CN218815085U - Construction scaffold - Google Patents

Construction scaffold Download PDF

Info

Publication number
CN218815085U
CN218815085U CN202222907806.1U CN202222907806U CN218815085U CN 218815085 U CN218815085 U CN 218815085U CN 202222907806 U CN202222907806 U CN 202222907806U CN 218815085 U CN218815085 U CN 218815085U
Authority
CN
China
Prior art keywords
workbench
channel steel
column
motor
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222907806.1U
Other languages
Chinese (zh)
Inventor
张虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Juyuda Electronic Technology Co ltd
Original Assignee
Suzhou Juyuda Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Juyuda Electronic Technology Co ltd filed Critical Suzhou Juyuda Electronic Technology Co ltd
Priority to CN202222907806.1U priority Critical patent/CN218815085U/en
Application granted granted Critical
Publication of CN218815085U publication Critical patent/CN218815085U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型涉及一种建筑施工脚手架,包括呈四周设置的槽钢,所述槽钢之间通过支撑杆相连接,所述支撑杆正下方分别安装有与槽钢相连接的第一工作台和第二工作台,所述第一工作台和第二工作台上均连接有与其相适配的扶梯并通过焊接固定的方式与槽钢相连接,且第一工作台上和第二工作台上均共同通过立柱连接有升降机构,所述升降机构包括置于立柱底端上的面板,所述面板上固定安装有电机,所述电机的输出轴上连接有螺杆。有益效果:本实用新型解决了现有机构设计复杂、人为操作不便、不能够有效快速的实现药物碾碎、影响到病人康复的技术问题。

Figure 202222907806

The utility model relates to a scaffolding for building construction, which comprises channel steels arranged around, the channel steels are connected by support rods, and a first workbench connected with the channel steels and a The second workbench, the first workbench and the second workbench are connected with an escalator that is compatible with it and are connected with the channel steel by welding and fixing, and the first workbench and the second workbench Both are connected with a lifting mechanism through the column, and the lifting mechanism includes a panel placed on the bottom of the column, a motor is fixedly installed on the panel, and a screw rod is connected to the output shaft of the motor. Beneficial effects: the utility model solves the technical problems that the existing mechanism is complex in design, inconvenient in human operation, unable to effectively and quickly realize the crushing of medicines, and affecting the recovery of patients.

Figure 202222907806

Description

一种建筑施工脚手架A building construction scaffolding

技术领域technical field

本实用新型涉及建筑脚手架技术领域,具体涉及一种建筑施工脚手架。The utility model relates to the technical field of building scaffolding, in particular to a building construction scaffolding.

背景技术Background technique

脚手架是为了保证各施工过程顺利进行而搭设的工作平台。按搭设的位置分为外脚手架、里脚手架;按材料不同可分为木脚手架、竹脚手架、钢管脚手架;按构造形式分为立杆式脚手架、桥式脚手架、门式脚手架、悬吊式脚手架、挂式脚手架、挑式脚手架、爬式脚手架。Scaffolding is a working platform set up to ensure the smooth progress of various construction processes. According to the erection position, it can be divided into external scaffolding and internal scaffolding; according to different materials, it can be divided into wooden scaffolding, bamboo scaffolding and steel pipe scaffolding; according to the structure form, it can be divided into vertical pole scaffolding, bridge scaffolding, portal scaffolding, suspension scaffolding Hanging scaffolding, picking scaffolding, climbing scaffolding.

脚手架作为建筑施工的重要工具,可以对不同高度的建筑体进行相应安装维修工作,但是在工作台上人员需要拿取工具或者其他配件时,往往需要落地进行获取,而不能够直接通过升降机构进行不同高度工作台的物件输送工作,降低了工作效率,也不利于人员的建筑操作,此外,脚手架的连接机构较为单一,一旦连接处发生结构损坏,立马会发生砸伤现象,从而影响到人员的安全性。As an important tool for building construction, scaffolding can be used for installation and maintenance of buildings of different heights. However, when people on the workbench need to pick up tools or other accessories, they often need to land on the ground to get them, and they cannot be directly carried out through the lifting mechanism. The work of conveying objects at workbenches at different heights reduces work efficiency and is not conducive to the construction operation of personnel. In addition, the connection mechanism of scaffolding is relatively simple. Once the structure is damaged at the connection, it will immediately cause bruises, which will affect the safety of personnel. safety.

实用新型内容Utility model content

本实用新型目的是提供一种建筑施工脚手架,解决了现有机构连接单一、安全性能差、不能够便于人员简单的获取工具的需求、影响到工作效率的技术问题,是通过如下方案实现的。The purpose of the utility model is to provide a scaffolding for building construction, which solves the technical problems of single connection of existing mechanisms, poor safety performance, inability to facilitate personnel to easily obtain tools, and affecting work efficiency. It is realized through the following scheme.

为了实现以上目的,本实用新型采用的技术方案为:一种建筑施工脚手架,其特征在于,包括呈四周设置的槽钢,所述槽钢之间通过支撑杆相连接,所述支撑杆正下方分别安装有与槽钢相连接的第一工作台和第二工作台,所述第一工作台和第二工作台上均连接有与其相适配的扶梯并通过焊接固定的方式与槽钢相连接,且第一工作台上和第二工作台上均共同通过立柱连接有升降机构;In order to achieve the above objectives, the technical solution adopted by the utility model is: a building construction scaffold, characterized in that it includes channel steels arranged around, the channel steels are connected by support rods, and the support rods directly below The first workbench and the second workbench connected with the channel steel are respectively installed, and the first workbench and the second workbench are connected with an escalator which is compatible with the channel steel and connected with the channel steel by welding. connected, and both the first workbench and the second workbench are connected with a lifting mechanism through a column;

所述升降机构包括置于立柱底端上的面板,所述面板上固定安装有电机,所述电机的输出轴上连接有螺杆,所述螺杆外壁上螺旋传动有固定在收纳盒上的安装块,且收纳盒外壁上的凸起部沿立柱高度方向连接有凹形滑槽,随着电机带动螺杆转动,收纳盒在立柱外壁上实现升降运动。The lifting mechanism includes a panel placed on the bottom of the column, a motor is fixedly installed on the panel, a screw is connected to the output shaft of the motor, and the screw drive on the outer wall of the screw has a mounting block fixed on the storage box , and the protrusion on the outer wall of the storage box is connected with a concave chute along the height direction of the column, and as the motor drives the screw to rotate, the storage box realizes lifting movement on the outer wall of the column.

进一步的,所述支撑杆和槽钢之间通过螺栓连接,且槽钢底端通过支架安装有滚轮,所述滚轮与扶梯之间的高度差为10-20cm。Further, the support rod and the channel steel are connected by bolts, and the bottom end of the channel steel is equipped with a roller through a bracket, and the height difference between the roller and the escalator is 10-20cm.

进一步的,所述第一工作台和第二工作台底端四周均设有与槽钢相连接的限位块,所述限位块与槽钢之间为焊接固定成型。Further, the bottoms of the first workbench and the second workbench are provided with limit blocks connected with the channel steel, and the limit block and the channel steel are welded and fixed.

进一步的,所述电机的输出轴和螺杆之间通过联轴器相固定,且电机的输出轴和螺杆的竖直中心线保持在同一轴线上。Further, the output shaft of the motor and the screw are fixed through a coupling, and the vertical centerlines of the output shaft of the motor and the screw are kept on the same axis.

进一步的,所述立柱上的凹形滑槽相对于收纳盒中心对称设置,且收纳盒和安装块之间通过螺栓连接。Further, the concave chute on the column is arranged symmetrically with respect to the center of the storage box, and the storage box and the installation block are connected by bolts.

本实用新型的技术效果在于:The technical effect of the utility model is:

1、本专利通过设计第一工作台、第二工作台、扶梯、升降机构和滚轮,首先脚手架上不同高度的工作台可以直接通过扶梯进行攀爬上去,此外,升降机构通过电机带动螺杆的转动,然后借助于螺旋传动的作用,使得收纳盒在立柱上进行升降活动,以此便于收纳盒中的工具在不同高度进行停止,从而便于人员拿取工具,而且收纳盒上的凸起部在立柱上的凹形滑槽进行移动,有效的避免运动位置发生偏离;1. This patent designs the first workbench, the second workbench, the escalator, the lifting mechanism and the rollers. First, the workbenches of different heights on the scaffold can be climbed directly through the escalator. In addition, the lifting mechanism drives the rotation of the screw through the motor. , and then with the help of the screw transmission, the storage box is lifted and lowered on the column, so that the tools in the storage box can be stopped at different heights, so that the personnel can take the tools, and the raised part on the storage box is on the column. The concave chute on the top moves, effectively avoiding the deviation of the movement position;

2、槽钢之间通过螺栓连接的支撑杆相连接,便于结构件的连接稳定,而且槽钢上设置的焊接固定的限位块可以对第一工作台和第二工作台底端起到支撑连接的作用,从而进一步保证结构连接的稳定性。2. The channel steels are connected by bolt-connected support rods, which facilitates the connection and stability of the structural parts, and the welded and fixed limit blocks set on the channel steels can support the bottom ends of the first workbench and the second workbench The role of the connection, thereby further ensuring the stability of the structural connection.

附图说明Description of drawings

图1为本实用新型的结构示意图一;Fig. 1 is a structural representation one of the utility model;

图2为本实用新型图1的A处放大图Fig. 2 is the enlarged view of A place of Fig. 1 of the utility model

图3为本实用新型的结构示意图二;Fig. 3 is the structural representation two of the utility model;

图4为本实用新型图3的B处放大图;Fig. 4 is the enlarged view of the B place of Fig. 3 of the utility model;

图5为本实用新型的正视图。Fig. 5 is a front view of the utility model.

附图标记:1-槽钢;2-支撑杆;3-第一工作台;4-第二工作台;5-扶梯;6-立柱;7-升降机构;8-面板;9-电机;10-螺杆;11-收纳盒;12-凸起部;13-凹形滑槽;14-滚轮;15-限位块。Reference signs: 1-channel steel; 2-support rod; 3-first workbench; 4-second workbench; 5-escalator; 6-column; 7-lifting mechanism; 8-panel; 9-motor; 10 - screw; 11 - storage box; 12 - raised part; 13 - concave chute; 14 - roller; 15 - limit block.

具体实施方式Detailed ways

参照附图1-5,一种建筑施工脚手架,其特征在于,包括呈四周设置的槽钢1,所述槽钢1之间通过支撑杆2相连接,所述支撑杆2正下方分别安装有与槽钢1相连接的第一工作台3和第二工作台4,所述第一工作台3和第二工作台4上均连接有与其相适配的扶梯5并通过焊接固定的方式与槽钢1相连接,且第一工作台3上和第二工作台4上均共同通过立柱6连接有升降机构7;With reference to accompanying drawings 1-5, a kind of building construction scaffold is characterized in that, comprises the channel steel 1 that is arranged all around, and said channel steel 1 is connected by support bar 2, and said support bar 2 is respectively installed with The first workbench 3 and the second workbench 4 that are connected with the channel steel 1 are all connected with an escalator 5 that is compatible with the first workbench 3 and the second workbench 4 and are fixed by welding. The channel steel 1 is connected, and the first workbench 3 and the second workbench 4 are jointly connected with a lifting mechanism 7 through a column 6;

所述升降机构7包括置于立柱6底端上的面板8,所述面板8上固定安装有电机9,所述电机9的输出轴上连接有螺杆10,所述螺杆10外壁上螺旋传动有固定在收纳盒11上的安装块,且收纳盒11外壁上的凸起部12沿立柱6高度方向连接有凹形滑槽13,随着电机9带动螺杆10转动,收纳盒11在立柱6外壁上实现升降运动。The lifting mechanism 7 includes a panel 8 placed on the bottom of the column 6, a motor 9 is fixedly installed on the panel 8, a screw 10 is connected to the output shaft of the motor 9, and the screw drive on the outer wall of the screw 10 has a The mounting block fixed on the receiving box 11, and the convex part 12 on the outer wall of the receiving box 11 is connected with a concave chute 13 along the height direction of the column 6, and the screw rod 10 is driven by the motor 9 to rotate, and the receiving box 11 is placed on the outer wall of the column 6 Up and down movement is realized.

本方案的具体实施例为,所述支撑杆2和槽钢1之间通过螺栓连接,且槽钢1底端通过支架安装有滚轮14,所述滚轮14与扶梯5之间的高度差为10-20cm,上述高度差的设置可以让装置在活动中避免扶梯5与地面相摩擦,从而导致结构产生碰撞损伤。The specific embodiment of this program is that the support rod 2 and the channel steel 1 are connected by bolts, and the bottom end of the channel steel 1 is equipped with a roller 14 through a bracket, and the height difference between the roller 14 and the escalator 5 is 10 -20cm, the setting of the above-mentioned height difference can prevent the escalator 5 from rubbing against the ground during the movement of the device, thus causing collision damage to the structure.

本方案的具体实施例为,所述第一工作台3和第二工作台4底端四周均设有与槽钢1相连接的限位块15,所述限位块15与槽钢1之间为焊接固定成型,槽钢1上的限位块15对工作台起到有效的支撑连接作用,可以防止受力过载,使得受力分散开来。The specific embodiment of this program is that the bottom of the first workbench 3 and the second workbench 4 are all provided with limit blocks 15 connected with the channel steel 1, and the distance between the limit block 15 and the channel steel 1 The space is welded and fixed, and the limit block 15 on the channel steel 1 plays an effective role in supporting and connecting the workbench, which can prevent overloading and disperse the stress.

本方案的具体实施例为,所述电机9的输出轴和螺杆10之间通过联轴器相固定,且电机9的输出轴和螺杆10的竖直中心线保持在同一轴线上,所述立柱6上的凹形滑槽13相对于收纳盒11中心对称设置,且收纳盒11和安装块之间通过螺栓连接,立柱6上对称设置的凹形滑槽13设置,可以保证收纳盒11的凸起部12在上下活动过程中起到良好运动的稳定性。The specific embodiment of this scheme is that the output shaft of the motor 9 and the screw rod 10 are fixed by a coupling, and the output shaft of the motor 9 and the vertical centerline of the screw rod 10 are kept on the same axis, and the column The concave chute 13 on the 6 is arranged symmetrically with respect to the center of the storage box 11, and the storage box 11 and the mounting block are connected by bolts. The lifting part 12 has good stability in movement during the up and down movement.

本方案的具体实施例为,本专利通过设计第一工作台3、第二工作台4、扶梯5、升降机构7和滚轮14,首先脚手架上不同高度的工作台可以直接通过扶梯5进行攀爬上去,此外,升降机构7通过电机9带动螺杆10的转动,然后借助于螺旋传动的作用,使得收纳盒11在立柱上进行升降活动,以此便于收纳盒11中的工具在不同高度进行停止,从而便于人员拿取工具,而且收纳盒上11的凸起部12在立柱6上的凹形滑槽13进行移动,有效的避免运动位置发生偏离。The concrete embodiment of this scheme is, this patent designs the first workbench 3, the second workbench 4, the escalator 5, the lifting mechanism 7 and the roller 14, firstly the workbenches of different heights on the scaffold can be directly climbed through the escalator 5 Going up, in addition, the lifting mechanism 7 drives the rotation of the screw rod 10 through the motor 9, and then by means of the effect of the screw transmission, the storage box 11 is lifted and lowered on the column, so that the tools in the storage box 11 are stopped at different heights. Thereby, it is convenient for personnel to take tools, and the protrusion 12 on the storage box 11 moves on the concave chute 13 on the column 6, effectively avoiding deviation of the moving position.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是本实用新型的原理,在不脱离本实用新型精神和范围的前提下本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型的范围内。本实用新型要求的保护范围由所附的权利要求书及其等同物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the industry should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions describe only the principle of the utility model. There will be various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The protection scope required by the utility model is defined by the appended claims and their equivalents.

Claims (5)

1.一种建筑施工脚手架,其特征在于,包括呈四周设置的槽钢(1),所述槽钢(1)之间通过支撑杆(2)相连接,所述支撑杆(2)正下方分别安装有与槽钢(1)相连接的第一工作台(3)和第二工作台(4),所述第一工作台(3)和第二工作台(4)上均连接有与其相适配的扶梯(5)并通过焊接固定的方式与槽钢(1)相连接,且第一工作台(3)上和第二工作台(4)上均共同通过立柱(6)连接有升降机构(7);1. A building construction scaffold is characterized in that, comprises the channel steel (1) that is arranged around, is connected by support rod (2) between described channel steel (1), directly below the support rod (2) A first workbench (3) and a second workbench (4) connected to the channel steel (1) are installed respectively, and the first workbench (3) and the second workbench (4) are connected with the The matching escalator (5) is connected with the channel steel (1) by welding and fixing, and the first workbench (3) and the second workbench (4) are connected with a column (6) Lifting mechanism (7); 所述升降机构(7)包括置于立柱(6)底端上的面板(8),所述面板(8)上固定安装有电机(9),所述电机(9)的输出轴上连接有螺杆(10),所述螺杆(10)外壁上螺旋传动有固定在收纳盒(11)上的安装块,且收纳盒(11)外壁上的凸起部(12)沿立柱(6)高度方向连接有凹形滑槽(13),随着电机(9)带动螺杆(10)转动,收纳盒(11)在立柱(6)外壁上实现升降运动。The lifting mechanism (7) includes a panel (8) placed on the bottom of the column (6), a motor (9) is fixedly installed on the panel (8), and an output shaft of the motor (9) is connected with Screw (10), the screw drive on the outer wall of the screw (10) has a mounting block fixed on the storage box (11), and the protrusion (12) on the outer wall of the storage box (11) is along the height direction of the column (6) A concave chute (13) is connected, and as the motor (9) drives the screw rod (10) to rotate, the storage box (11) realizes lifting motion on the outer wall of the column (6). 2.根据权利要求1所述的一种建筑施工脚手架,其特征在于,所述支撑杆(2)和槽钢(1)之间通过螺栓连接,且槽钢(1)底端通过支架安装有滚轮(14),所述滚轮(14)与扶梯(5)之间的高度差为10-20cm。2. A kind of scaffolding for building construction according to claim 1, characterized in that, the support bar (2) and the channel steel (1) are connected by bolts, and the bottom end of the channel steel (1) is installed with a The roller (14), the height difference between the roller (14) and the escalator (5) is 10-20cm. 3.根据权利要求1所述的一种建筑施工脚手架,其特征在于,所述第一工作台(3)和第二工作台(4)底端四周均设有与槽钢(1)相连接的限位块(15),所述限位块(15)与槽钢(1)之间为焊接固定成型。3. The scaffolding for building construction according to claim 1, characterized in that, the bottoms of the first workbench (3) and the second workbench (4) are provided with channels connected to the channel steel (1). The limit block (15) is welded and fixed between the limit block (15) and the channel steel (1). 4.根据权利要求1所述的一种建筑施工脚手架,其特征在于,所述电机(9)的输出轴和螺杆(10)之间通过联轴器相固定,且电机(9)的输出轴和螺杆(10)的竖直中心线保持在同一轴线上。4. A kind of scaffolding for building construction according to claim 1, characterized in that, the output shaft of the motor (9) and the screw rod (10) are fixed by a coupling, and the output shaft of the motor (9) Keep on the same axis with the vertical centerline of the screw rod (10). 5.根据权利要求1所述的一种建筑施工脚手架,其特征在于,所述立柱(6)上的凹形滑槽(13)相对于收纳盒(11)中心对称设置,且收纳盒(11)和安装块之间通过螺栓连接。5. A kind of construction scaffolding according to claim 1, characterized in that, the concave chute (13) on the column (6) is arranged symmetrically with respect to the center of the storage box (11), and the storage box (11) ) and the mounting block are connected by bolts.
CN202222907806.1U 2022-11-02 2022-11-02 Construction scaffold Expired - Fee Related CN218815085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222907806.1U CN218815085U (en) 2022-11-02 2022-11-02 Construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222907806.1U CN218815085U (en) 2022-11-02 2022-11-02 Construction scaffold

Publications (1)

Publication Number Publication Date
CN218815085U true CN218815085U (en) 2023-04-07

Family

ID=87252525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222907806.1U Expired - Fee Related CN218815085U (en) 2022-11-02 2022-11-02 Construction scaffold

Country Status (1)

Country Link
CN (1) CN218815085U (en)

Similar Documents

Publication Publication Date Title
CN114439211B (en) Building scaffold supporting structure
CN217106038U (en) Scaffold for building construction
CN113090070A (en) Top base of steel structure temporary support and installation and alignment method thereof
CN114215338A (en) A building construction aerial work platform
CN115749364B (en) A building height increase renovation and expansion construction equipment and renovation and expansion construction method
CN218815085U (en) Construction scaffold
CN219033973U (en) Building scaffold
CN211164702U (en) Beam slab bar planting drilling tool
CN220884745U (en) Manual installation of special scaffolding for ship construction
CN218292712U (en) But height-adjusting's scaffold frame for house construction
CN207092513U (en) A kind of rotary type lowering or hoisting gear for tank inside construction
CN214360123U (en) Small-size lift is used in engineering construction
CN215107218U (en) Dismounting device for scaffold in constructional engineering
CN212642069U (en) Scaffold for bridge and tunnel construction
CN211161302U (en) Multifunctional straightening equipment for H-beam processing
CN212385661U (en) Prefabricated plate napping device
CN219909860U (en) Guard bar scaffold
CN219587155U (en) Collapsible operation panel is used in scaffold frame maintenance
CN219411721U (en) Scaffold frame
CN222159524U (en) A construction pipe lifting device for construction engineering
CN222161920U (en) A retractable and movable building scaffold
CN224119976U (en) A general support structure for post-cast strips
CN221682397U (en) An assembled building construction platform
CN220226284U (en) Auxiliary installation device for welding ball net rack
CN221219593U (en) Scaffold frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230407

CF01 Termination of patent right due to non-payment of annual fee