CN218672615U - Fire control air pipe's mounting structure - Google Patents
Fire control air pipe's mounting structure Download PDFInfo
- Publication number
- CN218672615U CN218672615U CN202223260292.1U CN202223260292U CN218672615U CN 218672615 U CN218672615 U CN 218672615U CN 202223260292 U CN202223260292 U CN 202223260292U CN 218672615 U CN218672615 U CN 218672615U
- Authority
- CN
- China
- Prior art keywords
- plate
- chute
- fixedly connected
- support seat
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Air-Flow Control Members (AREA)
Abstract
本实用新型公开了一种消防通风管道的安装结构,属于管道安装技术领域,包括支撑座,支撑座的内部开设有凹槽,凹槽内壁对称开设有第三滑槽,第三滑槽内部滑动连接有滑块,滑块的上表面铰接有铰接杆,铰接杆的一端铰接有辊轮,支撑座的内部设有调节机构,支撑座的上表面固定连接有支撑板,支撑板的内侧设有横板,横板的下方设有限位板,支撑板的上端固定连接有膨胀螺栓。能够降低了通风管道与安装结构之间的摩擦力,因此在安装时施工人员将会很轻松便可以推动通风管道,从而比较省时省力,提高了通风管道的安装效率,其次降低了工人攀登的梯子倾斜几率,同时也降低了工人施工的安全隐患。
The utility model discloses an installation structure of a fire-fighting ventilation pipeline, which belongs to the technical field of pipeline installation, and comprises a support seat, a groove is opened inside the support seat, a third chute is symmetrically opened on the inner wall of the groove, and the third chute slides inside A slider is connected, the upper surface of the slider is hinged with a hinged rod, one end of the hinged rod is hinged with a roller, the inside of the support seat is provided with an adjustment mechanism, the upper surface of the support seat is fixedly connected with a support plate, and the inner side of the support plate is provided with The horizontal plate is provided with a limit plate under the horizontal plate, and the upper end of the support plate is fixedly connected with expansion bolts. It can reduce the friction between the ventilation pipe and the installation structure, so the construction personnel can easily push the ventilation pipe during installation, which saves time and effort, improves the installation efficiency of the ventilation pipe, and reduces the climbing time of workers The probability of ladder tilting also reduces the safety hazards of workers during construction.
Description
技术领域technical field
本实用新型涉及一种消防通风管道的安装结构,属于管道安装技术领域。The utility model relates to an installation structure of a fire-fighting ventilation pipeline, which belongs to the technical field of pipeline installation.
背景技术Background technique
通风管道是工业与民用建筑的通风与空调工程的通道,其目的是为了让空气流通,其主要应用于电子工业无尘厂房净化系统、医药食品无菌车间净化系统、酒店宾馆、商场医院以及写字楼的中央空调系统等。Ventilation duct is the channel of ventilation and air conditioning engineering in industrial and civil buildings. Its purpose is to let the air circulate. It is mainly used in the purification system of dust-free workshops in the electronics industry, the purification system of aseptic workshops in medicine and food, hotels, hotels, shopping malls, hospitals and office buildings. central air-conditioning system, etc.
目前现有的通过管道一般是通过吊筋和横杆将通过管道安装在建筑物上,但是在安装过程中一般都是将安装结构固定在建筑物上,之后再将通风管道一端放置在安装结构内侧,然后推动通风管道的另一端,从而将通风管道滑动到多个安装结构的上,由于通风管道一般都是安装在建筑物的顶面上,且通风管道与安装结构之间的摩擦力比较大,因此安装时比较费时费力,其次工人需要攀登在梯子上才能够对推动通风管道,当通风管道与安装结构之间的摩擦力较大时,在用力推动通风管道的情况下梯子容易倾斜,从而增加了工人施工的安全隐患。At present, the existing passing pipes are generally installed on the building through the hanging ribs and cross bars, but in the installation process, the installation structure is generally fixed on the building, and then one end of the ventilation pipe is placed on the installation structure inside, and then push the other end of the ventilation duct to slide the ventilation duct onto multiple installation structures, because the ventilation ducts are generally installed on the top surface of the building, and the friction between the ventilation duct and the installation structure is relatively Large, so the installation is time-consuming and laborious. Secondly, workers need to climb on the ladder to push the ventilation pipe. When the friction between the ventilation pipe and the installation structure is large, the ladder is easy to tilt when the ventilation pipe is pushed hard. Thereby increasing the safety hazard of worker's construction.
实用新型内容Utility model content
本实用新型的目的就在于为了解决上述问题而提供一种消防通风管道的安装结构,能够降低了通风管道与安装结构之间的摩擦力,因此在安装时施工人员将会很轻松便可以推动通风管道,从而比较省时省力,且提高了通风管道的安装效率,其次降低了工人攀登的梯子倾斜几率,同时也降低了工人施工的安全隐患。The purpose of this utility model is to provide a fire-fighting ventilation duct installation structure in order to solve the above problems, which can reduce the friction between the ventilation duct and the installation structure, so construction workers can easily push the ventilation during installation. Pipes, which save time and effort, and improve the installation efficiency of ventilation pipes, and secondly reduce the chance of tilting the ladders that workers climb, and also reduce the safety hazards of workers during construction.
本实用新型通过以下技术方案来实现上述目的,一种消防通风管道的安装结构,包括支撑座,所述支撑座的内部开设有凹槽,且凹槽内壁对称开设有第三滑槽,所述第三滑槽内部滑动连接有滑块,且滑块的上表面铰接有铰接杆,所述铰接杆的一端铰接有辊轮,所述支撑座的内部设有调节机构,所述支撑座的上表面固定连接有支撑板,且支撑板的内侧设有横板,所述横板的下方设有限位板,且支撑板的上端固定连接有膨胀螺栓。The utility model achieves the above-mentioned purpose through the following technical proposals. A fire-fighting ventilation duct installation structure includes a support seat, a groove is opened inside the support seat, and a third chute is symmetrically opened on the inner wall of the groove. The inside of the third chute is slidably connected with a slider, and the upper surface of the slider is hinged with a hinged rod, one end of the hinged rod is hinged with a roller, the inside of the support seat is provided with an adjustment mechanism, and the upper surface of the support seat The surface is fixedly connected with a support plate, and the inner side of the support plate is provided with a horizontal plate, the lower part of the horizontal plate is provided with a limit plate, and the upper end of the support plate is fixedly connected with an expansion bolt.
优选的,所述调节机构包括螺纹杆,且螺纹杆的一端穿过支撑座固定连接有转盘,所述螺纹杆与第三滑槽的内侧壁转动连接,且第三滑槽内部的滑块与螺纹杆螺纹连接方式相反。Preferably, the adjustment mechanism includes a threaded rod, and one end of the threaded rod passes through the support base and is fixedly connected to the turntable, the threaded rod is rotatably connected to the inner side wall of the third chute, and the slider inside the third chute is connected to the Threaded rods are threaded in the opposite way.
优选的,所述横板的内部开设有第一滑槽,且第一滑槽的内侧壁开设有多组卡槽,所述卡槽的内部设有卡板,且卡板的下端固定连接有滑板,所述滑板的下端与限位板的上端固定连接。Preferably, the inside of the horizontal plate is provided with a first chute, and the inner side wall of the first chute is provided with multiple sets of locking grooves, the inside of the locking groove is provided with a locking plate, and the lower end of the locking plate is fixedly connected with a slide plate, the lower end of the slide plate is fixedly connected with the upper end of the limiting plate.
优选的,所述第一滑槽的宽度大于滑板的宽度且小于卡板的宽度。Preferably, the width of the first chute is larger than that of the sliding plate and smaller than that of the clamping plate.
优选的,所述支撑板的内部开设有第二滑槽,且横板的两端通过滑块穿过第二滑槽固定连接有连接板,且连接板的上表面固定连接有双向螺纹伸缩杆,所述双向螺纹伸缩杆的上端与支撑板的上端固定连接。Preferably, the inside of the support plate is provided with a second chute, and the two ends of the horizontal plate pass through the second chute through the slider and are fixedly connected to the connecting plate, and the upper surface of the connecting plate is fixedly connected to a two-way threaded telescopic rod , the upper end of the two-way threaded expansion rod is fixedly connected with the upper end of the support plate.
本实用新型的有益效果是:本实用新型通过设置在铰接杆一端的辊轮与支撑座调节机构中的转盘和螺纹杆相互配合,从而能够方便将辊轮升起,因此在推动通风管道时管道与安装结构之间会产生滚到摩擦,从而能够降低了通风管道与安装结构之间的摩擦力,因此在安装时施工人员将会很轻松便可以推动通风管道,从而比较省时省力,且提高了通风管道的安装效率,其次降低了工人攀登的梯子倾斜几率,同时也降低了工人施工的安全隐患The beneficial effects of the utility model are: the utility model cooperates with the turntable and the threaded rod in the adjustment mechanism of the support seat through the roller arranged at one end of the hinged rod, so that the roller can be easily raised, so when the ventilation pipe is pushed, the pipe There will be rolling friction with the installation structure, which can reduce the friction between the ventilation pipe and the installation structure, so the construction personnel will easily push the ventilation pipe during installation, which saves time and effort, and improves It improves the installation efficiency of ventilation ducts, and secondly reduces the chances of workers climbing ladders tilting, and also reduces the safety hazards of workers during construction
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型中支撑座的内部结构示意图;Fig. 2 is a schematic diagram of the internal structure of the support seat in the utility model;
图3为本实用新型的仰视结构示意图。Fig. 3 is a schematic structural view of the utility model viewed from above.
图中:1支撑座、2转盘、3限位板、4连接板、5双向螺纹伸缩杆、6卡槽、7第一滑槽、8膨胀螺栓、9卡板、10第二滑槽、11凹槽、12辊轮、13铰接杆、14滑块、15螺纹杆、16第三滑槽、17滑板、18横板、19支撑板。In the figure: 1 support seat, 2 turntable, 3 limit plate, 4 connecting plate, 5 two-way thread telescopic rod, 6 card slot, 7 first chute, 8 expansion bolt, 9 clamp plate, 10 second chute, 11 Groove, 12 rollers, 13 hinged rods, 14 slide blocks, 15 threaded rods, 16 third chutes, 17 slide plates, 18 horizontal plates, 19 support plates.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-3所示,一种消防通风管道的安装结构,包括支撑座1,所述支撑座1的内部开设有凹槽11,且凹槽11内壁对称开设有第三滑槽16,所述第三滑槽16内部滑动连接有滑块14,且滑块14的上表面铰接有铰接杆13,所述铰接杆13的一端铰接有辊轮12,所述支撑座1的内部设有调节机构,所述支撑座1的上表面固定连接有支撑板19,且支撑板19的内侧设有横板18,所述横板18的下方设有限位板3,且支撑板19的上端固定连接有膨胀螺栓8。Please refer to Figs. 1-3, an installation structure of a fire-fighting ventilation duct, including a
作为本实用新型的一种技术优化方案,所述调节机构包括螺纹杆15,且螺纹杆15的一端穿过支撑座1固定连接有转盘2,所述螺纹杆15与第三滑槽16的内侧壁转动连接,且第三滑槽16内部的滑块14与螺纹杆15螺纹连接方式相反,通过调节机构中螺纹杆15的转动,能够对辊轮12进行升起和下降调节,从而方便对通风管道进行安装。As a technical optimization scheme of the present utility model, the adjustment mechanism includes a threaded
作为本实用新型的一种技术优化方案,所述横板18的内部开设有第一滑槽7,且第一滑槽7的内侧壁开设有多组卡槽6,所述卡槽6的内部设有卡板9,且卡板9的下端固定连接有滑板17,所述滑板17的下端与限位板3的上端固定连接,所述第一滑槽7的宽度大于滑板17的宽度且小于卡板9的宽度,通过卡槽6内部设置的卡板9和卡板9下方的滑板17与限位板3相互配合,从而能够对不同宽度的通风管道进行限位,因此提高了通风管道的安装稳定性。As a technical optimization scheme of the present utility model, the inside of the
作为本实用新型的一种技术优化方案,所述支撑板19的内部开设有第二滑槽10,且横板18的两端通过滑块穿过第二滑槽10固定连接有连接板4,且连接板4的上表面固定连接有双向螺纹伸缩杆5,所述双向螺纹伸缩杆5的上端与支撑板19的上端固定连接,方便调节横板18的高度,因此便于对通风管道进行挤压固定。As a technical optimization scheme of the present utility model, the inside of the
本实用新型在使用时,首先将支撑座1通过支撑板19上端的膨胀螺栓8固定在建筑物顶面,之后通过转盘2顺时针转动支撑座1内部的螺纹杆15,从而螺纹杆15将会带动第三滑槽16内部的滑块14相对靠近移动,从而铰接杆13将会把辊轮12升出凹槽11的内部,之后将通风管道的一端放置在辊轮12的上方,然后将工作人员便可以推动通风管道,此时通风管道与辊轮12将会产生滚动摩擦,因此工人只需要使用很小的力便可以推动通风管道,当通风管道移动到指定位置后,在通过转盘2逆时针转动,从而将辊轮12收进凹槽11的内部,此时通风管道将会落在支撑座1的上表面,之后转动双向螺纹伸缩杆5从而通过连接板4推动横板18靠近支撑座1上表面的通风管道,从而将通风管道固定住,之后在向上拉动卡板9将卡板9移出卡槽6的内部,此时便可以移动限位板3使得限位板3相对靠近通风管道,之后松快卡板9,在卡板9和限位板3受重力的情况下再次落在卡槽6的内部,从而能够对通风管道进行限位,防止通风管道横向晃动。When the utility model is in use, at first the
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223260292.1U CN218672615U (en) | 2022-12-06 | 2022-12-06 | Fire control air pipe's mounting structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223260292.1U CN218672615U (en) | 2022-12-06 | 2022-12-06 | Fire control air pipe's mounting structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218672615U true CN218672615U (en) | 2023-03-21 |
Family
ID=85548960
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223260292.1U Expired - Fee Related CN218672615U (en) | 2022-12-06 | 2022-12-06 | Fire control air pipe's mounting structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218672615U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116817443A (en) * | 2023-06-29 | 2023-09-29 | 合肥华峰暖通设备有限公司 | A ventilation duct installation structure |
-
2022
- 2022-12-06 CN CN202223260292.1U patent/CN218672615U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116817443A (en) * | 2023-06-29 | 2023-09-29 | 合肥华峰暖通设备有限公司 | A ventilation duct installation structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218672615U (en) | Fire control air pipe's mounting structure | |
| CN211899532U (en) | Construction platform convenient to remove | |
| CN209353658U (en) | A kind of scaffold for building | |
| CN219471557U (en) | Building engineering template fixing device | |
| CN207260392U (en) | Curtain wall panel fixing and mounting bracket | |
| CN206987338U (en) | Height-adjustable scaffold | |
| CN216076202U (en) | Indoor scaffold for building with regulatory function | |
| CN211524004U (en) | A mobile scaffold with high stability | |
| CN222204502U (en) | Brick lifting device | |
| CN219489543U (en) | Auxiliary device for mounting high-rise air conditioner | |
| CN223119460U (en) | Fixed bolster that building engineering used | |
| CN214246515U (en) | Operating platform for indoor construction | |
| CN114753665A (en) | A kind of edge protection device for high-rise concrete engineering construction | |
| CN220376194U (en) | An auxiliary installation device for an air conditioner outdoor unit | |
| CN219511897U (en) | A convenient mobile sampling device for indoor air detection | |
| CN223318594U (en) | A ventilation duct hanging rack | |
| CN217027988U (en) | Attachment support device | |
| CN214034467U (en) | Adjustable railing for corridor | |
| CN223867588U (en) | A glass curtain wall operable sash installation tool | |
| CN218862055U (en) | Movable operation platform for building construction | |
| CN223627976U (en) | A folding arc-shaped smoke curtain | |
| CN221524345U (en) | Building curtain maintenance and replacement device | |
| CN220929727U (en) | Easy-to-maintain smoke exhaust fan | |
| CN218117290U (en) | A positioning board for building curtain wall installation | |
| CN223256417U (en) | Scaffold frame of building engineering quick installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230321 |
