CN218714932U - Hoop type personnel operation hanging cage - Google Patents
Hoop type personnel operation hanging cage Download PDFInfo
- Publication number
- CN218714932U CN218714932U CN202221816215.7U CN202221816215U CN218714932U CN 218714932 U CN218714932 U CN 218714932U CN 202221816215 U CN202221816215 U CN 202221816215U CN 218714932 U CN218714932 U CN 218714932U
- Authority
- CN
- China
- Prior art keywords
- semi
- ring part
- ring
- half ring
- personnel operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 230000002093 peripheral effect Effects 0.000 claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 239000003351 stiffener Substances 0.000 claims description 8
- 238000009434 installation Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 230000001012 protector Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 14
- 238000005728 strengthening Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 239000000725 suspension Substances 0.000 description 6
- 238000003466 welding Methods 0.000 description 4
- 239000000284 extract Substances 0.000 description 3
- 230000007306 turnover Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/80—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
- Y02A40/81—Aquaculture, e.g. of fish
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a hoop type personnel operation hanging cage which comprises a closing component arranged on a stand column, wherein a supporting table is arranged on the peripheral surface of the stand column, the closing component comprises a first semi-ring part and a second semi-ring part, one side edge of the first semi-ring part is connected with one side edge of the second semi-ring part, the other side edge of the first semi-ring part is connected with the other side edge of the second semi-ring part, the first semi-ring part and the second semi-ring part are sleeved on the stand column, and the bottom ends of the first semi-ring part and the second semi-ring part are abutted against the top surface of the supporting table; the bearing frame is connected to one side, far away from the second semi-ring part, of the first semi-ring part; the steel basketry is laid on the bottom surface of the bearing frame. This application has the input that reduces manpower and materials, reduces the damage of steel pipe column wall, reduces the safety risk of setting up personnel, improves the effect of the utilization ratio of protector volume installation.
Description
Technical Field
The invention relates to the technical field of safety protection, in particular to a hoop type personnel operation hanging cage.
Background
The steel pipe concrete column is widely applied to multi-story high-rise and super high-rise steel structure buildings, the segmented position of the steel pipe column is generally about 1.3m above a floor beam during construction, and temporary scaffolds are often required to be erected or steel structure operation platforms are required to be installed in the processes of steel pipe concrete pouring, lower steel column hoisting fixing and welding so as to ensure the operation safety of constructors.
Among the prior art, need support members such as bracket at steel pipe column wall welded platform before the installation steel construction operation platform, the platform is demolishd the back and is needed flame to cut off the platform and support the bracket, to column wall welded position repair welding, polish and touch-up paint, because of steel construction operation platform volume, weight are great again, need adopt hoisting machinery to hoist and mount, take the trouble of taking and tearing interim scaffold frame, a large amount of manpower and materials are consumeed in whole process, and damage steel pipe column wall easily, it is high and reuse rate is low to set up personnel's safety risk.
Disclosure of Invention
In order to reduce the input of manpower and materials, reduce the damage of steel pipe column wall, reduce the safety risk of setting up personnel, improve the utilization ratio of protector volume installation, this application provides a cage is hung in staple bolt formula personnel's operation.
The application provides a staple bolt formula personnel operation hangs cage adopts following technical scheme:
a hoop type hanging cage for personnel operation comprises a closing component arranged on a stand column, wherein a supporting table is arranged on the peripheral surface of the stand column, the closing component comprises a first half ring part and a second half ring part, one side edge of the first half ring part is connected with one side edge of the second half ring part, the other side edge of the first half ring part is connected with the other side edge of the second half ring part, the first half ring part and the second half ring part are sleeved on the stand column, and the bottom ends of the first half ring part and the second half ring part are abutted against the top surface of the supporting table; the bearing frame is connected to one side, far away from the second half ring part, of the first half ring part; the steel basketry is laid on the bottom surface of the bearing frame.
By adopting the technical scheme, when construction is needed, the first semi-ring part and the second semi-ring part are placed on the support table, the first semi-ring part and the second semi-ring part are buckled on the upright post, the first semi-ring part and the second semi-ring part are connected, the involution component is fixed on the upright post, and a steel basketry net is laid in the bearing frame, so that a person can conveniently stand in the bearing frame for construction operation; when the construction finishes, remove the connection of first semi-ring portion and second semi-ring portion, alright in order to pull down first semi-ring portion and second semi-ring portion, it is convenient, the turnover is convenient to install, reduces artifical, mechanical expense, saves the time limit for a project, need not to weld hanging cage and stand, can reduce the damage of stand, and first semi-ring portion and second semi-ring portion under the dismantlement continue to use, help improving the utilization ratio of hanging the cage.
Optionally, the first half ring portion includes two half ring hoops and two pole settings, the pole setting is vertical to be set up, two the top of pole setting is connected respectively in one of them the both ends of half ring hoop, two the top of pole setting is connected respectively in another the both ends of half ring hoop, second half ring hoop and first half hoop structure is the same, and is adjacent interconnect between the pole setting.
Through adopting above-mentioned technical scheme, first half ring portion and second half ring portion all adopt two semi-ring staple bolts and two pole settings, connect through adjacent pole setting, adopt the staple bolt to closing structure, safety and stability to required material source is extensive, the consumption is few, preparation and low in use cost.
Optionally, a reinforcing rib is connected between the two half ring hoops connected with the vertical rod.
Through adopting above-mentioned technical scheme, be connected with the strengthening rib between two semi-ring staple bolts that the pole setting links to each other, utilize the strengthening rib to improve the joint strength between two semi-ring staple bolts to can improve the intensity of first semi-ring portion and second semi-ring portion, be favorable to improving the stability to closing the subassembly.
Optionally, the first semi-ring part and the second semi-ring part are both semi-circular arc plates, and the two semi-circular arc plates enclose a cylinder.
Through adopting above-mentioned technical scheme, two semicircle arcs carry out the lock, splice into a drum, and drum inner wall butt is global in the stand, because drum and stand are laminated mutually, the drum is stronger to the support intensity of stand for it is more stable to support to the subassembly.
Optionally, a sleeve is connected to one side of the first semi-ring portion, a rotating rod is connected to one side of the second semi-ring portion close to the first semi-ring portion, one end of the rotating rod penetrates through the sleeve, and a nut is connected to an end portion of the rotating rod in a threaded manner; the first semi-ring portion is kept away from sheathed tube one side is connected with the connecting rod, the second semi-ring portion is kept away from one side of dwang is connected with the go-between, connecting rod one end is passed the go-between, just connecting rod tip threaded connection has the nut.
By adopting the technical scheme, when the first semi-ring part and the second semi-ring part are connected, the rotating rod is inserted into the sleeve, the nut is screwed on the rotating rod, the rotating rod is fixed in the sleeve, the second semi-ring part rotates around the rotating rod, the connecting rod approaches to the connecting ring, the connecting rod is inserted into the connecting ring, the nut connecting rod is screwed on the end part of the connecting rod and is fixed, and the first semi-ring part and the second semi-ring part are connected and fixed, so that the welding is more convenient and faster compared with welding; when needs are dismantled, the nut is unscrewed, revolutes the rotating rod and rotates the half ring part of second, and the go-between is extracted to the connecting rod, extracts the sleeve pipe with the rotating rod again, alright dismantle first half ring part and half ring part of second, need not to cut, and is comparatively convenient.
Optionally, the both sides limit of first semi-ring portion all is connected with the sleeve pipe, the both sides limit of second semi-ring portion all is connected with the dwang, the one end of dwang is passed and is close to mutually the sleeve pipe, just the tip threaded connection of dwang has the nut.
