CN218538992U - A wall panel auxiliary installation hanger device - Google Patents

A wall panel auxiliary installation hanger device Download PDF

Info

Publication number
CN218538992U
CN218538992U CN202222984528.XU CN202222984528U CN218538992U CN 218538992 U CN218538992 U CN 218538992U CN 202222984528 U CN202222984528 U CN 202222984528U CN 218538992 U CN218538992 U CN 218538992U
Authority
CN
China
Prior art keywords
lifting rope
wall panel
wallboard
main longitudinal
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222984528.XU
Other languages
Chinese (zh)
Inventor
陈宇航
琚波
李佳佳
刘文杰
高春明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202222984528.XU priority Critical patent/CN218538992U/en
Application granted granted Critical
Publication of CN218538992U publication Critical patent/CN218538992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及墙板安装技术领域,特别涉及一种墙板辅助安装吊架装置,包括安装架体、卷扬机、定滑轮、第一吊绳以及夹具;所述所述安装架体包括主纵杆、长横杆、下横杆以及上横杆,四所述主纵杆两两顶部交叉设置于两侧,所述长横杆将同一侧的两所述主纵杆中下部连接,所述下横杆架设于两所述长横杆上,所述上横杆将两侧的所述主纵杆顶部连接;所述卷扬机安装于所述下横杆上;所述定滑轮悬挂于所述上横杆上;所述第一吊绳固定端缠绕于所述卷扬机上,所述第一吊绳游离端绕过所述定滑轮;用于夹持墙板的所述夹具设置于所述第一吊绳游离端。安装架体能够独立放置于地面,具有较高的稳定性;夹具能够对墙板产生有效的夹持作用,防止滑脱。

Figure 202222984528

The utility model relates to the technical field of wallboard installation, in particular to a wallboard auxiliary installation hanger device, which includes a mounting frame body, a hoist, a fixed pulley, a first hanging rope and a clamp; the mounting frame body includes a main longitudinal rod , a long cross bar, a lower cross bar and an upper cross bar, the two tops of the four main longitudinal bars are crossed on both sides, and the long cross bar connects the middle and lower parts of the two main longitudinal bars on the same side, and the lower The crossbar is erected on the two long crossbars, and the upper crossbar connects the tops of the main longitudinal bars on both sides; the hoist is installed on the lower crossbar; the fixed pulley is suspended on the upper on the cross bar; the fixed end of the first suspension rope is wound on the hoist, and the free end of the first suspension rope is passed around the fixed pulley; the clamp for clamping the wallboard is arranged on the first The free end of the sling. The mounting frame body can be placed independently on the ground and has high stability; the clamp can effectively clamp the wallboard to prevent slippage.

Figure 202222984528

Description

一种墙板辅助安装吊架装置A wall panel auxiliary installation hanger device

技术领域technical field

本实用新型涉及墙板安装技术领域,更具体地说,特别涉及一种墙板辅助安装吊架装置。The utility model relates to the technical field of wallboard installation, and more specifically relates to a wallboard auxiliary installation hanger device.

背景技术Background technique

轻质隔墙板也称蒸压加气轻质混凝土板,属于新型建筑节能产品。轻质隔墙板具有质量轻、强度高、保温隔声性好、耐火能力持久、造价低廉等优点。如今在装配式建筑大力发展的背景下,其成为装配式混凝土框架结构和钢结构外围护墙体的优选材料之一。目前在高层框架建筑以及工业厂房的内外墙体获得了较多的应用。Lightweight partition wall panels, also known as autoclaved aerated lightweight concrete panels, are new building energy-saving products. Lightweight partition board has the advantages of light weight, high strength, good thermal insulation and sound insulation, long-lasting fire resistance, and low cost. Nowadays, under the background of vigorous development of prefabricated buildings, it has become one of the preferred materials for prefabricated concrete frame structures and steel structure enclosure walls. At present, it has been widely used in high-rise frame buildings and the inner and outer walls of industrial plants.

当前,蒸压加气混凝土墙板的生产已具备系统化、标准化、规模化。其出厂时一般会制成600mm宽,长度超过2m的条板。但在现场安装拼接时,仍然受制于现场作业空间限制,且目前现场立板安装基本仍依靠人力利用简单工具进行抬、顶、撬、挪的方式。除了效率低、人力成本高外,还增加了安全隐患。At present, the production of autoclaved aerated concrete wall panels has been systematic, standardized and large-scale. When it leaves the factory, it is generally made into slats with a width of 600mm and a length of more than 2m. However, on-site installation and splicing are still subject to the limitation of on-site work space, and the current on-site vertical panel installation basically still relies on manpower to use simple tools to lift, jack, pry, and move. In addition to low efficiency and high labor costs, it also increases potential safety hazards.

基于此,授权公告号CN215254340U的实用新型专利公开了一种预制内墙板辅助安装工具,其利用空心钢管制作成梯形支架以及第一连接横杆组、第二连接横杆组、第三连接横杆、第一吊杆和第二吊杆,并且设置有卷扬机、吊钩、吊绳和滑轮,利用吊钩和吊绳将预制内墙板一端缠绕,并利用卷扬机提升,旋转吊架旋转保证预制内墙板一端缓慢抬起至竖直,省时省力,安装效率高,且梯形支架、第一连接横杆组、第二连接横杆组、第三连接横杆、第一吊杆和第二吊杆均为空心钢管,整个安装工具重量轻,便于搬运。但是其不足之处在于:使用时梯形支架顶端的支撑杆顶靠在框架梁的侧面上,稳定性不高;将吊钩端的吊绳缠绕在预制内墙板上端位置处,并通过吊钩钩紧吊绳进行起吊,吊绳与预制内墙板之间连接不牢固,容易滑脱;起吊时,启动卷扬机,同时需要人工使用撬棍抵住预制内墙板的底部,防止预制内墙板无法正常起吊。Based on this, the utility model patent with the authorized notification number CN215254340U discloses an auxiliary installation tool for prefabricated interior wall panels, which utilizes hollow steel pipes to make trapezoidal brackets and the first connecting cross bar set, the second connecting cross bar set, the third connecting cross bar set Rods, first suspenders and second suspenders, and are equipped with winches, hooks, ropes and pulleys, use the hooks and ropes to wind one end of the prefabricated interior wall panels, and use the winches to lift, and the rotating hanger rotates to ensure that the prefabricated One end of the inner wall panel is slowly lifted to the vertical, saving time and effort, and the installation efficiency is high, and the trapezoidal bracket, the first connecting crossbar group, the second connecting crossbar group, the third connecting crossbar, the first suspender and the second The suspenders are all hollow steel pipes, and the entire installation tool is light in weight and easy to carry. But its disadvantages are: when in use, the support rod at the top of the trapezoidal bracket leans against the side of the frame beam, and the stability is not high; Tighten the sling for lifting, the connection between the sling and the prefabricated interior wall panel is not firm, and it is easy to slip; when lifting, start the winch, and at the same time need to manually use a crowbar to hold the bottom of the prefabricated interior wall panel to prevent the prefabricated interior wall panel from malfunctioning lift.

实用新型内容Utility model content

本实用新型为克服现有的预制内墙板辅助安装工具,稳定性不高、吊绳与预制内墙板之间连接不牢固容易滑脱以及在需要人工辅助墙板起吊的问题,旨在提供一种能解决上述问题的墙板辅助安装吊架装置。The utility model aims to provide a tool for overcoming the problems of low stability of the existing prefabricated interior wall panel auxiliary installation tools, weak connection between the sling and the prefabricated interior wall panel and easy slippage, and the need for manual auxiliary wall panel lifting. A wallboard auxiliary installation hanger device capable of solving the above problems.

一种墙板辅助安装吊架装置,包括安装架体、卷扬机、定滑轮、第一吊绳以及夹具;所述所述安装架体包括主纵杆、长横杆、下横杆以及上横杆,四所述主纵杆两两顶部交叉设置于两侧,所述长横杆将同一侧的两所述主纵杆中下部连接,所述下横杆架设于两所述长横杆上,所述上横杆将两侧的所述主纵杆顶部连接;所述卷扬机安装于所述下横杆上;所述定滑轮悬挂于所述上横杆上;所述第一吊绳固定端缠绕于所述卷扬机上,所述第一吊绳游离端绕过所述定滑轮;用于夹持墙板的所述夹具设置于所述第一吊绳游离端。A wall panel auxiliary installation hanger device, including a mounting frame body, a winch, a fixed pulley, a first suspension rope and a clamp; the mounting frame body includes a main longitudinal bar, a long horizontal bar, a lower horizontal bar and an upper horizontal bar , the two tops of the four main longitudinal bars are arranged crosswise on both sides, the long horizontal bar connects the middle and lower parts of the two main longitudinal bars on the same side, and the lower horizontal bar is erected on the two long horizontal bars, The upper cross bar connects the tops of the main longitudinal bars on both sides; the winch is installed on the lower cross bar; the fixed pulley is suspended on the upper cross bar; the fixed end of the first suspension rope Wound on the hoist, the free end of the first suspension rope goes around the fixed pulley; the clamp for clamping the wallboard is arranged at the free end of the first suspension rope.

进一步的,所述第一吊绳游离端设置有第二吊绳,所述第一吊绳与第二吊绳中部固定连接,两所述夹具分别固定设置于所述第二吊绳两端。Further, the free end of the first sling is provided with a second sling, the first sling is fixedly connected to the middle of the second sling, and the two clamps are respectively fixedly arranged at both ends of the second sling.

进一步的,所述夹具包括相铰接的第一夹持臂及第二夹持臂,所述第一夹持臂顶部设置有与所述第二吊绳连接的第一连接环,所述第一连接环底部设置有限制第二夹持臂旋转角度的限位凸起,两所述夹持板内侧均设置有若干防滑凸起。Further, the clamp includes a hinged first clamping arm and a second clamping arm, the top of the first clamping arm is provided with a first connecting ring connected to the second sling, the first The bottom of the connecting ring is provided with a limiting protrusion which limits the rotation angle of the second clamping arm, and a plurality of anti-slip protrusions are provided on the inner sides of the two clamping plates.

进一步的,所述安装架体还包括防倾覆杆,四所述防倾覆杆分别设置于四所述主纵杆底部,且与所述主纵杆交叉连接。Further, the mounting frame body further includes anti-overturning rods, and the four anti-overturning rods are respectively arranged at the bottoms of the four main longitudinal rods and cross-connected with the main longitudinal rods.

进一步的,还包括撑托机构,所述撑托机构包括第三吊绳及撑托槽,所述第三吊绳两端分别与所述第一吊绳游离端以及撑托槽连接,所述撑托槽卡设于所述墙板远离所述夹具的一端。Further, it also includes a support mechanism, the support mechanism includes a third sling and a support slot, the two ends of the third sling are respectively connected to the free end of the first sling and the support slot, the The supporting bracket slot is clamped on the end of the wallboard away from the fixture.

进一步的,所述撑托槽包括底部上下交叠设置的上槽板及下槽板,所述上槽板及下槽板底部开设有长条形限位通孔,所述通孔穿设有限位螺栓。Further, the support groove includes an upper groove plate and a lower groove plate with the bottom overlapped up and down, and the bottom of the upper groove plate and the lower groove plate is provided with a strip-shaped limiting through hole, and the through hole is pierced with a limited bit bolts.

进一步的,所述第三吊绳包括上吊绳及下吊绳,所述上吊绳下端连接有第二连接环,所述下吊绳为钢丝绳,所述下吊绳上端设置有钢丝绳扣。Further, the third hanging rope includes an upper hanging rope and a lower hanging rope, the lower end of the upper hanging rope is connected with a second connecting ring, the lower hanging rope is a steel wire rope, and the upper end of the lower hanging rope is provided with a steel wire rope buckle.

进一步的,所述安装架体还包括短横杆,所述短横杆将同一侧的两所述主纵杆上部连接。Further, the installation frame body further includes a short cross bar, and the short cross bar connects the upper parts of the two main longitudinal bars on the same side.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

①本实用新型中的墙板辅助安装吊架装置,由主纵杆、长横杆、下横杆以及上横杆组合形成安装架体,安装架体能够以四个主纵杆为支撑独立放置于地面,相较于现有技术中梯形支架顶端的支撑杆顶靠在框架梁的侧面上,具有较高的稳定性。①The wall panel auxiliary installation hanger device in the utility model is composed of the main longitudinal bar, the long horizontal bar, the lower horizontal bar and the upper horizontal bar to form the mounting frame body, and the mounting frame body can be placed independently with the support of the four main longitudinal bars Compared with the prior art, the support rod at the top of the trapezoidal bracket leans against the side of the frame beam, which has higher stability.

②本实用新型中的墙板辅助安装吊架装置,通过设置夹具,能够对墙板产生有效的夹持作用,在起吊过程中,有效防止滑脱现象的发生。②The wall panel auxiliary installation hanger device in the utility model can effectively clamp the wall panel by setting the clamp, and effectively prevent the occurrence of slippage during the lifting process.

③本实用新型中的墙板辅助安装吊架装置,设置有撑托机构,撑托槽用于承托墙板的底部,使得夹具与第三吊绳以及撑托槽的作用下,使得墙板的上下两端同时具有受力点,在起吊过程中,在墙板的底部产生受力,有效提高墙板起吊的稳定性。③The wallboard auxiliary installation hanger device in the utility model is provided with a support mechanism, and the support groove is used to support the bottom of the wallboard, so that under the action of the clamp, the third hanging rope and the support groove, the wallboard The upper and lower ends of the wall panel have stress points at the same time. During the lifting process, the force is generated at the bottom of the wall panel, which effectively improves the stability of the wall panel hoisting.

附图说明Description of drawings

附图用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与本实用新型的实施例一起用于解释本实用新型,并不构成对本实用新型的限制。在附图中:The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the description, and are used to explain the utility model together with the embodiments of the utility model, and do not constitute a limitation to the utility model. In the attached picture:

图1是实施例一中的墙板辅助安装吊架装置的整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the wall panel auxiliary installation hanger device in the first embodiment.

图2是实施例一中的夹具的结构示意图。Fig. 2 is a schematic structural diagram of the clamp in the first embodiment.

图3是实施例二中的墙板辅助安装吊架装置的整体结构示意图。Fig. 3 is a schematic diagram of the overall structure of the wall panel auxiliary installation hanger device in the second embodiment.

图4是实施例二中的撑托槽的结构示意图。Fig. 4 is a schematic structural view of the bracket groove in the second embodiment.

图5是实施例二中的钢丝绳扣的结构示意图。Fig. 5 is a structural schematic diagram of the wire rope buckle in the second embodiment.

图6是实施例二中的墙板辅助安装吊架装置的使用状态示意图。Fig. 6 is a schematic view of the use state of the wall panel auxiliary installation hanger device in the second embodiment.

图中:1、主纵杆;2、长横杆;3、下横杆;4、上横杆;5、卷扬机;6、定滑轮;7、第一吊绳;8、夹具;81、第一夹持臂;82、第二夹持臂;83、第一连接环;84、限位凸起;85、防滑凸起;9、第二吊绳;10、防倾覆杆;11、第三吊绳;111、上吊绳;112、下吊绳;113、第二连接环;114、钢丝绳扣;12、撑托槽;121、上槽板;122、下槽板;123、限位通孔;124、限位螺栓;13、短横杆。Among the figure: 1, main longitudinal bar; 2, long cross bar; 3, lower cross bar; 4, upper cross bar; 5, winch; 6, fixed pulley; 7, first lifting rope; One clamping arm; 82, the second clamping arm; 83, the first connecting ring; 84, the limit protrusion; 85, the anti-slip protrusion; 9, the second lifting rope; 111, the upper sling; 112, the lower sling; 113, the second connecting ring; 114, the wire rope buckle; 12, the support groove; 121, the upper groove plate; 122, the lower groove plate; 123, the limit through hole ; 124, limit bolt; 13, short cross bar.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

具体实施例一:Specific embodiment one:

如图1所示,本实施例中的墙板辅助安装吊架装置,包括安装架体,安装架体包括主纵杆1、长横杆2、短横杆13、下横杆3以及上横杆4,四个主纵杆1两两顶部交叉连接设置于两侧。长横杆2水平设置于同一侧的两个主纵杆1的中下部,且两端分别与两个主纵杆1的中下部连接。短横杆13水平设置于同一侧的两个主纵杆1的上部,且两端分别与两个主纵杆1的上部连接。至少两个下横杆3平行架设于两个长横杆2上方,且两端分别与两个长横杆2连接。三个上横杆4水平且相互平行设置于主纵杆1顶部,且上横杆4的两端分别与呈相同角度的两个主纵杆1连接,三个上横杆4的中部还设有短竖杆。As shown in Figure 1, the wall panel auxiliary installation hanger device in this embodiment includes a mounting frame body, and the mounting frame body includes a main vertical bar 1, a long horizontal bar 2, a short horizontal bar 13, a lower horizontal bar 3 and an upper horizontal bar. Rods 4 and four main longitudinal rods 1 are arranged on both sides with cross-connected tops in pairs. The long horizontal bar 2 is horizontally arranged at the middle and lower parts of the two main longitudinal bars 1 on the same side, and both ends are respectively connected with the middle and lower parts of the two main longitudinal bars 1 . The short horizontal bar 13 is horizontally arranged on the upper parts of the two main longitudinal bars 1 on the same side, and the two ends are respectively connected with the upper parts of the two main longitudinal bars 1 . At least two lower crossbars 3 are erected in parallel above the two long crossbars 2 , and the two ends are respectively connected to the two long crossbars 2 . The three upper cross bars 4 are arranged horizontally and parallel to each other on the top of the main longitudinal bar 1, and the two ends of the upper cross bar 4 are respectively connected with the two main longitudinal bars 1 at the same angle. There are short vertical bars.

下横杆3上安装有卷扬机5,卷扬机5上缠绕有第一吊绳7。位于最上方的上横杆4中部悬挂有定滑轮6,第一吊绳7的游离端绕过所述定滑轮6且设置有第二吊绳9。第二吊绳9的中部与第一吊绳7的游离端固定连接,第二吊绳9的两端均设置有用于夹持墙板的夹具8。A hoist 5 is installed on the lower cross bar 3, and a first suspension rope 7 is wound on the hoist 5. A fixed pulley 6 is suspended in the middle of the uppermost upper cross bar 4 , and the free end of the first suspension rope 7 goes around the fixed pulley 6 and is provided with a second suspension rope 9 . The middle part of the second hanging rope 9 is fixedly connected with the free end of the first hanging rope 7 , and both ends of the second hanging rope 9 are provided with clamps 8 for clamping the wallboard.

在本实施例中,如图2所示,夹具8包括第一夹持臂81以及第二夹持臂82。第一夹持臂81以及第二夹持臂82顶部相铰接形成n型的夹具8,第一夹持臂81顶部一体设置有与第二吊绳9连接的第一连接环83,第一连接环83底部一体设置有限位凸起84,限位凸起84能够限制第二夹持臂82旋转的角度,防止第二夹持臂82向上方旋转,使得夹具8牢固的夹持墙板。第一夹持臂81及第二夹持臂82的夹持部位内侧均设置有若干防滑凸起85。具体的,防滑凸起85为橡胶防滑凸起85。In this embodiment, as shown in FIG. 2 , the clamp 8 includes a first clamping arm 81 and a second clamping arm 82 . The first clamping arm 81 and the top of the second clamping arm 82 are hinged to form an n-type clamp 8. The top of the first clamping arm 81 is integrally provided with a first connecting ring 83 connected to the second hanging rope 9. The bottom of the ring 83 is integrally provided with a limit protrusion 84, which can limit the rotation angle of the second clamping arm 82 and prevent the second clamping arm 82 from rotating upwards, so that the clamp 8 can firmly clamp the wallboard. A plurality of anti-slip protrusions 85 are disposed inside the clamping parts of the first clamping arm 81 and the second clamping arm 82 . Specifically, the anti-slip protrusions 85 are rubber anti-slip protrusions 85 .

本实施例中的安装架体,还包括防倾覆杆10。四个防倾覆杆10分别设置于四个主纵杆1底部,防倾覆杆10与主纵杆1交叉设置。防倾覆杆10顶部与主纵杆1连接,底部支撑于主纵杆1外侧。通过设置防倾覆杆10,增大安装架体底部的支撑范围,有效防止安装架体倾覆。The mounting frame body in this embodiment also includes an anti-overturning bar 10 . The four anti-overturning rods 10 are respectively arranged at the bottom of the four main longitudinal rods 1 , and the anti-overturning rods 10 are intersected with the main longitudinal rods 1 . The top of the anti-overturn bar 10 is connected with the main longitudinal bar 1 , and the bottom is supported on the outside of the main longitudinal bar 1 . By setting the anti-overturning rod 10, the support range at the bottom of the installation frame body is enlarged, and the overturning of the installation frame body is effectively prevented.

在本实施例中,主纵杆1、长横杆2、短横杆13、下横杆3、上横杆4、短竖杆以及防倾覆杆10均为钢管,钢管之间均采用钢管扣件进行连接,具体的钢管扣件可选择性的使用垂直扣件、旋转扣件等。第一吊绳7以及第二吊绳9均为钢丝绳。In this embodiment, the main longitudinal bar 1, the long bar 2, the short bar 13, the lower bar 3, the upper bar 4, the short bar and the anti-overturning bar 10 are all steel pipes, and steel pipe buckles are used between the steel pipes. The specific steel pipe fasteners can optionally use vertical fasteners, rotary fasteners, etc. Both the first hanging rope 7 and the second hanging rope 9 are steel wire ropes.

本实施例中的墙板辅助安装吊架装置的工作原理是:The working principle of the wallboard auxiliary installation hanger device in the present embodiment is:

使用时,将吊架装置以及隔墙板运至待装区域后,将两个夹具8夹持于墙板顶部,启动卷扬机5,卷扬机5收卷第一吊绳7,第一吊绳7向上拉伸第二吊绳9,第二吊绳9向上拉伸夹具8,夹具8在第二吊绳9的拉力作用下,牢固的夹持墙板,从而将墙板顶部吊起,当墙板树立角度达到可以拼装范围后,进入下一步安装环节。When in use, after the hanger device and the partition wall board are transported to the area to be installed, two clamps 8 are clamped on the top of the wall board, and the hoist 5 is started, and the hoist 5 winds up the first sling 7, and the first sling 7 goes upward. Stretch the second hanging rope 9, the second hanging rope 9 stretches the clamp 8 upward, and the clamp 8 firmly clamps the wallboard under the pulling force of the second hanging rope 9, thereby lifting the top of the wallboard, when the wallboard After the setting angle reaches the range that can be assembled, enter the next step of installation.

本实施例中的墙板辅助安装吊架装置,安装架体能够以四个主纵杆1以及四个防倾覆杆10为支撑独立放置于地面,相较于现有技术中梯形支架顶端的支撑杆顶靠在框架梁的侧面上,具有较高的稳定性。夹具8能够对墙板产生有效的夹持作用,在起吊过程中,有效防止滑脱现象的发生。In the wallboard auxiliary installation hanger device in this embodiment, the installation frame body can be independently placed on the ground with four main longitudinal bars 1 and four anti-overturning bars 10 as supports. The rod top rests on the side of the frame beam for high stability. The clamp 8 can effectively clamp the wallboard, and effectively prevent slippage during the lifting process.

具体实施例二:Specific embodiment two:

如图3所示,本实施例中的墙板辅助安装吊架装置,还包括撑托机构,撑托机构包括第三吊绳11及撑托槽12。第三吊绳11包括上吊绳111以及下吊绳112,上吊绳111上端与第二吊绳9中部固定连接,上吊绳111下端固定连接有第二连接环113;下吊绳112上端活动连接有钢丝绳扣114,如图5所示,下吊绳112的上端通过钢丝绳扣114与第二连接环113可拆卸连接,下吊绳112下端与撑托槽12固定连接。As shown in FIG. 3 , the wall panel auxiliary installation hanger device in this embodiment further includes a supporting mechanism, which includes a third hanging rope 11 and a supporting groove 12 . The third hanging rope 11 includes an upper hanging rope 111 and a lower hanging rope 112, the upper end of the upper hanging rope 111 is fixedly connected with the middle part of the second hanging rope 9, the lower end of the upper hanging rope 111 is fixedly connected with a second connecting ring 113; the upper end of the lower hanging rope 112 is movably connected with Wire rope buckle 114, as shown in FIG.

在本实施例中,如图4所示,撑托槽12包括上槽板121及下槽板122,上槽板121及下槽板122的截面均呈L型结构,上槽板121与下槽板122底部上下交叠设置,且上槽板121与下槽板122底部开设有限位通孔123,限位通孔123呈长条形且与撑托槽12的长度方向垂直,限位通孔123中穿设有限位螺栓124。通过设置限位通孔123及限位螺栓124,使用时,旋松限位螺栓124,调节上槽板121与下槽板122底部交叠的宽度,重新旋紧限位螺栓124,能够调节撑托槽12的宽度,使其适用不同厚度的墙板。In this embodiment, as shown in FIG. 4, the bracket groove 12 includes an upper groove plate 121 and a lower groove plate 122. The bottom of the slot plate 122 overlaps up and down, and the bottom of the upper slot plate 121 and the bottom of the lower slot plate 122 are provided with a limiting through hole 123. The limiting through hole 123 is elongated and perpendicular to the length direction of the support groove 12. A limiting bolt 124 passes through the hole 123 . By setting the limit through hole 123 and the limit bolt 124, during use, unscrew the limit bolt 124, adjust the overlapping width of the upper slot plate 121 and the bottom of the lower slot plate 122, and re-tighten the limit bolt 124, the support can be adjusted. The width of bracket 12 makes it suitable for wallboards of different thicknesses.

本实施例中的墙板辅助安装吊架装置,如图6所示,撑托槽12用于承托墙板的底部,使得夹具8与第三吊绳11以及撑托槽12的作用下,使得墙板的上下两端同时具有受力点,在起吊过程中,在墙板的底部产生受力,有效提高墙板起吊的稳定性。通过设置第二连接环113以及钢丝绳扣114,下吊绳112端部穿过第二连接环113换向后与下吊绳112内段重叠,经钢丝绳扣114的锁紧作用,从而使得下吊绳112与上吊绳111相连,使用时,旋松钢丝绳扣114上的螺栓,调节下吊绳112的重叠长度,从而调节第三吊绳11的整体长度,使其适用不同长度的墙板。The wallboard auxiliary installation hanger device in this embodiment, as shown in FIG. The upper and lower ends of the wallboard have stress points at the same time. During the lifting process, the bottom of the wallboard is stressed, which effectively improves the stability of the wallboard when it is hoisted. By setting the second connecting ring 113 and the wire rope buckle 114, the end of the lower hanging rope 112 overlaps with the inner section of the lower hanging rope 112 after passing through the second connecting ring 113, and through the locking effect of the wire rope buckle 114, the hanging Rope 112 links to each other with last hanging rope 111, during use, unscrew the bolt on the wire rope buckle 114, regulate the overlapping length of lower hanging rope 112, thereby regulate the overall length of the third hanging rope 11, make it applicable to the wallboard of different lengths.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (8)

1. The utility model provides a wallboard auxiliary installation gallows device which characterized in that includes:
the mounting frame comprises main longitudinal rods (1), long transverse rods (2), lower transverse rods (3) and upper transverse rods (4), the tops of every two of the four main longitudinal rods (1) are arranged on two sides in a crossed mode, the middle lower portions of the two main longitudinal rods (1) on the same side are connected through the long transverse rods (2), the lower transverse rods (3) are erected on the two long transverse rods (2), and the tops of the main longitudinal rods (1) on the two sides are connected through the upper transverse rods (4);
the winch (5) is installed on the lower cross rod (3);
the fixed pulley (6) is hung on the upper cross rod (4);
the fixed end of the first lifting rope (7) is wound on the winch (5), and the free end of the first lifting rope (7) bypasses the fixed pulley (6); and
the clamp (8) is used for clamping the wallboard, and the clamp (8) is arranged at the free end of the first lifting rope (7).
2. The wall panel mounting hanger apparatus of claim 1, wherein: the free end of the first lifting rope (7) is provided with a second lifting rope (9), the middle parts of the first lifting rope (7) and the second lifting rope (9) are fixedly connected, and the two clamps (8) are respectively and fixedly arranged at the two ends of the second lifting rope (9).
3. The wall panel mounting hanger apparatus of claim 2, wherein: anchor clamps (8) are including looks articulated first centre gripping arm (81) and second centre gripping arm (82), first centre gripping arm (81) top be provided with first connecting ring (83) that second lifting rope (9) are connected, first connecting ring (83) bottom is provided with spacing arch (84) of restriction second centre gripping arm (82) rotation angle, first centre gripping arm (81) and second centre gripping arm (82) inboard all are provided with a plurality of non-slip raised (85).
4. The wall panel installation hanger apparatus of claim 1, wherein: the mounting frame body still includes prevents pole (10) that topples, four prevent that topples pole (10) set up respectively in four main vertical pole (1) bottom, and with main vertical pole (1) cross connection.
5. The wall panel mounting hanger apparatus of any one of claims 1-4, wherein: the wallboard support device is characterized by further comprising a support mechanism, wherein the support mechanism comprises a third lifting rope (11) and a support groove (12), two ends of the third lifting rope (11) are respectively connected with the free end of the first lifting rope (7) and the support groove (12), and the support groove (12) is clamped at one end, far away from the clamp (8), of the wallboard.
6. The wall panel mounting hanger apparatus of claim 5, wherein: the bracket (12) comprises an upper groove plate (121) and a lower groove plate (122) which are overlapped from top to bottom, the bottoms of the upper groove plate (121) and the lower groove plate (122) are provided with elongated limiting through holes (123), and limiting bolts (124) are arranged through the through holes in a penetrating manner.
7. The wall panel mounting hanger apparatus of claim 5, wherein: the third lifting rope (11) comprises an upper lifting rope (111) and a lower lifting rope (112), the lower end of the upper lifting rope (111) is connected with a second connecting ring (113), the lower lifting rope (112) is a steel wire rope, and the upper end of the lower lifting rope (112) is movably connected with a steel wire rope buckle (114).
8. The wall panel installation hanger apparatus of claim 1, wherein: the mounting frame body still includes short horizontal pole (13), short horizontal pole (13) will be with two of one side main vertical pole (1) upper portion is connected.
CN202222984528.XU 2022-11-09 2022-11-09 A wall panel auxiliary installation hanger device Expired - Fee Related CN218538992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222984528.XU CN218538992U (en) 2022-11-09 2022-11-09 A wall panel auxiliary installation hanger device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222984528.XU CN218538992U (en) 2022-11-09 2022-11-09 A wall panel auxiliary installation hanger device

Publications (1)

Publication Number Publication Date
CN218538992U true CN218538992U (en) 2023-02-28

Family

ID=85261887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222984528.XU Expired - Fee Related CN218538992U (en) 2022-11-09 2022-11-09 A wall panel auxiliary installation hanger device

Country Status (1)

Country Link
CN (1) CN218538992U (en)

Similar Documents

Publication Publication Date Title
CN110748139B (en) A hanging basket support system
CN109487927B (en) Cable net supporting type glass curtain wall and construction method
CN103821341B (en) Attaching automatic lifting multilayer operation platform
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN218538992U (en) A wall panel auxiliary installation hanger device
CN210460016U (en) Integrated form single power lift material platform
CN215889405U (en) Foldable platform of unloading of encorbelmenting
CN118439488B (en) Lifting device of steel bar truss building carrier plate
CN118125286B (en) Automatic hoisting equipment for green assembly type building laminated slab
CN114961220A (en) Electric overall climbing system for high-rise building alternate construction
CN103821336B (en) A kind of fixed high-altitude long-span construction operation platform of rope and construction method thereof
CN217126649U (en) Special lifting appliance for large concrete prefabricated member
CN206174481U (en) Jack -up instrument is used in fan hoist and mount of tuber pipe and suspension type installation
CN214780419U (en) Evaporate and press aerated concrete wallboard hoist device
CN210438301U (en) Light slat lifting device for building partition wall
CN223893829U (en) Lifting support frame for binding beam steel bars and auxiliary tool for binding beam steel bars
CN214570136U (en) ALC slat lifting device
CN222525815U (en) A hanging basket device for equipment room on roof
CN223963108U (en) Arc steel mesh frame seals various steel sheet lifting device
CN115535845B (en) ALB board lifting and installation integrated device
CN223409224U (en) A large diameter steel bar sleeve connection, lifting and extension device
CN221609217U (en) Mounting structure of assembled circular arc furred ceiling
CN221093582U (en) A device for alternately lifting air ducts in narrow spaces
CN216583766U (en) Size-adjustable laminated slab lifting appliance with lifting function
CN217518116U (en) Lifting operation platform for construction of steel structure factory building top layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230228

CF01 Termination of patent right due to non-payment of annual fee