CN218524824U - A equipment testboard for intelligent house circuit board - Google Patents

A equipment testboard for intelligent house circuit board Download PDF

Info

Publication number
CN218524824U
CN218524824U CN202221548922.2U CN202221548922U CN218524824U CN 218524824 U CN218524824 U CN 218524824U CN 202221548922 U CN202221548922 U CN 202221548922U CN 218524824 U CN218524824 U CN 218524824U
Authority
CN
China
Prior art keywords
fixedly connected
bottom case
circuit boards
sides
smart home
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221548922.2U
Other languages
Chinese (zh)
Inventor
贾荣东
王莉花
莫晓君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ruiyuan Technology Co.,Ltd.
Original Assignee
Hubei Hehe Energy Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Hehe Energy Technology Development Co ltd filed Critical Hubei Hehe Energy Technology Development Co ltd
Priority to CN202221548922.2U priority Critical patent/CN218524824U/en
Application granted granted Critical
Publication of CN218524824U publication Critical patent/CN218524824U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tests Of Electronic Circuits (AREA)

Abstract

本实用新型涉及电路板组装测试技术领域,且公开了一种用于智能家居电路板的组装测试台,包括底壳,所述底壳的内部设有一端延伸至底壳左侧的移动装置,所述移动装置的前后两侧均固定连接有与底壳滑动连接且两端分别延伸至底壳上下两侧的升降装置。该用于智能家居电路板的组装测试台,具备便于使用等优点,解决了现有的能家居电路板的组装测试大都是通过操作员手持电路板,使用外界组装检测工具进行组装检测,在检测时手部的汗渍容易侵蚀电路板表层,同时在遇到外力触碰到操作员时电路板容易从手中脱落,造成电路板损坏,故意电子元器件松脱,不便于使用的问题。

Figure 202221548922

The utility model relates to the technical field of circuit board assembly and testing, and discloses an assembly test bench for circuit boards in smart homes, which includes a bottom case, and a moving device with one end extending to the left side of the bottom case is provided inside the bottom case. The front and rear sides of the moving device are fixedly connected with lifting devices which are slidingly connected to the bottom case and whose two ends respectively extend to the upper and lower sides of the bottom case. The assembly test bench for smart home circuit boards has the advantages of being easy to use, and solves the problem that most of the existing assembly tests of smart home circuit boards are carried out by operators holding the circuit boards and using external assembly testing tools for assembly testing. Sweat stains on the hands easily corrode the surface of the circuit board, and at the same time, the circuit board is easy to fall off from the operator's hand when the external force touches the operator, resulting in damage to the circuit board, deliberate loosening of electronic components, and inconvenient use.

Figure 202221548922

Description

一种用于智能家居电路板的组装测试台An assembly test bench for smart home circuit boards

技术领域technical field

本实用新型涉及用于电路板组装测试技术领域,具体为一种用于智能家居电路板的组装测试台。The utility model relates to the technical field of assembly and testing of circuit boards, in particular to an assembly and testing platform for circuit boards of smart homes.

背景技术Background technique

电路板的名称有:陶瓷电路板,氧化铝陶瓷电路板,氮化铝陶瓷电路板,线路板,PCB板,铝基板,高频板,厚铜板,阻抗板,PCB,超薄线路板,超薄电路板,印刷(铜刻蚀技术)电路板等。电路板使电路迷你化、直观化,对于固定电路的批量生产和优化用电器布局起重要作用。The names of the circuit boards are: ceramic circuit board, alumina ceramic circuit board, aluminum nitride ceramic circuit board, circuit board, PCB board, aluminum substrate, high frequency board, thick copper board, impedance board, PCB, ultra-thin circuit board, ultra-thin Thin circuit boards, printed (copper etching technology) circuit boards, etc. The circuit board makes the circuit miniaturized and intuitive, and plays an important role in mass production of fixed circuits and optimizing the layout of electrical appliances.

现有的能家居电路板的组装测试大都是通过操作员手持电路板,使用外界组装检测工具进行组装检测,在检测时手部的汗渍容易侵蚀电路板表层,同时在遇到外力触碰到操作员时电路板容易从手中脱落,造成电路板损坏,故意电子元器件松脱,不便于使用,故而提出一种用于智能家居电路板的组装测试台来解决上述所提的问题。The assembly and testing of the existing smart home circuit boards are mostly carried out by the operator holding the circuit board and using external assembly and testing tools for assembly and testing. During the test, the sweat stains on the hands are easy to erode the surface of the circuit board. When working, the circuit board is easy to fall off from the hand, causing the circuit board to be damaged, and the electronic components are intentionally loose, which is inconvenient to use. Therefore, an assembly test bench for smart home circuit boards is proposed to solve the above-mentioned problems.

实用新型内容Utility model content

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本实用新型提供了一种用于智能家居电路板的组装测试台,具备便于使用等优点,解决了现有的能家居电路板的组装测试大都是通过操作员手持电路板,使用外界组装检测工具进行组装检测,在检测时手部的汗渍容易侵蚀电路板表层,同时在遇到外力触碰到操作员时电路板容易从手中脱落,造成电路板损坏,故意电子元器件松脱,不便于使用的问题。Aiming at the deficiencies of the prior art, the utility model provides an assembly test bench for smart home circuit boards, which has the advantages of being easy to use, and solves the problem that most of the assembly tests of the existing smart home circuit boards are carried out by the operator holding the circuit board. The circuit board is assembled and tested using external assembly and testing tools. During the test, the sweat stains on the hands will easily corrode the surface of the circuit board. The device is loose and inconvenient to use.

(二)技术方案(2) Technical solution

本实用新型解决上述技术问题的技术方案如下:一种用于智能家居电路板的组装测试台,包括底壳,所述底壳的内部设有一端延伸至底壳左侧的移动装置,所述移动装置的前后两侧均固定连接有与底壳滑动连接且两端分别延伸至底壳上下两侧的升降装置,所述底壳的内部设有位于左右两侧升降装置之间且一端延伸至底壳下方的张紧装置,左右两侧所述升降装置的外侧均固定连接有位于张紧装置前侧且与张紧装置传动连接的并联装置,两个所述升降装置的顶部均固定连接有呈左右对称设置的夹持装置。The technical solution of the utility model to solve the above-mentioned technical problems is as follows: an assembly test bench for smart home circuit boards, including a bottom case, a mobile device with one end extending to the left side of the bottom case is provided inside the bottom case, the The front and rear sides of the mobile device are fixedly connected with lifting devices that are slidably connected to the bottom case and extend to the upper and lower sides of the bottom case respectively. For the tensioning device under the bottom shell, the outer sides of the lifting devices on the left and right sides are fixedly connected with a parallel device located on the front side of the tensioning device and connected to the tensioning device in transmission, and the tops of the two lifting devices are fixedly connected with The clamping device is arranged symmetrically from left to right.

本实用新型的有益效果是:将电路板放置在底壳上方,经由移动装置带动升降装置靠近电路板,在升降装置移动的同时,通过张紧装置保持并联装置与升降装置的连接性,再经由升降装置和并联装置带动夹持装置下压,通过夹持装置压住电路板,进行安装检测。The beneficial effect of the utility model is: the circuit board is placed above the bottom shell, the lifting device is driven close to the circuit board through the moving device, while the lifting device is moving, the connection between the parallel device and the lifting device is maintained through the tensioning device, and then the The lifting device and the parallel device drive the clamping device to press down, and press the circuit board through the clamping device for installation and inspection.

该用于智能家居电路板的组装测试台,具备了便于使用的优点。The assembly test bench for the smart home circuit board has the advantage of being easy to use.

在上述技术方案的基础上,本实用新型还可以做如下改进。On the basis of the above technical solutions, the utility model can also be improved as follows.

进一步,所述底壳包括壳体,所述壳体的顶部固定连接有位于左右两侧升降装置之间的安装垫,所述安装垫为海绵,所述壳体的右侧固定连接有与外界组装设备固定连接的连接器。Further, the bottom case includes a housing, the top of the housing is fixedly connected with an installation pad located between the left and right lifting devices, the installation pad is a sponge, and the right side of the housing is fixedly connected with a Connectors for fixed connection of assembled equipment.

采用上述进一步方案的有益效果是,海绵材质较软,能够更好的保护电路板的底部。The beneficial effect of adopting the above further scheme is that the sponge material is softer, which can better protect the bottom of the circuit board.

进一步,所述移动装置包括丝杠,所述丝杠与底壳的内部转动连接,所述丝杠的左侧固定连接有位于底壳左侧的第一转轮,所述丝杠的外侧螺纹连接有数量为两个且呈左右对称分布的移动板,两个所述移动板的底部均固定连接有呈前后对称分布且均与底壳内部滑动连接的第一滑块。Further, the moving device includes a lead screw, which is rotatably connected to the inside of the bottom case, and the left side of the lead screw is fixedly connected with a first runner located on the left side of the bottom case, and the outer thread of the lead screw There are two mobile plates which are symmetrically distributed left and right, and the bottoms of the two mobile plates are fixedly connected with first sliders which are symmetrically distributed front and rear and are slidably connected to the inside of the bottom case.

采用上述进一步方案的有益效果是,第一滑块能够提高移动板移动的稳定性。The beneficial effect of adopting the above further solution is that the first slider can improve the stability of the moving plate.

进一步,两个所述升降装置均包括螺管和滑管,两个所述螺管分别与两个移动板的前侧固定连接,两个所述滑管分别与两个移动板的后侧固定连接,两个所述螺管和滑管呈前后对称设置且高度相等并均与底壳的内部滑动连接,两个所述螺管的内部均滑动连接有两端分别延伸至底壳上下两侧的螺杆,两个所述滑管的内部均滑动连接有两端分别延伸至底壳上下两侧的滑杆,两个所述螺杆和两个滑杆的长度相等,两个所述螺管的底部均转动连接有与同侧螺杆外侧螺纹连接的螺环,左侧所述螺环的底部固定连接有位于同侧螺杆外侧的第二转轮。Further, the two lifting devices each include a spiral tube and a sliding tube, the two spiral tubes are respectively fixedly connected to the front sides of the two moving plates, and the two sliding tubes are respectively fixed to the rear sides of the two moving plates connection, the two spiral tubes and sliding tubes are arranged symmetrically front and back and have equal heights and are both slidably connected to the inside of the bottom shell. The screw rods of the two slide tubes are slidably connected with two ends extending to the upper and lower sides of the bottom shell respectively. The lengths of the two screw rods and the two slide rods are equal. The bottoms are all rotatably connected with a spiral ring that is threadedly connected to the outer side of the screw rod on the same side, and the bottom of the spiral ring on the left side is fixedly connected with a second runner located on the outer side of the screw rod on the same side.

采用上述进一步方案的有益效果是,螺管与滑管能够对螺杆和滑杆的升降进行限位。The beneficial effect of adopting the above further solution is that the spiral tube and the sliding tube can limit the lifting of the screw rod and the sliding rod.

进一步,所述张紧装置包括导向杆,所述导向杆与底壳的内部固定连接且位于移动装置的下方,所述导向杆的外侧滑动连接有滑环,所述滑环的正面与底壳的内部之间固定连接有同一个且位于导向杆外侧的第一弹簧,所述滑环的底部固定连接有一端延伸至底壳下方的安装块,所述安装块的左右两侧均固定连接有与底壳内部滑动连接且呈前后对称分布的第二滑块。Further, the tensioning device includes a guide rod, the guide rod is fixedly connected to the inside of the bottom case and is located below the moving device, the outer side of the guide rod is slidably connected with a slip ring, and the front side of the slip ring is connected to the bottom case The same first spring located on the outside of the guide rod is fixedly connected between the inside of the slip ring. The bottom of the slip ring is fixedly connected with a mounting block with one end extending to the bottom of the bottom case. The left and right sides of the mounting block are fixedly connected with The second sliding block is slidingly connected with the inside of the bottom shell and distributed symmetrically front and rear.

采用上述进一步方案的有益效果是,第二滑块能够提高安装块移动的稳定性,防止歪斜。The beneficial effect of adopting the above further proposal is that the second sliding block can improve the stability of the movement of the mounting block and prevent skewing.

进一步,所述并联装置包括第一带轮和数量为两个的第二带轮,所述第一带轮与张紧装置的底部转动连接且位于左右两侧升降装置之间,两个所述第二带轮分别与两个螺环的外侧固定连接,且呈左右对称分布,所述第一带轮与两个第二带轮之间传动连接有同一个皮带。Further, the parallel device includes a first pulley and two second pulleys, the first pulley is rotatably connected to the bottom of the tensioning device and is located between the lifting devices on the left and right sides, and the two pulleys The second pulleys are respectively fixedly connected to the outer sides of the two spiral rings, and are symmetrically distributed left and right, and the same belt is connected between the first pulley and the two second pulleys.

采用上述进一步方案的有益效果是,带传动传输稳定且噪音小。The beneficial effect of adopting the above further solution is that the transmission of the belt drive is stable and the noise is low.

进一步,所述夹持装置包括数量为两个的垫板,两个所述垫板分别与同侧滑管和螺管的顶部固定连接且呈左右对称分布,两个所述垫板的顶部均固定连接有固定板,两个所述固定板的内部均滑动连接有数量为两个且两端分别延伸至固定板上下两侧的压杆,四个所述压杆位于两侧螺管和滑管之间且呈矩形对称分布,左右两侧所述压杆的底部均固定连接有压垫,两个所述压垫的底部均固定连接有橡胶垫,两个所述固定板的顶部均固定连接有数量为两个且分别位于同侧两个压杆上方的固定壳,同侧所述固定壳与压杆之间固定连接有同一个第二弹簧。Further, the clamping device includes two backing plates, the two backing plates are respectively fixedly connected with the tops of the slide tube and the spiral tube on the same side and distributed symmetrically from left to right, and the tops of the two backing plates are both Fixedly connected with a fixed plate, the inside of the two fixed plates are slidingly connected with two pressure rods whose two ends respectively extend to the upper and lower sides of the fixed plate. The pipes are distributed symmetrically in a rectangular shape, the bottoms of the pressure rods on the left and right sides are fixedly connected with pressure pads, the bottoms of the two pressure pads are fixedly connected with rubber pads, and the tops of the two fixed plates are fixed There are two fixed shells which are respectively located above the two pressure rods on the same side, and the same second spring is fixedly connected between the fixed shells and the pressure rods on the same side.

采用上述进一步方案的有益效果是,橡胶垫能够在保持足够压力的情况下通过橡胶自身的物理特性保护电路板的上侧。The beneficial effect of adopting the above further solution is that the rubber pad can protect the upper side of the circuit board through the physical properties of the rubber itself while maintaining sufficient pressure.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型外观结构示意图;Fig. 2 is a schematic diagram of the appearance structure of the utility model;

图3为本实用新型壳体与移动装置连接结构侧视图;Fig. 3 is a side view of the connection structure between the housing and the mobile device of the present invention;

图4为本实用新型张紧装置与壳体连接结构侧视图。Fig. 4 is a side view of the connection structure between the tensioning device and the housing of the utility model.

图中:1、底壳;101、壳体;102、安装垫;103、连接器;2、移动装置;201、丝杠;202、第一转轮;203、移动板;204、第一滑块;3、升降装置;301、螺管;302、滑管;303、螺杆;304、滑杆;305、螺环;306、第二转轮;4、张紧装置;401、导向杆;402、滑环;403、第一弹簧;404、安装块;405、第二滑块;5、并联装置;501、第一带轮;502、第二带轮;503、皮带;6、夹持装置;601、垫板;602、固定板;603、压杆;604、压垫;605、固定壳;606、第二弹簧。In the figure: 1, bottom shell; 101, housing; 102, mounting pad; 103, connector; 2, moving device; 201, lead screw; 202, first runner; 203, moving plate; Block; 3, lifting device; 301, spiral tube; 302, slide pipe; 303, screw rod; 304, slide rod; 305, spiral ring; 306, second runner; 4, tensioning device; 401, guide rod; 402 , slip ring; 403, first spring; 404, mounting block; 405, second slider; 5, parallel device; 501, first pulley; 502, second pulley; 503, belt; 6, clamping device ; 601, backing plate; 602, fixed plate; 603, pressure rod; 604, pressure pad; 605, fixed shell; 606, second spring.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例中,由图1-4给出一种用于智能家居电路板的组装测试台,本实用新型包括一种用于智能家居电路板的组装测试台,包括底壳1,底壳1的内部设有一端延伸至底壳1左侧的移动装置2,移动装置2的前后两侧均固定连接有与底壳1滑动连接且两端分别延伸至底壳1上下两侧的升降装置3,底壳1的内部设有位于左右两侧升降装置3之间且一端延伸至底壳1下方的张紧装置4,左右两侧升降装置3的外侧均固定连接有位于张紧装置4前侧且与张紧装置4传动连接的并联装置5,两个升降装置3的顶部均固定连接有呈左右对称设置的夹持装置6;In the embodiment, an assembly test bench for smart home circuit boards is given by Figures 1-4. The utility model includes an assembly test bench for smart home circuit boards, including a bottom shell 1, and the bottom shell 1 There is a mobile device 2 with one end extending to the left side of the bottom case 1 inside. The front and rear sides of the mobile device 2 are fixedly connected with the lifting device 3 slidingly connected with the bottom case 1 and extending to the upper and lower sides of the bottom case 1 at both ends. The inside of the bottom shell 1 is provided with a tensioning device 4 located between the lifting devices 3 on the left and right sides and one end extends to the bottom of the bottom shell 1. The outer sides of the lifting devices 3 on the left and right sides are fixedly connected with a The parallel device 5 connected to the tensioning device 4 is driven, and the tops of the two lifting devices 3 are fixedly connected with a clamping device 6 arranged symmetrically from left to right;

底壳1包括壳体101,壳体101的顶部固定连接有位于左右两侧升降装置3之间的安装垫102,安装垫102为海绵,壳体101的右侧固定连接有与外界组装设备固定连接的连接器103;The bottom shell 1 includes a shell 101. The top of the shell 101 is fixedly connected with a mounting pad 102 located between the lifting devices 3 on the left and right sides. The mounting pad 102 is a sponge, and the right side of the shell 101 is fixedly connected with an external assembly device. connected connector 103;

海绵材质较软,能够更好的保护电路板的底部;The soft sponge material can better protect the bottom of the circuit board;

移动装置2包括丝杠201,丝杠201与底壳1的内部转动连接,丝杠201的左侧固定连接有位于底壳1左侧的第一转轮202,丝杠201的外侧螺纹连接有数量为两个且呈左右对称分布的移动板203,两个移动板203的底部均固定连接有呈前后对称分布且均与底壳1内部滑动连接的第一滑块204;The moving device 2 includes a lead screw 201, which is rotationally connected to the inside of the bottom case 1, the left side of the lead screw 201 is fixedly connected with a first wheel 202 located on the left side of the bottom case 1, and the outer side of the lead screw 201 is threadedly connected with a There are two moving plates 203 symmetrically distributed left and right, and the bottoms of the two moving plates 203 are fixedly connected with first sliders 204 which are symmetrically distributed front and rear and are slidingly connected to the inside of the bottom case 1;

第一滑块204能够提高移动板203移动的稳定性;The first slider 204 can improve the stability of the moving plate 203;

两个升降装置3均包括螺管301和滑管302,两个螺管301分别与两个移动板203的前侧固定连接,两个滑管302分别与两个移动板203的后侧固定连接,两个螺管301和滑管302呈前后对称设置且高度相等并均与底壳1的内部滑动连接,两个螺管301的内部均滑动连接有两端分别延伸至底壳1上下两侧的螺杆303,两个滑管302的内部均滑动连接有两端分别延伸至底壳1上下两侧的滑杆304,两个螺杆303和两个滑杆304的长度相等,两个螺管301的底部均转动连接有与同侧螺杆303外侧螺纹连接的螺环305,左侧螺环305的底部固定连接有位于同侧螺杆303外侧的第二转轮306;Both lifting devices 3 include a spiral tube 301 and a sliding tube 302, the two spiral tubes 301 are respectively fixedly connected to the front sides of the two moving plates 203, and the two sliding tubes 302 are respectively fixedly connected to the rear sides of the two moving plates 203 , the two spiral tubes 301 and the sliding tube 302 are symmetrically arranged front and back, have the same height and are both slidingly connected with the inside of the bottom case 1, and the inside of the two spiral tubes 301 are slidingly connected with two ends respectively extending to the upper and lower sides of the bottom case 1 The screw rods 303 of the two sliding tubes 302 are slidingly connected to the sliding rods 304 whose two ends respectively extend to the upper and lower sides of the bottom shell 1. The lengths of the two screw rods 303 and the two sliding rods 304 are equal, and the two screw tubes 301 The bottoms of the bottoms are all rotatably connected with the spiral ring 305 threadedly connected to the outside of the screw rod 303 on the same side, and the bottom of the left spiral ring 305 is fixedly connected with the second runner 306 positioned at the outside of the screw rod 303 on the same side;

螺管301与滑管302能够对螺杆303和滑杆304的升降进行限位;The screw tube 301 and the sliding tube 302 can limit the lifting of the screw rod 303 and the sliding rod 304;

张紧装置4包括导向杆401,导向杆401与底壳1的内部固定连接且位于移动装置2的下方,导向杆401的外侧滑动连接有滑环402,滑环402的正面与底壳1的内部之间固定连接有同一个且位于导向杆401外侧的第一弹簧403,滑环402的底部固定连接有一端延伸至底壳1下方的安装块404,安装块404的左右两侧均固定连接有与底壳1内部滑动连接且呈前后对称分布的第二滑块405;The tensioning device 4 includes a guide rod 401, the guide rod 401 is fixedly connected with the inside of the bottom case 1 and is located below the mobile device 2, the outer side of the guide rod 401 is slidably connected with a slip ring 402, and the front of the slip ring 402 is connected to the bottom case 1. The same first spring 403 located on the outside of the guide rod 401 is fixedly connected inside. The bottom of the slip ring 402 is fixedly connected to a mounting block 404 with one end extending to the bottom of the bottom case 1. The left and right sides of the mounting block 404 are fixedly connected. There is a second sliding block 405 that is slidingly connected to the inside of the bottom case 1 and distributed symmetrically front and back;

第二滑块405能够提高安装块404移动的稳定性,防止歪斜;The second slider 405 can improve the stability of the movement of the mounting block 404 and prevent skewing;

并联装置5包括第一带轮501和数量为两个的第二带轮502,第一带轮501与张紧装置4的底部转动连接且位于左右两侧升降装置3之间,两个第二带轮502分别与两个螺环305的外侧固定连接,且呈左右对称分布,第一带轮501与两个第二带轮502之间传动连接有同一个皮带503;The parallel device 5 includes a first pulley 501 and a number of two second pulleys 502, the first pulley 501 is rotatably connected to the bottom of the tensioning device 4 and is located between the lifting devices 3 on the left and right sides, and the two second pulleys The pulleys 502 are fixedly connected to the outer sides of the two spiral rings 305 respectively, and are symmetrically distributed left and right, and the same belt 503 is connected between the first pulley 501 and the two second pulleys 502;

带传动传输稳定且噪音小;The belt transmission is stable and the noise is low;

夹持装置6包括数量为两个的垫板601,两个垫板601分别与同侧滑管302和螺管301的顶部固定连接且呈左右对称分布,两个垫板601的顶部均固定连接有固定板602,两个固定板602的内部均滑动连接有数量为两个且两端分别延伸至固定板602上下两侧的压杆603,四个压杆603位于两侧螺管301和滑管302之间且呈矩形对称分布,左右两侧压杆603的底部均固定连接有压垫604,两个压垫604的底部均固定连接有橡胶垫,两个固定板602的顶部均固定连接有数量为两个且分别位于同侧两个压杆603上方的固定壳605,同侧固定壳605与压杆603之间固定连接有同一个第二弹簧606;The clamping device 6 includes two backing plates 601. The two backing plates 601 are respectively fixedly connected to the tops of the slide tube 302 and the spiral tube 301 on the same side and distributed symmetrically from left to right. The tops of the two backing plates 601 are all fixedly connected. There are fixed plates 602, and the insides of the two fixed plates 602 are slidingly connected with two pressure rods 603 whose two ends extend to the upper and lower sides of the fixed plate 602 respectively. The pipes 302 are distributed symmetrically in a rectangular shape. The bottoms of the pressure rods 603 on the left and right sides are fixedly connected with pressure pads 604, the bottoms of the two pressure pads 604 are fixedly connected with rubber pads, and the tops of the two fixed plates 602 are fixedly connected. There are two fixed shells 605 located above the two pressure rods 603 on the same side, and the same second spring 606 is fixedly connected between the fixed shells 605 and the pressure rods 603 on the same side;

橡胶垫能够在保持足够压力的情况下通过橡胶自身的物理特性保护电路板的上侧。The rubber pad can protect the upper side of the circuit board through the physical properties of the rubber itself while maintaining sufficient pressure.

工作原理:working principle:

创新点实施步骤:Innovation point implementation steps:

第一步:通过连接器103将底壳1与外界的组装设备固定连接,将电路板放置在底壳1上方安装垫102上,转动移动装置2的第一转轮202,第一转轮202经由丝杠201带动两个移动板203相互靠近,在移动板203移动的同时经由底部的两个第一滑块204保持移动板203移动的稳定性,移动板203带动两侧升降装置3的螺管301和滑管302靠近电路板,通过螺管301和滑管302带动上方的夹持装置6靠近电路板;Step 1: Fix the bottom case 1 with external assembly equipment through the connector 103, place the circuit board on the mounting pad 102 above the bottom case 1, turn the first wheel 202 of the mobile device 2, the first wheel 202 The two moving plates 203 are driven close to each other through the lead screw 201, and the stability of the moving plate 203 is maintained through the two first sliders 204 at the bottom while the moving plate 203 is moving, and the moving plate 203 drives the screws of the lifting devices 3 on both sides The tube 301 and the sliding tube 302 are close to the circuit board, and the upper clamping device 6 is driven close to the circuit board through the spiral tube 301 and the sliding tube 302;

第二步:在升降装置3左右移动的同时,张紧装置4的第一弹簧403推动滑环402经由导向杆401移动,滑环402带动安装块404经由第二滑块405远离升降装置3,通过张紧装置4的第二滑块405带动并联装置5的第一带轮501远离升降装置3,通过第一带轮501经由两个第二带轮502拉动皮带503,对皮带503进行张紧,保持并联装置5与升降装置3的连接性;Step 2: While the lifting device 3 moves left and right, the first spring 403 of the tensioning device 4 pushes the slip ring 402 to move through the guide rod 401, and the slip ring 402 drives the mounting block 404 away from the lifting device 3 via the second slider 405, The first pulley 501 of the parallel device 5 is driven away from the lifting device 3 by the second slider 405 of the tensioning device 4, and the belt 503 is pulled by the first pulley 501 via two second pulleys 502 to tension the belt 503 , maintaining the connectivity between the parallel device 5 and the lifting device 3;

第三步:转动升降装置3的第二转轮306,第二转轮306经由左侧螺环305带动左侧螺杆303经由左侧螺管301升降,在左侧螺环305转动的同时,带动左侧第二带轮502转动,左侧第二带轮502经由皮带503带动第一带轮501和右侧第二带轮502转动,通过右侧第二带轮502带动右侧螺环305经由螺管301转动,使右侧螺杆303经由右侧螺管301跟随左侧螺杆303同步升降,同时经由同侧夹持装置6的垫板601带动同侧的滑杆304经由同侧滑管302跟随同侧螺杆303同步升降,保持夹持装置6的下压稳定性,在垫板601下降的同时,经由上方的固定板602带动压杆603下压,使压杆603底部的压垫604与电路板的上方贴合,同时通过压杆603与固定板602的滑动连接挤压压杆603上方的第二弹簧606,通过第二弹簧606与上方固定壳605之间的反作用力推动压杆603,使其带动压垫604在压住电路板的同时不会因为过度用力造成电路板损坏,当电路板经由压垫604和安装垫102固定后,再进行组装检测。The third step: turn the second runner 306 of the lifting device 3, the second runner 306 drives the left screw rod 303 to go up and down through the left spiral tube 301 through the left spiral ring 305, and when the left spiral ring 305 rotates, it drives The left second pulley 502 rotates, the left second pulley 502 drives the first pulley 501 and the right second pulley 502 to rotate through the belt 503, and the right spiral ring 305 is driven by the right second pulley 502 The screw tube 301 rotates so that the right screw rod 303 moves up and down synchronously with the left screw rod 303 through the right screw tube 301, and at the same time drives the same-side slide rod 304 to follow through the same-side slide tube 302 through the backing plate 601 of the clamping device 6 on the same side. The screw rod 303 on the same side rises and falls synchronously to maintain the downward pressure stability of the clamping device 6. When the backing plate 601 descends, the pressure rod 603 is driven down through the upper fixing plate 602, so that the pressure pad 604 at the bottom of the pressure rod 603 and the circuit The top of the plate is attached, and at the same time, the second spring 606 above the pressure rod 603 is squeezed through the sliding connection between the pressure rod 603 and the fixed plate 602, and the pressure rod 603 is pushed by the reaction force between the second spring 606 and the upper fixed shell 605, Make it drive the pressure pad 604 to press the circuit board without causing damage to the circuit board due to excessive force. After the circuit board is fixed by the pressure pad 604 and the mounting pad 102, the assembly test is performed.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (7)

1.一种用于智能家居电路板的组装测试台,包括底壳(1),其特征在于:所述底壳(1)的内部设有一端延伸至底壳(1)左侧的移动装置(2),所述移动装置(2)的前后两侧均固定连接有与底壳(1)滑动连接且两端分别延伸至底壳(1)上下两侧的升降装置(3),所述底壳(1)的内部设有位于左右两侧升降装置(3)之间且一端延伸至底壳(1)下方的张紧装置(4),左右两侧所述升降装置(3)的外侧均固定连接有位于张紧装置(4)前侧且与张紧装置(4)传动连接的并联装置(5),两个所述升降装置(3)的顶部均固定连接有呈左右对称设置的夹持装置(6)。1. An assembly test bench for smart home circuit boards, including a bottom case (1), characterized in that: the inside of the bottom case (1) is provided with a mobile device with one end extending to the left side of the bottom case (1) (2), the front and rear sides of the mobile device (2) are fixedly connected with the lifting device (3) that is slidingly connected to the bottom case (1) and the two ends respectively extend to the upper and lower sides of the bottom case (1). The inside of the bottom case (1) is provided with a tensioning device (4) located between the lifting devices (3) on the left and right sides and one end extends to the bottom of the bottom case (1). The outside of the lifting devices (3) on the left and right sides Both are fixedly connected with a parallel device (5) located on the front side of the tensioning device (4) and connected with the tensioning device (4). Clamping device (6). 2.根据权利要求1所述的一种用于智能家居电路板的组装测试台,其特征在于:所述底壳(1)包括壳体(101),所述壳体(101)的顶部固定连接有位于左右两侧升降装置(3)之间的安装垫(102),所述安装垫(102)为海绵,所述壳体(101)的右侧固定连接有与外界组装设备固定连接的连接器(103)。2. An assembly test bench for smart home circuit boards according to claim 1, characterized in that: the bottom case (1) includes a housing (101), and the top of the housing (101) is fixed An installation pad (102) located between the lifting devices (3) on the left and right sides is connected, the installation pad (102) is a sponge, and the right side of the housing (101) is fixedly connected with an external assembly equipment. connector (103). 3.根据权利要求1所述的一种用于智能家居电路板的组装测试台,其特征在于:所述移动装置(2)包括丝杠(201),所述丝杠(201)与底壳(1)的内部转动连接,所述丝杠(201)的左侧固定连接有位于底壳(1)左侧的第一转轮(202),所述丝杠(201)的外侧螺纹连接有数量为两个且呈左右对称分布的移动板(203),两个所述移动板(203)的底部均固定连接有呈前后对称分布且均与底壳(1)内部滑动连接的第一滑块(204)。3. The assembly test bench for smart home circuit boards according to claim 1, characterized in that: the mobile device (2) includes a lead screw (201), and the lead screw (201) is connected with the bottom case (1) internal rotation connection, the left side of the lead screw (201) is fixedly connected with the first wheel (202) located on the left side of the bottom case (1), and the outer thread of the lead screw (201) is connected with There are two moving plates (203) symmetrically distributed left and right, and the bottoms of the two moving plates (203) are fixedly connected with first sliding plates that are distributed symmetrically front and back and are slidingly connected to the inside of the bottom case (1). block (204). 4.根据权利要求3所述的一种用于智能家居电路板的组装测试台,其特征在于:两个所述升降装置(3)均包括螺管(301)和滑管(302),两个所述螺管(301)分别与两个移动板(203)的前侧固定连接,两个所述滑管(302)分别与两个移动板(203)的后侧固定连接,两个所述螺管(301)和滑管(302)呈前后对称设置且高度相等并均与底壳(1)的内部滑动连接,两个所述螺管(301)的内部均滑动连接有两端分别延伸至底壳(1)上下两侧的螺杆(303),两个所述滑管(302)的内部均滑动连接有两端分别延伸至底壳(1)上下两侧的滑杆(304),两个所述螺杆(303)和两个滑杆(304)的长度相等,两个所述螺管(301)的底部均转动连接有与同侧螺杆(303)外侧螺纹连接的螺环(305),左侧所述螺环(305)的底部固定连接有位于同侧螺杆(303)外侧的第二转轮(306)。4. An assembly test bench for smart home circuit boards according to claim 3, characterized in that: the two lifting devices (3) both include a spiral tube (301) and a sliding tube (302), the two The two spiral tubes (301) are respectively fixedly connected to the front sides of the two moving plates (203), the two sliding tubes (302) are respectively fixedly connected to the rear sides of the two moving plates (203), and the two moving plates (203) are fixedly connected respectively. The spiral tube (301) and the sliding tube (302) are symmetrically arranged front and back and have the same height and are both slidingly connected to the inside of the bottom case (1). The screw rods (303) extending to the upper and lower sides of the bottom case (1), and the insides of the two sliding tubes (302) are slidably connected with sliding rods (304) extending to the upper and lower sides of the bottom case (1) respectively. , the lengths of the two screw rods (303) and the two slide rods (304) are equal, and the bottoms of the two spiral tubes (301) are rotatably connected with a screw ring ( 305), the bottom of the spiral ring (305) on the left side is fixedly connected with the second runner (306) located outside the screw rod (303) on the same side. 5.根据权利要求1所述的一种用于智能家居电路板的组装测试台,其特征在于:所述张紧装置(4)包括导向杆(401),所述导向杆(401)与底壳(1)的内部固定连接且位于移动装置(2)的下方,所述导向杆(401)的外侧滑动连接有滑环(402),所述滑环(402)的正面与底壳(1)的内部之间固定连接有同一个且位于导向杆(401)外侧的第一弹簧(403),所述滑环(402)的底部固定连接有一端延伸至底壳(1)下方的安装块(404),所述安装块(404)的左右两侧均固定连接有与底壳(1)内部滑动连接且呈前后对称分布的第二滑块(405)。5. An assembly test bench for smart home circuit boards according to claim 1, characterized in that: the tensioning device (4) includes a guide rod (401), and the guide rod (401) is connected to the bottom The inside of the shell (1) is fixedly connected and located below the mobile device (2), the outer side of the guide rod (401) is slidably connected with a slip ring (402), and the front of the slip ring (402) is connected to the bottom case (1 ) are fixedly connected with the same first spring (403) located outside the guide rod (401), and the bottom of the slip ring (402) is fixedly connected with a mounting block whose end extends to the bottom of the bottom case (1) (404), the left and right sides of the mounting block (404) are fixedly connected with second sliders (405) which are slidingly connected to the inside of the bottom case (1) and distributed symmetrically front and rear. 6.根据权利要求4所述的一种用于智能家居电路板的组装测试台,其特征在于:所述并联装置(5)包括第一带轮(501)和数量为两个的第二带轮(502),所述第一带轮(501)与张紧装置(4)的底部转动连接且位于左右两侧升降装置(3)之间,两个所述第二带轮(502)分别与两个螺环(305)的外侧固定连接,且呈左右对称分布,所述第一带轮(501)与两个第二带轮(502)之间传动连接有同一个皮带(503)。6. An assembly test bench for smart home circuit boards according to claim 4, characterized in that: the parallel device (5) includes a first pulley (501) and two second belts pulley (502), the first pulley (501) is rotatably connected to the bottom of the tensioning device (4) and is located between the lifting devices (3) on the left and right sides, and the two second pulleys (502) are respectively It is fixedly connected with the outer sides of the two spiral rings (305), and distributed symmetrically. The same belt (503) is connected between the first pulley (501) and the two second pulleys (502). 7.根据权利要求4所述的一种用于智能家居电路板的组装测试台,其特征在于:所述夹持装置(6)包括数量为两个的垫板(601),两个所述垫板(601)分别与同侧滑管(302)和螺管(301)的顶部固定连接且呈左右对称分布,两个所述垫板(601)的顶部均固定连接有固定板(602),两个所述固定板(602)的内部均滑动连接有数量为两个且两端分别延伸至固定板(602)上下两侧的压杆(603),四个所述压杆(603)位于两侧螺管(301)和滑管(302)之间且呈矩形对称分布,左右两侧所述压杆(603)的底部均固定连接有压垫(604),两个所述压垫(604)的底部均固定连接有橡胶垫,两个所述固定板(602)的顶部均固定连接有数量为两个且分别位于同侧两个压杆(603)上方的固定壳(605),同侧所述固定壳(605)与压杆(603)之间固定连接有同一个第二弹簧(606)。7. An assembly test bench for smart home circuit boards according to claim 4, characterized in that: the clamping device (6) includes two backing plates (601), the two The backing plate (601) is fixedly connected with the tops of the slide tube (302) and the spiral tube (301) on the same side respectively and distributed symmetrically from left to right, and the tops of the two backing plates (601) are fixedly connected with a fixing plate (602) , the insides of the two fixing plates (602) are slidingly connected with two pressure rods (603) whose two ends respectively extend to the upper and lower sides of the fixing plate (602), and the four pressure rods (603) It is located between the spiral tubes (301) and the sliding tubes (302) on both sides and is distributed symmetrically in a rectangular shape. The bottoms of the pressure rods (603) on the left and right sides are fixedly connected with pressure pads (604), and the two pressure pads The bottoms of (604) are fixedly connected with rubber pads, and the tops of the two fixed plates (602) are fixedly connected with two fixed shells (605) respectively located above the two pressure rods (603) on the same side , the same second spring (606) is fixedly connected between the fixed shell (605) and the pressing rod (603) on the same side.
CN202221548922.2U 2022-06-21 2022-06-21 A equipment testboard for intelligent house circuit board Active CN218524824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221548922.2U CN218524824U (en) 2022-06-21 2022-06-21 A equipment testboard for intelligent house circuit board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221548922.2U CN218524824U (en) 2022-06-21 2022-06-21 A equipment testboard for intelligent house circuit board

Publications (1)

Publication Number Publication Date
CN218524824U true CN218524824U (en) 2023-02-24

Family

ID=85236303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221548922.2U Active CN218524824U (en) 2022-06-21 2022-06-21 A equipment testboard for intelligent house circuit board

Country Status (1)

Country Link
CN (1) CN218524824U (en)

Similar Documents

Publication Publication Date Title
CN216859179U (en) A kind of flexible circuit board grinding device
CN221686087U (en) Circuit board testing equipment
CN220602801U (en) Fixing frame of pressure sensor
CN218938435U (en) Detection equipment for circuit board production
CN218524824U (en) A equipment testboard for intelligent house circuit board
CN118914606A (en) FCT functional test tool
CN207336582U (en) A kind of circuit board test device
CN111780652A (en) A kind of circuit board production and processing quality detection device
CN216792279U (en) BGA encapsulation radio frequency chip test fixture
CN206321672U (en) A kind of flexible absorptive table for adsorption flexible electronic component
CN118884183A (en) Circuit board bare board testing device and testing method
CN209157633U (en) An automatic screw mounting device for a PCB substrate
CN216925627U (en) Test fixture for testing flexible circuit board
CN108672595A (en) Three-pin inductor forming and testing integrated machine
CN212206549U (en) A mobile phone backlight board detection fixture
CN211540908U (en) PIN pressing tool equipment
CN219805986U (en) Nondestructive test fixture of radio frequency BGA shell
CN222952380U (en) Workbench for PCB (printed circuit board) detection
CN207832844U (en) A kind of high-precision detection tooling of flexible electric circuit board
CN221612907U (en) Electronic component check out test set for mechanical electronic engineering
CN220554138U (en) Circuit board clamp
CN221968294U (en) A printed circuit board processing drilling machine convenient for positioning
CN221925558U (en) Test fixture of cell-phone display screen COF resilience force
CN221811816U (en) A detection device convenient for fixing electronic products
CN220493207U (en) PCB for testing IC chip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20251105

Address after: 101300 Beijing Shunyi District Renhe Town Linhe South Street No. 9 Yard 4 Building 3rd Floor 3020 Room

Patentee after: Beijing Ruiyuan Technology Co.,Ltd.

Country or region after: China

Address before: 441000 Hubei Province, Xiangyang City, High-tech Development Zone, Huaguang Community, No. 72, street-side three-story storefronts, second floor, rooms 8, 9, 11

Patentee before: Hubei hehe Energy Technology Development Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right