosive residue more efficiently;
采用多限位孔,将扒渣铲限制在需要的角度进行活动,以防止其因为过度灵活的自由度而造成操作失误而出现不必要的意外,故采用该限位孔以辅助扒渣铲执行操作;Multiple limit holes are used to limit the movement of the slag shovel at the required angle to prevent unnecessary accidents caused by operating errors caused by excessively flexible degrees of freedom. Therefore, this limit hole is used to assist the slag shovel to perform operate;
卷扬机单一钢索牵引机械容易断裂,所以该装置采用了多刹车限位系统,并且限位装置可以帮助该装置停在目标区域以方便进行工作,也可以在意外情况下辅助控制机械刹车降低了财产损失。The single cable traction machinery of the hoist is easy to break, so the device adopts a multi-brake limit system, and the limit device can help the device stop in the target area to facilitate work, and can also assist in controlling the mechanical brake in case of accidents, reducing property loss.
本实用新型的有益效果是:以机械代替人工,能够大大提高施工效率,同时避免落石问题对施工人员生命安全带来的危害,降低施工方的财产损失。The beneficial effect of the utility model is that the construction efficiency can be greatly improved by using machinery instead of labor, and at the same time, the harm to the life safety of construction personnel caused by falling rocks can be avoided, and the property loss of the construction party can be reduced.
本实用新型的装置可有效利用扒渣铲将不同角度的残渣进行处理,同时自带的制动系统将安全系数大大的提升,并且存在着多电机控制运动,能大大增加效率,并且液压控制装置降低了由于较大活动导致的机械臂抱死。The device of the utility model can effectively use the slag shovel to process residues from different angles, and at the same time, the built-in braking system greatly improves the safety factor, and there are multiple motors to control the movement, which can greatly increase the efficiency, and the hydraulic control device Reduced arm locking due to large movements.
应当理解的是,以上的一般描述和后文的细节描述仅是示例性和解释性的,并不能限制本申请。It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the application.
附图说明Description of drawings
图1是根据一示例性实施例示出的处理坡度隧道爆破残留物的装置示意图。Fig. 1 is a schematic diagram of a device for treating blasting residues in sloped tunnels according to an exemplary embodiment.
图2是根据一示例性实施例示出的扒渣执行机构示意图。Fig. 2 is a schematic diagram of a slag removal actuator according to an exemplary embodiment.
图3是根据一示例性实施例示出的机械臂主体示意图。Fig. 3 is a schematic diagram of a main body of a robotic arm according to an exemplary embodiment.
图4是根据一示例性实施例示出的机械臂主体仰视示意图。Fig. 4 is a schematic bottom view of the main body of the robotic arm according to an exemplary embodiment.
图5是根据一示例性实施例示出的底座示意图。Fig. 5 is a schematic diagram of a base according to an exemplary embodiment.
图6是根据一示例性实施例示出的制动装置示意图。Fig. 6 is a schematic diagram of a braking device according to an exemplary embodiment.
图7是根据一示例性实施例示出的车轮示意图。Fig. 7 is a schematic diagram of a wheel according to an exemplary embodiment.
图8是根据一示例性实施例示出的底座后视示意图。Fig. 8 is a schematic rear view of the base according to an exemplary embodiment.
图9是根据一示例性实施例示出的导轨系统示意图。Fig. 9 is a schematic diagram of a guide rail system according to an exemplary embodiment.
图中的标记有:The markings in the figure are:
1、扒渣执行机构:1-1.步进电机;1-2.连接杆;1-3.液压限位杆;1-4.限位孔;1-5.可拆卸托盘;1-6.扒渣铲。1. Slag removal actuator: 1-1. stepping motor; 1-2. connecting rod; 1-3. hydraulic limit rod; 1-4. limit hole; 1-5. detachable tray; 1-6 . Slag removal shovel.
2、机械臂主体:2-1.液压推动杆;2-2.电机;2-3.驱动转盘;2-4.步进电机;2-5.连接杆;2-6.液压控制阀;2-7.机械连接臂;2-8.转台;2-9.卷扬机连接孔;2-10.旋转电机。2. Main body of the mechanical arm: 2-1. Hydraulic push rod; 2-2. Motor; 2-3. Drive turntable; 2-4. Stepper motor; 2-5. Connecting rod; 2-6. Hydraulic control valve; 2-7. Mechanical connecting arm; 2-8. Turntable; 2-9. Hoist connecting hole; 2-10. Rotating motor.
