CN218713779U - Industrial large floor drain mounting tool - Google Patents
Industrial large floor drain mounting tool Download PDFInfo
- Publication number
- CN218713779U CN218713779U CN202222608424.9U CN202222608424U CN218713779U CN 218713779 U CN218713779 U CN 218713779U CN 202222608424 U CN202222608424 U CN 202222608424U CN 218713779 U CN218713779 U CN 218713779U
- Authority
- CN
- China
- Prior art keywords
- floor drain
- installation
- installation frame
- sliding sleeve
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Floor Finish (AREA)
Abstract
本实用新型涉及工业建筑给排水施工领域,尤其是一种工业用大型地漏安装工具,包括安装框架,安装框架水平设置,安装框架上设置有水平调节杆,安装框架上螺纹连接有支腿,支腿底部设置有万向轮。本实用新型便于调整地漏的位置,提高地漏的安装精度,也避免地漏调整时不稳固,缩减地漏调整工序,提高安装效率;而且利用本安装工具作为地漏的支撑架体,提高了地漏的问固定,避免地漏在混凝土浇筑过程中出现便宜,提高施工质量。
The utility model relates to the field of water supply and drainage construction of industrial buildings, in particular to an installation tool for large industrial floor drains, which comprises an installation frame, which is arranged horizontally, a horizontal adjustment rod is arranged on the installation frame, and legs are threaded on the installation frame. Universal wheels are arranged at the bottom of the legs. The utility model is convenient to adjust the position of the floor drain, improves the installation accuracy of the floor drain, avoids the instability of the floor drain during adjustment, reduces the adjustment process of the floor drain, and improves the installation efficiency; and uses the installation tool as the support frame of the floor drain to improve the fixing of the floor drain , to prevent the floor drain from appearing cheap during the concrete pouring process, and improve the construction quality.
Description
技术领域technical field
本实用新型涉及工业建筑给排水施工领域,尤其是一种工业用大型地漏安装工具。The utility model relates to the construction field of water supply and drainage of industrial buildings, in particular to an installation tool for large industrial floor drains.
背景技术Background technique
传动工业地漏安装方法通常采用人工拉线、尺量、垫方木等方式进行测量地漏开口位置、调整地漏水平与标高、调整地漏角度与开口对中。但由于地漏体积大,且地漏不能有效固定,导致施工过程中经常因误差超出涉及规范要求而返工重新调整,返工重新调整过程繁琐,并且还增加了施工人员的工作量,影响了施工进度,无法满足施工现场工期紧、任务中的要求。The installation method of floor drains in the transmission industry usually uses manual wires, rulers, and square wood to measure the opening position of the floor drain, adjust the level and elevation of the floor drain, and adjust the angle of the floor drain and the centering of the opening. However, due to the large size of the floor drain and the fact that the floor drain cannot be effectively fixed, rework and readjustment are often caused during the construction process due to errors exceeding the requirements of the relevant specifications. Meet the requirements of the tight schedule and tasks on the construction site.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提出一种工业用大型地漏安装工具,其旨在解决工业用大型地漏不容易有效固定,容易在施工过程中出现偏移导致安装误差,需要返工重新安装,安装周期长,影响工期的问题。In order to solve the above technical problems, the utility model proposes a large-scale industrial floor drain installation tool, which aims to solve the problem that the large-scale industrial floor drain is not easy to be effectively fixed, and it is easy to be offset during the construction process and cause installation errors, requiring rework and reinstallation. The cycle is long and affects the construction period.
本实用新型采用如下技术方案:The utility model adopts the following technical solutions:
一种工业用大型地漏安装工具,包括安装框架,安装框架水平设置,安装框架上设置有水平调节杆,安装框架上螺纹连接有支腿,支腿底部设置有万向轮。The utility model relates to an installation tool for a large industrial floor drain, which comprises an installation frame, which is arranged horizontally, a horizontal adjustment rod is arranged on the installation frame, legs are threadedly connected to the installation frame, and universal wheels are arranged at the bottom of the legs.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
本安装工具降低了工业用大型地漏的安装难度,借助安装框架和支腿更有助于地漏的固定和移动,利用水平调节杆有助于调整地漏的安装精度,避免地漏因安装位置有偏差出现返工的情况。This installation tool reduces the installation difficulty of large industrial floor drains. The installation frame and legs are more helpful for the fixation and movement of the floor drain. The use of the horizontal adjustment rod is helpful for adjusting the installation accuracy of the floor drain and avoiding the deviation of the floor drain due to the installation position. The case of rework.
进一步的,本装置的优选方案在于:Further, the preferred version of this device is:
安装框架整体为矩形结构,安装框架的四个角分别竖向设置有螺纹套筒,每个螺纹套筒对应设置一根支腿,支腿外表面设置有与螺纹套筒相配合的外螺纹结构。The installation frame as a whole has a rectangular structure, and the four corners of the installation frame are respectively provided with threaded sleeves vertically, and each threaded sleeve is correspondingly provided with a leg, and the outer surface of the legs is provided with an external thread structure that matches the threaded sleeve .
安装框架整体由两根长杆和两根短杆连接而成,两根长杆之间滑动连接有两根水平调节杆。The installation frame as a whole is formed by connecting two long rods and two short rods, and two horizontal adjustment rods are slidingly connected between the two long rods.
水平调节杆的两个端头分别设置有一个滑套,滑套套装在其所在一端的长杆上并与长杆滑动连接。The two ends of the horizontal adjustment rod are respectively provided with a sliding sleeve, and the sliding sleeve is sleeved on the long rod at one end thereof and is slidably connected with the long rod.
每根支腿的顶部分别设置有把手一。The top of each supporting leg is respectively provided with a handle one.
滑套的外侧设置有把手二,把手二上固定设置有自带外螺纹结构的连接杆,每个滑套的两侧分别径向设置有一个圆孔,滑套的外侧对应圆孔焊接有固定螺母,连接杆与固定螺纹配合连接。There is handle 2 on the outside of the sliding sleeve, and a connecting rod with external thread structure is fixed on the handle 2. A round hole is arranged radially on both sides of each sliding sleeve, and the outer side of the sliding sleeve is welded to the corresponding round hole. The nut is connected with the connecting rod and the fixed thread.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为地漏安装在本安装工具上的示意图;Figure 2 is a schematic diagram of the floor drain installed on the installation tool;
图3为图2的1-1剖视图;Fig. 3 is the sectional view of 1-1 of Fig. 2;
图中:长杆1;螺纹套筒2;支腿3;把手一4;短杆5;水平调节杆6;滑套7;把手二8;万向轮9;地漏10;地面11;结构完成面12;膨胀螺栓13;扁钢14;连接杆15;固定螺母16。In the figure:
具体实施方式Detailed ways
以下结合附图和具体实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
如图1所示,一种工业用大型地漏安装工具,主要有安装框架,安装框架整体是由两根长杆1和两根短杆5连接形成的矩形结构,安装框架的四个顶角分别竖向焊接有螺纹套筒2,每个螺纹套筒2内分别设置有一根支腿3,每根支腿3分别是由螺杆制成,支腿3的顶部焊接有把手一4,支腿3的底部固定安装有万向轮9。本实施例中,旋转把手一4,通过支腿3带动万向轮9转动,以调节安装框架在支腿3上的升降,同时通过万向轮9移动,还能够调节安装框架的水平位置。As shown in Figure 1, a large-scale floor drain installation tool for industrial use mainly includes an installation frame. The entire installation frame is a rectangular structure formed by connecting two
安装框架的两根长杆1之间设置有两根水平调节杆6,且每根水平调节杆6的两端分别分别通过滑套7与长杆1滑动连接,滑套7套装在其所在一端的长杆1上,水平调节杆6通过两端的滑套7能够沿长杆1滑动。本实施例中,通过调节两根水平调节杆6之间的间距,满足不同尺寸的地漏10使用。Two
本实施例中,为了便于水平调节杆6的滑动,在每个滑套7的外侧(两根长杆1之间为内侧)分别焊接有一个竖向把手二8,把手二8上焊接有自带外螺纹结构的连接杆15,滑套7对应连接杆15的为开设有一个圆孔,滑套7对应圆孔的位置焊接有一个与连接杆15相配合的固定螺母16,调节好滑套7与长杆1的相对位置后,通过拧动把手二8使连接杆顶在长杆1上,对滑套7起固定作用,避免滑套7在安装工具整体在移动过程中发生移动。In this embodiment, in order to facilitate the sliding of the
本实施例中,两根短杆5的长度要大于地漏10的宽度,以保证地漏10能够置于安装框架内。In this embodiment, the length of the two short rods 5 is greater than the width of the
本安装工具在应用与工业用大型地漏安装时,如图1和图2所示,按照如下步骤进行:When this installation tool is applied to the installation of large industrial floor drains, as shown in Figure 1 and Figure 2, follow the steps below:
步骤一:根据地漏10的宽度调整两根水平调节杆6之间的间距,然后拧紧把手二8,将水平调节杆6与长杆1的位置固定,然后将地漏10由上向下放置在水平调节杆6上,地漏10的外沿搭接在水平调节杆6上;然后推动安装工具整体移动至地漏10的安装位置,通过转动把手一4进而带动支腿3转动,以调节安装框架的高度以及水平度,进而调节地漏10顶面的标高以及水平,保证地漏10顶面与地面11平齐,然后标记调节好标高后的地漏10底部预留排水管顶端标高。Step 1: Adjust the distance between the two
步骤二:先将地漏10移出安装工具,然后调节预留排水管道顶端标高,切除排水管道的多余部位;Step 2: first remove the
将地漏10重新放置在安装工具上,再次核对地漏10顶面标高与水平,符合要求后使用扁钢14将地漏10与结构完成面12固定,扁钢14与地漏10连接处焊接固定,扁钢14与结构完成面12连接处通过膨胀螺栓13连接固定;Re-place the
地漏10固定完成后,将预留排水管道与地漏10底部接口进行焊接。After the
步骤三:地漏10安装完成后,对地漏10周围缝隙进行混凝土浇筑,待混凝土达到一定强度后,通过旋松把手二8使得水平调节杆6能够沿长杆1滑动,并且将水平调节杆6向安装框架的两端滑动,转动把手一4调节安装框架的高度,使得安装框架的底面高于地漏10的顶面,最后将安装工具整体移出地漏10的施工位置。Step 3: After the
利用本安装工具安装地漏,便于调整地漏的位置,提高地漏的安装精度,也避免地漏调整时不稳固,缩减地漏调整工序,提高安装效率;而且利用本安装工具作为地漏的支撑架体,提高了地漏的问固定,避免地漏在混凝土浇筑过程中出现便宜,提高施工质量。Using the installation tool to install the floor drain facilitates the adjustment of the position of the floor drain, improves the installation accuracy of the floor drain, avoids the instability of the floor drain during adjustment, reduces the adjustment process of the floor drain, and improves the installation efficiency; The floor drain is fixed to prevent the floor drain from being cheap during the concrete pouring process and improve the construction quality.
以上仅为本实用新型的具体实施方式,但对本实用新型的保护并不局限于此,所有涉及本技术领域技术人员所能想到的对本技术方案技术特征提出的等效变化或替换,都包含在本实用新型的保护范围之内。The above is only a specific embodiment of the utility model, but the protection of the utility model is not limited thereto, and all equivalent changes or replacements proposed by those skilled in the art to the technical features of the technical solution are included in Within the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222608424.9U CN218713779U (en) | 2022-09-30 | 2022-09-30 | Industrial large floor drain mounting tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222608424.9U CN218713779U (en) | 2022-09-30 | 2022-09-30 | Industrial large floor drain mounting tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218713779U true CN218713779U (en) | 2023-03-24 |
Family
ID=85637260
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222608424.9U Active CN218713779U (en) | 2022-09-30 | 2022-09-30 | Industrial large floor drain mounting tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218713779U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115369985A (en) * | 2022-09-30 | 2022-11-22 | 中国二十二冶集团有限公司 | Industrial large floor drain mounting tool and mounting method |
-
2022
- 2022-09-30 CN CN202222608424.9U patent/CN218713779U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115369985A (en) * | 2022-09-30 | 2022-11-22 | 中国二十二冶集团有限公司 | Industrial large floor drain mounting tool and mounting method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207144503U (en) | A kind of thickness of concrete floor control device | |
| CN203603452U (en) | Folded plate small space formwork assembly | |
| CN104831756A (en) | Formwork jacking tool for constructing post-cast strip of cast-in-place slab and formwork supporting construction method | |
| CN216767412U (en) | Interim strutting arrangement of tunnel steel bow member | |
| CN216428331U (en) | Assembled piping lane mid-board positioner | |
| CN206338548U (en) | A kind of leveling support installed for heavy mechanical equipment pedestal | |
| CN205604741U (en) | A adjusting device that is used for ball joint point rack elevation | |
| CN203583380U (en) | Movable cast-in-situ culvert cover plate template support | |
| CN211114901U (en) | Bracket device convenient to precast beam is under construction fast | |
| CN211524184U (en) | Supporting device for building construction | |
| CN210086491U (en) | Supporting device is strengthened in building jacking control | |
| CN108193885A (en) | Fabricated shear wall abutting joint platform and its application method | |
| CN205369952U (en) | Pre -buried assistor | |
| CN115369985A (en) | Industrial large floor drain mounting tool and mounting method | |
| CN210195303U (en) | Prefabricated wall auxiliary mounting frame | |
| CN104018655B (en) | A kind of assembly type monomer bracing frame | |
| CN204510814U (en) | Beam for building jacking | |
| CN217975409U (en) | A device for detachable anchor bolts at the side wall formwork armpit corners of subway stations | |
| CN205935706U (en) | A elevation controlling means for terrace construction | |
| CN215366689U (en) | Smooth formula concrete road side form is to detaining socket joint support system | |
| CN205443821U (en) | Dolly is supported in track equipment | |
| CN206065553U (en) | Stretch frame in adjustable pipeline top | |
| CN112900695B (en) | Wall frame device for building and building implementation method thereof | |
| CN218668695U (en) | A wooden formwork early demolition independent support reinforcement system | |
| CN203437916U (en) | Adjustable central line adjusting wire frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |