CN218667016U - Concrete trowel for civil engineering construction - Google Patents

Concrete trowel for civil engineering construction Download PDF

Info

Publication number
CN218667016U
CN218667016U CN202222531176.2U CN202222531176U CN218667016U CN 218667016 U CN218667016 U CN 218667016U CN 202222531176 U CN202222531176 U CN 202222531176U CN 218667016 U CN218667016 U CN 218667016U
Authority
CN
China
Prior art keywords
rod
civil engineering
engineering construction
size
trowel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222531176.2U
Other languages
Chinese (zh)
Inventor
鲍健峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222531176.2U priority Critical patent/CN218667016U/en
Application granted granted Critical
Publication of CN218667016U publication Critical patent/CN218667016U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a concrete floating device is used in civil engineering construction, be two support body including quantity, the top of support body is equipped with adjustment mechanism, adjustment mechanism includes the inside lead screw of fixed mounting at the support body, threaded connection has the connecting seat on the periphery wall of lead screw, the top fixedly connected with slide bar of connecting seat, the bottom fixed mounting of support body has quantity to be two the dead lever, two fixed mounting has the connecting rod between the dead lever, the left and right sides outer wall fixed mounting of slide bar has first pulley. This concrete floating device for civil engineering construction can make the slide bar drive the bracing piece back-and-forth movement through the effect of lead screw and connecting seat, can adjust the distance of leveling chi and needs construction ground through the cooperation of electric lift pole and base, can adjust the distance between two electric lift poles through electric lift pole's effect, makes floating device can be applicable to the construction of many civil engineering road engineering.

Description

一种土木工程施工用混凝土抹平器Concrete trowel for civil engineering construction

技术领域technical field

本实用新型涉及抹平器技术领域,具体为一种土木工程施工用混凝土抹平器。The utility model relates to the technical field of trowels, in particular to a concrete trowel for civil engineering construction.

背景技术Background technique

抹平器一般用于道路上的混凝土抹平处理,使道路变得平整,便于行人和车辆的行驶。The trowel is generally used for concrete troweling on the road to make the road smooth and easy for pedestrians and vehicles to drive.

目前在土木工程施工中用的混凝土抹平器结构单一,无法调节抹平尺的长度,有的道路左右两侧的高度不同,当抹平尺的长度大于施工的道路的长度时,导致抹平尺无法正常使用,从而影响到了工作进度造成一定的影响,故而提出了一种土木工程施工用混凝土抹平器。At present, the concrete trowel used in civil engineering construction has a single structure, and the length of the trowel cannot be adjusted. Some roads have different heights on the left and right sides. The ruler cannot be used normally, thereby affecting the work progress and causing a certain impact, so a concrete trowel for civil engineering construction is proposed.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种土木工程施工用混凝土抹平器,具备可以适用于多种长度不同抹平尺工作的等优点,解决了土木工程施工中用的混凝土抹平器结构单一,无法调节抹平尺的长度,有的道路左右两侧的高度不同,当抹平尺的长度大于施工的道路的长度时,导致抹平尺无法正常使用,从而影响到了工作进度造成一定的影响的问题。Aiming at the deficiencies of the prior art, the utility model provides a concrete trowel for civil engineering construction, which has the advantages of being applicable to the work of various troweling rulers with different lengths, and solves the problem of concrete troweling used in civil engineering construction. The structure of the trowel is single, and the length of the trowel cannot be adjusted. Some roads have different heights on the left and right sides. When the length of the trowel is greater than the length of the road under construction, the trowel cannot be used normally, which affects the work progress and causes A question of certain influence.

为实现上述目的,本实用新型提供如下技术方案:一种土木工程施工用混凝土抹平器,包括数量为两个的架体,所述架体的顶部设有调节机构;In order to achieve the above purpose, the utility model provides the following technical solutions: a concrete trowel for civil engineering construction, including two frames, the top of which is provided with an adjustment mechanism;

所述调节机构包括固定安装在架体内部的丝杆,所述丝杆的外周壁上螺纹连接有连接座,所述连接座的顶部固定连接有滑动杆,所述架体的底部固定安装有数量为两个的固定杆,两个所述固定杆之间固定安装有连接杆,所述滑动杆的左右两侧外壁固定安装有第一滑轮,两个所述滑动杆之间固定安装有支撑杆,所述支撑杆的内部滑动连接有滑块,所述滑块的底部固定安装有电动升降杆,所述电动升降杆的底部固定安装有底座,所述底座的左右两侧均固定安装有固定块,所述固定块螺纹连接有螺钉,所述底座的底部活动安装有抹平尺,两个所述滑动杆相对的一侧固定安装有电动伸缩杆。The adjustment mechanism includes a screw rod fixedly installed inside the frame body, a connecting seat is threadedly connected to the outer peripheral wall of the screw rod, a sliding rod is fixedly connected to the top of the connecting seat, and a sliding rod is fixedly installed on the bottom of the frame body. There are two fixed rods, a connecting rod is fixedly installed between the two fixed rods, first pulleys are fixedly installed on the left and right outer walls of the sliding rod, and a support is fixedly installed between the two sliding rods. rod, the inside of the support rod is slidingly connected with a slider, the bottom of the slider is fixedly installed with an electric lifting rod, the bottom of the electric lifting rod is fixed with a base, and the left and right sides of the base are fixedly installed with A fixed block, the fixed block is threadedly connected with a screw, the bottom of the base is movably installed with a leveling ruler, and the opposite sides of the two sliding bars are fixedly installed with an electric telescopic rod.

进一步,所述滑动杆滑动连接在连接杆的内部,所述连接杆的内部开设有与滑动杆大小相适配的第一滑槽。Further, the sliding rod is slidably connected to the inside of the connecting rod, and the inside of the connecting rod is provided with a first chute matching the size of the sliding rod.

进一步,所述连接杆的顶部开设有第二滑槽,所述第一滑轮在第二滑槽内滑动连接,所述第二滑槽的大小与第一滑轮的大小相适配。Further, the top of the connecting rod is provided with a second chute, the first pulley is slidably connected in the second chute, and the size of the second chute matches the size of the first pulley.

进一步,两个所述电动伸缩杆远离滑动杆的一侧与电动升降杆固定连接。Further, the sides of the two electric telescopic rods away from the sliding rod are fixedly connected with the electric elevating rod.

进一步,所述架体的底部固定安装有数量为两个的第二滑轮,所述抹平尺下降的距离大于架体到第二滑轮底部的距离。Further, two second pulleys are fixedly installed on the bottom of the frame body, and the descending distance of the trowel is greater than the distance from the frame body to the bottom of the second pulleys.

进一步,所述支撑杆的底部外壁开设有第三滑槽,所述第三滑槽的大小与滑块的大小相适配。Further, the bottom outer wall of the support rod is provided with a third slide slot, and the size of the third slide slot matches the size of the slider.

进一步,所述固定块的内部和抹平尺的顶部开设有螺纹孔,所述螺纹孔的大小与螺钉的大小相适配。Further, the inside of the fixing block and the top of the leveling ruler are provided with threaded holes, and the size of the threaded holes matches the size of the screws.

与现有技术相比,本申请的技术方案具备以下有益效果:Compared with the prior art, the technical solution of the present application has the following beneficial effects:

该一种土木工程施工用混凝土抹平器,通过丝杆和连接座的作用可以使滑动杆带动支撑杆前后移动,通过电动升降杆和底座的配合可以调节抹平尺与需要施工地面的距离,通过电动伸缩杆的作用可以调节两个电动升降杆之间距离,使抹平器可以适用于多种土木工道路工程施工。The concrete trowel for civil engineering construction can make the sliding rod drive the support rod to move back and forth through the function of the screw rod and the connecting seat, and the distance between the trowel and the ground to be constructed can be adjusted through the cooperation of the electric lifting rod and the base. The distance between the two electric elevating rods can be adjusted through the action of the electric telescopic rod, so that the trowel can be applied to various civil engineering road engineering constructions.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型图一右侧结构示意图;Fig. 2 is a structural schematic diagram on the right side of Fig. 1 of the utility model;

图3为本实用新型图一连接杆俯视结构示意图。Fig. 3 is a schematic diagram of the top view of the connecting rod in Fig. 1 of the utility model.

图中:1、架体;2、调节机构;201、丝杆;202、连接座;203、滑动杆;204、连接杆;205、固定杆;206、第一滑轮;207、支撑杆;208、滑块;209、电动升降杆;210、底座;211、固定块;212、螺钉;213、抹平尺;214、电动伸缩杆;3、第二滑轮。Among the figure: 1, frame body; 2, adjustment mechanism; 201, screw rod; 202, connecting seat; 203, sliding rod; 204, connecting rod; 205, fixed rod; 206, first pulley; 207, support rod; 208 209, electric lifting rod; 210, base; 211, fixed block; 212, screw; 213, leveling ruler; 214, electric telescopic rod; 3, the second pulley.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-3,本实施例中的一种土木工程施工用混凝土抹平器,包括数量为两个的架体1,架体1的顶部设有调节机构2。Please refer to FIGS. 1-3 , a concrete trowel for civil engineering construction in this embodiment includes two frames 1 , and an adjustment mechanism 2 is provided on the top of the frames 1 .

调节机构2包括固定安装在架体1内部的丝杆201,丝杆201的外周壁上螺纹连接有连接座202,连接座202的顶部固定连接有滑动杆203,架体1的底部固定安装有数量为两个的固定杆205,两个固定杆205之间固定安装有连接杆204,滑动杆203滑动连接在连接杆204的内部,连接杆204的内部开设有与滑动杆203大小相适配的第一滑槽,滑动杆203的左右两侧外壁固定安装有第一滑轮206,连接杆204的顶部开设有第二滑槽,第一滑轮206在第二滑槽内滑动连接,第二滑槽的大小与第一滑轮206的大小相适配。The adjustment mechanism 2 includes a screw rod 201 fixedly installed inside the frame body 1, a connecting seat 202 is threadedly connected to the outer peripheral wall of the screw rod 201, the top of the connecting seat 202 is fixedly connected with a sliding rod 203, and the bottom of the frame body 1 is fixedly installed with a The number is two fixed rods 205, and a connecting rod 204 is fixedly installed between the two fixed rods 205. The sliding rod 203 is slidably connected to the inside of the connecting rod 204, and the inside of the connecting rod 204 is provided with a The first chute of the first chute, the outer walls of the left and right sides of the sliding rod 203 are fixedly equipped with a first pulley 206, and the top of the connecting rod 204 is provided with a second chute, the first pulley 206 is slidably connected in the second chute, and the second slide The size of the groove matches the size of the first pulley 206 .

两个滑动杆203之间固定安装有支撑杆207,支撑杆207的内部滑动连接有滑块208,支撑杆207的底部外壁开设有第三滑槽,第三滑槽的大小与滑块208的大小相适配,滑块208的底部固定安装有电动升降杆209,两个电动伸缩杆214远离滑动杆203的一侧与电动升降杆209固定连接,电动升降杆209的底部固定安装有底座210,底座210的左右两侧均固定安装有固定块211,固定块211螺纹连接有螺钉212,底座210的底部活动安装有抹平尺213,固定块211的内部和抹平尺213的顶部开设有螺纹孔,螺纹孔的大小与螺钉212的大小相适配,架体1的底部固定安装有数量为两个的第二滑轮3,抹平尺213下降的距离大于架体1到第二滑轮3底部的距离,两个滑动杆203相对的一侧固定安装有电动伸缩杆214。Between the two sliding bars 203, a support bar 207 is fixedly installed, and the inside of the support bar 207 is slidably connected with a slide block 208. Matching in size, the bottom of the slider 208 is fixedly equipped with an electric lifting rod 209, and the side of the two electric telescopic rods 214 away from the sliding rod 203 is fixedly connected with the electric lifting rod 209, and the bottom of the electric lifting rod 209 is fixedly installed with a base 210 , the left and right sides of the base 210 are fixedly equipped with a fixed block 211, the fixed block 211 is threadedly connected with a screw 212, the bottom of the base 210 is movably installed with a leveling ruler 213, the inside of the fixed block 211 and the top of the leveling ruler 213 are provided with Threaded hole, the size of the threaded hole matches the size of the screw 212, the bottom of the frame body 1 is fixedly installed with two second pulleys 3, and the distance of the leveling ruler 213 falling is greater than that of the frame body 1 to the second pulley 3 The distance from the bottom, the opposite side of the two sliding rods 203 is fixedly equipped with an electric telescopic rod 214 .

本实施例中的,滑块208的左右两侧固定安装有限位块,限位块的长度大于第三滑槽的宽度。In this embodiment, the left and right sides of the slider 208 are fixed with limiting blocks, and the length of the limiting blocks is greater than the width of the third chute.

需要说明的是,通过丝杆201和连接座202的作用使滑动杆203可以在连接杆204的内部滑动,滑动杆203带动了支撑杆207同方位移动。It should be noted that the sliding rod 203 can slide inside the connecting rod 204 through the function of the screw rod 201 and the connecting seat 202 , and the sliding rod 203 drives the supporting rod 207 to move in the same direction.

需要说明的是,通过电动伸缩杆214可以调节两个电动升降杆209之间的距离,可以适应多种长度不同的抹平尺213。It should be noted that the distance between the two electric elevating rods 209 can be adjusted through the electric telescopic rod 214 , which can adapt to various troweling rulers 213 of different lengths.

需要说明的是,固定杆205起到了一定的承重作用。It should be noted that the fixed rod 205 plays a certain load-bearing role.

上述实施例的工作原理为:The working principle of the above-mentioned embodiment is:

将混凝土抹平器通过第二滑轮3移动到需要工作的地方后,此时根据路面需要施工的宽度通过电动伸缩杆214调节两个电动升降杆209之间的距离,然后将抹平尺213通过螺钉212与固定块211连接,此时启动电动升降杆209,电动升降杆209将抹平尺213向下移动到与需要施工的地面接触,此时启动丝杆201,通过丝杆201的作用使滑动杆203开始移动,滑动杆203带动了支撑杆207同方位移动,此时混凝土抹平器便开始工作。After the concrete trowel is moved to the place where work needs to be done through the second pulley 3, the distance between the two electric lifting rods 209 is adjusted through the electric telescopic rod 214 according to the width of the road surface to be constructed, and then the troweling ruler 213 is passed The screw 212 is connected with the fixed block 211. At this time, the electric lifting rod 209 is started, and the electric lifting rod 209 moves the leveling ruler 213 down to contact with the ground to be constructed. The slide bar 203 starts to move, and the slide bar 203 drives the support bar 207 to move in the same direction, and now the concrete trowel starts to work.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (7)

1.一种土木工程施工用混凝土抹平器,包括数量为两个的架体(1),其特征在于:所述架体(1)的顶部设有调节机构(2);1. A concrete trowel for civil engineering construction, comprising two frame bodies (1) in quantity, characterized in that: the top of the frame body (1) is provided with an adjustment mechanism (2); 所述调节机构(2)包括固定安装在架体(1)内部的丝杆(201),所述丝杆(201)的外周壁上螺纹连接有连接座(202),所述连接座(202)的顶部固定连接有滑动杆(203),所述架体(1)的底部固定安装有数量为两个的固定杆(205),两个所述固定杆(205)之间固定安装有连接杆(204),所述滑动杆(203)的左右两侧外壁固定安装有第一滑轮(206),两个所述滑动杆(203)之间固定安装有支撑杆(207),所述支撑杆(207)的内部滑动连接有滑块(208),所述滑块(208)的底部固定安装有电动升降杆(209),所述电动升降杆(209)的底部固定安装有底座(210),所述底座(210)的左右两侧均固定安装有固定块(211),所述固定块(211)螺纹连接有螺钉(212),所述底座(210)的底部活动安装有抹平尺(213),两个所述滑动杆(203)相对的一侧固定安装有电动伸缩杆(214)。The adjustment mechanism (2) includes a screw rod (201) fixedly installed inside the frame body (1), the outer peripheral wall of the screw rod (201) is threaded with a connecting seat (202), and the connecting seat (202) ) is fixedly connected with a sliding bar (203), the bottom of the frame body (1) is fixedly equipped with two fixed bars (205), and a connecting link is fixedly installed between the two fixed bars (205). Rod (204), the first pulley (206) is fixedly installed on the outer walls of the left and right sides of the sliding rod (203), and a support rod (207) is fixedly installed between the two sliding rods (203). The inside of the rod (207) is slidingly connected with a slider (208), the bottom of the slider (208) is fixedly equipped with an electric elevating rod (209), and the bottom of the electric elevating rod (209) is fixedly installed with a base (210 ), the left and right sides of the base (210) are fixedly equipped with a fixed block (211), the fixed block (211) is threadedly connected with a screw (212), and the bottom of the base (210) is movable with a smoothing Ruler (213), the opposite side of two described slide bars (203) is fixedly equipped with electric telescopic link (214). 2.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:所述滑动杆(203)滑动连接在连接杆(204)的内部,所述连接杆(204)的内部开设有与滑动杆(203)大小相适配的第一滑槽。2. A concrete trowel for civil engineering construction according to claim 1, characterized in that: the sliding rod (203) is slidably connected to the inside of the connecting rod (204), and the connecting rod (204) A first chute matching the size of the sliding rod (203) is provided inside. 3.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:所述连接杆(204)的顶部开设有第二滑槽,所述第一滑轮(206)在第二滑槽内滑动连接,所述第二滑槽的大小与第一滑轮(206)的大小相适配。3. A concrete trowel for civil engineering construction according to claim 1, characterized in that: the top of the connecting rod (204) is provided with a second chute, and the first pulley (206) is The two sliding grooves are slidingly connected, and the size of the second sliding groove matches the size of the first pulley (206). 4.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:两个所述电动伸缩杆(214)远离滑动杆(203)的一侧与电动升降杆(209)固定连接。4. A concrete trowel for civil engineering construction according to claim 1, characterized in that: the side of the two electric telescopic rods (214) away from the sliding rod (203) is connected with the electric elevating rod (209) Fixed connection. 5.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:所述架体(1)的底部固定安装有数量为两个的第二滑轮(3),所述抹平尺(213)下降的距离大于架体(1)到第二滑轮(3)底部的距离。5. A kind of concrete trowel for civil engineering construction according to claim 1, characterized in that: the bottom of the frame (1) is fixedly equipped with two second pulleys (3), the The descending distance of the leveling ruler (213) is greater than the distance from the frame body (1) to the bottom of the second pulley (3). 6.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:所述支撑杆(207)的底部外壁开设有第三滑槽,所述第三滑槽的大小与滑块(208)的大小相适配。6. A concrete trowel for civil engineering construction according to claim 1, characterized in that: the bottom outer wall of the support rod (207) is provided with a third chute, the size of the third chute is the same as The size of the slider (208) matches. 7.根据权利要求1所述的一种土木工程施工用混凝土抹平器,其特征在于:所述固定块(211)的内部和抹平尺(213)的顶部开设有螺纹孔,所述螺纹孔的大小与螺钉(212)的大小相适配。7. A concrete trowel for civil engineering construction according to claim 1, characterized in that: the inside of the fixed block (211) and the top of the trowel (213) are provided with threaded holes, and the threaded The size of the hole matches the size of the screw (212).
CN202222531176.2U 2022-09-24 2022-09-24 Concrete trowel for civil engineering construction Expired - Fee Related CN218667016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222531176.2U CN218667016U (en) 2022-09-24 2022-09-24 Concrete trowel for civil engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222531176.2U CN218667016U (en) 2022-09-24 2022-09-24 Concrete trowel for civil engineering construction

Publications (1)

Publication Number Publication Date
CN218667016U true CN218667016U (en) 2023-03-21

Family

ID=85561251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222531176.2U Expired - Fee Related CN218667016U (en) 2022-09-24 2022-09-24 Concrete trowel for civil engineering construction

Country Status (1)

Country Link
CN (1) CN218667016U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118390843A (en) * 2024-06-27 2024-07-26 内蒙古国嶙建设工程有限公司 Construction device for civil engineering construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118390843A (en) * 2024-06-27 2024-07-26 内蒙古国嶙建设工程有限公司 Construction device for civil engineering construction
CN118390843B (en) * 2024-06-27 2024-10-25 建泰建设有限公司 Construction device for civil engineering construction

Similar Documents

Publication Publication Date Title
CN218667016U (en) Concrete trowel for civil engineering construction
CN209652778U (en) Movable formwork trolley for culvert construction
CN211473275U (en) A troweling device for building wall construction
CN108886977A (en) A kind of flat grain equipment of truss-like and control method
CN216181426U (en) Quick plastering tool for concrete structure production
CN209849594U (en) Novel numerical control bender for wooden case processing
CN217831643U (en) Reinforcing bar device of flare-outing adds holds mechanism of flare-outing
CN112081606A (en) Slidable inverted arch formwork and construction method thereof
CN108529197B (en) Carrying device of intelligent building beam column manufacturing equipment
CN218881573U (en) Civil engineering template bearing structure
CN216971226U (en) A kind of slate handling transition tooling
CN217819650U (en) Engineering construction supervises and uses concrete detection equipment
CN217975440U (en) Concrete vibrating device for construction engineering
CN112281594B (en) Vibration forming device for recycled cement stabilized macadam and working method thereof
CN213629741U (en) Electronic theodolite for slope construction
CN211006254U (en) A vibrating device for municipal road construction
CN211691513U (en) Leveling device for concrete structure of constructional engineering
CN115285838A (en) Prefabricated part installation equipment for antique building construction
CN218758563U (en) Wall floating device for house building engineering construction
CN220790671U (en) Auxiliary support frame for house ceiling
CN217054204U (en) A wall leveling device for house construction
CN217581430U (en) A new type of environmental protection support device for steel structure construction
CN218532611U (en) Construction site steel bar rolling machine
CN221943719U (en) Flatness detection device for construction
CN219151700U (en) Steel grating cutting device with positioning mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230321