CN218509112U - Operation ladder for construction - Google Patents

Operation ladder for construction Download PDF

Info

Publication number
CN218509112U
CN218509112U CN202222295506.2U CN202222295506U CN218509112U CN 218509112 U CN218509112 U CN 218509112U CN 202222295506 U CN202222295506 U CN 202222295506U CN 218509112 U CN218509112 U CN 218509112U
Authority
CN
China
Prior art keywords
ladder
fixing plate
lead screw
plate
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222295506.2U
Other languages
Chinese (zh)
Inventor
辛耀龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Heng'an Heavy Industry Co ltd
Original Assignee
Shandong Heng'an Heavy Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Heng'an Heavy Industry Co ltd filed Critical Shandong Heng'an Heavy Industry Co ltd
Priority to CN202222295506.2U priority Critical patent/CN218509112U/en
Application granted granted Critical
Publication of CN218509112U publication Critical patent/CN218509112U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of the operation ladder, especially, be an operation ladder is used in construction, comprises an operation bench, both sides all are equipped with the bracing piece around the operation panel bottom, the bottom of bracing piece is provided with the bottom plate, the left and right sides of operation panel all is provided with the cat ladder, be provided with the lifting unit who is used for carrying the outer wall material between operation panel and the bottom plate, the outside of operation panel and bottom plate is provided with first fixed plate and second fixed plate respectively, the bottom of first fixed plate is provided with the motor, fixedly connected with lead screw on the output shaft of motor, the outer wall of lead screw is provided with the elevator, be provided with two slide bars, two between first fixed plate and the second fixed plate the slide bar sets up both sides around the elevator respectively, the right side of elevator passes through connecting rod fixedly connected with defeated material platform. The utility model has the advantages that: when the outer wall of a factory building is constructed, the building materials can be conveniently transported to the operating platform, and the labor force of workers is saved.

Description

Operation ladder for construction
Technical Field
The utility model belongs to the technical field of the operation ladder, concretely relates to operation ladder is used in construction.
Background
In the construction of the outer wall of an industrial factory building, the outer wall sandwich board and the window glass need to be installed, during construction, a scaffold is usually used, but a large number of steel pipes need to be consumed for building the scaffold, manpower is consumed, and the outer wall material is inconvenient to transport to an operation table in the construction process.
SUMMERY OF THE UTILITY MODEL
To above problem, the utility model aims to: the utility model provides an operation ladder is used in construction, solves in the factory building work progress, is not convenient for carry the problem of outer wall material on to the operation panel.
For the purpose of realizing above, the utility model discloses a technical scheme: the utility model provides an operation ladder is used in construction, includes the operation panel, both sides all are provided with the bracing piece around the operation panel bottom, the bottom of bracing piece is provided with the bottom plate, the four corners of bottom plate bottom all is provided with the walking wheel, the left and right sides of operation panel all is provided with the cat ladder, the inboard and the bottom plate fixed connection of cat ladder, be provided with the lifting unit who is used for carrying outer wall material between operation panel and the bottom plate, lifting unit includes first fixed plate, second fixed plate, motor, lead screw, elevator and defeated material platform, the outside of operation panel and bottom plate is provided with first fixed plate and second fixed plate respectively, the bottom of first fixed plate is provided with the motor, fixedly connected with lead screw on the output shaft of motor, the lead screw rotates with the second fixed plate to be connected, the outer wall of lead screw is provided with the elevator, be provided with two slide bars between first fixed plate and the second fixed plate, two the slide bar sets up both sides around the elevator respectively, slide bar and elevator sliding connection, the right side of elevator passes through connecting rod fixedly connected with defeated material platform.
The utility model has the advantages that: set up the cat ladder through the left and right sides at the operation panel, can be convenient for the workman go up on the operation panel, through setting up lifting unit, can be convenient for carry the operation panel with outer wall material from subaerial on, save workman's labour, simultaneously with pneumatic cylinder downstream, drive supporting seat downstream, and make supporting seat and ground contact, be convenient for keep the stability of whole operation ladder when carrying outer wall material, guarantee construction worker's safety, set up the walking wheel in the bottom of bottom plate, can be convenient for remove the position of whole operation ladder according to the construction demand.
In order to ensure the safety of workers during construction:
as a further improvement of the above technical solution: the front side of the operation table is provided with a fence, and the middle part of the fence is provided with a feeding port.
The beneficial effect of this improvement does: the front side of the operation table is provided with the fence, so that workers can be protected during construction, and the safety of the workers is guaranteed.
In order to facilitate the worker to transfer the material on the conveying table to the operating platform:
as a further improvement of the technical scheme: the conveying table is arranged right below the feeding port.
The beneficial effect of this improvement does: will fail the material platform setting under the pay-off mouth, can be convenient for the workman will fail the material on the material platform to shift to the operation panel.
In order to prevent the tool from falling off the operation table during construction:
as a further improvement of the above technical solution: the rear side of the operating platform is provided with a tool box, and the top of the tool box is provided with a cover plate.
The beneficial effect of this improvement does: set up the tool holder at the rear side of operation panel, deposit in the tool holder is put to the instrument that can use during the construction to take during the construction, prevent that the instrument from dropping, cause the injury to the workman of below.
In order to maintain the stability of the whole operation ladder when conveying the outer wall materials:
as a further improvement of the technical scheme: both sides all are provided with the pneumatic cylinder around the cat ladder bottom, the bottom of pneumatic cylinder all is provided with the supporting seat.
The beneficial effect of this improvement does: during construction, the hydraulic cylinder moves downwards to drive the supporting seat to move downwards, and the supporting seat is in contact with the ground, so that the stability of the whole operation ladder is kept when the outer wall material is conveyed.
To increase the stability of the operating ladder:
as a further improvement of the above technical solution: two be provided with the horizontal pole between the bracing piece, the top and the bottom of horizontal pole all are provided with the backup pad of crossing type.
The beneficial effect of this improvement does: through set up crisscross backup pad between two bracing pieces, can increase the stability of bracing piece to can increase the stability of whole operation ladder.
Drawings
Fig. 1 is a schematic left-side view of the three-dimensional structure of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is a schematic diagram of the right-side view structure of the present invention;
fig. 4 is a schematic view of the right side sectional structure of the present invention.
In the figure: 1. an operation table; 2. a support bar; 3. a base plate; 4. a traveling wheel; 5. climbing a ladder; 6. a first fixing plate; 7. a second fixing plate; 8. a motor; 9. a screw rod; 10. a lifting block; 11. a material conveying table; 12. a slide bar; 13. a fence; 14. a feed port; 15. a tool box; 16. a cover plate; 17. a hydraulic cylinder; 18. a supporting seat; 19. a cross bar; 20. and a support plate.
Detailed Description
In order to make the technical solutions of the present invention better understood by those skilled in the art, the present invention is described in detail below with reference to the accompanying drawings, and the description in this section is only exemplary and explanatory, and should not have any limiting effect on the scope of the present invention.
Example 1:
as shown in fig. 1-4, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on the front side and the rear side of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladder stands 5 are disposed on the left side and the right side of the operation table 1, the inner sides of the ladder stands 5 are fixedly connected with the bottom plate 3, a lifting assembly for conveying exterior wall materials is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixing plate 6, a second fixing plate 7, a motor 8, a lead screw 9, a lifting block 10 and a conveying table 11, a first fixing plate 6 and a second fixing plate 7 are disposed on the outer sides of the operation table 1 and the bottom plate 3, a motor 8 is disposed at the bottom of the first fixing plate 6, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixing plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two slide bars 12 are disposed between the first fixing plate 6 and the second fixing plate 7, two slide bars 12 are fixedly connected to the right side of the lifting block 10, and the lifting block 11 are connected to the slide bars 10.
Example 2:
as shown in fig. 1-2, as a further optimization of the above embodiment, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on both sides of the front and back of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladders 5 are disposed on both sides of the left and right of the operation table 1, an inner side of each ladder 5 is fixedly connected to the bottom plate 3, a lifting assembly for conveying an exterior wall material is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixing plate 6, a second fixing plate 7, a motor 8, a lead screw 9, a lifting block 10 and a material conveying table 11, the outer sides of the operation table 1 and the bottom plate 3 are respectively provided with the first fixing plate 6 and the second fixing plate 7, the bottom of the first fixing plate 6 is provided with the motor 8, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixing plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two fixing plates 12 are disposed between the first fixing plate 6 and the second fixing plate 7, two slide rods 12 are disposed respectively disposed on the front and back of the sliding rod 10, and on both sides of the lifting block 10, and the sliding rod 10 are connected to the sliding rod 11, and the sliding rod 10 are connected to the sliding rod 11, and the material conveying table 11. The front side of the operation platform 1 is provided with a fence 13, and the middle part of the fence 13 is provided with a feeding port 14.
Example 3:
as shown in fig. 2, as a further optimization of the above embodiment, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on the front and rear sides of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladders 5 are disposed on the left and right sides of the operation table 1, the inner side of each ladder 5 is fixedly connected with the bottom plate 3, a lifting assembly for conveying an exterior wall material is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixing plate 6, a second fixing plate 7, a motor 8, a lead screw 9, a lifting block 10 and a conveying table 11, the outer sides of the operation table 1 and the bottom plate 3 are respectively provided with the first fixing plate 6 and the second fixing plate 7, the bottom of the first fixing plate 6 is provided with the motor 8, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixing plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two lifting blocks 12 are disposed between the first fixing plate 6 and the second fixing plate 7, the two lifting blocks 12 are respectively disposed on the front and rear sides of the lifting block 10, the sliding rods 12 are connected to the sliding rod 10, and the sliding rod 11, and the lifting block 10 are connected to the lifting block 10, and the lifting block 11, and the lifting block are connected to the lifting block 10, and the lifting block 11. The material conveying table 11 is arranged right below the material feeding port 14.
Example 4:
as shown in fig. 1 to 4, as a further optimization of the above embodiment, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on both sides of the front and back of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladders 5 are disposed on both sides of the left and right of the operation table 1, an inner side of each ladder 5 is fixedly connected to the bottom plate 3, a lifting assembly for conveying an exterior wall material is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixed plate 6, a second fixed plate 7, a motor 8, a lead screw 9, a lifting block 10 and a material conveying table 11, the outer sides of the operation table 1 and the bottom plate 3 are respectively provided with the first fixed plate 6 and the second fixed plate 7, the bottom of the first fixed plate 6 is provided with the motor 8, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixed plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two sliding rods 12 are disposed between the first fixed plate 6 and the second fixed plate 7, the two sliding blocks 12 are disposed on the front and back of the sliding rods 10, and the sliding rod 10 are connected to the right of the lifting block 10, and the sliding rod 11, and the sliding rod 10 are connected to the material conveying table 11. The rear side of the operation table 1 is provided with a tool box 15, and the top of the tool box 15 is provided with a cover plate 16.
Example 5:
as shown in fig. 2-4, as a further optimization of the above embodiment, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on both sides of the front and back of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladders 5 are disposed on both sides of the left and right of the operation table 1, an inner side of each ladder 5 is fixedly connected to the bottom plate 3, a lifting assembly for conveying an outer wall material is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixing plate 6, a second fixing plate 7, a motor 8, a lead screw 9, a lifting block 10 and a conveying table 11, the outer walls of the lead screw 9 are respectively provided with the first fixing plate 6 and the second fixing plate 7, the bottom of the first fixing plate 6 is provided with the motor 8, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixing plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two slide rods 12 are respectively disposed on both sides of the front and back of the slide rod 10, and the two slide rods 12 are connected to the lifting block 10, and the lifting block 11 are connected to the lifting block 10, and the lifting block 11 is connected to the lifting block 11. Both sides all are provided with pneumatic cylinder 17 around the cat ladder 5 bottom, the bottom of pneumatic cylinder 17 all is provided with supporting seat 18.
Example 6:
as shown in fig. 4, as a further optimization of the above embodiment, an operation ladder for construction includes an operation table 1, support rods 2 are disposed on the front and rear sides of the bottom of the operation table 1, a bottom plate 3 is disposed at the bottom of the support rods 2, traveling wheels 4 are disposed at four corners of the bottom plate 3, ladders 5 are disposed on the left and right sides of the operation table 1, the inner side of each ladder 5 is fixedly connected with the bottom plate 3, a lifting assembly for conveying an exterior wall material is disposed between the operation table 1 and the bottom plate 3, the lifting assembly includes a first fixing plate 6, a second fixing plate 7, a motor 8, a lead screw 9, a lifting block 10 and a conveying table 11, the outer sides of the operation table 1 and the bottom plate 3 are respectively provided with the first fixing plate 6 and the second fixing plate 7, the bottom of the first fixing plate 6 is provided with the motor 8, a lead screw 9 is fixedly connected to an output shaft of the motor 8, the lead screw 9 is rotatably connected to the second fixing plate 7, a lifting block 10 is disposed on the outer wall of the lead screw 9, two lifting blocks 12 are disposed between the first fixing plate 6 and the second fixing plate 7, the two lifting blocks 12 are respectively disposed on the front and rear sides of the lifting block 10, the sliding rods 12 are connected to the sliding rod 10, and the sliding rod 11, and the lifting block 10 are connected to the lifting block 10, and the lifting block 11, and the lifting block are connected to the lifting block 10, and the lifting block 11. A cross rod 19 is arranged between the two support rods 2, and cross-shaped support plates 20 are arranged at the top and the bottom of the cross rod 19.
The utility model discloses a theory of operation and use flow: when the lifting device is used specifically, the whole operation ladder is moved to a site to be constructed through the travelling wheels 4, the hydraulic cylinder 17 moves downwards through control, the supporting seat 18 is driven to move downwards, the supporting seat 18 is in contact with the ground and fixes the position of the whole operation ladder, a construction worker enters the operation platform 1 through the crawling ladder 5, the fence 13 on the operation platform 1 can protect the worker and is used for being supported by the worker, the material required by the construction of the worker on the ground is placed on the conveying platform during construction, the screw rod 9 is driven to run anticlockwise through the control motor 8, the lifting block 10 is driven to slide upwards along the outer walls of the screw rod 9 and the slide rod 12, the material on the conveying platform and the conveying platform are driven to ascend to the material conveying port 14, and the worker on the operation platform 1 transfers the material to the operation platform 1 through the material conveying port 14 and is used by the worker.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The principles and embodiments of the present invention have been described herein using specific examples, which are presented only to aid in understanding the methods and core concepts of the present invention. The foregoing are only preferred embodiments of the present invention, and it should be noted that there are practically unlimited specific structures due to the limited character expressions, and it will be apparent to those skilled in the art that a plurality of modifications, decorations or changes can be made without departing from the principle of the present invention, and the technical features described above can also be combined in a suitable manner; such modifications, variations, combinations, or adaptations of the invention in other contexts without modification may be viewed as within the scope of the invention.

Claims (6)

1. The utility model provides an operation ladder is used in construction which characterized in that: comprises an operation table (1), wherein supporting rods (2) are arranged on the front side and the rear side of the bottom of the operation table (1), a bottom plate (3) is arranged at the bottom of each supporting rod (2), walking wheels (4) are arranged at four corners of the bottom plate (3), ladder stands (5) are arranged on the left side and the right side of the operation table (1), the inner sides of the ladder stands (5) are fixedly connected with the bottom plate (3), a lifting assembly for conveying an outer wall material is arranged between the operation table (1) and the bottom plate (3), the lifting assembly comprises a first fixing plate (6), a second fixing plate (7), a motor (8), a lead screw (9), a lifting block (10) and a material conveying table (11), a first fixing plate (6) and a second fixing plate (7) are respectively arranged on the outer sides of the operation table (1) and the bottom plate (3), the motor (8) is arranged at the bottom of the first fixing plate (6), the output shaft of the motor (8) is fixedly connected with a lead screw (9), the lead screw (9) is rotatably connected with the second fixing plate (7), the lifting block (10) is arranged on the outer wall of the lead screw (9), two lifting blocks (12) are respectively arranged between the front side and the rear side of the sliding rod (7), the sliding rod (12) is connected with the lifting block (10) in a sliding mode, and the right side of the lifting block (10) is fixedly connected with the material conveying platform (11) through a connecting rod.
2. The operation ladder for construction according to claim 1, wherein: the front side of the operating platform (1) is provided with a fence (13), and the middle part of the fence (13) is provided with a feeding port (14).
3. The operation ladder for construction according to claim 1, wherein: the material conveying platform (11) is arranged right below the material feeding port (14).
4. The operation ladder for construction according to claim 1, wherein: the rear side of the operating platform (1) is provided with a tool box (15), and the top of the tool box (15) is provided with a cover plate (16).
5. The operation ladder for construction according to claim 1, wherein: both sides all are provided with pneumatic cylinder (17) around cat ladder (5) bottom, the bottom of pneumatic cylinder (17) all is provided with supporting seat (18).
6. The operation ladder for construction according to claim 1, wherein: a cross rod (19) is arranged between the two support rods (2), and crossed support plates (20) are arranged at the top and the bottom of the cross rod (19).
CN202222295506.2U 2022-08-31 2022-08-31 Operation ladder for construction Active CN218509112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222295506.2U CN218509112U (en) 2022-08-31 2022-08-31 Operation ladder for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222295506.2U CN218509112U (en) 2022-08-31 2022-08-31 Operation ladder for construction

Publications (1)

Publication Number Publication Date
CN218509112U true CN218509112U (en) 2023-02-21

Family

ID=85210952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222295506.2U Active CN218509112U (en) 2022-08-31 2022-08-31 Operation ladder for construction

Country Status (1)

Country Link
CN (1) CN218509112U (en)

Similar Documents

Publication Publication Date Title
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN113202312B (en) Horizontal full-automatic mechanical binding equipment and binding method for reinforcing steel bars
CN110607902B (en) Construction platform
CN206032715U (en) Heated board pile up neatly system and destacking feeding system
CN106241399B (en) A kind of thermal insulation board palletizing system and destacking feeding system
CN115301859A (en) Automatic production system for precast beam body steel bar structure and production method thereof
KR101441332B1 (en) A method for supplying materials for access floor of clean room and an apparatus therefor
CN203247031U (en) Hoisting device for curtain board transporting
CN212823126U (en) Lifting device of H-shaped steel numerical control cutting machine
CN212689504U (en) A construction scaffolding for easy transportation of materials
CN111115461B (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
CN115091267A (en) A billet heating unit in an automatic production line for ring forgings
CN212425165U (en) Building site is with snatching handling device
CN212173399U (en) Three-dimensional storage system of prefabricated component mould platform
CN201626706U (en) Front and rear axle conveying device
CN208453121U (en) A steel mesh transport trolley
CN218517632U (en) Automatic Production System for Prefabricated Beam Reinforcement Structures
CN217417225U (en) Side discharging conveying mechanism for steel grating welding machine
CN220848822U (en) A vertical transportation tool for lightweight platforms used in industrialized construction of high-rise buildings
CN215407335U (en) Transfer equipment for construction with sliding mounting structure
CN222501103U (en) Material turnover device for discharging platform
CN212832418U (en) Equipment of quick transport or removal in work progress
CN219344183U (en) Turnover type light finished product processing shed
CN215760327U (en) Scaffold for building decoration
CN217151114U (en) Scaffold capable of transporting materials

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant