CN218581296U - Foundation pit guardrail for building construction - Google Patents

Foundation pit guardrail for building construction Download PDF

Info

Publication number
CN218581296U
CN218581296U CN202222306704.4U CN202222306704U CN218581296U CN 218581296 U CN218581296 U CN 218581296U CN 202222306704 U CN202222306704 U CN 202222306704U CN 218581296 U CN218581296 U CN 218581296U
Authority
CN
China
Prior art keywords
fixedly connected
warning
rod
foundation pit
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222306704.4U
Other languages
Chinese (zh)
Inventor
崔艳苏
崔秋艳
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222306704.4U priority Critical patent/CN218581296U/en
Application granted granted Critical
Publication of CN218581296U publication Critical patent/CN218581296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a foundation ditch guardrail for construction relates to construction auxiliary assembly technical field, including stand and warning pole, the side activity of stand is pegged graft and is had the rail, the mesh has been seted up in the front of rail, the positive below of rail bonds and has the reflection of light subsides, the positive middle part fixed mounting of rail has the warning slogan, the both sides fixedly connected with inserted bar one of rail, the stand includes inserted bar two, the top of inserted bar two is pegged graft with the bottom of warning pole, the jack has been seted up to one side of stand, the inner wall fixedly connected with rubber pad of jack, the surface of rubber pad cup joints with the surface activity of inserted bar one. The utility model discloses an in inserting ground with the staple, the diaphragm of reuse screw rod with bottom plate and staple both sides is screwed up, increases the stability of overall structure, passes through anchor nail and flange dish with the vaulting pole of pole setting side again simultaneously and fixes on ground, can block the crosswind effectively.

Description

一种建筑施工用基坑护栏Foundation pit guardrail for building construction

技术领域technical field

本实用新型涉及建筑施工辅助设备技术领域,具体涉及一种建筑施工用基坑护栏。The utility model relates to the technical field of building construction auxiliary equipment, in particular to a foundation pit guardrail for building construction.

背景技术Background technique

基坑是在基础设计位置按基底标高和基础平面尺寸所开挖的土坑,在建筑施工过程中首先挖出基坑,为了防止掉落的发生,通常在基坑的边缘设置基坑护栏进行防护作业。The foundation pit is an earth pit excavated at the foundation design position according to the base elevation and foundation plane size. During the construction process, the foundation pit is first dug out. In order to prevent the occurrence of falling, foundation pit guardrails are usually set up on the edge of the foundation pit Protection work.

针对现有技术存在以下问题:There are following problems at prior art:

现有建筑施工用基坑护栏多为整体固定式结构,当需要使用或者撤掉时,整体性使得施工难度变大,且增加工作时间,这使得工作效率非常低;且现有护栏结构简单,遇到强风很容易就倒塌,在夜晚施工时也不能很有效的标注基坑的位置,不能为他人提供便利。Most of the existing foundation pit guardrails for building construction are integral fixed structures. When they need to be used or removed, the integrity makes the construction more difficult and increases the working time, which makes the work efficiency very low; and the existing guardrail structure is simple, It is easy to collapse when encountering strong winds, and the location of the foundation pit cannot be marked effectively during night construction, and it cannot provide convenience for others.

实用新型内容Utility model content

本实用新型提供一种建筑施工用基坑护栏,以解决上述背景技术中提出的问题。The utility model provides a foundation pit guardrail for building construction to solve the problems raised in the above-mentioned background technology.

为解决上述技术问题,本实用新型所采用的技术方案是:In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is:

一种建筑施工用基坑护栏,包括立柱和警示杆,所述立柱的侧面活动插接有围栏,所述围栏的正面开设有网眼,所述围栏的正面下方粘接有反光贴,所述围栏的正面中部固定安装有警示标语,所述围栏的两侧固定连接有插杆一,所述立柱包括插杆二,所述插杆二的顶部与警示杆的底部插接,所述立柱的一侧开设有插孔,所述插孔的内壁固定连接有橡胶垫,所述橡胶垫的表面与插杆一的表面活动套接,所述警示杆包括凹型杆,所述凹型杆的内壁与插杆二的表面插接,所述警示杆的上表面固定连接有固定杆一,所述固定杆一的顶部固定连接有警示牌。A foundation pit guardrail for building construction, comprising a column and a warning pole, the side of the column is movably inserted with a fence, the front of the fence is provided with mesh, the front of the fence is bonded with reflective stickers, the fence A warning slogan is fixedly installed in the middle of the front of the fence, and the two sides of the fence are fixedly connected with the first insertion rod, and the column includes the second insertion rod. There is a socket on the side, and the inner wall of the socket is fixedly connected with a rubber pad. The surface of the rubber pad is movably socketed with the surface of the insertion rod one. The surface of the rod two is plugged, the upper surface of the warning rod is fixedly connected with the fixed rod one, and the top of the fixed rod one is fixedly connected with a warning sign.

本实用新型技术方案的进一步改进在于:所述立柱的一侧固定连接有撑杆,所述撑杆的底端固定连接有法兰盘,所述法兰盘的底部固定连接有地面,所述法兰盘的内部插接有锚固钉,所述锚固钉的表面与地面的内部插接。The further improvement of the technical solution of the utility model lies in that: one side of the column is fixedly connected with a strut, the bottom end of the strut is fixedly connected with a flange, and the bottom of the flange is fixedly connected with the ground, the Anchor nails are inserted into the inside of the flange, and the surface of the anchor nails is inserted into the inside of the ground.

本实用新型技术方案的进一步改进在于:所述立柱的底部固定连接有底板,所述底板的底部固定连接有固定钉。The further improvement of the technical solution of the utility model lies in that: the bottom of the upright column is fixedly connected with a bottom plate, and the bottom of the bottom plate is fixedly connected with fixing nails.

本实用新型技术方案的进一步改进在于:所述固定钉的表面与地面的内部插接,所述固定钉的两侧固定安装有横板,所述底板的内部且位于横板的内部螺纹连接有螺杆。The further improvement of the technical solution of the utility model lies in that: the surface of the fixing nail is plugged into the inside of the ground, horizontal plates are fixedly installed on both sides of the fixing nail, and the inside of the bottom plate is threadedly connected to the inside of the horizontal plate. screw.

本实用新型技术方案的进一步改进在于:所述警示杆的上表面右侧固定连接有固定杆二,所述固定杆二的顶部固定连接有灯盘,所述灯盘的正面固定安装有灯泡。The further improvement of the technical solution of the utility model lies in that: the upper surface of the warning rod is fixedly connected with the second fixed rod on the right side, the top of the fixed rod two is fixedly connected with the lamp panel, and the front of the lamp panel is fixedly equipped with a light bulb.

本实用新型技术方案的进一步改进在于:所述警示杆的正面固定连接有红外感应器,所述警示杆的正面固定连接有喇叭。The further improvement of the technical solution of the utility model lies in that: the front of the warning pole is fixedly connected with an infrared sensor, and the front of the warning pole is fixedly connected with a horn.

由于采用了上述技术方案,本实用新型相对现有技术来说,取得的技术进步是:Owing to adopting above-mentioned technical scheme, relative to the prior art, the technical progress of the utility model is:

1、本实用新型提供一种建筑施工用基坑护栏,采用立柱、固定钉、插孔、插杆二、底板、螺杆、撑杆、锚固钉、法兰盘、橡胶垫和横板之间的相互配合,通过将固定钉插入地面里,再用螺杆将底板和固定钉两侧的横板拧紧,增加整个结构的稳定性,同时再将立杆侧面的撑杆通过锚固钉和法兰盘固定在地面,能有效地阻挡横风,防止结构倾斜,同时插孔内的橡胶垫在围栏插接时能有效地减少摩擦力,让二者更加贴合。1. The utility model provides a foundation pit guardrail for building construction, which adopts uprights, fixing nails, sockets, inserting rods, bottom plates, screws, struts, anchor nails, flanges, rubber pads and horizontal plates. Cooperate with each other, insert the fixing nails into the ground, and then tighten the bottom plate and the horizontal plates on both sides of the fixing nails with screws to increase the stability of the entire structure, and at the same time fix the braces on the side of the pole through the anchor nails and flanges On the ground, it can effectively block the crosswind and prevent the structure from tilting. At the same time, the rubber pad in the jack can effectively reduce the friction when the fence is plugged in, making the two fit better.

2、本实用新型提供一种建筑施工用基坑护栏,采用警示杆、凹型杆、红外感应器、喇叭、固定杆一、警示牌固定杆二、灯盘和灯泡之间的相互配合,通过凹型杆将整个警示杆固定在立柱上,警示杆顶部的警示牌可以张贴“前方基坑”等警示图,用来警示人员前方为基坑,同时在警示杆正面设置的红外感应器在有人员靠近时通过喇叭来提醒他人不要靠近,谨防发生意外,在夜晚时,因为施工现场的特殊性,警示杆上方的灯盘设置了很多灯泡,在夜晚进行施工时可以用来照明,同时可以用来标注基坑位置,防止夜晚人员坠落。2. The utility model provides a foundation pit guardrail for building construction, which adopts the cooperation between warning poles, concave poles, infrared sensors, loudspeakers, fixed pole one, warning sign fixed pole two, lamp panels and light bulbs. The pole fixes the entire warning pole on the column. The warning sign on the top of the warning pole can post warning pictures such as "foundation pit in front" to warn people that the foundation pit is ahead. At the same time, the infrared sensor installed on the front of the warning pole Use the horn to remind others not to approach and beware of accidents. At night, because of the particularity of the construction site, the light panel above the warning pole is equipped with many light bulbs. It can be used for lighting during construction at night, and can also be used for marking The location of the foundation pit to prevent people from falling at night.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的结构剖视图;Fig. 2 is a structural sectional view of the utility model;

图3为本实用新型立杆的结构剖视图;Fig. 3 is a structural sectional view of the utility model pole;

图4为本实用新型警示杆的结构剖视图。Fig. 4 is a structural sectional view of the warning rod of the present invention.

图中:1、围栏;11、警示标语;12、网眼;13、反光贴;14、插杆一;2、立柱;21、固定钉;22、插孔;23、插杆二;24、底板;25、螺杆;26、撑杆;27、锚固钉;28、法兰盘;29、橡胶垫;210、横板;3、警示杆;31、凹型杆;32、红外感应器;33、喇叭;34、固定杆一;35、警示牌;36、固定杆二;37、灯盘;38、灯泡;4、地面。In the figure: 1. Fence; 11. Warning slogan; 12. Mesh; 13. Reflective sticker; 14. Insertion rod 1; ;25, screw rod; 26, strut; 27, anchor nail; 28, flange plate; 29, rubber pad; 210, horizontal plate; 3, warning rod; 31, concave rod; 32, infrared sensor; 33, horn ; 34, fixed pole one; 35, warning sign; 36, fixed pole two; 37, lamp panel; 38, light bulb; 4, ground.

具体实施方式Detailed ways

下面结合实施例对本实用新型做进一步详细说明:Below in conjunction with embodiment the utility model is described in further detail:

实施例1Example 1

如图1-4所示,本实用新型提供了一种建筑施工用基坑护栏,包括立柱2和警示杆3,立柱2的侧面活动插接有围栏1,围栏1的正面开设有网眼12,围栏1的正面下方粘接有反光贴13,围栏1的正面中部固定安装有警示标语11,围栏1的两侧固定连接有插杆一14,立柱2包括插杆二23,插杆二23的顶部与警示杆3的底部插接,立柱2的一侧开设有插孔22,插孔22的内壁固定连接有橡胶垫29,橡胶垫29的表面与插杆一14的表面活动套接,警示杆3包括凹型杆31,凹型杆31的内壁与插杆二23的表面插接,警示杆3的上表面固定连接有固定杆一34,固定杆一34的顶部固定连接有警示牌35。As shown in Figures 1-4, the utility model provides a foundation pit guardrail for building construction, including a column 2 and a warning rod 3, the side of the column 2 is movably inserted with a fence 1, and the front of the fence 1 is provided with a mesh 12, The front lower part of the fence 1 is bonded with a reflective sticker 13, and the front middle part of the fence 1 is fixedly equipped with a warning slogan 11, and both sides of the fence 1 are fixedly connected with an insertion rod one 14, and the column 2 includes an insertion rod two 23, and the insertion rod two 23 The top is plugged with the bottom of the warning rod 3, and one side of the column 2 is provided with a jack 22, and the inner wall of the jack 22 is fixedly connected with a rubber pad 29, and the surface of the rubber pad 29 is movably socketed with the surface of the plunger 14 to warn Rod 3 comprises concave rod 31, and the inwall of concave rod 31 is plugged with the surface of insertion rod two 23, and the upper surface of warning rod 3 is fixedly connected with fixed rod one 34, and the top of fixed rod one 34 is fixedly connected with warning sign 35.

在本实施例中,通过将两侧立柱2设置在地面4上,再将围栏1通过插杆一14插入到立柱2侧面,再将警示杆3底部的凹型杆31与立柱2顶部的插杆二23插接,这样整个结构即可拼接完成,因为整个都是可拼接的,极大地节省了人员与功耗,做到即拼即用,快捷方便,同时围栏1的正面设有网眼12,在外界风力过大时,可以导流,让整个结构受到更小的风力,而且围栏1底部设置有反光贴13,在有光亮照射到时可以反光,对路过的人提醒,同时围栏1的中部还有警示标语11,提醒路过的人此处有基坑,有危险。In this embodiment, by setting the columns 2 on both sides on the ground 4, the fence 1 is inserted into the side of the column 2 through the insertion rod 14, and then the concave rod 31 at the bottom of the warning rod 3 is connected with the insertion rod at the top of the column 2. Two 23 plugs, so that the whole structure can be spliced, because the whole can be spliced, which greatly saves personnel and power consumption, and can be assembled and used quickly and conveniently. At the same time, the front of the fence 1 is equipped with mesh 12 When the external wind is too strong, it can divert the flow, so that the whole structure is subjected to a smaller wind force, and the bottom of the fence 1 is provided with reflective stickers 13, which can reflect light when there is light, and remind passers-by. At the same time, the middle of the fence 1 There is also a warning sign 11, reminding passers-by that there is a foundation pit here and there is danger.

实施例2Example 2

如图1-4所示,在实施例1的基础上,本实用新型提供一种技术方案:优选的,立柱2的一侧固定连接有撑杆26,撑杆26的底端固定连接有法兰盘28,法兰盘28的底部固定连接有地面4,法兰盘28的内部插接有锚固钉27,锚固钉27的表面与地面4的内部插接,立柱2的底部固定连接有底板24,底板24的底部固定连接有固定钉21,固定钉21的表面与地面4的内部插接,固定钉21的两侧固定安装有横板210,底板24的内部且位于横板210的内部螺纹连接有螺杆25。As shown in Figures 1-4, on the basis of Embodiment 1, the utility model provides a technical solution: preferably, one side of the column 2 is fixedly connected with a strut 26, and the bottom end of the strut 26 is fixedly connected with a A blue plate 28, the bottom of the flange plate 28 is fixedly connected with the ground 4, the inside of the flange plate 28 is inserted with an anchor nail 27, the surface of the anchor nail 27 is inserted with the inside of the ground 4, and the bottom of the column 2 is fixedly connected with a bottom plate 24. The bottom of the bottom plate 24 is fixedly connected with a fixing nail 21, the surface of the fixing nail 21 is plugged into the interior of the ground 4, the two sides of the fixing nail 21 are fixedly installed with a horizontal plate 210, and the inside of the bottom plate 24 is located inside the horizontal plate 210 Screw rod 25 is threadedly connected.

在本实施例中,通过将固定钉21插入地面4里,再用螺杆25将底板24和固定钉21两侧的横板210拧紧,增加整个结构的稳定性,同时再将立柱2侧面的撑杆26通过锚固钉27和法兰盘28固定在地面4,能有效地阻挡横风,防止结构倾斜,同时插孔22内的橡胶垫29在与围栏1插接时能有效地减少摩擦力,让二者更加贴合。In this embodiment, by inserting the fixing nails 21 into the ground 4, and then tightening the bottom plate 24 and the horizontal plates 210 on both sides of the fixing nails 21 with the screw rod 25, the stability of the whole structure is increased, and at the same time, the support on the side of the column 2 is tightened. The rod 26 is fixed on the ground 4 through the anchor nail 27 and the flange 28, which can effectively block the cross wind and prevent the structure from tilting. At the same time, the rubber pad 29 in the jack 22 can effectively reduce the friction when it is plugged into the fence 1. Make the two fit better.

实施例3Example 3

如图1-4所示,在实施例1的基础上,本实用新型提供一种技术方案:优选的,警示杆3的上表面右侧固定连接有固定杆二36,固定杆二36的顶部固定连接有灯盘37,灯盘37的正面固定安装有灯泡38,警示杆3的正面固定连接有红外感应器32,警示杆3的正面固定连接有喇叭33。As shown in Figures 1-4, on the basis of Embodiment 1, the utility model provides a technical solution: preferably, the right side of the upper surface of the warning rod 3 is fixedly connected with a fixed rod two 36, and the top of the fixed rod two 36 Fixedly connected with a lamp panel 37, the front of the lamp panel 37 is fixedly equipped with a bulb 38, the front of the warning rod 3 is fixedly connected with an infrared sensor 32, and the front of the warning rod 3 is fixedly connected with a horn 33.

在本实施例中,通过凹型杆将整个警示杆固定在立柱上,警示杆3顶部的警示牌35可以张贴“前方基坑”等警示图,用来警示人员前方为基坑,同时在警示杆3正面设置的红外感应器32在有人员靠近时通过喇叭33来提醒他人不要靠近,谨防发生意外,在夜晚时,因为施工现场的特殊性,警示杆3上方的灯盘37设置了很多灯泡38,在夜晚进行施工时可以用来照明,同时可以用来标注基坑位置,防止夜晚人员坠落。In this embodiment, the entire warning pole is fixed on the column by a concave rod, and the warning sign 35 on the top of the warning pole 3 can post warning pictures such as "the foundation pit in front" to warn personnel that the foundation pit is ahead, and at the same time, the warning signs on the warning pole 3. The infrared sensor 32 arranged on the front reminds others not to approach through the loudspeaker 33 when people approach, so as to prevent accidents. At night, because of the particularity of the construction site, the lamp panel 37 above the warning pole 3 is provided with many bulbs 38 , It can be used for lighting during construction at night, and it can also be used to mark the location of the foundation pit to prevent people from falling at night.

下面具体说一下该建筑施工用基坑护栏的工作原理。Let's talk about the working principle of the foundation pit guardrail for building construction.

如图1-4所示,通过将固定钉21插入地面4里,再用螺杆25将底板24和固定钉21两侧的横板210拧紧,增加整个结构的稳定性,同时再将立柱2侧面的撑杆26通过锚固钉27和法兰盘28固定在地面4,能有效地阻挡横风,防止结构倾斜,再将围栏1通过插杆一14插入到立柱2侧面。插孔22内的橡胶垫29在与围栏1插接时能有效地减少摩擦力,让二者更加贴合,将警示杆3底部的凹型杆31与立柱2顶部的插杆二23插接,警示杆3顶部的警示牌35可以张贴“前方基坑”等警示图,用来警示人员前方为基坑,同时在警示杆3正面设置的红外感应器32在有人员靠近时通过喇叭33来提醒他人不要靠近,谨防发生意外,在夜晚时,因为施工现场的特殊性,警示杆3上方的灯盘37设置了很多灯泡38,在夜晚进行施工时可以用来照明,同时可以用来标注基坑位置,防止夜晚人员坠落,这样整个结构即可拼接完成,因为整个都是可拼接的,极大地节省了人员与功耗,做到即拼即用,快捷方便,同时围栏1的正面设有网眼12,在外界风力过大时,可以导流,让整个结构受到更小的风力,而且围栏1底部设置有反光贴13,在有光亮照射到时可以反光,对路过的人提醒,同时围栏1的中部还有警示标语11,提醒路过的人此处有基坑,有危险。As shown in Figure 1-4, by inserting the fixing nail 21 into the ground 4, and then screwing the bottom plate 24 and the horizontal plates 210 on both sides of the fixing nail 21 with the screw 25, the stability of the whole structure is increased, and at the same time, the side of the column 2 The supporting rod 26 is fixed on the ground 4 by the anchor nail 27 and the flange 28, which can effectively block the crosswind and prevent the structure from tilting, and then the fence 1 is inserted into the side of the column 2 by the insertion rod-14. The rubber pad 29 in the jack 22 can effectively reduce the frictional force when it is plugged in with the fence 1, so that the two can fit together more. The concave rod 31 at the bottom of the warning rod 3 is plugged in with the rod 2 23 on the top of the column 2, The warning sign 35 on the top of the warning pole 3 can post warning pictures such as "the foundation pit in front", which is used to warn the personnel that the front is the foundation pit, and the infrared sensor 32 arranged on the front of the warning pole 3 reminds by the loudspeaker 33 when there are people approaching Do not approach other people to prevent accidents. At night, due to the particularity of the construction site, the lamp panel 37 above the warning pole 3 is equipped with a lot of bulbs 38, which can be used for lighting when construction is carried out at night, and can be used to mark the foundation pit at the same time location, to prevent people from falling at night, so that the whole structure can be spliced, because the whole can be spliced, which greatly saves personnel and power consumption, and it can be assembled and used quickly and conveniently. At the same time, the front of the fence 1 is equipped with mesh 12. When the external wind is too strong, it can guide the flow, so that the whole structure is subjected to a smaller wind force, and the bottom of the fence 1 is equipped with reflective stickers 13, which can reflect light when there is light, and remind passers-by. At the same time, the fence 1 There is also a warning sign 11 in the middle of the road, reminding passers-by that there is a foundation pit here and there is danger.

上文一般性的对本实用新型做了详尽的描述,但在本实用新型基础上,可以对之做一些修改或改进,这对于技术领域的一般技术人员是显而易见的。因此,在不脱离本实用新型思想精神的修改或改进,均在本实用新型的保护范围之内。The above has generally described the utility model in detail, but on the basis of the utility model, some modifications or improvements can be made to it, which is obvious to those skilled in the art. Therefore, any modification or improvement that does not depart from the spirit of the present utility model is within the protection scope of the present utility model.

Claims (6)

1.一种建筑施工用基坑护栏,包括立柱(2)和警示杆(3),其特征在于:所述立柱(2)的侧面活动插接有围栏(1),所述围栏(1)的正面开设有网眼(12),所述围栏(1)的正面下方粘接有反光贴(13),所述围栏(1)的正面中部固定安装有警示标语(11),所述围栏(1)的两侧固定连接有插杆一(14);1. A foundation pit guardrail for building construction, comprising a column (2) and a warning rod (3), characterized in that: the side of the column (2) is movably plugged with a fence (1), and the fence (1) The front side of the fence (1) is provided with a mesh (12), the front side of the fence (1) is bonded with reflective stickers (13), and the front middle part of the fence (1) is fixedly equipped with warning signs (11), and the fence (1) ) is fixedly connected with an insertion rod one (14); 所述立柱(2)包括插杆二(23),所述插杆二(23)的顶部与警示杆(3)的底部插接,所述立柱(2)的一侧开设有插孔(22),所述插孔(22)的内壁固定连接有橡胶垫(29),所述橡胶垫(29)的表面与插杆一(14)的表面活动套接;The column (2) includes a second insertion rod (23), the top of the second insertion rod (23) is inserted into the bottom of the warning rod (3), and a jack (22) is opened on one side of the column (2). ), the inwall of the jack (22) is fixedly connected with a rubber pad (29), and the surface of the rubber pad (29) is movably socketed with the surface of the insertion rod one (14); 所述警示杆(3)包括凹型杆(31),所述凹型杆(31)的内壁与插杆二(23)的表面插接,所述警示杆(3)的上表面固定连接有固定杆一(34),所述固定杆一(34)的顶部固定连接有警示牌(35)。The warning rod (3) includes a concave rod (31), the inner wall of the concave rod (31) is inserted into the surface of the second insertion rod (23), and the upper surface of the warning rod (3) is fixedly connected with a fixed rod One (34), the top of the fixed rod one (34) is fixedly connected with a warning sign (35). 2.根据权利要求1所述的一种建筑施工用基坑护栏,其特征在于:所述立柱(2)的一侧固定连接有撑杆(26),所述撑杆(26)的底端固定连接有法兰盘(28),所述法兰盘(28)的底部固定连接有地面(4),所述法兰盘(28)的内部插接有锚固钉(27),所述锚固钉(27)的表面与地面(4)的内部插接。2. A foundation pit guardrail for building construction according to claim 1, characterized in that: one side of the column (2) is fixedly connected with a strut (26), and the bottom end of the strut (26) A flange (28) is fixedly connected, and the bottom of the flange (28) is fixedly connected with the ground (4), and an anchor nail (27) is inserted inside the flange (28), and the anchor The surface of nail (27) is plugged in with the inside of ground (4). 3.根据权利要求1所述的一种建筑施工用基坑护栏,其特征在于:所述立柱(2)的底部固定连接有底板(24),所述底板(24)的底部固定连接有固定钉(21)。3. The foundation pit guardrail for building construction according to claim 1, characterized in that: the bottom of the column (2) is fixedly connected with a base plate (24), and the bottom of the base plate (24) is fixedly connected with a fixed Nails (21). 4.根据权利要求3所述的一种建筑施工用基坑护栏,其特征在于:所述固定钉(21)的表面与地面(4)的内部插接,所述固定钉(21)的两侧固定安装有横板(210),所述底板(24)的内部且位于横板(210)的内部螺纹连接有螺杆(25)。4. A foundation pit guardrail for building construction according to claim 3, characterized in that: the surface of the fixing nail (21) is inserted into the interior of the ground (4), and the two fixing nails (21) A horizontal plate (210) is fixedly installed on the side, and a screw rod (25) is threaded inside the bottom plate (24) and positioned at the internal of the horizontal plate (210). 5.根据权利要求1所述的一种建筑施工用基坑护栏,其特征在于:所述警示杆(3)的上表面右侧固定连接有固定杆二(36),所述固定杆二(36)的顶部固定连接有灯盘(37),所述灯盘(37)的正面固定安装有灯泡(38)。5. A kind of foundation pit guardrail for building construction according to claim 1, characterized in that: the upper surface right side of the warning rod (3) is fixedly connected with two fixed rods (36), and the two fixed rods ( A lamp panel (37) is fixedly connected to the top of 36), and a light bulb (38) is fixedly installed on the front of the lamp panel (37). 6.根据权利要求1所述的一种建筑施工用基坑护栏,其特征在于:所述警示杆(3)的正面固定连接有红外感应器(32),所述警示杆(3)的正面固定连接有喇叭(33)。6. A foundation pit guardrail for building construction according to claim 1, characterized in that: the front of the warning pole (3) is fixedly connected with an infrared sensor (32), and the front of the warning pole (3) Fixedly connected with loudspeaker (33).
CN202222306704.4U 2022-08-30 2022-08-30 Foundation pit guardrail for building construction Expired - Fee Related CN218581296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222306704.4U CN218581296U (en) 2022-08-30 2022-08-30 Foundation pit guardrail for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222306704.4U CN218581296U (en) 2022-08-30 2022-08-30 Foundation pit guardrail for building construction

Publications (1)

Publication Number Publication Date
CN218581296U true CN218581296U (en) 2023-03-07

Family

ID=85362098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222306704.4U Expired - Fee Related CN218581296U (en) 2022-08-30 2022-08-30 Foundation pit guardrail for building construction

Country Status (1)

Country Link
CN (1) CN218581296U (en)

Similar Documents

Publication Publication Date Title
CN209099247U (en) A kind of safety protection device of municipal road foundation pit
KR101338390B1 (en) Support fixed apparatus
CN202509849U (en) Windproof isolation warning board
CN209195176U (en) A kind of municipal works fence easy to use
CN209040031U (en) A kind of isolation guardrail of road center
CN207020924U (en) Construction building site propaganda board
CN202012232U (en) Combined construction surrounding retainer
CN218324279U (en) A road barrier structure used in municipal engineering construction
CN217205219U (en) Novel floor type engineering construction scaffold
CN219569651U (en) Early warning device of face limit protection in construction
CN219887630U (en) Construction arrangement structure is built in narrow place room
CN218375756U (en) A stable fence that can be used at night
CN223062148U (en) Foundation pit safety protection device
CN213038250U (en) Municipal works road construction warning device
CN220377175U (en) Isolation fence
CN218060051U (en) road guardrail for traffic facilities
CN219992276U (en) Energy-saving type indication board
CN219828688U (en) Street lamp equipment convenient to interim construction installation
CN219100927U (en) A warning pre-buried electric safety fence
CN214330209U (en) Building construction protective fence
CN224002469U (en) Assembled construction enclosure serving as illumination
CN218715705U (en) A kind of safety fence for expressway construction project
CN216240142U (en) A construction engineering protective fence that is easy to disassemble and transport
CN218438616U (en) Anti-overturning assembled building engineering railing convenient to disassemble and assemble
CN218322507U (en) A protective guardrail with prompting function for road traffic safety

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230307