CN218562948U - Construction bearing frame for building management - Google Patents

Construction bearing frame for building management Download PDF

Info

Publication number
CN218562948U
CN218562948U CN202222722695.7U CN202222722695U CN218562948U CN 218562948 U CN218562948 U CN 218562948U CN 202222722695 U CN202222722695 U CN 202222722695U CN 218562948 U CN218562948 U CN 218562948U
Authority
CN
China
Prior art keywords
support frame
frame
bolted
construction
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222722695.7U
Other languages
Chinese (zh)
Inventor
曹雪晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222722695.7U priority Critical patent/CN218562948U/en
Application granted granted Critical
Publication of CN218562948U publication Critical patent/CN218562948U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a construction bearing frame for building management, it includes two support frames, the top joint of support frame has the mechanism of bearing, the left side swing joint of support frame has cat ladder structure, the bottom bolt joint that bears the mechanism has four bosses, the boss is close to one side and the support frame bolt joint of support frame, the inside welding of support frame has the anti-sway pole, the bottom bolt joint of support frame has the base, has solved current construction bearing frame and has installed bearing platform and support frame through the mode of external part usually at the in-process of concatenation, when accomplishing the construction and need demolish the construction and bear the frame, need dismantle external part and just can carry out subsequent dismantlement work, in case appear the operation use and cause the construction to bear the condition that the frame appears empting easily, the construction bearing frame is when the installation is accomplished, and the difficult work position that climbs the construction and bear the frame of staff, the problem that the user used is not convenient for not.

Description

Construction bearing frame for building management
Technical Field
The utility model relates to a construction bears the frame field for the building management, especially relates to a construction bears frame for the building management.
Background
The construction bearing frame for building management is a working platform erected for ensuring each construction process to be smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold according to the configuration form, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging type scaffold, choose formula scaffold, climb formula scaffold, construction bearing frame can often be used during construction management construction, and current construction bearing frame is installed through external part's mode with plummer and support frame at the in-process of concatenation usually, when accomplishing the construction and need demolish construction bearing frame, need dismantle external part and just can carry out subsequent dismantlement work, in case the condition that topples appears in the easy construction bearing frame that causes of operation use, cause the injury to the field crew easily, construction bearing frame is when the installation is accomplished, the difficult workstation that climbs the construction bearing frame of staff, the user of not being convenient for uses.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a construction bears frame for building management aims at solving above-mentioned technical problem.
In order to achieve the purpose, the utility model provides a construction is born with construction and is born frame includes two support frames, the top joint of support frame has bears the mechanism, the left side swing joint of support frame has the cat ladder structure, the bottom bolt that bears the mechanism has four bosses, the boss is close to one side and the support frame bolt of support frame, the inside welding of support frame has prevents shaking the pole, the bottom bolt of support frame has the base.
In one embodiment, the bearing mechanism comprises a pedal, a plurality of connecting rods and a fixing frame, the connecting rods are bolted with the inside of the fixing frame, the bottom of the fixing frame is clamped with the top of the supporting frame, the pedal is placed at the top of the connecting rods, and the bottom of the fixing frame is bolted with the top of the reinforcing block.
In an embodiment, the bottom welding of mount has the fixture block, the quantity of fixture block is two, and evenly distributed in the bottom of mount, the surface of fixture block and the inner wall joint of support frame, the draw-in groove that uses with the fixture block cooperation is seted up to the inside of support frame.
In one embodiment, two first connecting blocks are bolted to the left side of the supporting frame, a first annular block is welded to the left side of each first connecting block, and a clamping column is clamped inside each first annular block.
In one embodiment, the surface of the clamping column is bolted with a second annular block, the left side of the second annular block is bolted with a second connecting block, and the left side of the second connecting block is bolted with the right side of the ladder climbing structure.
In one embodiment, the first annular blocks are internally provided with mounting holes matched with the clamping columns for use, and one sides of the two first annular blocks, which are opposite to each other, are bolted with supporting rods.
In one embodiment, two connecting plates are bolted on the right side of the ladder stand structure, a rest block is bolted on the right side of the connecting plates, and the right side of the rest block is in contact with the left side of the support frame.
In one embodiment, the top of the base is bolted with a plurality of triangular blocks, and one side of each triangular block, which is close to the supporting frame, is bolted with the supporting frame.
The technical scheme of the utility model, through setting up the support frame, bear the weight of the mechanism, the cat ladder structure, the boss, prevent shaking pole and base, during the use the support frame places suitable position through the base, then carry out the joint with bearing the weight of the mechanism and support frame, install the boss through the staff after that, place the support frame and appear self unstable condition at the in-process that supports bearing the weight of the mechanism, after that, through the inside pole of shaking of preventing of support frame, can be convenient for increase the stability of support frame when supporting, avoid supporting the condition of rocking around the in-process that appears supporting, after that the user fixes the left side of cat ladder structure to the support frame, then can be convenient for the staff scrambles the top of bearing the mechanism through the cat ladder structure, convenient to use person uses, accomplish the work of being convenient for to install bearing the mechanism.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
fig. 2 is a schematic structural view of a bearing mechanism according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a pedal according to an embodiment of the present invention;
fig. 4 is a schematic structural view of the supporting frame according to the embodiment of the present invention;
fig. 5 is a schematic structural diagram of a second connection block according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of a first connecting block according to an embodiment of the present invention.
The reference numbers illustrate: 1. a support frame; 2. a carrying mechanism; 201. a pedal; 202. a connecting rod; 203. a fixed mount; 3. a ladder stand structure; 4. a reinforcing block; 5. a sway bar; 6. a base; 7. a clamping block; 8. a card slot; 9. a first connection block; 10. a first ring block; 11. clamping the column; 12. a second ring block; 13. a second connecting block; 14. mounting holes; 15. a support bar; 16. a connecting plate; 17. a backup block; 18. and (5) a triangular block.
The realization, the functional characteristics and the advantages of the utility model are further explained by combining the embodiment and referring to the attached drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that all the directional indicators (such as up, down, left, right, front, back \8230;) in the embodiments of the present invention are only used to explain the relative position relationship between the components, the motion situation, etc. in a specific posture (as shown in the attached drawings), and if the specific posture is changed, the directional indicator is changed accordingly.
In addition, descriptions in the present application as to "first", "second", and the like are for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicit to the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
Moreover, the technical solutions in the embodiments of the present invention can be combined with each other, but it is necessary to be able to be realized by a person having ordinary skill in the art as a basis, and when the technical solutions are contradictory or can not be realized, the combination of the technical solutions should be considered to be absent, and is not within the protection scope of the present invention.
The utility model provides a construction bears frame for building management.
As shown in fig. 1-6, the embodiment of the utility model provides a pair of construction is born frame for building management, including two support frames 1, the top joint of support frame 1 has bearing mechanism 2, and the left side swing joint of support frame 1 has cat ladder structure 3, and four bosses 4 have been bolted to the bottom of bearing mechanism 2, and boss 4 is close to one side of support frame 1 and is bolted with support frame 1, and the inside welding of support frame 1 has prevents shaking pole 5, and the bottom of support frame 1 has bolted base 6.
The technical scheme of the utility model, through setting up support frame 1, bearing mechanism 2, cat ladder structure 3, the boss 4, prevent shaking pole 5 and base 6, suitable position is placed through base 6 to support frame 1 during the use, carry out the joint with bearing mechanism 2 and support frame 1 after that, install boss 4 through the staff after that, place support frame 1 and appear self unstable condition in the in-process that supports bearing mechanism 2, prevent shaking pole 5 through the support frame is inside after that, can be convenient for increase support frame 1 stability when supporting, avoid supporting the condition that rocks around the in-process that supports appears, after that the user fixes cat ladder structure 3 to support frame 1's left side, after that can be convenient for the staff climbs bearing mechanism 2's top through cat ladder structure 3, convenient to use person uses, accomplish the work of being convenient for install bearing mechanism 2.
Referring to fig. 2, the supporting mechanism 2 includes a pedal 201, a plurality of connecting rods 202 and a fixing frame 203, the connecting rods 202 are bolted to the inside of the fixing frame 203, the bottom of the fixing frame 203 is clamped to the top of the supporting frame 1, the pedal 201 is placed on the top of the connecting rods 202, and the bottom of the fixing frame 203 is bolted to the top of the reinforcing block 4. In this embodiment, through setting up footboard 201, connecting rod 202 and mount 203, drive connecting rod 202 joint at the top of support frame 1 through mount 203 during the use, place footboard 201 at the top of connecting rod 202 after that, can be convenient for the staff carries out work at the top of footboard 201, make the installation that footboard 201 can be convenient.
Further, please refer to fig. 2, the bottom of the fixing frame 203 is welded with two clamping blocks 7, the two clamping blocks 7 are uniformly distributed at the bottom of the fixing frame 203, the surface of the clamping block 7 is clamped with the inner wall of the supporting frame 1, and the supporting frame 1 is provided with a clamping groove 8 inside for cooperating with the clamping block 7. In this embodiment, through setting up fixture block 7, can convenient to use person remove mount 203 and drive fixture block 7 and move about, get into the inner wall of support frame 1 with fixture block 7 joint after that, convenient to use person carries out the installation to mount 203, through the draw-in groove 8 that support frame 1 is inside seted up, can be convenient for fixture block 7 installs through draw-in groove 8.
With continued reference to fig. 1 and 6, the left side of the left support frame 1 is bolted with two first connecting blocks 9, the left side of the first connecting blocks 9 is welded with a first annular block 10, and a clamping column 11 is clamped inside the first annular block 10. In this embodiment, through setting up first connecting block 9, first annular piece 10 and card post 11, can be convenient for first annular piece 10 fix the left side at support frame 1 through first connecting block 9, drive card post 11 through cat ladder structure 3 and move about after that, be convenient for fix the cat ladder.
Referring to fig. 5 and 6, a second ring block 12 is bolted to the surface of the clamping column 11, a second connecting block 13 is bolted to the left side of the second ring block 12, and the left side of the second connecting block 13 is bolted to the right side of the ladder stand structure 3. In the embodiment, by arranging the second ring block 12 and the second connecting block 13, the position of the clamping column 11 can be fixed by the second ring block 12 conveniently, then the position of the second ring block 12 and the second connecting block 13 can be fixed, and then the ladder climbing structure 3 is clamped to the inner part of the first ring block 10 through the clamping column 11.
In addition, referring to fig. 3 and 6, the first ring blocks 10 are provided with mounting holes 14 inside for cooperating with the fastening posts 11, and the opposite sides of the two first ring blocks 10 are bolted with support rods 15. In this embodiment, through the inside mounting hole 14 of seting up of first annular piece 10, can be convenient for fix the position of card post 11, through setting up bracing piece 15, can be convenient for play the guard action to the staff, avoid the staff to appear stepping on empty condition, convenient to use person uses when climbing the top of footboard 201.
In addition, referring to fig. 5, two connecting plates 16 are bolted to the right side of the ladder structure 3, a rest block 17 is bolted to the right side of the connecting plates 16, and the right side of the rest block 17 is in contact with the left side of the support frame 1. In this embodiment, through setting up connecting plate 16 and leaning on piece 17, can be convenient for promote the stability of cat ladder, avoid the staff to appear the condition that cat ladder self rocks at will in the in-process of climbing.
In addition, referring to fig. 4, the top of the base 6 is bolted with a plurality of triangular blocks 18, and one side of the triangular block 18 close to the supporting frame 1 is bolted with the supporting frame 1. In this embodiment, the triangular blocks 18 are arranged, so that the fixing property of the support frame 1 and the base 6 can be improved, and the situation that the support frame 1 shakes during fixing is avoided.
The above only is the preferred embodiment of the present invention, not so limiting the patent scope of the present invention, all under the concept of the present invention, the equivalent structure transformation made by the contents of the specification and the drawings is utilized, or the direct/indirect application is included in other related technical fields in the patent protection scope of the present invention.

Claims (8)

1. The utility model provides a construction bears frame for building management, its characterized in that, construction bears frame for building management includes two support frames (1), the top joint of support frame (1) has bearing mechanism (2), the left side swing joint of support frame (1) has cat ladder structure (3), four boss (4) have been bolted to the bottom of bearing mechanism (2), one side that boss (4) are close to support frame (1) is bolted with support frame (1), the inside welding of support frame (1) has prevents shaking pole (5), the bottom of support frame (1) has bolted base (6).
2. The construction loading frame for building management according to claim 1, wherein the loading mechanism (2) comprises a pedal (201), a plurality of connecting rods (202) and a fixing frame (203), the connecting rods (202) are bolted with the inner part of the fixing frame (203), the bottom of the fixing frame (203) is clamped with the top of the support frame (1), the pedal (201) is placed on the top of the connecting rods (202), and the bottom of the fixing frame (203) is bolted with the top of the reinforcing block (4).
3. The construction bearing frame for the building management according to claim 2, wherein the fixing frame (203) is welded with two clamping blocks (7) at the bottom, the two clamping blocks (7) are uniformly distributed at the bottom of the fixing frame (203), the surface of each clamping block (7) is clamped with the inner wall of the support frame (1), and a clamping groove (8) matched with the clamping block (7) for use is formed in the support frame (1).
4. The construction loading frame for building management according to claim 1, characterized in that two first connecting blocks (9) are bolted on the left side of the support frame (1) on the left side, a first annular block (10) is welded on the left side of the first connecting blocks (9), and a clamping column (11) is clamped inside the first annular block (10).
5. The construction carrier for building management according to claim 4, characterised in that the surface of the snap post (11) is bolted with a second ring block (12), the left side of the second ring block (12) is bolted with a second connection block (13), and the left side of the second connection block (13) is bolted with the right side of the ladder structure (3).
6. The construction carrier for building management as claimed in claim 4, wherein the first ring blocks (10) are provided with mounting holes (14) inside for cooperating with the clamping posts (11), and support rods (15) are bolted to opposite sides of the two first ring blocks (10).
7. The construction carriage for building management according to claim 1, characterised in that two connection plates (16) are bolted to the right side of the ladder structure (3), that a rest block (17) is bolted to the right side of the connection plates (16), and that the right side of the rest block (17) is in contact with the left side of the support frame (1).
8. The construction carrier for building management according to claim 1, c h a r a c t e r i z e d in that the top of the foundation (6) is bolted with a number of triangular blocks (18), the triangular blocks (18) being bolted to the support frame (1) on the side close to the support frame (1).
CN202222722695.7U 2022-10-14 2022-10-14 Construction bearing frame for building management Expired - Fee Related CN218562948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222722695.7U CN218562948U (en) 2022-10-14 2022-10-14 Construction bearing frame for building management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222722695.7U CN218562948U (en) 2022-10-14 2022-10-14 Construction bearing frame for building management

Publications (1)

Publication Number Publication Date
CN218562948U true CN218562948U (en) 2023-03-03

Family

ID=85318013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222722695.7U Expired - Fee Related CN218562948U (en) 2022-10-14 2022-10-14 Construction bearing frame for building management

Country Status (1)

Country Link
CN (1) CN218562948U (en)

Similar Documents

Publication Publication Date Title
CN209924434U (en) High-altitude overhanging formwork support frame body
CN215441501U (en) Cantilever steel structure combined construction hanging basket
CN218562948U (en) Construction bearing frame for building management
CN217557608U (en) Non-vertical outer vertical face curtain wall construction hanging basket
CN213572944U (en) Overhead working hanging basket arranged on flower stand beam
CN215594829U (en) Combined adjustable diagonal type outer frame auxiliary supporting frame
CN114045852B (en) A large circular caisson steel bar integral binding and hoisting process
CN218970567U (en) Metal scaffold mechanism convenient to dismouting
CN223497964U (en) Nuclear power plant steam turbine ring support
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN212671160U (en) Combined building scaffold
CN218667143U (en) Bridge pier column reinforcing bar installation auxiliary stand
CN218311796U (en) Circular tube component welding operation platform
CN216834210U (en) Hanging and jumping device for ship jumping
CN215368621U (en) Construction support device for elevator shaft
CN219586921U (en) High-precision stiff column and steel beam node connector
CN214399569U (en) A large-volume bearing platform steel cage hoisting device
CN219281215U (en) Scaffold with stable supporting structure
CN222879169U (en) A portable scaffold board support for installation of evaporative condenser steel construction
CN222847533U (en) Loading steel frame capable of realizing multi-angle drawing
CN216515152U (en) Self-stabilizing type intelligent combined module telescopic bearing support
CN217998865U (en) Wall scaffold board installation device is leaned on to activity assembled scaffold frame
CN218933797U (en) High-altitude operation platform device for tower platform beam of steelmaking main plant
CN216042488U (en) Novel scaffold for multi-use architecture construction
CN223034488U (en) Overhanging type safety cat ladder for building deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230303

CF01 Termination of patent right due to non-payment of annual fee