By adopting the technical scheme, the rotating rods on the two sides of the second semi-ring part are inserted into the sleeve of the first semi-ring part, and then the nuts are screwed on the end parts of the rotating rods, so that the rotating rods and the sleeve can be fixedly connected, and the installation is convenient; when first semi-ring portion and second semi-ring portion were dismantled to needs, the nut was screwed off, extracted the dwang, and is convenient demolishs first semi-ring portion and second semi-ring portion, and it is comparatively convenient to dismantle.
Optionally, both sides of the first half ring portion are connected with connecting rings, both sides of the second half ring portion are connected with connecting rods, one end of each connecting rod penetrates through the adjacent connecting rings, and nuts are connected to the end portions of the connecting rods in a threaded manner.
By adopting the technical scheme, the connecting rods are aligned to the connecting rings, the first semi-ring part and the second semi-ring part are pushed to be close to each other, the two connecting rods of the second semi-ring part are inserted into the connecting rings of the first semi-ring part, and nuts are screwed on the end parts of the connecting rods, so that the first semi-ring part and the second semi-ring part can be connected, and the installation is convenient; when first semi-ring portion and second semi-ring portion are unpacked apart to needs, the nut is unscrewed, extracts the connecting rod, alright in order to unpack first semi-ring portion and second semi-ring portion apart, it is comparatively convenient.
Optionally, the both sides of bearing frame all are connected with the stiffener, stiffener one end is connected in the top of first semicircle portion, the other end of stiffener is connected in the bearing frame.
Through adopting above-mentioned technical scheme, set up the stiffener in the both sides of bearing frame, through the stiffener in order to strengthen the joint strength of bearing frame, improve the stability of bearing frame.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when construction needs to be carried out, the first semi-ring part and the second semi-ring part are placed on the support table, the first semi-ring part and the second semi-ring part are buckled on the upright post, the first semi-ring part and the second semi-ring part are connected, the involution component is fixed on the upright post, and a steel fence is laid in the bearing frame, so that a worker can conveniently stand in the bearing frame for construction operation; when the construction is finished, the connection between the first semi-ring part and the second semi-ring part is removed, so that the first semi-ring part and the second semi-ring part can be detached, the installation is convenient and fast, the turnover is convenient, the labor and mechanical cost is reduced, the construction period is saved, the hanging cage and the upright post do not need to be welded, the damage of the upright post can be reduced, the detached first semi-ring part and the detached second semi-ring part can be continuously used, and the utilization rate of the hanging cage is improved;
2. the first semi-ring part and the second semi-ring part are both provided with two semi-ring hoops and two upright posts, are connected through the adjacent upright posts, are in a hoop folding structure, are safe and stable, and have the advantages of wide material source, low consumption and low manufacturing and using cost;
3. be connected with the strengthening rib between two semi-ring staple bolts that the pole setting links to each other, utilize the strengthening rib to improve the joint strength between two semi-ring staple bolts to can improve the intensity of first semi-ring portion and second semi-ring portion, be favorable to improving the stability to closing the subassembly.
Drawings
Fig. 1 is a schematic structural diagram of a hanging cage and a column in embodiment 1 of the present application.
Fig. 2 is a schematic structural diagram of a suspension cage in embodiment 1 of the present application.
Fig. 3 is a structural schematic diagram of the suspension cage in embodiment 2 of the present application.
Fig. 4 is a structural schematic diagram of the suspension cage of embodiment 3 of the present application.
Fig. 5 is a structural schematic diagram of the suspension cage of embodiment 4 of the present application.
Fig. 6 is a structural schematic diagram of the suspension cage of embodiment 5 of the present application.
Fig. 7 is a structural diagram of a suspension cage in embodiment 6 of the present application.
Description of reference numerals:
1. a column; 11. a support table; 2. involution components; 21. a first semi-ring portion; 211. a semi-ring hoop; 212. erecting a rod; 22. a second half ring portion; 3. a bearing frame; 31. a column; 32. a cross bar; 33. a reinforcing bar; 4. a steel fence mesh; 5. reinforcing ribs; 61. a sleeve; 62. rotating the rod; 71. a connecting ring; 72. a connecting rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-7.
Example 1
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. Referring to fig. 1 and 2, the hanging cage includes a buckling assembly mounted on a column 311, a bearing frame 3 and a steel fence 4, the column 311 may be a steel pipe concrete column, and a support table 11 is fixedly connected to the circumferential surface of the column 311; the involutory component 2 comprises a first semi-ring part 21 and a second semi-ring part 22, the first semi-ring part 21 and the second semi-ring part 22 have the same structure, the first semi-ring part 21 and the second semi-ring part 22 are both arranged on the top surface of the support table 11, the first semi-ring part 21 comprises two semi-ring hoops 211 and two upright rods 212, the two upright rods 212 are vertically arranged, two ends of one semi-ring hoop 211 are respectively and fixedly connected to the top ends of the two upright rods 212, and two ends of the other semi-ring hoop 211 are respectively and fixedly connected to the bottom ends of the two upright rods 212; fixedly connected with strengthening rib 5 between two semi-ring staple bolts 211, strengthening rib 5 are located the intermediate position of semi-ring staple bolt 211, and strengthening rib 5 is used for strengthening first semi-ring portion 21's support intensity.
Referring to fig. 1 and 2, two sleeves 61 are fixedly connected to the peripheral surface of one of the upright rods 212 of the first half ring part 21, the two sleeves 61 are vertically arranged, the two sleeves 61 are located on the same straight line, two rotating rods 62 are fixedly connected to the peripheral surface of one of the upright rods 212 of the second half ring part 22, the two rotating rods 62 are vertically arranged, the two rotating rods 62 are located on the same straight line, the bottom ends of the two rotating rods 62 are respectively inserted into the two sleeves 61, and nuts are connected to the bottom ends of the rotating rods 62 through threads, and the nuts fixedly connect the sleeves 61 and the rotating rods 62; two connecting rings 71 are fixedly connected to the peripheral surface of the other upright 212 of the first half ring portion 21, the two connecting rings 71 are positioned on the same straight line, the openings of the two connecting rings 71 are horizontally arranged, two connecting rods 72 are fixedly connected to the peripheral surface of the other upright 212 of the second half ring portion 22, the two connecting rods 72 correspond to the two connecting rings 71, one end of each connecting rod 72 is inserted into the corresponding connecting ring 71, and a nut is screwed to the end of the corresponding connecting ring 71 and fixes the corresponding connecting rod 72 and the corresponding connecting ring 71.
Referring to fig. 1 and 2, the bearing frame 3 includes four upright columns 311 and four cross bars 32, wherein two upright columns 311 are fixedly connected between the two half-ring hoops 211 of the first half-ring portion 21, the two upright columns 311 are respectively located at two sides of the reinforcing rib 5, six cross bars 32 are provided, the bottom ends and the top ends of the two upright columns 311 are respectively connected with one cross bar 32, and the four cross bars 32 are parallel to each other; the other two upright posts 311 are respectively fixedly connected to the ends, far away from the semi-ring hoop 211, of the two cross rods 32 on the two sides, one cross rod 32 is fixedly connected between the top ends of the two upright posts 311, and one cross rod 32 is fixedly connected between the bottom ends of the two upright posts 311; a reinforcing rod 33 is fixedly connected between the two upright columns 311 on the same side, one end of the reinforcing rod 33 is fixedly connected to the upper semicircular hoop, the other end of the reinforcing rod 33 is fixedly connected to the bottom end of the upright rod 212 far away from the semicircular hoop, and the reinforcing rod 33 is used for improving the connection strength of the bearing frame 3; a steel fence 4 is laid between the cross bars 32 connected to the bottom ends of the uprights 311.
The implementation principle of the hoop type personnel operation hanging cage in the embodiment of the application is as follows: when construction is needed, the first half ring part 21 is placed on the top surface of the support platform 11 and is attached to the upright column 311, the rotating rod 62 is inserted into the sleeve 61, the nut is screwed to rotate the rotating rod 62, the rotating rod 62 is fixed in the sleeve 61, the second half ring part 22 rotates around the rotating rod 62, the connecting rod 72 approaches to the connecting ring 71, the connecting rod 72 is inserted into the connecting ring 71, the nut screwed to the end part of the connecting rod 72 is fixed to the connecting rod 72, the first half ring part 21 and the second half ring part 22 are connected and fixed, the involution component 2 is fixed on the upright column 311, the steel basketry 4 is laid in the bearing frame 3, and construction operation is convenient for personnel to stand in the bearing frame 3; when the construction finishes, the nut is screwed off, the second half ring part 22 rotates around the rotating rod 62, the connecting rod 72 extracts the connecting ring 71, the rotating rod 62 is extracted from the sleeve 61, the first half ring part 21 and the second half ring part 22 can be disassembled, the installation is convenient and quick, the turnover is convenient, the labor and the mechanical cost are reduced, the construction period is shortened, the hanging cage and the stand column 311 are not required to be welded, the damage of the stand column 311 can be reduced, the disassembled first half ring part 21 and the disassembled second half ring part 22 can be continuously used, and the utilization rate of the hanging cage is improved.
Example 2
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. The difference from embodiment 1 is that, referring to fig. 3, two sleeves 61 are fixedly connected to the peripheral surfaces of the two upright rods 212 of the first half ring portion 21, two rotating rods 62 are fixedly connected to the peripheral surfaces of the two upright rods 212 of the second half ring portion 22, the bottom ends of the rotating rods 62 are inserted into the sleeves 61, and nuts are screwed to the bottom ends of the rotating rods 62.
The implementation principle of the hoop type personnel operation hanging cage in the embodiment of the application is as follows: firstly, the first semi-ring part 21 is placed on the top surface of the support platform 11, the rotating rod 62 on the second semi-ring part 22 is inserted from the top end of the sleeve 61, the second semi-ring part 22 is placed on the top surface of the support platform 11, and the first semi-ring part 21 and the second semi-ring part 22 can be connected by screwing a nut; when the first half ring part 21 and the second half ring part 22 need to be disassembled, the nut is screwed off.
Example 3
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. The difference from the embodiment 1 is that, referring to fig. 4, two connecting rings 71 are fixedly connected to the peripheral surfaces of the two vertical rods 212 of the first half ring part 21, two connecting rods 72 are fixedly connected to the peripheral surfaces of the two vertical rods 212 of the second half ring part 22, the connecting rods 72 are aligned with the connecting rings 71, the connecting rods 72 are inserted into the connecting rings 71, and nuts are threadedly connected to the ends of the connecting rods 72, and the nuts fix the connecting rods 72 and the connecting rings 71.
The implementation principle of the hoop type personnel operation hanging cage in the embodiment of the application is as follows: firstly, the first semi-ring part 21 is placed on the top surface of the support platform 11, the connecting rod 72 of the second semi-ring part 22 is aligned to the connecting ring 71 of the first semi-ring part 21, the first semi-ring part 21 and the second semi-ring part 22 are pushed to be close to each other, the connecting rod 72 is inserted into the connecting ring 71, and then a nut is screwed on the end part of the connecting rod 72, so that the connecting rod 72 and the connecting ring 71 can be fixed; when the first connecting part and the second connecting part need to be detached, the nut is screwed off, and the connecting rod 72 is pulled out.
Example 4
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. The difference from embodiment 1 is that, referring to fig. 5, the first half ring part 21 and the second half ring part 22 are both semicircular arc plates, one side edge of the first half ring part 21 is fixedly connected with two sleeves 61, the two sleeves 61 are vertically arranged, the two sleeves 61 are positioned on the same straight line, one side edge of the second half ring part 22 is fixedly connected with two rotating rods 62, the two rotating rods 62 are vertically arranged, the two rotating rods 62 are positioned on the same straight line, the bottom ends of the two rotating rods 62 are respectively inserted into the two sleeves 61, the bottom ends of the rotating rods 62 are in threaded connection with nuts, and the sleeves 61 and the rotating rods 62 are fixedly connected by the nuts; two connecting rings 71 are fixedly connected to the other side edge of the first half ring part 21, the two connecting rings 71 are located on the same straight line, the orifices of the two connecting rings 71 are horizontally arranged, two connecting rods 72 are fixedly connected to the other side edge of the second half ring part 22, the two connecting rods 72 correspond to the two connecting rings 71, one end of each connecting rod 72 is inserted into the corresponding connecting ring 71, a nut is connected to the end portion of the corresponding connecting ring 71 in a threaded mode, and the connecting rods 72 and the corresponding connecting rings 71 are fixed through the nuts.
The implementation principle of the hoop type personnel operation hanging cage in the embodiment of the application is as follows: first half ring portion 21 and second half ring portion 22 all adopt the semicircle arc, adopt global design, and support intensity is higher, and it is more convenient to assemble.
Example 5
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. Different from embodiment 2, referring to fig. 6, the first half ring part 21 and the second half ring part 22 are both semicircular arc plates, two sleeves 61 are fixedly connected to both side edges of the first half ring part 21, two rotating rods 62 are fixedly connected to both side edges of the second half ring part 22, the bottom ends of the rotating rods 62 are inserted into the sleeves 61, and nuts are screwed to the bottom ends of the rotating rods 62.
Example 6
The embodiment of the application discloses cage is hung in staple bolt formula personnel's operation. The difference from embodiment 1 is that, referring to fig. 7, the first half ring part 21 and the second half ring part 22 are both semicircular arc-shaped plates, two connecting rings 71 are fixedly connected to both side edges of the first half ring part 21, two connecting rods 72 are fixedly connected to both side edges of the second half ring part 22, the connecting rods 72 are aligned with the connecting rings 71, the connecting rods 72 are inserted into the connecting rings 71, and nuts are screwed to the ends of the connecting rods 72, and the connecting rods 72 and the connecting rings 71 are fixed by the nuts.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a cage is hung in staple bolt formula personnel operation which characterized in that:
the folding device comprises a folding component arranged on a stand column, wherein a supporting table is arranged on the peripheral surface of the stand column, the folding component comprises a first half ring part and a second half ring part, one side edge of the first half ring part is connected with one side edge of the second half ring part, the other side edge of the first half ring part is connected with the other side edge of the second half ring part, the first half ring part and the second half ring part are sleeved on the stand column, and the bottom ends of the first half ring part and the second half ring part are abutted to the top surface of the supporting table;
the bearing frame is connected to one side, far away from the second half ring part, of the first half ring part;
the steel basketry is laid on the bottom surface of the bearing frame.
2. The hoop type personnel operation hanging cage according to claim 1, characterized in that: the first semi-ring part comprises two semi-ring hoops and two vertical rods, the vertical arrangement of the vertical rods is that the top ends of the vertical rods are connected to two ends of one of the semi-ring hoops respectively, the top ends of the vertical rods are connected to the other two ends of the other semi-ring hoop respectively, the second semi-ring hoop is the same as the first semi-ring hoop in structure, and the two semi-ring hoops are adjacent to each other and connected between the vertical rods.
3. The hoop type personnel operation hanging cage according to claim 2, characterized in that: and a reinforcing rib is connected between the two semi-ring hoops connected with the vertical rod.
4. The hoop type personnel operation hanging cage according to claim 1, characterized in that: the first semi-ring part and the second semi-ring part are both semi-circular arc plates, and the two semi-circular arc plates enclose a cylinder.
5. The hoop type personnel operation hanging cage according to claim 1, characterized in that: one side of the first semi-ring part is connected with a sleeve, one side of the second semi-ring part close to the first semi-ring part is connected with a rotating rod, one end of the rotating rod penetrates through the sleeve, and a nut is connected to the end part of the rotating rod in a threaded manner; the first semi-ring portion is kept away from sheathed tube one side is connected with the connecting rod, the second semi-ring portion is kept away from one side of dwang is connected with the go-between, connecting rod one end is passed the go-between, just connecting rod tip threaded connection has the nut.
6. The hoop type personnel operation hanging cage according to claim 1, characterized in that: the both sides limit of first semi-ring portion all is connected with the sleeve pipe, the both sides limit of second semi-ring portion all is connected with the dwang, the one end of dwang is passed and is close to mutually the sleeve pipe, just the tip threaded connection of dwang has the nut.
7. The hoop type personnel operation hanging cage according to claim 1, characterized in that: the two sides of the first semi-ring part are connected with connecting rings, the two sides of the second semi-ring part are connected with connecting rods, one end of each connecting rod penetrates through the connecting rings close to each other, and nuts are connected to the end portions of the connecting rods in a threaded mode.
8. The hoop type personnel operation hanging cage according to claim 1, characterized in that: the both sides of bearing frame all are connected with the stiffener, stiffener one end is connected in the top of first semi-ring portion, the other end of stiffener is connected in the bearing frame.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221816215.7U CN218714932U (en) | 2022-07-14 | 2022-07-14 | Hoop type personnel operation hanging cage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221816215.7U CN218714932U (en) | 2022-07-14 | 2022-07-14 | Hoop type personnel operation hanging cage |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218714932U true CN218714932U (en) | 2023-03-24 |
Family
ID=85627386
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221816215.7U Expired - Fee Related CN218714932U (en) | 2022-07-14 | 2022-07-14 | Hoop type personnel operation hanging cage |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218714932U (en) |
-
2022
- 2022-07-14 CN CN202221816215.7U patent/CN218714932U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205476401U (en) | Elevator well type steel protection construction platform | |
| CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
| CN204644884U (en) | High pier over-form construction reinforced bar installs mobile stock | |
| CN114991477A (en) | Construction method of umbrella-shaped support system of silo conical shell structure | |
| CN207392716U (en) | A kind of tool-type suspension scaffold | |
| CN213115442U (en) | Combined operating platform for open caisson | |
| CN212897502U (en) | Assembled lifting scaffold | |
| CN218714932U (en) | Hoop type personnel operation hanging cage | |
| CN111705677A (en) | A smooth frame that rises for high pier stud turns over mould construction | |
| CN115538678A (en) | Construction method for large-angle overhanging landscape platform side small platform | |
| CN210738053U (en) | A turnable operating platform suitable for elevator counterweight installation | |
| JPH1150653A (en) | Scaffolding plate support frame, method of mounting and removing the same, and method of constructing reinforced concrete wall using the same | |
| CN209975987U (en) | Outer wall scaffold with safety protection structure | |
| CN218842883U (en) | Detachable floating type mobile operation platform on water | |
| CN210216478U (en) | Open caisson construction work platform | |
| CN213654364U (en) | Many function combination formula removes protection canopy | |
| CN219011871U (en) | Device for attaching hanging frame | |
| CN206971808U (en) | Modular support device | |
| CN214657090U (en) | Combined steel baffle concrete inner support for foundation pit | |
| CN113931354B (en) | Cantilever scaffold and curtain wall integrated structure and construction method | |
| CN209837748U (en) | Top bracing type protective frame | |
| CN214423194U (en) | Novel assembled ladder shaft of going up construction of strideing railway bridge crossbeam | |
| CN2782835Y (en) | Foldable scaffold | |
| CN214615669U (en) | Be suitable for special plain type reinforcing bar protection canopy of processing pile foundation steel reinforcement cage | |
| CN212428008U (en) | Lower supporting type overhanging scaffold construction device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230324 |