CN218779343U - Basket is hung to pivot before cable-stay bridge - Google Patents

Basket is hung to pivot before cable-stay bridge Download PDF

Info

Publication number
CN218779343U
CN218779343U CN202223020314.7U CN202223020314U CN218779343U CN 218779343 U CN218779343 U CN 218779343U CN 202223020314 U CN202223020314 U CN 202223020314U CN 218779343 U CN218779343 U CN 218779343U
Authority
CN
China
Prior art keywords
bearing platform
cable
poured
piece
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223020314.7U
Other languages
Chinese (zh)
Inventor
冉明
张军
朱长江
杜恩华
许荣浩
谢飞
惠衡
王辉
张蓉
杨传峰
余黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Beixin Geotechnical Engineering Survey And Design Co ltd
Xinjiang Beixin Road and Bridge Group Co Ltd
Original Assignee
Xinjiang Beixin Geotechnical Engineering Survey And Design Co ltd
Xinjiang Beixin Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Beixin Geotechnical Engineering Survey And Design Co ltd, Xinjiang Beixin Road and Bridge Group Co Ltd filed Critical Xinjiang Beixin Geotechnical Engineering Survey And Design Co ltd
Priority to CN202223020314.7U priority Critical patent/CN218779343U/en
Application granted granted Critical
Publication of CN218779343U publication Critical patent/CN218779343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a basket is hung to pivot before cable-stay bridge relates to bridge construction equipment technical field. The front pivot hanging basket of the cable-stayed bridge comprises a bearing platform, a template piece and a driving mechanism. The bearing platform comprises a beam main body and suspension pieces, the suspension pieces are arranged on two sides of the beam main body, the template piece is detachably arranged on the beam main body and used for pouring the beam, the driving mechanism comprises a driving piece and slide rails, and the driving piece and the slide rails are both used for being arranged on a poured beam section. Through hanging the flying piece and establishing the slide rail that sets up on pouring the beam section and make flying piece and slide rail sliding fit, through driving piece drive flying piece along the slide rail removal, can make bearing platform displacement steadily, avoid bearing platform's both sides lateral shifting speed inconsistent and lead to transversely receiving to turn round, and avoid bearing platform to break away from pouring the beam section, realized that bearing platform can the steady movement, ensure that the construction goes on smoothly.

Description

Basket is hung to pivot before cable-stay bridge
Technical Field
The utility model relates to a bridge construction equipment technical field particularly, relates to a basket is hung to pivot before cable-stay bridge.
Background
The cable-stay bridge is at the in-process of construction, and under the great condition of length and width of main part beam section, the required dimensional span of hanging the basket is great, and the present basket of hanging is difficult to control when its structural span is great, breaks away from with main part beam section at hanging the basket removal in-process easily, increases the construction degree of difficulty.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a basket is hung to pivot before cable-stay bridge, it can make load-bearing platform stably remove, ensures that the construction goes on smoothly.
The embodiment of the utility model is realized like this:
in a first aspect, the utility model provides a basket is hung to pivot before cable-stay bridge, include:
the bearing platform comprises a beam main body and suspension pieces, wherein the suspension pieces are arranged on two sides of the beam main body and are used for being suspended on a poured beam section;
the template component is arranged on the beam main body and used for pouring a beam body; and the number of the first and second groups,
the driving mechanism comprises a driving part and a sliding rail, the driving part and the sliding rail are both used for being arranged on the poured beam section, the hanging part is hung on the sliding rail, and the driving part is used for driving the hanging part to move along the sliding rail.
In an optional embodiment, the beam main body comprises a first cross beam, a second cross beam, a first longitudinal beam and a second longitudinal beam, the first cross beam and the second cross beam are arranged between the first longitudinal beam and the second longitudinal beam and are in a frame structure, and the template component is laid on the first cross beam, the second cross beam, the first longitudinal beam and the second longitudinal beam.
In an alternative embodiment, the beam body further includes a third cross beam disposed between the first longitudinal beam and the second longitudinal beam and on a side of the second cross beam away from the first cross beam.
In an optional implementation mode, the cable-stayed bridge front supporting point hanging basket further comprises an anchoring assembly, the anchoring assembly comprises a first anchor rod, a second anchor rod and a third anchor rod, the first anchor rod is used for penetrating the poured beam section and is connected with the second cross beam, the second anchor rod is used for penetrating the poured beam section and is connected with the first longitudinal beam and the second longitudinal beam in a position corresponding to the second cross beam, and the third anchor rod is used for penetrating the poured beam section and is connected with the first longitudinal beam and the second longitudinal beam in a position corresponding to the third cross beam.
In an optional implementation mode, the cable-stayed bridge front supporting point hanging basket further comprises a tensioning mechanism, the tensioning mechanism is arranged at one end of the bearing platform, and the tensioning mechanism is used for connecting the bearing platform and the stay cable.
In an alternative embodiment, the driving mechanism further comprises a counter roller, and the counter roller is arranged on the bearing platform.
In an optional embodiment, the cable-stayed bridge front support point hanging basket further comprises a thrust mechanism, the thrust mechanism is used for being arranged on the bottom wall of the poured beam section, the beam main body is provided with a limiting part, and the thrust mechanism is used for being abutted against the limiting part.
In an optional embodiment, the cable-stayed bridge front supporting point hanging basket further comprises a lifting mechanism, one end of the lifting mechanism is used for being connected with the poured beam section, the other end of the lifting mechanism is connected with the bearing platform, and the lifting mechanism is used for lifting the bearing platform.
In an optional embodiment, the cable-stayed bridge front supporting point hanging basket comprises an operating platform, wherein the operating platform is arranged on the side periphery of the bearing platform and is used for bearing operators.
In an alternative embodiment, the hanger is C-shaped.
The embodiment of the utility model provides a basket is hung to forward fulcrum before cable-stay bridge's beneficial effect includes: through hanging the flying piece and establishing the slide rail that sets up on pouring the beam section and make flying piece and slide rail sliding fit, through driving piece drive flying piece along the slide rail removal, can make bearing platform displacement steadily, avoid bearing platform's both sides lateral shifting speed inconsistent and lead to transversely receiving to turn round, and avoid bearing platform to break away from pouring the beam section, realized that bearing platform can the steady movement, ensure that the construction goes on smoothly.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a first view structural diagram of a front supporting point cradle of a cable-stayed bridge according to an embodiment of the present invention;
fig. 2 is a second view structural diagram of a front supporting point cradle of a cable-stayed bridge according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a beam main body provided in an embodiment of the present invention.
