CN218569697U - 10kV steel-pipe tower instrument for stringing - Google Patents

10kV steel-pipe tower instrument for stringing Download PDF

Info

Publication number
CN218569697U
CN218569697U CN202223153421.7U CN202223153421U CN218569697U CN 218569697 U CN218569697 U CN 218569697U CN 202223153421 U CN202223153421 U CN 202223153421U CN 218569697 U CN218569697 U CN 218569697U
Authority
CN
China
Prior art keywords
pulley
supporting
support
tool
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202223153421.7U
Other languages
Chinese (zh)
Inventor
石绍才
代英德
张立府
张秀亮
张兴军
石婷婷
李祥
信先胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mengyin Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Mengyin Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mengyin Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Mengyin Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN202223153421.7U priority Critical patent/CN218569697U/en
Application granted granted Critical
Publication of CN218569697U publication Critical patent/CN218569697U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

本实用新型涉及一种10kV钢管塔紧线用工具,包括:置于底端的底座,所述底座上方连接有支撑架;支撑架两侧和顶端分别连接有副加强挂环和支撑臂;支撑臂之间设置有同轴连的滑轮轴和滑轮;防脱卡扣设置于支撑臂内侧且位于滑轮的上方;底座上设有开设滑槽的侧板,紧固螺杆穿置于滑槽内;通过设置有紧固螺杆的底底座与钢管塔横担相配合,使本工具固定于钢管塔上,防止布置线缆时本工具产生晃动;通过设置防脱卡扣,避免了导线在展放过程中滑出;副加强挂环为紧线器提供固定点,方便紧线和调整导线弧垂;本实用新型大大降低了导线脱落和放线滑车掉落的安全风险。

Figure 202223153421

The utility model relates to a tool for tightening wires of a 10kV steel pipe tower, comprising: a base placed at the bottom, a support frame is connected above the base; both sides and the top of the support frame are respectively connected with auxiliary reinforcement hanging rings and support arms; the support arm A coaxially connected pulley shaft and a pulley are arranged between them; the anti-off buckle is arranged on the inner side of the support arm and above the pulley; the base is provided with a side plate with a chute, and the fastening screw is placed in the chute; through The bottom base with fastening screw is matched with the cross arm of the steel pipe tower, so that the tool is fixed on the steel pipe tower to prevent the tool from shaking when the cable is arranged; Slide out; the auxiliary reinforced hanging ring provides a fixed point for the wire tensioner, which is convenient for tightening the wire and adjusting the sag of the wire; the utility model greatly reduces the safety risk of the wire falling off and the wire pulley falling.

Figure 202223153421

Description

一种10kV钢管塔紧线用工具A tool for tightening wires of 10kV steel pipe tower

【技术领域】【Technical field】

本实用新型涉及一种10kV钢管塔紧线用工具,属于电力施工工具领域。The utility model relates to a tool for tightening wires of a 10kV steel pipe tower, which belongs to the field of electric construction tools.

【背景技术】【Background technique】

随着我国电力建设事业的大力发展,目前已建成了覆盖全国的涵盖多种电压的主干输电网;与之配套的城乡配电线路建设也正在进行,施工建设的覆盖面广、工程量大。目前配电网工程终端杆的紧线工作大部分已在地面实施,操作过程包括:由杆上安装紧线专用工具,然后在地面用紧线机或绞磨进行紧线。10KV钢管塔紧线时多采用辅助构件(小U型环)悬挂放线滑车的方式进行紧线,如果放线滑车锁扣未扣紧在紧线时易造成放线滑车损坏,更为严重的是造成导线脱落或是放线滑车掉落,给杆上及作业点下方区域的作业人员增加较大的安全风险。With the vigorous development of my country's electric power construction industry, a backbone transmission network covering a variety of voltages covering the whole country has been built; the supporting urban and rural power distribution lines are also under construction, with a wide coverage and a large amount of construction. At present, most of the wire tightening work of the terminal pole of the distribution network project has been implemented on the ground. The operation process includes: installing a special tool for tightening the wire on the pole, and then tightening the wire with a wire tightening machine or a winch on the ground. 10KV steel pipe towers often use auxiliary components (small U-shaped rings) to hang the pay-off block to tighten the line. If the lock of the pay-off block is not fastened when tightening the line, it is easy to cause damage to the pay-off block, which is more serious. It will cause the wire to fall off or the pay-off block to fall, which will increase the safety risk of the operators on the pole and in the area below the operating point.

【实用新型内容】【Content of utility model】

根据以上相关技术中的不足,本实用新型要解决的技术问题是:为解决上述问题,提供一种10kV钢管塔紧线用工具。According to the deficiencies in the above related technologies, the technical problem to be solved by the utility model is: in order to solve the above problems, a tool for tightening the wire of a 10kV steel pipe tower is provided.

本实用新型所述的一种10kV钢管塔紧线用工具,包括:A 10kV steel pipe tower tightening tool described in the utility model includes:

置于底端的底座,所述底座上方连接有支撑架;所述支撑架顶端连接有支撑臂,所述支撑架两侧设置有副加强挂环;所述支撑臂之间设置有滑轮轴和滑轮,所述滑轮穿置于滑轮轴上;防脱卡扣铰接于所述支撑臂一侧且覆盖于所述滑轮的上方;A base placed at the bottom, a support frame is connected above the base; a support arm is connected to the top of the support frame, and auxiliary reinforcement hanging rings are arranged on both sides of the support frame; a pulley shaft and a pulley are arranged between the support arms , the pulley is placed on the pulley shaft; the anti-off buckle is hinged on one side of the support arm and covers the top of the pulley;

所述底座两侧分别设有侧板,所述侧板上开设有滑槽,紧固螺杆穿置于所述滑槽内;所述滑槽垂直贯穿于侧板,滑槽之间轴线互为平行。The two sides of the base are respectively provided with side plates, and the side plates are provided with chute, and the fastening screw is inserted in the chute; the chute runs through the side plate vertically, and the axes between the chute are mutually parallel.

可选的,所述支撑架包括:支撑柱、支撑板;所述支撑柱均匀布置于支撑板下面;所述支撑柱一侧设有定位孔所述定位孔与滑槽位于同侧且定位孔轴线垂直于支撑柱面;所述副加强环连接于定位孔内。Optionally, the support frame includes: a support column and a support plate; the support column is evenly arranged under the support plate; one side of the support column is provided with a positioning hole, the positioning hole and the chute are located on the same side and the positioning hole The axis is perpendicular to the support cylinder; the secondary reinforcement ring is connected in the positioning hole.

可选的,所述支撑臂垂直设置于支撑板上,支撑臂之间留有间隔,支撑臂上贯穿设置有滑轮轴孔,所述滑轮轴孔轴线保持水平且平行于侧板;所述滑轮轴穿置于滑轮轴孔内。Optionally, the support arms are vertically arranged on the support plate, there is a gap between the support arms, and a pulley shaft hole is provided through the support arm, and the axis of the pulley shaft hole is kept horizontal and parallel to the side plate; The wheel shaft is passed through the pulley shaft hole.

可选的,所述支撑臂内侧上方设置有铰链座,所述铰链座转动轴线为水平且平行于支撑臂。Optionally, a hinge seat is provided above the inner side of the support arm, and the rotation axis of the hinge seat is horizontal and parallel to the support arm.

可选的,所述防脱卡扣下面一侧设置有铰链块,所述铰链块通过销轴铰接于铰链座上,销轴上穿设有扭力弹簧,所述扭力弹簧包容于防脱卡扣覆盖范围内。Optionally, a hinge block is arranged on the lower side of the anti-off buckle, and the hinge block is hinged on the hinge seat through a pin shaft, and a torsion spring is pierced on the pin shaft, and the torsion spring is contained in the anti-off buckle coverage.

与现有技术相比,本实用新型具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

本实用新型所述的一种10kV钢管塔紧线用工具,通过设置有紧固螺杆的底底座与钢管塔横担相配合,使本工具固定于钢管塔上,防止布置线缆时本工具产生晃动;通过设置防脱卡扣,避免了导线在展放过程中滑出;副加强挂环为紧线器提供固定点,方便紧线和调整导线弧垂;综上所述,本实用新型大大降低了导线脱落和放线滑车掉落的安全风险。A 10kV steel pipe tower wire tightening tool described in the utility model is fixed on the steel pipe tower by cooperating with the bottom base provided with the fastening screw rod and the steel pipe tower cross arm, so as to prevent the tool from being damaged when cables are arranged. Shaking; by setting the anti-off buckle, the wire is prevented from slipping out during the unfolding process; the auxiliary reinforced hanging ring provides a fixed point for the wire tensioner, which is convenient for tightening the wire and adjusting the sag of the wire; in summary, the utility model greatly Reduced safety risk of wires coming off and payoff trolley falling.

【附图说明】【Description of drawings】

为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍。在所有附图中,类似的元件或部分一般由类似的附图标记标识。附图中,各元件或部分并不一定按照实际的比例绘制。In order to more clearly illustrate the specific implementation of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the specific implementation or the prior art. Throughout the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, elements or parts are not necessarily drawn in actual scale.

图1:本实用新型的结构示意图;Fig. 1: structural representation of the utility model;

图2:防脱卡扣的结构示意图;Figure 2: Schematic diagram of the structure of the anti-off buckle;

图3:底座的结构示意图;Figure 3: Schematic diagram of the structure of the base;

图4:支撑架的结构示意图。Figure 4: Schematic diagram of the structure of the support frame.

图中:In the picture:

1.底座、滑槽1.1、侧板1.2;1. Base, chute 1.1, side plate 1.2;

2.支撑架、支撑柱2.1、支撑板2.2、定位孔2.3;2. Support frame, support column 2.1, support plate 2.2, positioning hole 2.3;

3.支撑臂、滑轮轴3.1、滑轮轴孔3.2、铰链座3.3;3. Support arm, pulley shaft 3.1, pulley shaft hole 3.2, hinge seat 3.3;

4.防脱卡扣、铰链块4.1;4. Anti-off buckle, hinge block 4.1;

5.滑轮;5. Pulley;

6.副加强挂环;6. Vice-reinforced hanging ring;

7.紧固螺杆;7. Fasten the screw;

8.扭力弹簧。8. Torsion spring.

【具体实施方式】【Detailed ways】

以下结合附图和具体的实施方式对本实用新型做进一步说明:The utility model will be further described below in conjunction with accompanying drawing and specific embodiment:

以下通过具体实施例对本实用新型作进一步说明,但不用以限制本实用新型,凡在本实用新型精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The utility model is further described through specific examples below, but it is not intended to limit the utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the utility model should be included in the utility model. within the scope of protection.

如图1-4所示,所述的一种10kV钢管塔紧线用工具,包括:As shown in Figure 1-4, the 10kV steel pipe tower tightening tool includes:

置于底端的底座1,本实施例中底座1材料采用低碳钢,所述底座1上方焊接有支撑架2;支撑架2为低碳钢材料,其顶端焊接支撑臂3,所述支撑架2两侧安装有副加强挂环6,所述副加强挂环6采用不锈钢棒料制成,其一端为圆柱型凸块;所述支撑臂3之间设置有滑轮轴3.1和滑轮5,所述滑轮5穿置于滑轮轴3.1上,二者采用键连接;防脱卡扣4铰接于所述支撑臂3一侧且覆盖于所述滑轮5的上方;防脱卡扣4、滑轮5均采用工程塑料制成;The base 1 placed at the bottom, in this embodiment, the base 1 is made of low-carbon steel, and a support frame 2 is welded above the base 1; the support frame 2 is made of low-carbon steel, and its top is welded with a support arm 3. 2. Auxiliary reinforced hanging rings 6 are installed on both sides. The auxiliary reinforced hanging rings 6 are made of stainless steel bars, and one end of them is a cylindrical bump; a pulley shaft 3.1 and a pulley 5 are arranged between the supporting arms 3. The pulley 5 is placed on the pulley shaft 3.1, and the two are connected by a key; the anti-off buckle 4 is hinged on one side of the support arm 3 and covers the top of the pulley 5; the anti-off buckle 4 and the pulley 5 are both Made of engineering plastics;

所述底座1两侧分别焊接有侧板1.2,两侧板1.2之间保持平行且侧板1.2面上开设有滑槽1.1,紧固螺杆7穿置于所述滑槽1.1内;所述滑槽1.1垂直贯穿于侧板1.2上,两侧板上位置相对的滑槽1.1同心设置,滑槽1.1之间轴线互为平行。The two sides of the base 1 are respectively welded with side plates 1.2, the two side plates 1.2 are kept parallel, and a chute 1.1 is opened on the surface of the side plate 1.2, and the fastening screw 7 is inserted into the chute 1.1; The groove 1.1 vertically runs through the side plate 1.2, and the slide grooves 1.1 opposite to each other on the two side plates are arranged concentrically, and the axes between the slide grooves 1.1 are parallel to each other.

支撑架2结构包括:支撑柱2.1、支撑板2.2;此处,支撑板2.2为正方形,所述支撑柱2.1为矩形钢柱,其均匀焊接于支撑板2.2下面的四角上;所述支撑柱2.1一侧设有定位孔2.3,所述定位孔2.3与滑槽1.1位于同侧且定位孔2.3轴线垂直于所在支撑柱2.1一面;所述副加强环6圆柱型凸块设置于定位孔2.1内,二者连接方式采用螺纹连接或焊接。The structure of the support frame 2 includes: a support column 2.1 and a support plate 2.2; here, the support plate 2.2 is a square, and the support column 2.1 is a rectangular steel column, which is uniformly welded on the four corners below the support plate 2.2; the support column 2.1 One side is provided with a positioning hole 2.3, the positioning hole 2.3 and the chute 1.1 are located on the same side and the axis of the positioning hole 2.3 is perpendicular to the side of the support column 2.1 where it is located; the cylindrical protrusion of the auxiliary reinforcement ring 6 is set in the positioning hole 2.1, The connection method of the two adopts threaded connection or welding.

本实施例中支撑臂3为两块低碳钢制成的钢板,支撑臂垂直设置于支撑板2.2上,两支撑臂3之间平行设置且保持间隔,间隔距离略大于滑轮5的宽度,支撑臂3上贯穿设置有滑轮轴孔3.2其位置相对,所述滑轮轴孔3.2轴线保持水平且平行于侧板1.2所在平面;所述滑轮轴3.1穿置于滑轮轴孔3.2内,轴端安装有滚动轴承。In the present embodiment, the support arm 3 is a steel plate made of two low-carbon steels. The support arm is vertically arranged on the support plate 2.2. The two support arms 3 are arranged in parallel and kept at intervals. The interval distance is slightly greater than the width of the pulley 5. The arm 3 is provided with a pulley shaft hole 3.2 whose position is opposite, the axis of the pulley shaft hole 3.2 is kept horizontal and parallel to the plane where the side plate 1.2 is located; the pulley shaft 3.1 is placed in the pulley shaft hole 3.2, and the shaft end is installed rolling bearings.

所述支撑臂3内侧上方焊接有铰链座3.3,铰链座3.3由两片支座板组成,支座板之间保持距离,所述铰链座3.3转动轴线为水平且平行于支撑臂3平面;本实施例中,铰链座3.3转动轴线距滑轮5的最小距离为25cm。A hinge seat 3.3 is welded above the inner side of the support arm 3. The hinge seat 3.3 is composed of two support plates, and a distance is kept between the support plates. The rotation axis of the hinge seat 3.3 is horizontal and parallel to the plane of the support arm 3; In the embodiment, the minimum distance between the rotation axis of the hinge base 3.3 and the pulley 5 is 25 cm.

所述防脱卡扣4下面一侧设置有铰链块4.1,铰链块4.1由两片支座板组成,支座板之间保持距离;所述铰链块4.1夹于铰链座3.3的两支座板之间,所述扭力弹簧8置于铰链块4.1两片支座板之间,三者用销轴穿设连接。A hinge block 4.1 is arranged on the lower side of the anti-off buckle 4, and the hinge block 4.1 is composed of two support plates, and a distance is kept between the support plates; the hinge block 4.1 is sandwiched between the two support plates of the hinge seat 3.3 In between, the torsion spring 8 is placed between the two support plates of the hinge block 4.1, and the three are connected with pin shafts.

使用时,将底座1套设于钢管塔的横担上,然后将紧固螺杆7穿设于滑槽1.1内,拧紧螺母,两侧的侧板1.2向内收缩,将底座1抱紧于横担之上;架设线缆时,将防脱卡扣4压下留出与支撑臂之间的空隙,使得线缆穿过空隙放置于滑轮5的滑轮槽上,随之防脱卡扣4在扭力弹簧的作用下复位,空隙减小,防止线缆移动时从滑轮上方滑出,防脱卡扣4为单向设置,只得向下活动;副加强挂环6为紧线器提供锚点,紧线时将紧线器挂钩挂接到副加强挂环6内,操作紧线器以副加强挂环6为基点带动线缆向钢管塔一侧收缩,进而实现紧线操作。When in use, set the base 1 on the cross arm of the steel pipe tower, then put the fastening screw 7 in the chute 1.1, tighten the nut, the side plates 1.2 on both sides shrink inward, and hold the base 1 tightly on the cross arm. When erecting the cable, press down the anti-off buckle 4 to leave a gap with the support arm, so that the cable passes through the gap and is placed on the pulley groove of the pulley 5, and then the anti-off buckle 4 is in place. Reset under the action of the torsion spring, the gap is reduced, preventing the cable from slipping out from above the pulley when moving, the anti-off buckle 4 is set in one direction, and can only move downward; the auxiliary reinforced hanging ring 6 provides an anchor point for the tensioner, When tightening the wire, hook the hook of the wire tensioner into the auxiliary reinforced hanging ring 6, and operate the wire tensioner with the auxiliary reinforced hanging ring 6 as the base point to drive the cable to shrink to the side of the steel pipe tower, thereby realizing the wire tightening operation.

以上显示和描述了本实用新型的基本原理、主要特征以及本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.

Claims (5)

1. The utility model provides a 10kV steel-pipe tower instrument for solidus which characterized in that: the method comprises the following steps:
the base (1) is arranged at the bottom end, and a support frame (2) is connected above the base (1); the top end of the support frame (2) is connected with a support arm (3), and auxiliary reinforcing hanging rings (6) are arranged on two sides of the support frame (2); a pulley shaft (3.1) and a pulley (5) are arranged between the supporting arms (3), and the pulley (5) is arranged on the pulley shaft (3.1) in a penetrating manner; the anti-falling buckle (4) is hinged to one side of the supporting arm (3) and covers the upper part of the pulley (5);
two sides of the base (1) are respectively provided with a side plate (1.2), the side plates (1.2) are provided with a sliding chute (1.1), and a fastening screw (7) penetrates through the sliding chute (1.1); the sliding grooves (1.1) vertically penetrate through the side plates (1.2), and the axes of the sliding grooves (1.1) are parallel to each other.
2. The tool for 10kV steel tube tower stringing as claimed in claim 1, wherein:
the support frame (2) comprises: a support column (2.1) and a support plate (2.2); the supporting columns (2.1) are uniformly arranged below the supporting plate (2.2); a positioning hole (2.3) is formed in one side of the supporting column (2.1), the positioning hole (2.3) and the sliding groove (1.1) are located on the same side, and the axis of the positioning hole (2.3) is perpendicular to the surface of the supporting column (2.1); the auxiliary reinforcing hanging ring (6) is connected in the positioning hole (2.3).
3. The tool for 10kV steel tube tower stringing as claimed in claim 1, wherein:
the supporting arms (3) are vertically arranged on the supporting plates (2.2), intervals are reserved among the supporting arms (3), pulley shaft holes (3.2) penetrate through the supporting arms (3), and the axes of the pulley shaft holes (3.2) are kept horizontal and parallel to the side plates (1.2); the pulley shaft (3.1) is arranged in the pulley shaft hole (3.2) in a penetrating way.
4. The tool for 10kV steel tube tower stringing as claimed in claim 1, wherein:
the hinge seat (3.3) is arranged above the inner side of the supporting arm (3), and the rotating axis of the hinge seat (3.3) is horizontal and parallel to the supporting arm (3).
5. The tool for 10kV steel tube tower stringing as claimed in claim 1 or 4, wherein:
one side below the anti-falling buckle (4) is provided with a hinge block (4.1), the hinge block (4.1) is hinged to a hinge seat (3.3) through a pin shaft, a torsion spring (8) penetrates through the pin shaft, and the torsion spring (8) is contained in the coverage range of the anti-falling buckle (4).
CN202223153421.7U 2022-11-25 2022-11-25 10kV steel-pipe tower instrument for stringing Expired - Fee Related CN218569697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223153421.7U CN218569697U (en) 2022-11-25 2022-11-25 10kV steel-pipe tower instrument for stringing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223153421.7U CN218569697U (en) 2022-11-25 2022-11-25 10kV steel-pipe tower instrument for stringing

Publications (1)

Publication Number Publication Date
CN218569697U true CN218569697U (en) 2023-03-03

Family

ID=85305256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223153421.7U Expired - Fee Related CN218569697U (en) 2022-11-25 2022-11-25 10kV steel-pipe tower instrument for stringing

Country Status (1)

Country Link
CN (1) CN218569697U (en)

Similar Documents

Publication Publication Date Title
CN112850538A (en) Conductor lifter on distribution line pole
CN213265396U (en) A portable distribution network transformer quick installation device
CN213537033U (en) Independent lifting rack
CN214204819U (en) Novel cable support for electrical engineering
CN201266809Y (en) Transmission line sustained center chucking tool
CN110690589A (en) A grounding pile that can be pulled out quickly
CN217555571U (en) Multifunctional hoisting device for hoisting materials on electric pole
CN113363922B (en) External protection structure for underground high-temperature-resistant and high-voltage-resistant cable
CN214755189U (en) Cable laying device suitable for trapezoidal crane span structure
CN114300990B (en) A combination lifting device for pipe mother
CN210825317U (en) Angle iron pile auxiliary pulling device
CN212223633U (en) Electric climbing hanging basket for high-position small-space operation
CN203582376U (en) Slidably mounting and lifting structure
CN206727531U (en) Adjustable double bundle conductor suspension hook card
CN201388018Y (en) UHV combined pay-off tackle
CN207330112U (en) A kind of device for improving large rotor bearing shell overhaul efficiency
CN211393635U (en) A lifting tool that can be fixed on an overhead line cross-arm
CN221186272U (en) Spray tower pipeline elbow mounting tool
CN211351471U (en) Turning guide device for construction engineering cable erection
CN223823173U (en) A sling structure for hoisting large pipe culverts
CN217458488U (en) Cooler head lifting device
CN215496282U (en) Transformer mounting structure convenient to maintenance
CN221644328U (en) Hoisting tool for large-diameter steel bars of bridge tower column
CN203284092U (en) Transformer substation insulator lifting frame
JP3247876U (en) A device that crosses electrified power lines in the suburbs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230303