CN218619546U - Building engineering cable pay-off - Google Patents
Building engineering cable pay-off Download PDFInfo
- Publication number
- CN218619546U CN218619546U CN202222815089.XU CN202222815089U CN218619546U CN 218619546 U CN218619546 U CN 218619546U CN 202222815089 U CN202222815089 U CN 202222815089U CN 218619546 U CN218619546 U CN 218619546U
- Authority
- CN
- China
- Prior art keywords
- cable
- guide roller
- sliding seat
- clamping device
- winding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004804 winding Methods 0.000 claims abstract description 36
- 238000010276 construction Methods 0.000 claims description 5
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Unwinding Of Filamentary Materials (AREA)
Abstract
The utility model belongs to the technical field of the cable is received and releases line, a building engineering cable pay-off has been solved to some narrow and small spatial position, and the cable shaft supports inconveniently, and the cable twists reverse easily when the work load of acting as go-between is big, and the unwrapping wire, the problem of pulling of the cable of knoing, being not convenient for. The cable pay-off device for the building engineering comprises a winding roller, a guide rail, a sliding seat, a cable clamping device, a winding motor, a winding frame and a trolley; the cable winding device comprises a guide rail, a winding frame, a winding drum, a sliding seat, a cable clamping device, a cable unwinding position and a cable unwinding position. The device occupies small space, can reduce the phenomena of twisting and knotting of the cable, and is convenient for dragging the cable; and the trolley is used for transportation, so that the trolley is convenient to move and saves space.
Description
Technical Field
The utility model belongs to the technical field of the cable is received and is paid off, concretely relates to building engineering cable pay-off.
Background
When cables are paid off in building engineering, a cable reel is well supported by a pay-off rack, a guide wheel is erected in the middle of a cable path, and the cables are dragged by a winch and paid off manually.
However, for some narrow space positions, the cable shaft is inconvenient to support, and the cable is usually paid off from the cable shaft, cut to a required length, carried to a specified position and pulled to be paid off, but the method has the disadvantages of large workload of pulling, easy torsion and knotting of the cable during paying off and inconvenience in pulling the cable.
Disclosure of Invention
The utility model discloses a solve above-mentioned at least one technical problem who exists among the prior art, provide a building engineering cable pay-off, occupation space is little, and the cable of winding on the wire winding cylinder sees off through cable clamping device, and the slide makes the cable keep following straightly according to cable unwinding position slip.
The utility model discloses a following technical scheme realizes: a cable pay-off device for building engineering comprises a winding roller, a guide rail, a sliding seat, a cable clamping device, a winding motor, a winding frame and a trolley; the guide rail and the winding frame are fixed on the trolley, the winding drum is rotatably arranged on the winding frame and driven by the winding motor, the sliding seat is slidably mounted on the guide rail, the cable clamping device is fixedly connected onto the sliding seat, the cable wound on the winding drum is sent out by the cable clamping device, and the sliding seat slides according to the unwinding position of the cable to keep the cable straight.
Preferably, the cable clamping device comprises an upper guide roller and a lower guide roller, the cable being fed out through a clamping space between the upper guide roller and the lower guide roller.
Preferably, the cable clamping device further comprises a guide roller adjusting screw, an upper guide roller frame and a lower guide roller frame, wherein the upper guide roller frame is in threaded connection with the rod part of the guide roller adjusting screw, the lower end of the guide roller adjusting screw is in threaded connection with the upper end of the sliding seat and penetrates through the sliding seat, the lower guide roller frame is fixed at the upper end of the sliding seat, and the upper guide roller and the lower guide roller are respectively in rotary connection with the upper guide roller frame and the lower guide roller frame; keeping the position of the upper guide roller frame still, and adjusting the relative positions of the guide roller adjusting screw and the sliding seat so as to enable the cable clamping device to be suitable for cables with different specifications.
Preferably, the slide comprises a lower slide slidably connected to the rail and an upper pallet for mounting the cable holding device.
Preferably, a side wall of the lower sliding block of the sliding seat is fixedly connected with a push-pull handle, and the push-pull handle is used for driving the sliding seat to move according to the unwinding position of the cable.
Compared with the prior art, the beneficial effects of the utility model are that:
the device occupies small space, the cable wound on the winding drum is sent out through the cable clamping device, the sliding seat manually controls the sliding according to the unwinding position of the cable to keep the cable straight, the phenomena of twisting and knotting of the cable are reduced, and the cable is convenient to drag; and the trolley is used for transportation, so that the trolley is convenient to move and saves space.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present embodiment.