Icon: 10-a front supporting point hanging basket of the cable-stayed bridge; 100-a load-bearing platform; 110-a beam body; 111-a first beam; 112-a second beam; 113-a third beam; 114-a first stringer; 115-a second stringer; 116-a limiting part; 120-a suspension member; 200-a template member; 300-a drive mechanism; 310-a drive member; 320-a slide rail; 400-an anchor assembly; 500-a tensioning mechanism; 600-a thrust mechanism; 700-a lifting mechanism; 20-poured beam sections.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined or explained in subsequent figures.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate the position or positional relationship based on the position or positional relationship shown in the drawings, or the position or positional relationship which is usually placed when the product of the present invention is used, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance.
Furthermore, the terms "horizontal", "vertical" and the like do not imply that the components are required to be absolutely horizontal or pendant, but rather may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
Referring to fig. 1 to 3, the utility model provides a basket 10 is hung to cable-stay bridge front pivot, is applied to the building bridge field, specially adapted border cable face broad width cable-stay bridge concrete beam.
The cable-stayed bridge front supporting point hanging basket 10 comprises a bearing platform 100, a template component 200, a driving mechanism 300, an anchoring component 400, a tensioning mechanism 500, a thrust mechanism 600, a lifting mechanism 700 and an operating platform, wherein the template component 200, the driving mechanism 300, the anchoring component 400, the tensioning mechanism 500, the thrust mechanism 600, the lifting mechanism 700 and the operating platform are all arranged on the bearing platform 100, continuous beam sections are formed in sequence through pouring on the bearing platform 100 to finally form a main beam, and therefore construction of a cable-stayed bridge is achieved.
Further, the platform 100 includes a beam body 110 and suspension members 120, the suspension members 120 are disposed on two sides of the beam body 110, the template member 200 is detachably disposed on the beam body 110, the template member 200 is used for casting the beam body, the driving mechanism 300 includes a driving member 310 and a sliding rail 320, the driving member 310 and the sliding rail 320 are both used for being disposed on the cast beam section 20, the suspension members 120 are suspended on the sliding rail 320, and the driving member 310 is used for driving the suspension members 120 to move along the sliding rail 320.
In the present embodiment, the hanging members 120 are hung on both sides of the poured beam section 20 to hang the load-bearing platform 100 on the poured beam section 20, so that the beam body pouring operation is performed on the formwork members 200 corresponding to the ends of the poured beam section 20 to form a new poured beam section; by hanging the hanging member 120 on the sliding rail 320 arranged on the poured beam section 20 and making the hanging member 120 slide-fit with the sliding rail 320, the hanging member 120 is driven by the driving member 310 to move along the sliding rail 320, so that the load-bearing platform 100 can be stably displaced, the lateral twisting caused by the non-uniform lateral moving speed of the two sides of the load-bearing platform 100 can be avoided, the load-bearing platform 100 can be prevented from being separated from the poured beam section 20, the stable movement of the load-bearing platform 100 along the end direction of the poured beam section 20 can be realized, and the smooth construction can be ensured.
Specifically, the driving member 310 may be a cylinder; the skid rails 320 are fixed to the surface of the cast beam section 20 by means of expansion bolts. Furthermore, the hanger 120 is C-shaped to facilitate hanging on the poured beam section 20.
It should be noted that the driving mechanism 300 drives the loading platform 100 to move when the loading platform 100 is in the unloaded state.
Further, the driving mechanism 300 further includes a counter roller, and the counter roller is disposed on the supporting platform 100.
In this embodiment, the counter rollers are disposed between the load platform 100 and the poured beam segment 20, thereby facilitating movement of the poured beam segment 20.
Further, the beam main body 110 includes a first cross beam 111, a second cross beam 112, a third cross beam 113, a first longitudinal beam 114 and a second longitudinal beam 115, the first cross beam 111 and the second cross beam 112 are disposed between the first longitudinal beam 114 and the second longitudinal beam 115 and are in a frame structure, the third cross beam 113 is disposed between the first longitudinal beam 114 and the second longitudinal beam 115 and is located on one side of the second cross beam 112 far away from the first cross beam 111, and the formwork members 200 are laid on the first cross beam 111, the second cross beam 112, the first longitudinal beam 114 and the second longitudinal beam 115.
In this embodiment, the first cross beam 111, the second cross beam 112, the third cross beam 113, the first longitudinal beam 114, and the second longitudinal beam 115 together form a frame structure and a main body structure of the beam main body 110, and the overall structural strength is high and stable, and the beam main body can be stably suspended on a cast beam section with a large size span.
Specifically, the third beam 113 is a connection beam; in addition, a plurality of third longitudinal beams are further provided between the first cross member 111 and the second cross member 112, thereby increasing the structural strength of the beam body 110. The number of the suspending members 120 is two, and the two suspending members 120 are respectively connected to the first longitudinal beam 114 and the second longitudinal beam 115, and are respectively connected to positions of the first longitudinal beam 114 and the second longitudinal beam 115 corresponding to the second cross beam 112. The first cross member 111, the second cross member 112, the third cross member 113, the first longitudinal member 114, and the second longitudinal member 115 are all friction-type high-strength bolts or welded.
Further, the tensioning mechanism 500 is disposed at an end of the load-bearing platform 100 away from the poured beam segment 20, and the tensioning mechanism 500 is used for connecting the load-bearing platform 100 and the stay cable.
In this embodiment, the tensioning mechanism 500 is connected to the load-bearing platform 100 to form a front pivot, so as to reduce a temporary peak internal force generated by the cast beam segment 20 during the construction process; after the pouring is completed, the stay cables and the tensioning mechanism 500 are separated, that is, the stay cables are separated from the bearing platform 100 and are fixedly arranged on the poured beam section 20, so that the force conversion is realized.
Further, one end of the lifting mechanism 700 is used for connecting with the poured beam segment 20, the other end is connected with the load-bearing platform 100, and the lifting mechanism 700 is used for lifting or lowering the load-bearing platform 100.
In this embodiment, the load-bearing platform 100 is raised or lowered relative to the poured beam section 20 by the lifting mechanism 700 to transfer the load of the load-bearing platform 100 to the counter-roller and hanger 120 or to the anchor assembly 400 and the lifting mechanism 700, in other words, the lifting mechanism 700 is used to transfer the load of the load-bearing platform 100 to facilitate the movement of the load-bearing platform 100.
Further, the anchoring assembly 400 includes a first anchor rod, a second anchor rod and a third anchor rod, the first anchor rod is used for penetrating the poured beam section 20 and is connected with the second cross beam 112, the second anchor rod is used for penetrating the poured beam section 20 and is connected with the first longitudinal beam 114 and the second longitudinal beam 115 corresponding to the position of the second cross beam 112, and the third anchor rod is used for penetrating the poured beam section 20 and is connected with the first longitudinal beam 114 and the second longitudinal beam 115 corresponding to the position of the third cross beam 113.
In the present embodiment, the first anchor rod, the second anchor rod and the third anchor rod penetrate through the poured beam section 20 and are respectively connected with the second cross beam 112, the first longitudinal beam 114 and the second longitudinal beam 115, so as to fix the load-bearing platform 100 and the poured beam section 20 and perform a load-bearing function.
Further, the thrust mechanism 600 is configured to be disposed on a bottom wall of the poured beam segment 20, the beam body 110 is provided with the limiting portion 116, and the thrust mechanism 600 is configured to abut against the limiting portion 116.
In this embodiment, the limiting portion 116 is disposed on the first longitudinal beam 114 and the second longitudinal beam 115, and the thrust mechanism 600 is abutted by the limiting portion 116, so that the load-bearing platform 100 can be positioned; in addition, the thrust mechanism 600, the anchor assembly 400 and the lifting mechanism 700 are combined, so that the initial positioning and fine-tuning positioning functions of the bearing platform 100 before casting can be realized, and the operation quality of casting construction operation can be improved.
Further, the operation platform is disposed on a lateral periphery of the carrying platform 100, and the operation platform is used for carrying an operator.
In this embodiment, the operation platform includes a tension operation platform, a first longitudinal beam 114 walkway, a second cross beam 112 walkway, a first cross beam 111 walkway and the like, and the operation platform is arranged on the side periphery of the bearing platform 100, so that the construction personnel can conveniently perform corresponding construction operation on the operation platform, and the safety of the construction operation personnel is ensured.
It should be noted that the bearing platform 100 has two states, namely, a walking state and a pouring state, during the construction process of each segment. The main construction process is as follows:
firstly, after the nth beam section is poured, prestress tensioning is carried out on a construction section; and the cable force on the bearing platform 100 is converted to the poured beam section 20, so that the cable force conversion is realized; the tension mechanism 500 is removed, the thrust mechanism 600 is removed, and the tension mechanism is connected with the stay cable and placed on the first longitudinal beam 114 and the second longitudinal beam 115;
demolding is carried out;
mounting the sliding rails 320, and ensuring that each sliding rail 320 is provided with at least 6 groups of rail limiting devices (embedded steel bars or expansion bolts), and the distance between the sliding rails 320 is not more than 1500mm;
removing the first set of anchors from second beam 112;
the bearing platform 100 is lowered 1200mm integrally through the cooperation of the second anchor rod group, the third anchor rod group and the jacking mechanism on the first longitudinal beam 114 and the second longitudinal beam 115; the lifting mechanism 700 lifts the tail part of the load-bearing platform 100 by 5-10mm more, the counter-roller is erected, the lifting mechanism 700 is retracted, the load of the tail part of the load-bearing platform 100 is converted onto the counter-roller, the first anchor rod, the second anchor rod and the third anchor rod group are removed, the load of the front part of the load-bearing platform 100 is converted onto the hanging part 120, and the lifting mechanism 700 is retracted;
synchronously operating the driving mechanism 300 to move the loading platform 100 forward by a section (for example, 7 m), ensuring that the stroke deviation of the two hanging members 120 is not more than 50mm during the propelling process, and ensuring that the transverse deviation of the loading platform 100 is not more than 30mm from the central axis;
the load-bearing platform 100 is walked in place, the anchor assembly 400 is installed, the lifting mechanism 700 is extended to the bottom of the poured beam section 20, the load of the load-bearing platform 100 is transferred to the anchor assembly 400 and the lifting mechanism 700, and the walking counter-roller is laid down;
under the cooperative operation of the anchoring assembly 400 and the lifting mechanism 700, the load-bearing platform 100 is lifted by 1200mm integrally, so that the load-bearing platform 100 is in place; setting a template part 200; a first anchor group mounted on the thrust mechanism 600 and the second beam 112; adjusting the position of the tensioning mechanism 500, connecting the tensioning mechanism with the stay cable, and measuring elevation; adjusting the thrust mechanism 600, the lifting mechanism 700 and the anchor assembly 400 to accurately position the load-bearing platform 100 and meet the pre-deformation requirements;
and (5) pouring the (n + 1) th main beam, and circularly performing the steps.
In summary, the utility model provides a front supporting point hanging basket 10 for cable-stayed bridge, which is characterized in that hanging pieces 120 are hung on two sides of a poured beam section 20 to hang a bearing platform 100 on the poured beam section 20, so that a beam body pouring operation is performed on a template member 200 corresponding to the end part of the poured beam section 20 to form a new poured beam section; by hanging the hanging element 120 on the sliding rail 320 arranged on the poured beam section 20 and making the hanging element 120 slide-fit with the sliding rail 320, and driving the hanging element 120 to move along the sliding rail 320 by the driving element 310, the loading platform 100 can be stably displaced, lateral twisting caused by the non-uniform lateral moving speed of the two sides of the loading platform 100 can be avoided, and the loading platform 100 can be prevented from being separated from the poured beam section 20, so that the loading platform 100 can stably move along the end direction of the poured beam section 20, and the construction can be ensured to be smoothly carried out.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a basket is hung to pivot before cable-stay bridge which characterized in that includes:
the bearing platform comprises a beam main body and hanging pieces, wherein the hanging pieces are arranged on two sides of the beam main body and are used for being hung on a poured beam section;
a form piece disposed in the beam body, the form piece being for performingBeam bodyPouring operation; and (c) a second step of,
the driving mechanism comprises a driving piece and a sliding rail, the driving piece and the sliding rail are both used for being arranged on the poured beam section, the hanging piece is hung on the sliding rail, and the driving piece is used for driving the hanging piece to move along the sliding rail.
2. The basket according to claim 1, wherein said beam body comprises a first cross member, a second cross member, a first longitudinal member and a second longitudinal member, said first cross member and said second cross member are disposed between said first longitudinal member and said second longitudinal member and are in a frame structure, and said formwork members are disposed on said first cross member, said second cross member, said first longitudinal member and said second longitudinal member.
3. The basket according to claim 2, wherein said beam body further comprises a third cross member disposed between said first longitudinal member and said second longitudinal member and located on a side of said second cross member remote from said first cross member.
4. The cable-stayed bridge front supporting point hanging basket according to claim 3, characterized in that the cable-stayed bridge front supporting point hanging basket further comprises an anchoring assembly, the anchoring assembly comprises a first anchor rod, a second anchor rod and a third anchor rod, the first anchor rod is used for penetrating the poured beam section and is connected with the second cross beam, the second anchor rod is used for penetrating the poured beam section and is connected with the first longitudinal beam and the second longitudinal beam corresponding to the position of the second cross beam, and the third anchor rod is used for penetrating the poured beam section and is connected with the first longitudinal beam and the second longitudinal beam corresponding to the position of the third cross beam.
5. The basket according to claim 1, further comprising a tensioning mechanism disposed at one end of said support platform, said tensioning mechanism being configured to connect said support platform and said stay cable.
6. The basket according to claim 1, wherein said driving mechanism further comprises a counter roller, said counter roller being disposed on said platform.
7. The cable-stayed bridge front pivot cradle according to claim 1, further comprising a thrust mechanism, wherein the thrust mechanism is arranged on the bottom wall of the poured beam section, the beam body is provided with a limiting part, and the thrust mechanism is abutted against the limiting part.
8. The cable-stayed bridge front supporting point hanging basket according to claim 1, characterized by further comprising a lifting mechanism, wherein one end of the lifting mechanism is used for being connected with the poured beam section, the other end of the lifting mechanism is connected with the bearing platform, and the lifting mechanism is used for lifting the bearing platform.
9. The cable-stayed bridge front pivot cradle according to claim 1, characterized in that the cable-stayed bridge front pivot cradle comprises an operating platform, the operating platform is arranged on the side periphery of the bearing platform, and the operating platform is used for bearing operators.
10. A cable-stayed bridge front pivot cradle according to claim 1, characterized in that the suspension element is C-shaped.
CN202223020314.7U 2022-11-14 2022-11-14 Basket is hung to pivot before cable-stay bridge Active CN218779343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223020314.7U CN218779343U (en) 2022-11-14 2022-11-14 Basket is hung to pivot before cable-stay bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223020314.7U CN218779343U (en) 2022-11-14 2022-11-14 Basket is hung to pivot before cable-stay bridge

Publications (1)

Publication Number Publication Date
CN218779343U true CN218779343U (en) 2023-03-31

Family

ID=85716409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223020314.7U Active CN218779343U (en) 2022-11-14 2022-11-14 Basket is hung to pivot before cable-stay bridge

Country Status (1)

Country Link
CN (1) CN218779343U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926709A (en) * 2024-01-22 2024-04-26 中交路桥华东工程有限公司 Combined hanging basket assembly for cable-stayed bridge girder construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926709A (en) * 2024-01-22 2024-04-26 中交路桥华东工程有限公司 Combined hanging basket assembly for cable-stayed bridge girder construction

Similar Documents

Publication Publication Date Title
CN113882279B (en) Self-propelled and adjustable concrete continuous beam cantilever pouring construction equipment and technology
CN115637658B (en) Cantilever casting walking machine
CN115305835B (en) Construction method for erecting double-section whole-section steel truss girder by using girder erecting crane
CN109267490B (en) Long guide beam type movable formwork and construction method thereof
CN115613478B (en) Continuous beam cantilever pouring method
CN115341482B (en) A unilaterally widened unbalanced cantilever box beam hanging basket and construction method thereof
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN113120771A (en) Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge and construction method
CN112482317A (en) Door slot second-stage concrete self-climbing slip form pouring system and construction method
CN212052371U (en) Hanging basket device for variable width concrete box girder suspension casting construction
CN115613477B (en) Main girder cantilever trackless triangular hanging basket and construction method
CN112030777B (en) A down-type mobile formwork support bracket spanning transfer construction method
CN113882281B (en) Hanging basket walking system for bridge cantilever construction and operation method
CN115125856A (en) Multifunctional bridge fabrication machine
CN115369771A (en) Novel cast-in-place support system of steel-concrete composite beam bridge deck cantilever
CN213296087U (en) Quick construction support frame for cantilever flange plate of steel-concrete composite beam
CN116695589B (en) Integral assembling and lifting construction method for guy rope hanging basket structure
CN214656451U (en) Front fulcrum composite hanging basket
CN119041293A (en) Intelligent cantilever pouring integrated machine
CN216238175U (en) A kind of bridge cantilever construction hanging basket walking system
CN215558503U (en) Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge
CN115125851A (en) Corrugated steel web plate hoisting system for bridge and construction method thereof
CN213198142U (en) A T beam hydraulic demoulding device
CN212292560U (en) Large-tonnage pipe ring hoisting machine
CN209990133U (en) Reinforced concrete wall sliding formwork device