3、底座机构:3-1.底座托盘;3-2.制动装置;3-2-1.弹簧控制装置;3-2-2.弹簧;3-2-3.制动杆;3-3.限位孔识别器;3-4.车轮连接桁架;3-5.底座连接桁架;3-6.车轮;3-6-1.“梅花”型制动控制连接器;3-6-2.控制电机;3-6-3.控制连接外槽轮盘轮盘;3-6-4.轴承,3-7.卷扬机连接孔。3. Base mechanism: 3-1. Base tray; 3-2. Brake device; 3-2-1. Spring control device; 3-2-2. Spring; 3-2-3. Brake lever; 3- 3. Limit hole identifier; 3-4. Wheel connection truss; 3-5. Base connection truss; 3-6. Wheel; 3-6-1. "Plum blossom" type brake control connector; 3-6- 2. Control motor; 3-6-3. Control and connect outer groove wheel wheel; 3-6-4. Bearing, 3-7. Hoist connection hole.
4、导轨系统:4-1.制动限位孔;4-2.U型导轨;4-3.固定横板。4. Guide rail system: 4-1. Brake limit hole; 4-2. U-shaped guide rail; 4-3. Fixed horizontal plate.
具体实施方式Detailed ways
现结合附图对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此仅显示与本实用新型有关的构成。Now in conjunction with accompanying drawing, the utility model is described in further detail. These drawings are all simplified schematic diagrams, and only illustrate the basic structure of the utility model in a schematic way, so only the configurations related to the utility model are shown.
如图1所示,装置包括扒渣执行机构1、机械臂主体2、底座机构3、导轨系统4和卷扬机;扒渣执行机构1与机械臂主体2通过连接杆连接,机械臂主体2安装在在底座机构3上面,底座机构3通过车轮在导轨系统4的导轨上移动,特制的导轨系统4铺设在坡度隧道内沿上方,卷扬机放置在坡度隧道以外的平地上通过牵引绳连接底座机构3。As shown in Figure 1, the device includes a
如图9所示,特制的导轨系统4主要由固定横板4-3与固定在固定横板4-3上的U型导轨4-2组成,车轮3-6位于U型导轨4-2中进行运动,U型导轨4-2沿自身导轨方向间隔均布地开设多个用于制动的制动限位孔4-1,而制动限位孔4-1则作为制动保证。As shown in Figure 9, the special
如图5所示,底座机构3主要由底座托盘3-1、车轮连接架3-4、底座连接架3-5组成,环形的底座托盘3-1横跨布置导轨系统4上,底座托盘3-1沿导轨系统4的两侧和前后侧均设有底座连接架3-5;两侧的底座连接架3-5上还安装有车轮连接架3-4,车轮连接架3-4上安装车轮3-6,车轮3-6位于导轨系统4的U型导轨4-2上;前后侧的底座连接架3-5上还安装有制动装置3-2,制动装置3-2用于连接到导轨系统4形成制动,制动装置3-2处的底座连接架3-5上安装限位孔识别器3-3,限位孔识别器3-3用于检测是否移动到导轨系统4的制动限位孔4-1处。As shown in Figure 5, the
车轮连接架3-4于底座连接架3-5之间使用刚性连接,底座连接架3-5与底座托盘3-1之间用卡槽的方式进行连接,其中限位孔识别器3-3刚性安装在底座连接架3-5上,通过识别材质信号确定是否存在限位孔,以帮助装置制动。The wheel connecting frame 3-4 is rigidly connected between the base connecting frame 3-5, and the base connecting frame 3-5 and the base tray 3-1 are connected by a card slot, wherein the limit hole identifier 3-3 It is rigidly installed on the base connecting frame 3-5, and whether there is a limit hole is determined by identifying the material signal to help the device brake.
如图6所示,制动装置3-2主要由制动外壳、弹簧控制装置3-2-1、弹簧3-2-2和制动杆3-2-3组成,制动外壳固定在底座连接架3-5上,制动外壳内安装有弹簧3-2-2,制动杆3-2-3的内端经弹簧控制装置3-2-1和弹簧3-2-2连接,外端活动穿过底座连接架3-5后用于插装到导轨系统4的U型导轨4-2的制动限位孔4-1中。As shown in Figure 6, the brake device 3-2 is mainly composed of a brake housing, a spring control device 3-2-1, a spring 3-2-2 and a brake lever 3-2-3, and the brake housing is fixed on the base On the connecting frame 3-5, spring 3-2-2 is installed in the brake housing, and the inner end of brake lever 3-2-3 is connected with spring 3-2-2 through spring control device 3-2-1, and the outer After the end moves through the base connecting frame 3-5, it is used to be inserted into the braking limit hole 4-1 of the U-shaped guide rail 4-2 of the
弹簧控制装置3-2-1有两段式结构,后一部分刚性连接与外壳,其中为空心结构,如遇信号需要制动前一部分受信号影响会伸出并且嵌套在其外的弹簧3-2-2会因压缩的力量弹出,并且与其相连的制动杆3-2-3被其伸出伸入制动限位孔4-1中,以完成装置的制动。The spring control device 3-2-1 has a two-stage structure, the latter part is rigidly connected to the shell, which is a hollow structure, and if the signal needs to be braked, the former part will protrude and be nested outside the spring 3- 2-2 will pop up due to the force of compression, and the brake lever 3-2-3 connected with it is stretched out into the brake limit hole 4-1 to complete the braking of the device.
如图7所示,车轮3-6包括“梅花”型制动控制连接器3-6-1、控制电机3-6-2和控制连接外槽轮盘轮盘3-6-3;控制电机3-6-2一端通过轴3-6-4安装连接到车轮连接架3-4,控制电机3-6-2的输出轴经“梅花”型制动控制连接器3-6-1和控制连接外槽轮盘轮盘3-6-3同轴连接。As shown in Figure 7, the wheel 3-6 includes a "plum blossom" type brake control connector 3-6-1, a control motor 3-6-2 and a control connection outer groove wheel disc 3-6-3; the control motor One end of 3-6-2 is installed and connected to the wheel connecting frame 3-4 through the shaft 3-6-4, and the output shaft of the control motor 3-6-2 is controlled by the "plum blossom" type brake control connector 3-6-1. Connect the outer groove roulette 3-6-3 coaxial connection of the roulette.
同时如遇突发情况需要紧急制动时,车轮3-6中也存在制动系统可在一定程度上缓解这一问题,其中“梅花”型制动控制连接器3-6-1,由其相连的控制电机3-6-2控制,不工作时“梅花”型制动控制连接器3-6-1在其中随车轮而旋转,当遇信号,相连电机3-6-2对其进行控制,“梅花”型制动控制连接器3-6-1抱死,控制连接的外槽轮盘3-6-3同时停止,将整个车轮3-6停止转动以达到紧急制动的目的,同时卷扬机可与底座托盘上的连接孔3-7连接也是一种保护装置。Simultaneously, when emergency braking is needed in case of an emergency, there is also a braking system in the wheels 3-6 which can alleviate this problem to a certain extent, wherein the "plum blossom" type braking control connector 3-6-1 is formed by its The connected control motor 3-6-2 is controlled, and the "plum blossom" type brake control connector 3-6-1 rotates with the wheel when it is not working. When a signal is encountered, the connected motor 3-6-2 controls it , "Plum Blossom" type brake control connector 3-6-1 is locked, and the connected outer groove wheel disc 3-6-3 is controlled to stop at the same time, and the entire wheel 3-6 is stopped to achieve the purpose of emergency braking, and at the same time It is also a protective device that the winch can be connected with the connecting hole 3-7 on the base pallet.
如图8所示,底座托盘3-1上还设有用于系接牵引绳的卷扬机连接孔3-7。As shown in FIG. 8 , the base tray 3-1 is also provided with a hoist connection hole 3-7 for tying a traction rope.
如图3和图4所示,机械臂主体2主要由转台2-8、机械连接臂2-7和支臂构成,转台2-8位于底部,转台2-8的中间安装有旋转电机2-10,旋转电机2-10输出轴和转台2-8下方的机架连接;转台2-8上安装有电机2-1,转台2-8之上铰接安装有支臂,电机2-1输出轴经驱动转盘2-3和支臂下端连接进而带动支臂旋转,支臂上端安装有步进电机2-4,步进电机2-4的输出轴经连接杆2-5和机械连接臂2-7的一端固接,同时机械连接臂2-7的该端和液压推动杆2-1的上端连接,液压推动杆2-1的下端连接到转台2-8,机械连接臂2-7和液压推动杆2-1之间设有液压控制阀2-6,机械连接臂2-7另一端与扒渣执行机构1相连。As shown in Figures 3 and 4, the main body of the
转台2-8侧面还设有用于系接牵引绳的卷扬机连接孔2-9。The side of the turntable 2-8 is also provided with a hoist connection hole 2-9 for tying the traction rope.
同时液压推动杆2-1与液压控制阀2-7控制机械连接臂2-7绕连接杆2-5旋转运动,并且步进电机2-4同时通过连接杆操控了机械连接臂2-7的旋转运动,多位控制保障了其运动效率并且增加了防故障的能力,电机2-3与驱动转盘2-3通过小轴承相连接,控制着主体的活动,转台2-8在其底部存在一个旋转电机2-10可控制其旋转,以实现不同方向的活动。该主体其中多镂空结构以连接杆连接组成,可减少其自身承重,使整个机械足够轻盈,并且可活动的空间也足够大,同时能够减少成本。At the same time, the hydraulic push rod 2-1 and the hydraulic control valve 2-7 control the rotation of the mechanical connecting arm 2-7 around the connecting rod 2-5, and the stepper motor 2-4 simultaneously controls the movement of the mechanical connecting arm 2-7 through the connecting rod. Rotational movement, multi-position control ensures its movement efficiency and increases the ability to prevent failure. The motor 2-3 is connected with the driving turntable 2-3 through a small bearing to control the activity of the main body. There is a turntable 2-8 at its bottom. Rotary motor 2-10 can control its rotation, to realize the activity of different directions. The main body is composed of multiple hollow structures connected by connecting rods, which can reduce its own load, make the whole machine light enough, and the movable space is also large enough, while reducing costs.
如图2所示,扒渣执行机构1包括步进电机1-1、连接杆1-2、液压限位杆1-3、限位孔1-4、可拆卸托盘1-5和扒渣铲1-6;步进电机1-1安装在机械臂主体2的机械连接臂2-7末端,步进电机1-1的输出轴经连接杆1-2和扒渣壳体固定连接,扒渣壳体内设有回转电机,扒渣壳体下部套设有环形的可拆卸托盘1-5,回转电机和可拆卸托盘1-5连接,可拆卸托盘1-5通过回转电机带动下绕扒渣壳体外周旋转,可拆卸托盘1-5下端和扒渣铲1-6固定连接;扒渣壳体外壁安装有可伸缩移动的液压限位杆1-3,可拆卸托盘1-5沿圆周周向间隔开设多个限位孔1-4,液压限位杆1-3下端可伸缩移动地伸入或者伸出限位孔1-4中。As shown in Figure 2, the
通过扒渣铲1-6取隧道内的爆破残留物进行搬运。The blasting residues in the tunnel are taken and transported by slag removal shovels 1-6.
步进电机1-1通过驱动连接杆控制机构1在其正方向上的不同角度进行活动,液压限位杆1-3通过其内液压系统操控前段伸缩杆进入限位孔1-4对可拆卸托盘1-5进行限位,并且限位孔为每30°设置一个限位孔,同时可拆卸托盘1-5内置电机可驱动其进行不同角度的旋转,以满足扒渣铲1-6不同工作情景下的需求,以卡槽的方式与扒渣铲相连,方便应对不同情况下以更换不同扒渣铲的类型及尺寸,实现功能的多样性。The stepper motor 1-1 drives the connecting
本实用新型的工作原理过程如下:The working principle process of the present utility model is as follows:
如图1和图4所示,转台2-8在旋转电机2-10的带动下进行旋转以控制整个机械臂的多面操作,同时电机2-2带动驱动转盘2-3带动机械臂主体在不同角度的活动,以完成工作需求,在步进电机2-4与液压推动杆2-1的带动下使机械连接臂2-7能够进行活动控制扒渣执行机构1在步进电机1-1的驱动下进行扒渣,同时应对不同的角度由液压限位杆1-3将可拆卸托盘1-4限制在不同的角度再通过扒渣铲1-6完成目标工作。As shown in Figures 1 and 4, the turntable 2-8 rotates under the drive of the rotating motor 2-10 to control the multi-faceted operation of the entire mechanical arm, and the motor 2-2 drives the driving turntable 2-3 to drive the main body of the mechanical arm in different positions. Angle activities, to complete the work requirements, under the drive of the stepper motor 2-4 and the hydraulic push rod 2-1, the mechanical connecting arm 2-7 can be moved to control the
制动系统由三部分组成,The braking system consists of three parts,
第一部分由制动装置3-2组成,主要由制动孔识别器3-3传递信号给弹簧控制装置3-2-1来控制弹簧3-2-2推动限位杆3-2-3伸入限位孔4-1实现制动;The first part is made up of brake device 3-2, mainly by the brake hole recognizer 3-3 transmission signal to the spring control device 3-2-1 to control the spring 3-2-2 to push the limit rod 3-2-3 to extend into the limit hole 4-1 to achieve braking;
第二部分由车轮3-6组成,主要由电机3-6-2限制梅花”型制动控制连接器3-6-1的转动来限制车轮3-6的转动来控制车轮抱死;The second part is composed of wheels 3-6, mainly by the motor 3-6-2 to limit the rotation of the plum blossom type brake control connector 3-6-1 to limit the rotation of the wheels 3-6 to control the wheel locking;
第三部分主要由卷扬机通过牵引绳连接卷扬机的连接孔3-7来从地面上实现安全制动。即可完成其所需要的的扒渣过程,能够有效代替人工,降低不确定因素。The third part mainly realizes safety braking from the ground by the winch connecting the connecting hole 3-7 of the winch through the traction rope. The required slag removal process can be completed, which can effectively replace manual labor and reduce uncertain factors.
以上所述仅是本实用新型的优选实施方式,应当指出:在不脱离本实用新型工作原理的前提下,还可以做出改进及细化,这些改进和细化也应当视为本实用新型的保护范围。The above is only the preferred implementation of the present utility model, it should be pointed out that: under the premise of not departing from the working principle of the present utility model, improvements and refinements can also be made, and these improvements and refinements should also be regarded as the embodiment of the present utility model. protected range.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221810723.4U CN218862612U (en) | 2022-07-13 | 2022-07-13 | A slag removal device suitable for treating blasting residues in sloped tunnels |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221810723.4U CN218862612U (en) | 2022-07-13 | 2022-07-13 | A slag removal device suitable for treating blasting residues in sloped tunnels |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218862612U true CN218862612U (en) | 2023-04-14 |
Family
ID=87356988
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221810723.4U Active CN218862612U (en) | 2022-07-13 | 2022-07-13 | A slag removal device suitable for treating blasting residues in sloped tunnels |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218862612U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115306422A (en) * | 2022-07-13 | 2022-11-08 | 浙江理工大学 | Slag removing device suitable for treating blasting residues of gradient tunnel |
-
2022
- 2022-07-13 CN CN202221810723.4U patent/CN218862612U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115306422A (en) * | 2022-07-13 | 2022-11-08 | 浙江理工大学 | Slag removing device suitable for treating blasting residues of gradient tunnel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111706255A (en) | A dual-rotation automatic drilling rig host | |
| CN105846352B (en) | Adapt to the inspection robot mechanical structure and its obstacle-detouring method of solid conductor | |
| CA2987663C (en) | Operating method of a wind power jib of a crane and crane | |
| CN109296017B (en) | Multifunctional double-head operation engineering vehicle | |
| CN106996297A (en) | The assembled mechanism of multiple degrees of freedom rectangle section of jurisdiction displacement and its assembling method | |
| CN208888146U (en) | A kind of ground iron chassis intelligent checking system | |
| CN109424318A (en) | Drill jumbo and its control method with long-range remote control function | |
| CN109812261B (en) | An underwater drilling tool posture detection system | |
| CN204591270U (en) | The airborne collapsible advanced stand device of development machine hydraulic pressure | |
| CN212024593U (en) | Efficient gantry crane for foundation pit and foundation pit using same | |
| CN210768900U (en) | Translation device in shield machine station | |
| CN115306422A (en) | Slag removing device suitable for treating blasting residues of gradient tunnel | |
| CN113120541B (en) | Obstacle clearing device for road tunnel and using method thereof | |
| CN113716488A (en) | Lifting platform device | |
| CN105621268A (en) | Multifunctional electric work vehicle | |
| CN105060127A (en) | Fixed-column-type cantilever crane | |
| CN216426609U (en) | Lifting platform device | |
| CN210189787U (en) | Mobile platform parallel robot | |
| CN210509040U (en) | Omnibearing multi-freedom-degree anchor rod drill carriage | |
| CN117301019A (en) | A pneumatically controlled coal mine robot and its use method | |
| CN202451153U (en) | Entry-driving machine and auxiliary walking system thereof | |
| CN202148473U (en) | Dragging machine special for railway | |
| CN204848015U (en) | Small -sizely decide pillar jib crane | |
| CN223225661U (en) | A multifunctional lifting and hoisting equipment suitable for multiple scenarios | |
| CN224256786U (en) | Emergency rescue vehicle for collapsed tunnels |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |