CN218667289U - A gate swing door structure - Google Patents

A gate swing door structure Download PDF

Info

Publication number
CN218667289U
CN218667289U CN202223040926.2U CN202223040926U CN218667289U CN 218667289 U CN218667289 U CN 218667289U CN 202223040926 U CN202223040926 U CN 202223040926U CN 218667289 U CN218667289 U CN 218667289U
Authority
CN
China
Prior art keywords
gate
movement
swing door
mounting block
upper frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223040926.2U
Other languages
Chinese (zh)
Inventor
何辉
林辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Axint Intelligent Co ltd
Original Assignee
Shenzhen Axint Intelligent Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Axint Intelligent Co ltd filed Critical Shenzhen Axint Intelligent Co ltd
Priority to CN202223040926.2U priority Critical patent/CN218667289U/en
Application granted granted Critical
Publication of CN218667289U publication Critical patent/CN218667289U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/20—Hydro energy

Landscapes

  • Gates (AREA)

Abstract

本实用新型公开了一种道闸摆门结构,包括底座,底座上的两侧均设置有闸头,两个闸头之间设置有机芯,两个机芯之间设置有中闸,闸头与机芯之间设置有第一安装组件,机芯与中闸之间设置有第二安装组件;本实用新型通过道闸摆门设置为闸头、机芯和中闸分体结构,闸头、机芯和中闸之间通过第一安装组件和第二安装组件实现可拆装连接,同时保证道闸摆门结构之间紧密连接而具有稳定性,方便拆卸检修而减少检修成本,此外适用于一些临时需要限制人流量的场所而进行拆卸搬动,从而提高道闸摆门的使用性能。

Figure 202223040926

The utility model discloses a swing door structure of a barrier gate, which comprises a base, and gate heads are arranged on both sides of the base; There is a first installation component between the head and the movement, and a second installation component between the movement and the middle gate; the utility model is provided with a split structure of the head, the movement and the middle gate through the swing door of the barrier gate. The detachable connection between the head, the movement and the middle gate is realized through the first installation component and the second installation component, and at the same time, the structure of the swing door of the barrier gate is tightly connected and stable, which is convenient for disassembly and maintenance and reduces maintenance costs. It is suitable for dismantling and moving in some temporary places that need to limit the flow of people, so as to improve the performance of the swing gate of the barrier gate.

Figure 202223040926

Description

一种道闸摆门结构A barrier swing door structure

技术领域technical field

本实用新型涉及道闸的技术领域,具体为一种道闸摆门结构。The utility model relates to the technical field of barrier gates, in particular to a barrier gate swing door structure.

背景技术Background technique

道闸摆门是一种通道阻挡装置,用于管理人流并规范行人出入,其道闸摆门的形态是具有一定面积的平面,垂直于地面,通过旋转摆动实现拦阻和放行,其最基本最核心的功能是实现一次只通过一人,现已被广泛应用于地铁闸机系统、收费检票闸机系统等。The swing gate of the barrier gate is a passage blocking device, which is used to manage the flow of people and regulate the pedestrians' entry and exit. The core function is to realize the passage of only one person at a time, and it has been widely used in subway gate systems, toll ticket gate systems, etc.

现有道闸摆门的门板和机身是采用铁或者不锈钢通过焊接在一起,使得整体结构较大,但是人们在通过不及时时就会冲撞到摆闸门,受力过猛可能会造成道闸摆门的损坏而不方便检修,检修成本较大,且在一些临时需要限制人流量的场所不适宜搬动,从而降低了道闸摆门的使用性能。The door panel and the fuselage of the existing swing gate of the barrier gate are welded together by iron or stainless steel, making the overall structure larger, but people will collide with the swing gate when they do not pass through in time, and excessive force may cause the barrier gate to be damaged. The damage of the swing door is inconvenient for maintenance, and the maintenance cost is relatively large, and it is not suitable for moving in some places where the flow of people needs to be temporarily restricted, thereby reducing the performance of the swing door of the barrier gate.

实用新型内容Utility model content

本实用新型的目的在于提供一种道闸摆门结构,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a barrier gate swing door structure to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种道闸摆门结构,包括底座,所述底座上的两侧均设置有闸头,两个闸头之间设置有机芯,两个机芯之间设置有中闸,闸头与机芯之间设置有第一安装组件,机芯与中闸之间设置有第二安装组件。In order to achieve the above purpose, the utility model provides the following technical solutions: a structure of a swing door of a barrier gate, including a base, and both sides of the base are provided with gate heads, and a movement is provided between the two gate heads, and two A middle gate is arranged between the movement, a first installation assembly is arranged between the brake head and the movement, and a second installation assembly is arranged between the movement and the middle gate.

优选的,所述闸头包括闸头支撑架、闸头中间面板和闸头上架,闸头支撑架呈“工”字型结构,且两侧架体形成中间嵌入槽,闸头中间面板分别与闸头支撑架和闸头上架之间固定连接,闸头上架的侧面开设有框型槽。Preferably, the gate includes a gate support frame, a gate middle panel and a gate upper frame, the gate support frame has an "I"-shaped structure, and the frames on both sides form a middle embedded groove, and the gate middle panel is respectively connected to the The gate supporting frame and the gate upper frame are fixedly connected, and the side of the gate upper frame is provided with a frame-shaped groove.

优选的,所述机芯包括机芯底座、机芯上罩和摆门组件,机芯底座与中间嵌入槽之间嵌入匹配,机芯上罩固定在机芯底座上,摆门组件转动连接在机芯上罩上。Preferably, the movement includes a movement base, a movement upper cover and a swing door assembly, the movement base is embedded and matched with the middle embedding groove, the movement upper cover is fixed on the movement base, and the swing door assembly is rotatably connected to Cover the movement.

优选的,所述第一安装组件包括第一安装块,机芯上罩的两侧均设置有第一安装块和第二安装块,第一安装块上设置有第一螺纹孔,第一安装块与框型槽之间插接设置。Preferably, the first mounting assembly includes a first mounting block, the first mounting block and the second mounting block are provided on both sides of the upper cover of the movement, the first mounting block is provided with a first threaded hole, and the first mounting block The plug-in setting between the block and the frame slot.

优选的,所述第一安装块和闸头上架上设置有第一固定螺杆,第一固定螺杆贯穿闸头上架和第一安装块上的第一螺纹孔且与第一螺纹孔之间螺纹连接。Preferably, the first mounting block and the upper frame of the brake head are provided with a first fixing screw, and the first fixing screw passes through the first threaded hole on the upper frame of the brake head and the first mounting block and is threadedly connected with the first threaded hole .

优选的,所述中闸包括中闸底座、中闸中间面板和中闸上架,中闸底座呈“工”字型结构,且两侧架体形成插接槽,中闸中间面板分别与中闸底座和中闸上架之间固定连接。Preferably, the middle gate includes a middle gate base, a middle gate middle panel and a middle gate upper frame. There is a fixed connection between the base and the upper frame of the middle gate.

优选的,所述第二安装组件包括第二安装块,中闸上架的两侧均开设有卡接槽,卡接槽与第二安装块之间插接设置。Preferably, the second installation assembly includes a second installation block, and both sides of the upper frame of the middle gate are provided with snap-in slots, and the snap-in slots are inserted into the second installation block.

优选的,所述第二安装块上开设有第二螺纹孔,第二安装块和中闸上架上设置有第二固定螺杆,第二固定螺杆贯穿中闸上架和第二螺纹孔且与第二螺纹孔之间螺纹连接。Preferably, the second mounting block is provided with a second threaded hole, the second mounting block and the upper frame of the middle gate are provided with a second fixing screw, and the second fixing screw passes through the upper frame of the middle brake and the second threaded hole and is connected with the second Threaded connection between threaded holes.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型通过道闸摆门设置为闸头、机芯和中闸分体结构,闸头、机芯和中闸之间通过第一安装组件和第二安装组件实现可拆装连接,同时保证道闸摆门结构之间紧密连接而具有稳定性,方便拆卸检修而减少检修成本,此外适用于一些临时需要限制人流量的场所而进行拆卸搬动,从而提高道闸摆门的使用性能。The utility model is configured as a split structure of the gate, the core and the middle gate through the swing gate of the barrier gate. The detachable connection between the gate, the core and the middle gate is realized through the first installation component and the second installation component, and at the same time, the The structure of the swing door of the barrier gate is tightly connected and has stability, which is convenient for disassembly and maintenance and reduces the cost of maintenance. In addition, it is suitable for disassembly and movement in places where the flow of people needs to be limited temporarily, so as to improve the performance of the swing gate of the barrier gate.

附图说明Description of drawings

图1为本实用新型道闸摆门结构的结构示意图。Fig. 1 is a structural schematic diagram of the swing door structure of the barrier gate of the present invention.

图2为本实用新型闸头的结构示意图。Fig. 2 is a structural schematic diagram of the brake head of the present invention.

图3为本实用新型机芯的结构示意图。Fig. 3 is a structural schematic diagram of the movement of the utility model.

图4为本实用新型中闸的结构示意图。Fig. 4 is a structural schematic diagram of the middle gate of the present invention.

图中:1、底座;2、闸头;21、闸头支撑架;22、闸头中间面板;23、闸头上架;24、中间嵌入槽;25、框型槽;3、机芯;31、机芯底座;32、机芯上罩;33、摆门组件;34、第一安装块;35、第二安装块;36、第一螺纹孔;37、第一固定螺杆;38、第二螺纹孔;4、中闸;41、中闸底座;42、中闸中间面板;43、中闸上架;44、插接槽;45、卡接槽;46、第二固定螺杆。In the figure: 1. base; 2. brake head; 21. brake head support frame; 22. middle panel of brake head; 23. brake head rack; 24. middle embedded groove; 25. frame groove; , movement base; 32, movement upper cover; 33, swing door assembly; 34, first installation block; 35, second installation block; 36, first threaded hole; 37, first fixing screw; 38, second 4, the middle gate; 41, the base of the middle gate; 42, the middle panel of the middle gate; 43, the upper frame of the middle gate; 44, the insertion groove; 45, the clamping groove; 46, the second fixing screw.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1至图4,本实用新型提供一种技术方案:一种道闸摆门结构,包括底座1,底座1上的两侧均设置有闸头2,两个闸头2之间设置有机芯3,两个机芯3之间设置有中闸4,闸头2包括闸头支撑架21、闸头中间面板22和闸头上架23,闸头支撑架21呈“工”字型结构,且两侧架体形成中间嵌入槽24,闸头中间面板22分别与闸头支撑架21和闸头上架23之间固定连接,闸头上架23的侧面开设有框型槽25,机芯3、闸头2和中闸4均固定安装在底座1上。Please refer to Fig. 1 to Fig. 4, the utility model provides a technical solution: a barrier gate swing door structure, including a base 1, the two sides of the base 1 are provided with gates 2, and the two gates 2 are provided with There is a core 3, and a middle gate 4 is arranged between the two cores 3. The gate 2 includes a gate support frame 21, a gate middle panel 22 and a gate upper frame 23. The gate support frame 21 is in the shape of "I" structure, and the two side frames form the middle embedded groove 24, the middle panel 22 of the brake head is fixedly connected with the brake head support frame 21 and the brake head upper frame 23 respectively, and the side of the brake head upper frame 23 is provided with a frame-shaped groove 25, and the movement 3. Both the brake head 2 and the middle gate 4 are fixedly installed on the base 1 .

机芯3包括机芯底座31、机芯上罩32和摆门组件33,机芯底座31与中间嵌入槽24之间嵌入匹配,使得机芯3底部与闸头2底部之间紧密连接,增加装置的稳定性,机芯上罩32固定在机芯底座31上,摆门组件33转动连接在机芯上罩32上。The movement 3 includes a movement base 31, a movement upper cover 32 and a swing door assembly 33. The movement base 31 is embedded and matched with the middle embedding groove 24, so that the bottom of the movement 3 is closely connected with the bottom of the brake head 2, increasing For the stability of the device, the movement upper cover 32 is fixed on the movement base 31 , and the swing door assembly 33 is rotatably connected to the movement upper cover 32 .

闸头2与机芯3之间设置有第一安装组件,第一安装组件包括第一安装块34,机芯上罩32的两侧均焊接有第一安装块34和第二安装块35,第一安装块34上开设有第一螺纹孔36,第一安装块34与框型槽25之间插接设置,第一安装块34和闸头上架23上插接有第一固定螺杆37,第一固定螺杆37贯穿闸头上架23和第一安装块34上的第一螺纹孔36且与第一螺纹孔36之间螺纹连接,形成闸头2与机芯3之间固定安装。A first installation assembly is arranged between the brake head 2 and the movement 3, the first installation assembly includes a first installation block 34, the first installation block 34 and the second installation block 35 are welded on both sides of the movement upper cover 32, The first mounting block 34 is provided with a first threaded hole 36, which is inserted between the first mounting block 34 and the frame groove 25, and a first fixing screw 37 is inserted into the first mounting block 34 and the brake head upper frame 23, The first fixing screw 37 passes through the first threaded hole 36 on the upper frame 23 of the brake head and the first mounting block 34 and is threadedly connected with the first threaded hole 36 to form a fixed installation between the brake head 2 and the movement 3 .

机芯3与中闸4之间设置有第二安装组件,中闸4包括中闸底座41、中闸中间面板42和中闸上架43,中闸底座41呈“工”字型结构,且两侧架体形成插接槽44,中闸中间面板42分别与中闸底座41和中闸上架43之间固定连接,插接槽44与机芯底座31之间嵌入匹配,使得机芯3底部与中闸4底部之间紧密连接,增加装置的稳定性。A second installation assembly is arranged between the core 3 and the middle gate 4. The middle gate 4 includes a middle gate base 41, a middle gate middle panel 42 and a middle gate upper frame 43. The middle gate base 41 is in the shape of an "I" shape, and the two The side frame body forms an insertion groove 44, and the middle panel 42 of the middle gate is fixedly connected with the middle gate base 41 and the upper frame 43 of the middle gate respectively. The insertion groove 44 is embedded and matched with the movement base 31, so that the bottom of the movement 3 and The bottoms of the middle gate 4 are closely connected to increase the stability of the device.

第二安装组件包括第二安装块35,中闸上架43的两侧均开设有卡接槽45,卡接槽45与第二安装块35之间插接设置,第二安装块35上开设有第二螺纹孔38,第二安装块35和中闸上架43上插接有第二固定螺杆46,第二固定螺杆46贯穿中闸上架43和第二螺纹孔38且与第二螺纹孔38之间螺纹连接,形成中闸4与机芯3之间固定安装。The second installation assembly includes a second installation block 35, both sides of the middle gate upper frame 43 are provided with snap-in slots 45, and the snap-in slots 45 and the second installation block 35 are inserted and arranged, and the second installation block 35 is provided with The second threaded hole 38, the second mounting block 35 and the middle gate upper frame 43 are plugged with a second fixing screw 46, the second fixing screw 46 runs through the middle gate upper frame 43 and the second threaded hole 38 and is connected with the second threaded hole 38. Between the threaded connection, form the fixed installation between the middle gate 4 and the movement 3.

实际使用时,将机芯底座31与中间嵌入槽24之间嵌入匹配,使得机芯3底部与闸头2底部之间紧密连接,此时第一安装块34插接在框型槽25内,通过旋拧第一固定螺杆37,使其端部贯穿闸头上架23和第一安装块34上的第一螺纹孔36且与第一螺纹孔36之间螺纹连接,形成闸头2与机芯3之间固定安装;再将中闸上架43上的卡接槽45套接在第二安装块35上,此时插接槽44与机芯底座31之间嵌入匹配,使得机芯3底部与中闸4底部之间紧密连接,通过旋拧第二固定螺杆46,使其端部贯穿中闸上架43和第二螺纹孔38且与第二螺纹孔38之间螺纹连接,形成中闸4与机芯3之间固定安装,最后将机芯3、闸头2和中闸4均通过螺栓固定安装在底座1上;在需要拆卸时,通过分别反方向旋拧第一固定螺杆37和第二固定螺杆46,将闸头2与机芯3之间、中闸4与机芯3之间分离即可,实现道闸摆门结构可拆装连接,方便拆卸检修而减少检修成本,此外适用于一些临时需要限制人流量的场所而进行拆卸搬动,从而提高道闸摆门的使用性能。In actual use, the movement base 31 is embedded and matched with the middle embedding groove 24, so that the bottom of the movement 3 and the bottom of the brake head 2 are tightly connected. At this time, the first mounting block 34 is inserted into the frame-shaped groove 25, By screwing the first fixing screw 37, its end passes through the first threaded hole 36 on the brake head upper frame 23 and the first mounting block 34 and is threadedly connected with the first threaded hole 36 to form the brake head 2 and the movement. 3 and fixedly installed between them; then the snap-in groove 45 on the upper frame 43 of the middle gate is socketed on the second mounting block 35, and at this time, the insertion groove 44 is embedded and matched with the movement base 31, so that the bottom of the movement 3 and the bottom of the movement The bottom of the middle gate 4 is tightly connected, and by screwing the second fixing screw 46, the end thereof passes through the upper frame 43 of the middle gate and the second threaded hole 38 and is threadedly connected with the second threaded hole 38 to form the middle gate 4 and the second threaded hole 38. The movement 3 is fixedly installed, and finally the movement 3, the gate head 2 and the middle gate 4 are fixed on the base 1 by bolts; when disassembly is required, the first fixing screw 37 and the second Fix the screw 46, just separate the brake head 2 from the movement 3, and the middle gate 4 from the movement 3, so as to realize the detachable connection of the swing door structure of the barrier gate, which is convenient for disassembly and maintenance and reduces the maintenance cost. In addition, it is suitable for Some places that temporarily need to limit the flow of people are dismantled and moved, so as to improve the performance of the barrier gate swing door.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (8)

1.一种道闸摆门结构,包括底座(1),其特征在于:所述底座(1)上的两侧均设置有闸头(2),两个闸头(2)之间设置有机芯(3),两个机芯(3)之间设置有中闸(4),闸头(2)与机芯(3)之间设置有第一安装组件,机芯(3)与中闸(4)之间设置有第二安装组件。1. A barrier gate swing door structure, comprising a base (1), characterized in that: both sides on the base (1) are provided with gates (2), and between the two gates (2) are provided with The core (3), the middle brake (4) is arranged between the two cores (3), the first installation assembly is arranged between the brake head (2) and the core (3), the core (3) and the middle A second installation component is arranged between the gates (4). 2.根据权利要求1所述的一种道闸摆门结构,其特征在于:所述闸头(2)包括闸头支撑架(21)、闸头中间面板(22)和闸头上架(23),闸头支撑架(21)呈“工”字型结构,且两侧架体形成中间嵌入槽(24),闸头中间面板(22)分别与闸头支撑架(21)和闸头上架(23)之间固定连接,闸头上架(23)的侧面开设有框型槽(25)。2. The structure of a barrier gate swing door according to claim 1, characterized in that: the gate head (2) comprises a gate head support frame (21), a gate head middle panel (22) and a gate head upper frame (23 ), the gate support frame (21) has an "I"-shaped structure, and the two sides of the frame form a middle embedded groove (24), and the gate middle panel (22) is connected with the gate support frame (21) and the gate upper frame respectively. (23) are fixedly connected, and the side of the brake head upper frame (23) offers a frame groove (25). 3.根据权利要求1所述的一种道闸摆门结构,其特征在于:所述机芯(3)包括机芯底座(31)、机芯上罩(32)和摆门组件(33),机芯底座(31)与中间嵌入槽(24)之间嵌入匹配,机芯上罩(32)固定在机芯底座(31)上,摆门组件(33)转动连接在机芯上罩(32)上。3. A barrier gate swing door structure according to claim 1, characterized in that: the movement (3) comprises a movement base (31), a movement upper cover (32) and a swing door assembly (33) , the movement base (31) is embedded and matched with the middle embedding groove (24), the movement upper cover (32) is fixed on the movement base (31), and the swing door assembly (33) is rotatably connected to the movement upper cover ( 32) on. 4.根据权利要求1所述的一种道闸摆门结构,其特征在于:所述第一安装组件包括第一安装块(34),机芯上罩(32)的两侧均设置有第一安装块(34)和第二安装块(35),第一安装块(34)上设置有第一螺纹孔(36),第一安装块(34)与框型槽(25)之间插接设置。4. A barrier gate swing door structure according to claim 1, characterized in that: said first mounting assembly includes a first mounting block (34), and both sides of the movement upper cover (32) are provided with a second A mounting block (34) and a second mounting block (35), the first mounting block (34) is provided with a first threaded hole (36), inserted between the first mounting block (34) and the frame groove (25) connection settings. 5.根据权利要求4所述的一种道闸摆门结构,其特征在于:所述第一安装块(34)和闸头上架(23)上设置有第一固定螺杆(37),第一固定螺杆(37)贯穿闸头上架(23)和第一安装块(34)上的第一螺纹孔(36)且与第一螺纹孔(36)之间螺纹连接。5. A barrier gate swing door structure according to claim 4, characterized in that: the first mounting block (34) and the gate upper frame (23) are provided with a first fixing screw (37), the first The fixing screw (37) passes through the first threaded hole (36) on the gate upper frame (23) and the first mounting block (34) and is threadedly connected with the first threaded hole (36). 6.根据权利要求1所述的一种道闸摆门结构,其特征在于:所述中闸(4)包括中闸底座(41)、中闸中间面板(42)和中闸上架(43),中闸底座(41)呈“工”字型结构,且两侧架体形成插接槽(44),中闸中间面板(42)分别与中闸底座(41)和中闸上架(43)之间固定连接。6. The swing door structure of a barrier gate according to claim 1, characterized in that: the central gate (4) comprises a central gate base (41), a central gate middle panel (42) and a central gate upper frame (43) , the middle gate base (41) has an "I"-shaped structure, and the two sides of the frame form a socket (44), and the middle gate middle panel (42) is respectively connected to the middle gate base (41) and the middle gate upper frame (43) fixed connection between. 7.根据权利要求1所述的一种道闸摆门结构,其特征在于:所述第二安装组件包括第二安装块(35),中闸上架(43)的两侧均开设有卡接槽(45),卡接槽(45)与第二安装块(35)之间插接设置。7. The structure of a barrier gate swing door according to claim 1, characterized in that: the second installation assembly includes a second installation block (35), and both sides of the middle gate upper frame (43) are provided with clamping joints. The slot (45) is inserted between the clamping slot (45) and the second mounting block (35). 8.根据权利要求7所述的一种道闸摆门结构,其特征在于:所述第二安装块(35)上开设有第二螺纹孔(38),第二安装块(35)和中闸上架(43)上设置有第二固定螺杆(46),第二固定螺杆(46)贯穿中闸上架(43)和第二螺纹孔(38)且与第二螺纹孔(38)之间螺纹连接。8. The structure of a barrier gate swing door according to claim 7, characterized in that: the second mounting block (35) is provided with a second threaded hole (38), and the second mounting block (35) and the middle The second fixed screw rod (46) is arranged on the brake upper frame (43), and the second fixed screw rod (46) runs through the middle brake upper frame (43) and the second threaded hole (38) and is threaded between the second threaded hole (38). connect.
CN202223040926.2U 2022-11-15 2022-11-15 A gate swing door structure Expired - Fee Related CN218667289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223040926.2U CN218667289U (en) 2022-11-15 2022-11-15 A gate swing door structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223040926.2U CN218667289U (en) 2022-11-15 2022-11-15 A gate swing door structure

Publications (1)

Publication Number Publication Date
CN218667289U true CN218667289U (en) 2023-03-21

Family

ID=85535622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223040926.2U Expired - Fee Related CN218667289U (en) 2022-11-15 2022-11-15 A gate swing door structure

Country Status (1)

Country Link
CN (1) CN218667289U (en)

Similar Documents

Publication Publication Date Title
CN109989592A (en) An automatic prefabricated building component installation vertical adjustment device
CN210688010U (en) A display installation structure of a smart street lamp
CN205026327U (en) LED court screen angle modulation structure
CN216190189U (en) Elevator guide rail bracket
CN217762940U (en) Indoor combined fire detection alarm for building
CN219222734U (en) Constant air quantity valve capable of filtering air
CN211422025U (en) An assembly structure of a power grid line tower
CN211774754U (en) A color steel plate connection device for clean room walls
CN221323065U (en) Linear guide rail with adjustable
CN221000749U (en) Mounting plate structure for gate
CN214615795U (en) A new type of electric fence railing
CN209760543U (en) A Curtain Wall Column-Beam Connection Structure
CN218386323U (en) Auxiliary installation structure for distribution box and distribution box
CN209817196U (en) A beam frame unit and a curtain wall
CN222976126U (en) A modular assembled building wall panel connection structure
CN221646704U (en) Easy-to-install pendulum stopper
CN219241746U (en) An adjustable and integrated standardized exterior elevator protection door
CN219281322U (en) A positioning device for PC components in flue construction
CN218560773U (en) A platform elevator derrick structure
CN221503114U (en) Aluminum alloy door and window installed by splicing
CN211549100U (en) A new type of easy-to-assemble galvanized steel guardrail
CN219916538U (en) Building intelligent multi-system combined training device
CN206759011U (en) Support for the section cable laying of track traffic underground
CN221663458U (en) A bridge steel structure reinforcement device
CN218293029U (en) A kind of UHV transmission tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230321

CF01 Termination of patent right due to non-payment of annual fee