In the figure: 1-a winding drum; 2-a guide rail; 3-a slide seat; 3.1-lower slide block; 3.2-mounting the platform; 4-a wound motor; 5-a bobbin; 6-pushing the cart; 7.1-upper guide rollers; 7.2-lower guide roller; 7.3-guide roller adjusting screw; 7.4-upper guide roller frame; 7.5-lower guide roller frame; 8-a push-pull handle.
Detailed Description
The technical solutions in the embodiments of the present invention are clear and fully described with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
It should be understood that the structures, ratios, sizes, and the like shown in the drawings and described in the specification are only used for matching with the disclosure of the specification, so as to be understood and read by those skilled in the art, and are not used to limit the practical limitations of the present invention, so they have no technical essence, and any modifications of the structures, ratios, or sizes should still fall within the scope of the present invention, which can be covered by the technical disclosure, without affecting the efficacy and the achievable purpose of the present invention.
The utility model provides an embodiment:
as shown in fig. 1, a cable pay-off device for construction engineering comprises a winding drum 1, a guide rail 2, a sliding seat 3, a cable clamping device, a winding motor 4, a winding frame 5 and a trolley 6; the guide rail 2 and the winding frame 5 are fixed on the cart 6, the winding drum 1 is rotatably arranged on the winding frame 5 and is driven by the winding motor 4, the sliding seat 3 is slidably mounted on the guide rail 2, the cable clamping device is fixedly connected onto the sliding seat 3, a cable wound on the winding drum 1 is sent out by the cable clamping device, and the sliding seat 3 slides according to the unwinding position of the cable to keep the cable straight.
In the embodiment, the cable clamping device comprises an upper guide roller 7.1, a lower guide roller 7.2, a guide roller adjusting screw 7.3, an upper guide roller frame 7.4 and a lower guide roller frame 7.5, the cable passes through a clamping space between the upper guide roller 7.1 and the lower guide roller 7.2 and is sent out, wherein the upper guide roller frame 7.4 is in threaded connection with the rod part of the guide roller adjusting screw 7.3, the lower end of the guide roller adjusting screw 7.3 is in threaded connection with the upper end of the sliding seat 3 and penetrates through the sliding seat 3, the lower guide roller frame 7.5 is fixed at the upper end of the sliding seat 3, and the upper guide roller 7.1 and the lower guide roller 7.2 are respectively in rotational connection with the upper guide roller frame 7.4 and the lower guide roller frame 7.5; the position of the upper guide roller frame 7.4 is kept still, and the relative position of the guide roller adjusting screw 7.3 and the sliding seat 3 is adjusted so that the cable clamping device is suitable for cables with different specifications.
The sliding seat 3 comprises a lower sliding block 3.1 and an upper supporting table 3.2, wherein the lower sliding block 3.1 is connected with the guide rail 2 in a sliding manner, and the upper supporting table 3.2 is used for installing a cable clamping device; one side wall of the lower sliding block 3.1 of the sliding seat 3 is fixedly connected with a push-pull handle 8, and the push-pull handle 8 is used for driving the sliding seat 3 to move according to the unwinding position of the cable.
The method comprises the following specific operation steps:
the cable is initially laid and wound on the winding drum 1 under the action of the winding motor 4, and the whole device is transported to a specified position;
during threading, the cable passes through the space between the upper guide roller 7.1 and the lower guide roller 7.2, the position of the lower guide roller 7.2 is kept unchanged, the guide roller adjusting screw 7.3 is rotated to adjust the height of the upper guide roller 7.1, and the upper guide roller 7.1 and the lower guide roller 7.2 are further used for clamping the cable;
in the wire feeding process, the sliding seat 3 is pushed and pulled manually and the horizontal position of the sliding seat 8 is moved, so that the position of the cable clamping device and the unwinding position of the cable on the winding drum 1 are in a straight line, and the cable is convenient to pull.
The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (5)
1. The utility model provides a building engineering cable pay-off which characterized in that: comprises a winding drum (1), a guide rail (2), a sliding seat (3), a cable clamping device, a winding motor (4), a winding frame (5) and a cart (6);
guide rail (2) and bobbin (5) are fixed on shallow (6), and wire winding cylinder (1) rotates to be set up on bobbin (5) and through wire winding motor (4) drive, and slide (3) slidable mounting is on guide rail (2), and cable clamping device links firmly on slide (3), and the cable of winding on wire winding cylinder (1) sees off through cable clamping device, and slide (3) are according to the cable position of unwinding slip messenger's cable and are kept in the same direction as straight.
2. A construction work cable paying out device according to claim 1, wherein: the cable clamping device comprises an upper guide roller (7.1) and a lower guide roller (7.2), and the cable passes through a clamping space between the upper guide roller (7.1) and the lower guide roller (7.2) to be sent out.
3. The construction engineering cable pay-off device as claimed in claim 2, wherein: the cable clamping device further comprises a guide roller adjusting screw (7.3), an upper guide roller frame (7.4) and a lower guide roller frame (7.5), wherein the upper guide roller frame (7.4) is in threaded connection with the rod part of the guide roller adjusting screw (7.3), the lower end of the guide roller adjusting screw (7.3) is in threaded connection with the upper end of the sliding seat (3) and penetrates through the sliding seat (3), the lower guide roller frame (7.5) is fixed at the upper end of the sliding seat (3), and an upper guide roller (7.1) and a lower guide roller (7.2) are respectively in rotary connection with the upper guide roller frame (7.4) and the lower guide roller frame (7.5); the position of the upper guide roller frame (7.4) is kept still, and the relative position of the guide roller adjusting screw (7.3) and the sliding seat (3) is adjusted so that the cable clamping device is suitable for cables with different specifications.
4. A construction work cable paying out device according to claim 1, wherein: the sliding seat (3) comprises a lower sliding block (3.1) and an upper supporting table (3.2), wherein the lower sliding block (3.1) is connected with the guide rail (2) in a sliding mode, and the upper supporting table (3.2) is used for installing the cable clamping device.
5. The construction engineering cable pay-off device as claimed in claim 4, wherein: and a push-pull handle (8) is fixedly connected to one side wall of the lower sliding block (3.1) of the sliding seat (3), and the push-pull handle (8) is used for driving the sliding seat (3) to move according to the unwinding position of the cable.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222815089.XU CN218619546U (en) | 2022-10-25 | 2022-10-25 | Building engineering cable pay-off |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222815089.XU CN218619546U (en) | 2022-10-25 | 2022-10-25 | Building engineering cable pay-off |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218619546U true CN218619546U (en) | 2023-03-14 |
Family
ID=85471516
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222815089.XU Active CN218619546U (en) | 2022-10-25 | 2022-10-25 | Building engineering cable pay-off |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218619546U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117486010A (en) * | 2023-08-29 | 2024-02-02 | 国网浙江省电力有限公司嘉善县供电公司 | A multifunctional cable rack |
-
2022
- 2022-10-25 CN CN202222815089.XU patent/CN218619546U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117486010A (en) * | 2023-08-29 | 2024-02-02 | 国网浙江省电力有限公司嘉善县供电公司 | A multifunctional cable rack |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209767009U (en) | automatic cable laying system and cable laying device thereof | |
| CN211110391U (en) | Wire rope is with receiving and releasing device for elevator | |
| CN218619546U (en) | Building engineering cable pay-off | |
| CN217867382U (en) | Electric power construction pay off rack | |
| CN210558494U (en) | Movable multi-station pay-off device | |
| CN215885910U (en) | Portable cable reel winding and unwinding devices | |
| CN104528478A (en) | Automatic winding and unwinding device for electric cables | |
| CN207810903U (en) | A new type of fully automatic wire feeding machine with guiding structure | |
| CN221680347U (en) | Winding roller for automatic unreeling of cables | |
| CN119683422A (en) | Support device | |
| CN219341236U (en) | Cable winding and unwinding devices for power engineering | |
| CN217675753U (en) | Automatic feeding and discharging machine | |
| CN206735510U (en) | A kind of electric power cable coiling apparatus | |
| CN217947256U (en) | Cable laying pay-off | |
| CN113023470B (en) | Take-up device and cable rewinder | |
| CN111049062B (en) | Reel support that power cable laid for electromechanical engineering construction | |
| CN213568816U (en) | Threading wire barrow among electrical engineering | |
| CN209913374U (en) | Cable laying device with adjustable height | |
| CN210710357U (en) | Hook device for cable coil | |
| CN211790427U (en) | A kind of line lifter for straight line segment of distribution network | |
| JP2000295726A (en) | Overhead cable installation method and spiral wire pay- off device used for the method | |
| CN220866979U (en) | Unidirectional cable arranging device | |
| CN222743820U (en) | Cable wringing mill | |
| CN221573580U (en) | Weaving system for silica gel cable weaving layer | |
| CN119460881B (en) | Installation equipment of photovoltaic power transmission aluminum alloy conductor cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |