CN218603088U - Auxiliary device for electric power engineering - Google Patents

Auxiliary device for electric power engineering Download PDF

Info

Publication number
CN218603088U
CN218603088U CN202221930431.4U CN202221930431U CN218603088U CN 218603088 U CN218603088 U CN 218603088U CN 202221930431 U CN202221930431 U CN 202221930431U CN 218603088 U CN218603088 U CN 218603088U
Authority
CN
China
Prior art keywords
clamp
auxiliary device
power engineering
fixedly connected
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221930431.4U
Other languages
Chinese (zh)
Inventor
熊超
胡亮
熊友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Jineng Construction Engineering Co ltd
Original Assignee
Wuhan Jineng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Jineng Construction Engineering Co ltd filed Critical Wuhan Jineng Construction Engineering Co ltd
Priority to CN202221930431.4U priority Critical patent/CN218603088U/en
Application granted granted Critical
Publication of CN218603088U publication Critical patent/CN218603088U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Clamps And Clips (AREA)

Abstract

本实用新型公开了一种电力工程用辅助装置,涉及电力工程技术领域,包括安装架,安装架的内部转动连接有支架,支架的顶部转动连接有支撑架,支撑架的顶部固定连接有第一夹具,第一夹具的顶部设置有第二夹具,第一夹具相对应的两侧均开设有限位孔。本实用新型的有益效果为:该电力工程用辅助装置,通过支撑架相对应两侧设置的升降式限位架,对两个夹具之间插接的插件进行限位,代替螺丝将两个夹具连接在一起,使其能够快速对不同尺寸的电力管道进行夹持固定,便于管道的安装和拆卸,且两个夹具的内部均滑动连接有固定板,通过弹簧调节对管道夹持的力度,并对管道进行减震缓冲,有利于提高管道安装的稳定性。

Figure 202221930431

The utility model discloses an auxiliary device for electric power engineering, which relates to the technical field of electric power engineering and comprises a mounting frame. For the clamp, the top of the first clamp is provided with a second clamp, and both sides corresponding to the first clamp are provided with limiting holes. The beneficial effects of the utility model are: the auxiliary device for electric power engineering, through the lift-type limit frame set on the corresponding two sides of the support frame, the plug-in plug-in between the two clamps is limited, and the two clamps are replaced by screws. They are connected together so that they can quickly clamp and fix power pipes of different sizes, which is convenient for installation and disassembly of the pipes, and the inside of the two clamps are slidingly connected with a fixing plate, and the force of clamping the pipes is adjusted by springs, and The shock absorption and buffering of the pipeline is beneficial to improve the stability of the pipeline installation.

Figure 202221930431

Description

一种电力工程用辅助装置An auxiliary device for electrical engineering

技术领域technical field

本实用新型涉及电力工程技术领域,具体为一种电力工程用辅助装置。The utility model relates to the technical field of electric power engineering, in particular to an auxiliary device for electric power engineering.

背景技术Background technique

在电力技术和电力设备日益发展的当下,电力行业在市场中发展速度越来越快,随着电力需求量的不断增长,电力涉及到的领域越来越多,对市场经济产生的影响也越来越大,电力建设工程中所用到的新型施工技术和新型的设备越来越多。With the development of power technology and power equipment, the power industry is developing faster and faster in the market. With the continuous growth of power demand, more and more fields are involved in power, and the impact on the market economy is also increasing. More and more new construction technologies and new equipment are used in electric power construction projects.

在电力管道安装的过程中,多通过螺丝对管道进行夹持固定,但是固定后不便于调节管道角度和方向的同时,受到螺丝松动的影响,管道容易位移,且安装和拆卸时需要借助工具,操作较为麻烦。During the installation of power pipelines, the pipeline is usually clamped and fixed by screws, but it is not convenient to adjust the angle and direction of the pipeline after fixing. At the same time, the pipeline is easily displaced due to the influence of loose screws, and tools are required for installation and disassembly. The operation is more troublesome.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种电力工程用辅助装置,解决了上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the utility model provides an auxiliary device for electric power engineering, which solves the problems raised in the above-mentioned background technology.

为实现以上目的,本实用新型通过以下技术方案予以实现:一种电力工程用辅助装置,包括安装架,所述安装架的内部转动连接有支架,所述支架的顶部转动连接有支撑架,所述支撑架的顶部固定连接有第一夹具,所述第一夹具的顶部设置有第二夹具,所述第一夹具相对应的两侧均开设有限位孔,所述第二夹具底部相对应的两侧均固定连接有插件,两个所述插件的一端分别贯穿两个限位孔,所述支撑架相对应的两侧均开设有凸形槽,所述凸形槽的内部滑动连接有凸形块,所述凸形块的一侧固定连接有第一限位架,所述第一限位架的内部滑动连接有第二限位架,所述第二限位架的一端贯穿插件,所述第一限位架的一侧螺纹连接有第一螺栓,所述插件的内部开设有与第二限位架相配合的固定孔。In order to achieve the above purpose, the utility model is achieved through the following technical solutions: an auxiliary device for electric power engineering, including a mounting frame, the inside of the mounting frame is rotatably connected to a bracket, and the top of the bracket is rotatably connected to a support frame, so The top of the support frame is fixedly connected with a first clamp, the top of the first clamp is provided with a second clamp, the corresponding sides of the first clamp are provided with limiting holes, and the bottom of the second clamp is corresponding Both sides are fixedly connected with plug-ins, and one end of the two plug-ins passes through two limit holes respectively, and the corresponding two sides of the support frame are provided with convex grooves, and the inside of the convex grooves is slidably connected with convex holes. Shaped block, one side of the convex block is fixedly connected with a first limiter, the inside of the first limiter is slidably connected with a second limiter, one end of the second limiter runs through the plug-in, A first bolt is threadedly connected to one side of the first limiting frame, and a fixing hole matching the second limiting frame is opened inside the insert.

优选的,所述第一夹具和第二夹具的内部均滑动连接有减震杆,所述减震杆的一端固定连接有固定板,两个所述减震杆的外侧均套接有弹簧,两个弹簧的一侧分别与第一夹具和第二夹具的外壁固定连接。Preferably, both the inside of the first clamp and the second clamp are slidably connected with a shock absorbing rod, one end of the shock absorbing rod is fixedly connected with a fixing plate, and the outer sides of the two shock absorbing rods are sleeved with springs, One side of the two springs is respectively fixedly connected with the outer walls of the first clamp and the second clamp.

优选的,所述安装架的内壁开设有滑槽,所述滑槽的内部滑动连接有齿条,所述安装架的一侧螺纹连接有第二螺栓。Preferably, the inner wall of the installation frame is provided with a chute, the inside of the chute is slidably connected with a rack, and one side of the installation frame is threaded with a second bolt.

优选的,所述安装架的内壁且位于滑槽的顶部开设有凹槽,所述凹槽的内部转动连接有齿轮,所述齿轮与齿条啮合,所述齿轮与支架固定连接。Preferably, a groove is provided on the inner wall of the installation frame and at the top of the chute, a gear is rotatably connected to the inside of the groove, the gear meshes with the rack, and the gear is fixedly connected to the bracket.

优选的,所述凸形槽的内部转动连接有丝杆,所述丝杆贯穿凸形块并与凸形块螺纹连接。Preferably, a threaded rod is rotatably connected inside the convex groove, and the threaded rod passes through the convex block and is threadedly connected with the convex block.

优选的,所述支撑架的内部且位于两个凸形槽的底部开设有限位槽,所述限位槽的内部转动连接有两个链轮,两个所述链轮的外侧啮合有链条,两个所述链轮分别与两个丝杆固定连接。Preferably, a limit slot is provided inside the support frame and at the bottom of the two convex grooves, the inside of the limit slot is rotatably connected with two sprockets, and the outer sides of the two sprockets are engaged with chains, The two sprockets are respectively fixedly connected with the two screw rods.

优选的,所述支撑架的底部转动连接有转把,所述转把与其中一个链轮固定连接。Preferably, a turning handle is rotatably connected to the bottom of the support frame, and the turning handle is fixedly connected to one of the sprockets.

本实用新型提供了一种电力工程用辅助装置,具备以下有益效果:The utility model provides an auxiliary device for electric power engineering, which has the following beneficial effects:

1、该电力工程用辅助装置,通过支撑架相对应两侧设置的升降式限位架,对两个夹具之间插接的插件进行限位,代替螺丝将两个夹具连接在一起,使其能够快速对不同尺寸的电力管道进行夹持固定,便于管道的安装和拆卸,且两个夹具的内部均滑动连接有固定板,通过弹簧调节对管道夹持的力度,并对管道进行减震缓冲,有利于提高管道安装的稳定性。1. The auxiliary device for electric power engineering, through the lifting limit frame set on both sides of the support frame, limits the plug-in plug-in between the two fixtures, and connects the two fixtures together instead of screws, so that It can quickly clamp and fix power pipelines of different sizes, which is convenient for installation and disassembly of the pipelines, and the inside of the two clamps are slidingly connected with fixing plates, and the force of clamping the pipelines is adjusted by springs, and the pipelines are shock-absorbed and buffered , which is conducive to improving the stability of pipeline installation.

2、该电力工程用辅助装置,通过安装架与支架的转动连接,利用安装架内齿轮与齿条的啮合,使齿条在转动时可以触发齿轮以及支架的旋转,达到调节夹具角度的效果,且支架与夹具底部支撑架的转动连接,使夹具可以自由控制方向,从而适用于不同种类的管道,不需要在更换管道时,重新安装和拆卸装置。2. The auxiliary device for electric power engineering is connected through the rotation of the installation frame and the bracket, and utilizes the meshing between the gear and the rack in the installation frame, so that the rack can trigger the rotation of the gear and the bracket when rotating, so as to achieve the effect of adjusting the angle of the fixture. Moreover, the rotation connection between the bracket and the support frame at the bottom of the clamp enables the clamp to freely control the direction, thereby being applicable to different types of pipelines, and there is no need to reinstall and disassemble the device when replacing the pipeline.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型图1中A处放大图;Fig. 2 is the enlarged view of place A in Fig. 1 of the utility model;

图3为本实用新型侧视图。Fig. 3 is a side view of the utility model.

图中:1、安装架;2、支架;3、支撑架;4、第一夹具;5、第二夹具;6、限位孔;7、插件;8、凸形槽;9、凸形块;10、第一限位架;11、第二限位架;12、第一螺栓;13、减震杆;14、固定板;15、滑槽;16、齿条;17、第二螺栓;18、凹槽;19、齿轮;20、丝杆;21、限位槽;22、链轮;23、链条;24、转把。In the figure: 1. Mounting frame; 2. Bracket; 3. Support frame; 4. The first fixture; 5. The second fixture; 6. Limiting hole; 7. Insert; 8. Convex groove; 10, the first limit frame; 11, the second limit frame; 12, the first bolt; 13, the damping rod; 14, the fixed plate; 15, the chute; 16, the rack; 17, the second bolt; 18, groove; 19, gear; 20, screw mandrel; 21, limit groove; 22, sprocket wheel; 23, chain; 24, turn handle.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

请参阅图1至图3,本实用新型提供一种技术方案:一种电力工程用辅助装置,包括安装架1,安装架1的内部转动连接有支架2,支架2的顶部转动连接有支撑架3,支撑架3的顶部固定连接有第一夹具4,第一夹具4的顶部设置有第二夹具5,安装架1的内壁开设有滑槽15,滑槽15的内部滑动连接有齿条16,安装架1的一侧螺纹连接有第二螺栓17,便于对齿条16的位置进行锁紧,防止齿条16位移,以及第一夹具4和管道重力的作用下翻转,安装架1的内壁且位于滑槽15的顶部开设有凹槽18,凹槽18的内部转动连接有齿轮19,齿轮19与齿条16啮合,齿轮19与支架2固定连接,通过齿轮19与齿条16的啮合,使齿条16位移时,带动齿轮19和支架2顶部第一夹具4的旋转,达到调节管道角度的效果,第一夹具4相对应的两侧均开设有限位孔6,第二夹具5底部相对应的两侧均固定连接有插件7,两个插件7的一端分别贯穿两个限位孔6,支撑架3相对应的两侧均开设有凸形槽8,第一夹具4和第二夹具5的内部均滑动连接有减震杆13,减震杆13的一端固定连接有固定板14,两个减震杆13的外侧均套接有弹簧,两个弹簧的一侧分别与第一夹具4和第二夹具5的外壁固定连接,通过弹簧调节对管道夹持的力度,并对管道进行减震缓冲,有利于提高管道安装的稳定性,凸形槽8的内部滑动连接有凸形块9,凸形块9的一侧固定连接有第一限位架10,第一限位架10的内部滑动连接有第二限位架11,第二限位架11的一端贯穿插件7,第一限位架10的一侧螺纹连接有第一螺栓12,插件7的内部开设有与第二限位架11相配合的固定孔,由第二限位架11的伸展对插件7内固定孔的限位,代替螺丝对插件7内的固定,便于第二夹具5与第一夹具4对管道的快速夹持和拆卸,凸形槽8的内部转动连接有丝杆20,丝杆20贯穿凸形块9并与凸形块9螺纹连接,通过丝杆20与凸形块9的螺纹连接,使凸形块9一侧的第一限位架10和第二限位架11能够随着丝杆20的旋转进行升降,从而拉动两个插件7位移,促使第一夹具4和第二夹具5对电力管进行夹持固定,支撑架3的内部且位于两个凸形槽8的底部开设有限位槽21,限位槽21的内部转动连接有两个链轮22,两个链轮22的外侧啮合有链条23,两个链轮22分别与两个丝杆20固定连接,使两个链轮22在转动时,能够带动两个丝杆20同时旋转,支撑架3的底部转动连接有转把24,转把24与其中一个链轮22固定连接,便于从外部控制链轮22的转动。Please refer to Figures 1 to 3, the utility model provides a technical solution: an auxiliary device for electric power engineering, including a mounting frame 1, the inside of the mounting frame 1 is rotatably connected to a bracket 2, and the top of the bracket 2 is rotatably connected to a support frame 3. The top of the support frame 3 is fixedly connected with the first clamp 4, the top of the first clamp 4 is provided with the second clamp 5, the inner wall of the installation frame 1 is provided with a chute 15, and the inside of the chute 15 is slidably connected with a rack 16 One side of the installation frame 1 is threaded with a second bolt 17, which is convenient for locking the position of the rack 16, preventing the displacement of the rack 16, and turning over under the action of the first clamp 4 and the gravity of the pipeline. The inner wall of the installation frame 1 And be positioned at the top of chute 15 and be provided with groove 18, the inner rotation of groove 18 is connected with gear 19, and gear 19 meshes with rack 16, and gear 19 is fixedly connected with support 2, by the meshing of gear 19 and rack 16, When the rack 16 is displaced, it drives the gear 19 and the rotation of the first clamp 4 on the top of the bracket 2 to achieve the effect of adjusting the angle of the pipeline. The corresponding two sides of the first clamp 4 are provided with limiting holes 6, and the bottom of the second clamp 5 is connected to each other. Corresponding two sides are fixedly connected with plug-in 7, and one end of two plug-in 7 passes through two limit holes 6 respectively, and both sides corresponding to support frame 3 are provided with convex groove 8, and the first clamp 4 and the second clamp The inside of 5 is all slidingly connected with a shock absorber 13, and one end of the shock absorber 13 is fixedly connected with a fixed plate 14, and the outsides of the two shock absorbers 13 are all sleeved with springs, and one side of the two springs is connected to the first clamp respectively. 4 and the outer wall of the second fixture 5 are fixedly connected, and the strength of clamping the pipe is adjusted by the spring, and the pipe is shock-absorbed and buffered, which is conducive to improving the stability of the pipe installation. The inner sliding connection of the convex groove 8 is connected with a convex block 9. One side of the convex block 9 is fixedly connected with a first limiting frame 10, and the inside of the first limiting frame 10 is slidably connected with a second limiting frame 11, and one end of the second limiting frame 11 runs through the plug-in 7, and the second limiting frame 11 One side of a spacer 10 is threadedly connected with a first bolt 12, and the inside of the plug-in 7 is provided with a fixing hole matched with the second spacer 11. instead of fixing the screw to the inside of the plug-in 7, it is convenient for the second clamp 5 and the first clamp 4 to quickly clamp and disassemble the pipeline. The inside of the convex groove 8 is connected with a screw 20 for rotation, and the screw 20 runs through the convex shape block 9 and is threadedly connected with convex block 9, through the threaded connection of screw mandrel 20 and convex block 9, the first limit frame 10 and the second limit frame 11 on one side of convex block 9 can follow the wire The rotation of the rod 20 lifts and lowers, thereby pulling the displacement of the two inserts 7, impelling the first clamp 4 and the second clamp 5 to clamp and fix the power tube. Bit groove 21, the inner rotation of limiting groove 21 is connected with two sprockets 22, and the outer side of two sprockets 22 is meshed with chain 23, and two sprockets 22 are fixedly connected with two screw mandrels 20 respectively, makes two chains When the wheel 22 rotates, it can drive the two screw mandrels 20 to rotate simultaneously. The bottom of the support frame 3 is connected with a handle 24, which is fixedly connected with one of the sprocket wheels 22. It is convenient to control the rotation of the sprocket 22 from the outside.

综上,该电力工程用辅助装置,使用时,将电力管放置在第一夹具4内后,将第二夹具5覆盖在管道的上方,使第二夹具5相对应两侧的插件7贯穿第一夹具4相对应两侧的限位孔6,此时转动支撑架3底部的转把24,利用支撑架3内两个链轮22外侧啮合的链条23,触发支撑架3内两个丝杆20同时转动,通过两个丝杆20与凸形块9的螺纹连接,使丝杆20转动时,带动凸形块9一侧第一限位架10升降至插件7内固定孔位置,并滑动第一限位架10内的第二限位架11,使其穿过固定孔,对插件7进行限位,并转动第一限位架10一侧的第一螺栓12,对第二限位架11的长度进行固定,同理,此时转动转把24,触发第一限位架10和第二限位架11持续位移,拉动两个插件7下降,带动第二夹具5和第一夹具4对管道进行夹持固定,当需要调节管道的角度时,利用安装架1内齿条16与齿轮19的啮合,通过齿条16的位移,可以触发齿轮19的旋转,从而带动第一夹具4下方支架2转动,达到调节管道角度的效果,同理,转动安装架1一侧的第二螺栓17,即可对齿条16的位置进行固定,避免第一夹具4和管道在重力的作用下翻转。To sum up, when using the auxiliary device for electric power engineering, after placing the power pipe in the first fixture 4, the second fixture 5 is covered on the pipe, so that the inserts 7 on the corresponding sides of the second fixture 5 penetrate through the first fixture 5. A fixture 4 corresponds to the limit holes 6 on both sides. At this time, turn the handle 24 at the bottom of the support frame 3, and use the chain 23 engaged on the outside of the two sprockets 22 in the support frame 3 to trigger the two screw rods in the support frame 3. 20 rotate at the same time, through the threaded connection between two screw rods 20 and the convex block 9, when the screw rod 20 rotates, the first limiter 10 on one side of the convex block 9 is driven to lift to the position of the fixed hole in the plug-in 7, and slides The second spacer 11 in the first spacer 10 makes it pass through the fixing hole to limit the plug-in 7, and rotates the first bolt 12 on one side of the first spacer 10 to the second spacer. The length of the frame 11 is fixed, and in the same way, turn the handle 24 at this time to trigger the continuous displacement of the first limit frame 10 and the second limit frame 11, pull the two plug-ins 7 down, and drive the second clamp 5 and the first clamp 4 Clamp and fix the pipeline. When the angle of the pipeline needs to be adjusted, the gear 19 can be triggered to rotate through the displacement of the rack 16 through the meshing between the rack 16 and the gear 19 in the mounting frame 1, thereby driving the first clamp 4 The lower bracket 2 is rotated to achieve the effect of adjusting the angle of the pipe. Similarly, the position of the rack 16 can be fixed by rotating the second bolt 17 on one side of the mounting frame 1 to prevent the first clamp 4 and the pipe from being under the action of gravity Flip.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (7)

1.一种电力工程用辅助装置,包括安装架(1),其特征在于:所述安装架(1)的内部转动连接有支架(2),所述支架(2)的顶部转动连接有支撑架(3),所述支撑架(3)的顶部固定连接有第一夹具(4),所述第一夹具(4)的顶部设置有第二夹具(5),所述第一夹具(4)相对应的两侧均开设有限位孔(6),所述第二夹具(5)底部相对应的两侧均固定连接有插件(7),两个所述插件(7)的一端分别贯穿两个限位孔(6),所述支撑架(3)相对应的两侧均开设有凸形槽(8),所述凸形槽(8)的内部滑动连接有凸形块(9),所述凸形块(9)的一侧固定连接有第一限位架(10),所述第一限位架(10)的内部滑动连接有第二限位架(11),所述第二限位架(11)的一端贯穿插件(7),所述第一限位架(10)的一侧螺纹连接有第一螺栓(12),所述插件(7)的内部开设有与第二限位架(11)相配合的固定孔。1. An auxiliary device for power engineering, comprising a mounting frame (1), characterized in that: the inside of the mounting frame (1) is rotatably connected with a bracket (2), and the top of the bracket (2) is rotatably connected with a support frame (3), the top of the support frame (3) is fixedly connected with a first clamp (4), the top of the first clamp (4) is provided with a second clamp (5), and the first clamp (4) ) are provided with limited holes (6) on both sides corresponding to the bottom of the second fixture (5), and are fixedly connected with plug-ins (7) on both sides corresponding to the bottom of the second fixture (5), and one end of the two plug-ins (7) penetrates through the Two limiting holes (6), convex grooves (8) are opened on the corresponding sides of the support frame (3), and convex blocks (9) are slidably connected inside the convex grooves (8) , one side of the convex block (9) is fixedly connected with a first spacer (10), and the inside of the first spacer (10) is slidably connected with a second spacer (11), the One end of the second spacer (11) runs through the insert (7), and one side of the first spacer (10) is threaded with a first bolt (12), and the inside of the insert (7) is provided with a The second spacer (11) is matched with the fixing hole. 2.根据权利要求1所述的一种电力工程用辅助装置,其特征在于:所述第一夹具(4)和第二夹具(5)的内部均滑动连接有减震杆(13),所述减震杆(13)的一端固定连接有固定板(14),两个所述减震杆(13)的外侧均套接有弹簧,两个弹簧的一侧分别与第一夹具(4)和第二夹具(5)的外壁固定连接。2. A kind of auxiliary device for electric power engineering according to claim 1, characterized in that: the insides of the first clamp (4) and the second clamp (5) are slidingly connected with damping rods (13), so One end of the damping rod (13) is fixedly connected with a fixed plate (14), and springs are sleeved on the outside of the two damping rods (13), and one side of the two springs is connected to the first clamp (4) respectively. It is fixedly connected with the outer wall of the second clamp (5). 3.根据权利要求1所述的一种电力工程用辅助装置,其特征在于:所述安装架(1)的内壁开设有滑槽(15),所述滑槽(15)的内部滑动连接有齿条(16),所述安装架(1)的一侧螺纹连接有第二螺栓(17)。3. An auxiliary device for power engineering according to claim 1, characterized in that: the inner wall of the installation frame (1) is provided with a chute (15), and the inside of the chute (15) is slidingly connected with A rack (16), a second bolt (17) is threadedly connected to one side of the mounting frame (1). 4.根据权利要求3所述的一种电力工程用辅助装置,其特征在于:所述安装架(1)的内壁且位于滑槽(15)的顶部开设有凹槽(18),所述凹槽(18)的内部转动连接有齿轮(19),所述齿轮(19)与齿条(16)啮合,所述齿轮(19)与支架(2)固定连接。4. An auxiliary device for electric power engineering according to claim 3, characterized in that: the inner wall of the installation frame (1) and the top of the chute (15) are provided with a groove (18), and the groove (18) is A gear (19) is rotatably connected to the inside of the groove (18), the gear (19) meshes with the rack (16), and the gear (19) is fixedly connected with the bracket (2). 5.根据权利要求1所述的一种电力工程用辅助装置,其特征在于:所述凸形槽(8)的内部转动连接有丝杆(20),所述丝杆(20)贯穿凸形块(9)并与凸形块(9)螺纹连接。5. An auxiliary device for electric power engineering according to claim 1, characterized in that: the inside of the convex groove (8) is connected with a screw (20) for rotation, and the screw (20) runs through the convex groove (8). Block (9) is also threaded with convex block (9). 6.根据权利要求5所述的一种电力工程用辅助装置,其特征在于:所述支撑架(3)的内部且位于两个凸形槽(8)的底部开设有限位槽(21),所述限位槽(21)的内部转动连接有两个链轮(22),两个所述链轮(22)的外侧啮合有链条(23),两个所述链轮(22)分别与两个丝杆(20)固定连接。6. An auxiliary device for power engineering according to claim 5, characterized in that: the inside of the support frame (3) and the bottom of the two convex grooves (8) are provided with a limiting groove (21), Two sprockets (22) are connected to the inside of the limiting groove (21), and the outer sides of the two sprockets (22) are engaged with chains (23), and the two sprockets (22) are respectively connected with Two screw mandrels (20) are fixedly connected. 7.根据权利要求6所述的一种电力工程用辅助装置,其特征在于:所述支撑架(3)的底部转动连接有转把(24),所述转把(24)与其中一个链轮(22)固定连接。7. An auxiliary device for power engineering according to claim 6, characterized in that: the bottom of the support frame (3) is rotatably connected with a handle (24), and the handle (24) is connected to one of the chains Wheel (22) is fixedly connected.
CN202221930431.4U 2022-07-21 2022-07-21 Auxiliary device for electric power engineering Expired - Fee Related CN218603088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221930431.4U CN218603088U (en) 2022-07-21 2022-07-21 Auxiliary device for electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221930431.4U CN218603088U (en) 2022-07-21 2022-07-21 Auxiliary device for electric power engineering

Publications (1)

Publication Number Publication Date
CN218603088U true CN218603088U (en) 2023-03-10

Family

ID=85396768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221930431.4U Expired - Fee Related CN218603088U (en) 2022-07-21 2022-07-21 Auxiliary device for electric power engineering

Country Status (1)

Country Link
CN (1) CN218603088U (en)

Similar Documents

Publication Publication Date Title
CN218603088U (en) Auxiliary device for electric power engineering
CN208083776U (en) A kind of fixing device for pipe fitting welding
CN213003940U (en) Butterfly valve machining clamp
CN212107617U (en) A classroom multimedia projector suspension mount
CN219188209U (en) Clamping device of profile straightening machine
CN219310975U (en) Polishing device for crane part machining
CN218785504U (en) Tool for measuring total length of front shock absorber
CN217291005U (en) A welding device for electric bicycle frame production
CN216883453U (en) Self-adaptation vice that atress is even
CN217871949U (en) Reinforcing apparatus for ancient building is repaired
CN214743809U (en) Water pipe side longitudinal anti-seismic support with adjustable size
CN206069187U (en) A kind of planar magnetic lifting frame
CN218225355U (en) A welding jig for metal pipes
CN211332855U (en) Auxiliary fixing structure for pipeline installation
CN116104991A (en) A support and hanger for convenient adjustment of clamping force
CN212251467U (en) A kind of petrochemical pipeline support
CN221723578U (en) Pipeline hoisting structure for gas design
CN207272247U (en) For the vertical clamping of laboratory hand-held drilling machine and guider
CN218907290U (en) Pipeline transportation equipment for building
CN221704766U (en) Pipeline bracket with damping function
CN113021214A (en) Four-wheel positioning fixture convenient to adjust for automobile
CN210732205U (en) Processing clamp for engineering plastic part
CN219382652U (en) A pipe climbing device with high adaptability
CN217776032U (en) Welding jig is used in robot production
CN112757847A (en) Maintenance device convenient for rapidly replacing automobile tires

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230310