CN218493084U - Regularization secondary structure turn-ups pours module - Google Patents

Regularization secondary structure turn-ups pours module Download PDF

Info

Publication number
CN218493084U
CN218493084U CN202221651610.4U CN202221651610U CN218493084U CN 218493084 U CN218493084 U CN 218493084U CN 202221651610 U CN202221651610 U CN 202221651610U CN 218493084 U CN218493084 U CN 218493084U
Authority
CN
China
Prior art keywords
rod
panel
horizontal
reinforcement
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221651610.4U
Other languages
Chinese (zh)
Inventor
吴刚
童星
黄新东
林松
冯永红
何金辉
周磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhulemei City Development Co Ltd
Original Assignee
Zhejiang Green City Zhulemei City Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green City Zhulemei City Development Co ltd filed Critical Zhejiang Green City Zhulemei City Development Co ltd
Priority to CN202221651610.4U priority Critical patent/CN218493084U/en
Application granted granted Critical
Publication of CN218493084U publication Critical patent/CN218493084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种定型化二次结构翻边浇筑模组,该模组包括模板单元,所述模板单元包括第一面板以及第二面板,所述第一面板与所述第二面板各自的外侧表面均设置有两个水平加强件;两个所述水平加强件分别设置有上下相对的竖向插槽卡;所述加固单元包括第一加固组合件以及第二加固组合件;所述第一加固组合件包括第一水平杆以及第一竖向杆,所述第二加固组合件包括第二水平杆以及第二竖向杆。本申请提供的定型化二次结构翻边浇筑模组,结构简单合理,安装使用方便,制作成本低廉。模板及加固组件材料刚度大,因此翻边浇筑成型的观感质量好,且安装、组合、拆卸方便快捷,提高施工效率。材料基本无损耗,可多次回收重复利用。

Figure 202221651610

The utility model discloses a stereotyped secondary structure flanging pouring module, the module includes a template unit, the template unit includes a first panel and a second panel, the first panel and the second panel are respectively Two horizontal reinforcements are provided on the outer surface of each; the two horizontal reinforcements are respectively provided with vertical slot cards facing up and down; the reinforcement unit includes a first reinforcement assembly and a second reinforcement assembly; the The first reinforcement assembly includes a first horizontal rod and a first vertical rod, and the second reinforcement assembly includes a second horizontal rod and a second vertical rod. The finalized secondary structure flanging pouring module provided by this application has simple and reasonable structure, convenient installation and use, and low production cost. The formwork and reinforcement components have high rigidity, so the quality of flanging casting is good, and the installation, assembly and disassembly are convenient and quick, which improves the construction efficiency. The material is basically lossless and can be recycled and reused many times.

Figure 202221651610

Description

一种定型化二次结构翻边浇筑模组A stereotyped secondary structure flanging pouring module

技术领域technical field

本实用新型涉及建筑施工技术领域,特别是涉及一种定型化二次结构翻边浇筑模组。The utility model relates to the technical field of building construction, in particular to a stereotyped secondary structure flanging casting module.

背景技术Background technique

混凝土翻边是房屋、住宅等建筑工程中经常会见到的一种结构,比如在居民住房的厨房、卫生间等入口处常常会用混凝土沿着门框底部位置突生出一个小长条,而这个小长条的作用就是为了防止厨房用水或者卫生间用水通过门缝流入到客厅或其他房间去。为确保混凝土翻边结构的施工质量,使混凝土翻边与楼板浇筑成整体,不留施工缝,排除渗漏隐患,从根源上杜绝厨卫间根部的漏水现象发生,按设计要求混凝土翻边与楼板一次浇筑成型,达到结构自防水的效果。目前厨房以及卫生间混凝土翻边的施工方法主要采用吊模或在已浇筑好的结构板面上支模进行二次浇筑两种方法。Concrete flanging is a structure that is often seen in construction projects such as houses and residences. For example, at the entrance of kitchens and bathrooms in residential houses, a small strip is often protruded out of concrete along the bottom of the door frame, and this small strip The function of the strip is to prevent kitchen water or bathroom water from flowing into the living room or other rooms through the crack of the door. In order to ensure the construction quality of the concrete flanging structure, the concrete flanging and the floor slab are poured as a whole, leaving no construction joints, eliminating hidden dangers of leakage, and preventing water leakage at the root of the kitchen and bathroom from the root. According to the design requirements, the concrete flanging and The floor slab is poured and formed at one time to achieve the effect of self-waterproofing of the structure. At present, the construction methods of concrete flanging in kitchen and bathroom mainly adopt two methods of hanging formwork or supporting formwork on the poured structural slab surface for secondary pouring.

现有技术中,房屋建筑施工中,厨卫间二次结构翻边通常采用木模板、方木、螺杆进行支模和加固。该种方式因支撑不够牢固,导致翻边浇筑时易产生变形,同时对模板、方木的浪费较大,不能回收利用。In the prior art, in the building construction, the secondary structure flange of the kitchen and bathroom usually adopts wooden formwork, square timber, and screw rods for formwork support and reinforcement. Because the support is not strong enough in this way, it is easy to deform when the flanging is poured. At the same time, the waste of formwork and square timber is relatively large and cannot be recycled.

实用新型内容Utility model content

本实用新型提供了一种定型化二次结构翻边浇筑模组。The utility model provides a stereotyped secondary structure flanging casting module.

本实用新型提供了如下方案:The utility model provides following scheme:

一种定型化二次结构翻边浇筑模组,包括:A finalized secondary structure flanging pouring module, including:

模板单元,所述模板单元包括第一面板以及第二面板,所述第一面板与所述第二面板各自的外侧表面均设置有两个水平加强件;两个所述水平加强件分别设置有上下相对的竖向插槽卡;A formwork unit, the formwork unit includes a first panel and a second panel, two horizontal reinforcements are provided on the respective outer surfaces of the first panel and the second panel; the two horizontal reinforcements are respectively provided with Up and down vertical slot cards;

若干加固单元,所述加固单元包括第一加固组合件以及第二加固组合件;所述第一加固组合件包括第一水平杆以及第一竖向杆,所述第二加固组合件包括第二水平杆以及第二竖向杆;所述第一竖向杆与所述第一面板包含的各个所述竖向插槽卡插接相连,所述第二竖向杆用于与所述第二面板包含的各个所述竖向插槽卡插接相连;Several reinforcement units, the reinforcement unit includes a first reinforcement assembly and a second reinforcement assembly; the first reinforcement assembly includes a first horizontal bar and a first vertical bar, and the second reinforcement assembly includes a second reinforcement assembly A horizontal bar and a second vertical bar; the first vertical bar is plugged and connected with each of the vertical slot cards included in the first panel, and the second vertical bar is used for connecting with the second Each of the vertical slot cards contained in the panel is plugged and connected;

其中,所述第一水平杆设置有插口部,所述插口部设置有第一插孔;所述第二水平杆设置有插杆部,所述插杆部设置有第二插孔,所述插杆部用于插接于所述插口部的内部并通过插接于所述第一插孔以及所述第二插孔内的插销相连,以使所述第一加固组合件与所述第二加固组合件形成整体结构。Wherein, the first horizontal rod is provided with a socket portion, and the socket portion is provided with a first socket; the second horizontal rod is provided with an insertion rod portion, and the insertion rod portion is provided with a second socket, and the The inserting rod part is used to be inserted into the inside of the socket part and connected through the pins inserted into the first socket and the second socket, so that the first reinforcement assembly is connected to the second socket. Two reinforcement assemblies form the overall structure.

优选地:所述第一插孔包括多个且多个所述第一插孔沿所述插口部的轴向均匀分布,所述第二插孔包括多个且多个所述第二插孔沿所述插杆部的轴向均匀分布。Preferably: the first insertion holes include a plurality of first insertion holes evenly distributed along the axial direction of the socket portion, and the second insertion holes include a plurality of second insertion holes Evenly distributed along the axial direction of the insertion rod part.

优选地:所述第一加固组合件还包括第一斜向支撑杆,所述第一斜向支撑杆的两端分别连接至所述第一水平杆以及所述第一竖向杆;所述第二加固组合件还包括第二斜向支撑杆,所述第二斜向支撑杆的两端分别连接至所述第二水平杆以及所述第二竖向杆。Preferably: the first reinforcement assembly further includes a first oblique support rod, the two ends of the first oblique support rod are respectively connected to the first horizontal rod and the first vertical rod; The second reinforcement assembly further includes a second oblique support rod, and two ends of the second oblique support rod are respectively connected to the second horizontal rod and the second vertical rod.

优选地:所述第一水平杆以及所述第二水平杆的材质均为40x40毫米的方钢管,所述第一斜向支撑杆以及所述第二斜向支撑杆的材质均为20x40毫米的方钢管。Preferably: the material of the first horizontal bar and the second horizontal bar is a square steel pipe of 40x40 mm, and the material of the first oblique support rod and the second oblique support rod is 20x40 mm Square steel tube.

优选地:所述第一面板以及所述第二面板的材质均为钢板。Preferably: the materials of the first panel and the second panel are both steel plates.

优选地:所述第一面板与两个所述水平加强件采用焊接工艺相连,所述第二面板与两个所述水平加强件采用焊接工艺相连。Preferably, the first panel is connected to the two horizontal reinforcements by welding, and the second panel is connected to the two horizontal reinforcements by welding.

优选地:所述竖向插槽卡与所述水平加强件采用焊接工艺相连。Preferably: the vertical slot card is connected to the horizontal reinforcement by welding.

优选地:所述第一面板与所述第二面板之间设置有端头板。Preferably: an end plate is arranged between the first panel and the second panel.

根据本实用新型提供的具体实施例,本实用新型公开了以下技术效果:According to the specific embodiment provided by the utility model, the utility model discloses the following technical effects:

通过本实用新型,可以实现一种定型化二次结构翻边浇筑模组,在一种实现方式下,该模组可以包括模板单元,所述模板单元包括第一面板以及第二面板,所述第一面板与所述第二面板各自的外侧表面均设置有两个水平加强件;两个所述水平加强件分别设置有上下相对的竖向插槽卡;若干加固单元,所述加固单元包括第一加固组合件以及第二加固组合件;所述第一加固组合件包括第一水平杆以及第一竖向杆,所述第二加固组合件包括第二水平杆以及第二竖向杆;所述第一竖向杆与所述第一面板包含的各个所述竖向插槽卡插接相连,所述第二竖向杆用于与所述第二面板包含的各个所述竖向插槽卡插接相连;其中,所述第一水平杆设置有插口部,所述插口部设置有第一插孔;所述第二水平杆设置有插杆部,所述插杆部设置有第二插孔,所述插杆部用于插接于所述插口部的内部并通过插接于所述第一插孔以及所述第二插孔内的插销相连,以使所述第一加固组合件与所述第二加固组合件形成整体结构。本申请提供的定型化二次结构翻边浇筑模组,结构简单合理,安装使用方便,制作成本低廉。模板及加固组件材料刚度大,因此翻边浇筑成型的观感质量好,且安装、组合、拆卸方便快捷,提高施工效率。材料基本无损耗,可多次回收重复利用。值得大面积推广使用。Through the utility model, a stereotyped secondary structure flanging pouring module can be realized. In one implementation mode, the module can include a formwork unit, and the formwork unit includes a first panel and a second panel. The outer surfaces of the first panel and the second panel are respectively provided with two horizontal reinforcements; the two horizontal reinforcements are respectively provided with vertical slot cards facing up and down; several reinforcement units, the reinforcement units include A first reinforcement assembly and a second reinforcement assembly; the first reinforcement assembly includes a first horizontal bar and a first vertical bar, and the second reinforcement assembly includes a second horizontal bar and a second vertical bar; The first vertical bar is plugged and connected with each of the vertical slot cards included in the first panel, and the second vertical bar is used for connecting with each of the vertical slot cards included in the second panel. The slot cards are plugged and connected; wherein, the first horizontal bar is provided with a socket portion, and the socket portion is provided with a first socket; the second horizontal bar is provided with an inserting rod portion, and the inserting rod portion is provided with a second Two sockets, the rod part is used to be plugged into the socket part and connected through the pins plugged into the first socket and the second socket, so that the first reinforcement The assembly forms a unitary structure with said second reinforcement assembly. The finalized secondary structure flanging pouring module provided by this application has simple and reasonable structure, convenient installation and use, and low production cost. The formwork and reinforcement components have high rigidity, so the appearance quality of the flanging casting is good, and the installation, assembly and disassembly are convenient and quick, which improves the construction efficiency. The material is basically lossless and can be recycled and reused many times. It is worth promoting and using on a large scale.

当然,实施本实用新型的任一产品并不一定需要同时达到以上所述的所有优点。Of course, implementing any product of the present utility model does not necessarily need to achieve all the advantages described above at the same time.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

图1是本实用新型实施例提供的一种定型化二次结构翻边浇筑模组的结构示意图;Fig. 1 is a structural schematic diagram of a finalized secondary structure flanging pouring module provided by an embodiment of the present invention;

图2是本实用新型实施例提供的模板单元的结构示意图;Fig. 2 is the structural representation of the formwork unit that the utility model embodiment provides;

图3是本实用新型实施例提供的加固单元的结构示意图;Fig. 3 is a schematic structural view of the reinforcement unit provided by the embodiment of the present invention;

图4是本实用新型实施例提供的一种定型化二次结构翻边浇筑模组的主视图;Fig. 4 is a front view of a finalized secondary structure flanging pouring module provided by the embodiment of the present invention;

图5是本实用新型实施例提供的一种定型化二次结构翻边浇筑模组应用于阳角翻边浇筑使用时的结构示意图。Fig. 5 is a structural schematic diagram of a finalized secondary structure flanging pouring module provided by an embodiment of the present invention when it is used in external corner flanging pouring.

图中:模板单元1、第一面板11、第二面板12、水平加强件13、竖向插槽卡14、加固单元2、第一加固组合件21、第一水平杆211、插口部2111、第一插孔2112、第一竖向杆212、第一斜向支撑杆213、第二加固组合件22、第二水平杆221、插杆部2211、第二插孔2212、第二竖向杆222、第二斜向支撑杆223、插销23、端头板3。In the figure: template unit 1, first panel 11, second panel 12, horizontal reinforcement 13, vertical slot card 14, reinforcement unit 2, first reinforcement assembly 21, first horizontal bar 211, socket part 2111, The first socket 2112, the first vertical rod 212, the first oblique support rod 213, the second reinforcing assembly 22, the second horizontal rod 221, the rod part 2211, the second socket 2212, the second vertical rod 222 , the second oblique support rod 223 , the latch 23 , and the end plate 3 .

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

实施例Example

参见图1、图2、图3、图4、图5,为本实用新型实施例提供的一种定型化二次结构翻边浇筑模组,如图1、图2、图3、图4、图5所示,该模组可以包括:Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, it is a stereotyped secondary structure flanging pouring module provided by the embodiment of the utility model, as shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, As shown in Figure 5, the module can include:

模板单元1,所述模板单元1包括第一面板11以及第二面板12,所述第一面板11与所述第二面板12各自的外侧表面均设置有两个水平加强件13;两个所述水平加强件13分别设置有上下相对的竖向插槽卡14;The formwork unit 1, the formwork unit 1 includes a first panel 11 and a second panel 12, the outer surfaces of the first panel 11 and the second panel 12 are respectively provided with two horizontal reinforcements 13; The horizontal reinforcements 13 are respectively provided with vertical slot cards 14 facing up and down;

加固单元2,所述加固单元2包括第一加固组合件21以及第二加固组合件22;所述第一加固组合件21包括第一水平杆211以及第一竖向杆212,所述第二加固组合件22包括第二水平杆221以及第二竖向杆222;所述第一竖向杆212与所述第一面板11包含的各个所述竖向插槽卡14插接相连,所述第二竖向杆222用于与所述第二面板12包含的各个所述竖向插槽卡14插接相连;The reinforcement unit 2, the reinforcement unit 2 includes a first reinforcement assembly 21 and a second reinforcement assembly 22; the first reinforcement assembly 21 includes a first horizontal rod 211 and a first vertical rod 212, the second reinforcement assembly 21 The reinforcement assembly 22 includes a second horizontal bar 221 and a second vertical bar 222; the first vertical bar 212 is plugged and connected to each of the vertical slot cards 14 contained in the first panel 11, and the The second vertical rod 222 is used for plugging and connecting with each of the vertical slot cards 14 contained in the second panel 12;

其中,所述第一水平杆211设置有插口部2111,所述插口部2111设置有第一插孔2112;所述第二水平杆221设置有插杆部2211,所述插杆部2211设置有第二插孔2212,所述插杆部2212用于插接于所述插口部2211的内部并通过插接于所述第一插孔2112以及所述第二插孔2212内的插销23相连,以使所述第一加固组合件21与所述第二加固组合件22形成整体结构。Wherein, the first horizontal rod 211 is provided with a socket portion 2111, and the socket portion 2111 is provided with a first socket 2112; the second horizontal rod 221 is provided with an insertion rod portion 2211, and the insertion rod portion 2211 is provided with The second insertion hole 2212, the insertion rod portion 2212 is used to be plugged into the inside of the socket portion 2211 and connected through the plug pin 23 inserted into the first insertion hole 2112 and the second insertion hole 2212, Such that the first reinforcement assembly 21 and the second reinforcement assembly 22 form an integral structure.

本申请实施例提供的定型化二次结构翻边浇筑模组,采用加固单元对模板单元进行加固连接,连接速度快,同时还可以保证模板单元连接后更加稳固。同时加固单元可以重复利用,可以避免传统模板固定时出现的材料浪费。The finalized secondary structure flanging pouring module provided by the embodiment of the present application adopts the reinforcing unit to reinforce and connect the formwork units, which has a fast connection speed and can also ensure that the formwork units are more stable after being connected. At the same time, the reinforcement unit can be reused, which can avoid the material waste that occurs when the traditional formwork is fixed.

为了进一步的可以保证本申请实施例提供的加固单元可以适用于不同宽度的翻边浇筑使用,本申请实施例可以提供所述第一插孔2112包括多个且多个所述第一插孔2112沿所述插口部2111的轴向均匀分布,所述第二插孔2212包括多个且多个所述第二插孔2212沿所述插杆部2211的轴向均匀分布。通过调节不同的第一插孔与不同的第二插孔相对,可以实现对浇筑型腔宽度的调节。In order to further ensure that the reinforcement unit provided by the embodiment of the present application can be applied to flanging castings of different widths, the embodiment of the present application can provide that the first insertion hole 2112 includes a plurality of first insertion holes 2112 Evenly distributed along the axial direction of the socket portion 2111 , the second insertion holes 2212 include a plurality of the second insertion holes 2212 evenly distributed along the axial direction of the insertion rod portion 2211 . By adjusting different first sockets to be opposite to different second sockets, the width of the pouring cavity can be adjusted.

为了进一步的提高第一加固组合件以及第二加固组合件的强度,本申请实施例还可以提供所述第一加固组合件21还包括第一斜向支撑杆213,所述第一斜向支撑杆213的两端分别连接至所述第一水平杆211以及所述第一竖向杆212;所述第二加固组合件22还包括第二斜向支撑杆223,所述第二斜向支撑杆223的两端分别连接至所述第二水平杆221以及所述第二竖向杆222。通过斜向支撑杆的设置可以有效的提高加固组合件的强度。In order to further improve the strength of the first reinforcement assembly and the second reinforcement assembly, the embodiment of the present application can also provide that the first reinforcement assembly 21 also includes a first oblique support rod 213, and the first oblique support Both ends of the rod 213 are respectively connected to the first horizontal rod 211 and the first vertical rod 212; the second reinforcement assembly 22 also includes a second oblique support rod 223, the second oblique support Both ends of the rod 223 are respectively connected to the second horizontal rod 221 and the second vertical rod 222 . The strength of the reinforcement assembly can be effectively improved by setting the oblique support rods.

进一步的,所述第一面板11与所述第二面板12之间设置有端头板3。Further, an end plate 3 is arranged between the first panel 11 and the second panel 12 .

为了取材方便,本申请实施例还可以提供所述第一水平杆以及所述第二水平杆的材质均为40x40毫米的方钢管,所述第一斜向支撑杆以及所述第二斜向支撑杆的材质均为20x40毫米的方钢管。For the convenience of obtaining materials, the embodiment of the present application can also provide square steel pipes whose materials are both 40x40mm for the first horizontal bar and the second horizontal bar, and for the first oblique support rod and the second oblique support The rods are made of square steel pipes of 20x40 mm.

为了防止面板在使用过程中发生变形,影响二次使用,本申请实施例还可以提供所述第一面板以及所述第二面板的材质均为钢板。为了保障面板与各部件连接的稳固性,本申请实施例可以提供所述第一面板与两个所述水平加强件采用焊接工艺相连,所述第二面板与两个所述水平加强件采用焊接工艺相连。所述竖向插槽卡与所述水平加强件采用焊接工艺相连。In order to prevent deformation of the panel during use and affect secondary use, the embodiment of the present application may also provide that the materials of the first panel and the second panel are both steel plates. In order to ensure the stability of the connection between the panel and each component, the embodiment of the present application may provide that the first panel is connected to the two horizontal reinforcements by welding, and the second panel is connected to the two horizontal reinforcements by welding. The process is connected. The vertical slot card is connected with the horizontal reinforcement by welding.

本申请实施例提供的面板采用钢板,水平加强件、竖向杆、斜向支撑杆采用20×40mm方钢管,水平杆采用40×40mm方钢管。面板根据翻边高度加工,与水平加强件焊接成整体,作为翻边的模板,并在水平加强件上焊接竖向插槽卡用于连接加固组合件。加固单元由第一加固组合件与第二加固组合件通过插接件连接组合,并可以调整插接长度,以适用于不同宽度的翻边。加固组合件组合完成后,用插销进行固定,再整体插入竖向插槽卡,完成模板加固。拆模时,以支模的相反顺序即可拆卸各组件。The panels provided in the embodiments of the present application are made of steel plates, the horizontal reinforcements, vertical rods, and oblique support rods are made of 20×40mm square steel pipes, and the horizontal rods are made of 40×40mm square steel pipes. The panel is processed according to the height of the flange, and is welded with the horizontal reinforcement as a template for the flange, and the vertical slot card is welded on the horizontal reinforcement to connect the reinforcement assembly. The reinforcement unit is composed of the first reinforcement assembly and the second reinforcement assembly connected by a plug-in piece, and the length of the plug-in connection can be adjusted to be suitable for flanges of different widths. After the reinforcement assembly is assembled, fix it with a bolt, and then insert the vertical slot card as a whole to complete the template reinforcement. When removing the formwork, each component can be disassembled in the reverse order of supporting the formwork.

总之,本申请提供的定型化二次结构翻边浇筑模组,结构简单合理,安装使用方便,制作成本低廉。模板及加固组件材料刚度大,因此翻边浇筑成型的观感质量好,且安装、组合、拆卸方便快捷,提高施工效率。材料基本无损耗,可多次回收重复利用。值得大面积推广使用。In a word, the finalized secondary structure flanging pouring module provided by this application has simple and reasonable structure, convenient installation and use, and low manufacturing cost. The formwork and reinforcement components have high rigidity, so the appearance quality of the flanging casting is good, and the installation, assembly and disassembly are convenient and quick, which improves the construction efficiency. The material is basically lossless and can be recycled and reused many times. It is worth promoting and using on a large scale.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

以上所述仅为本实用新型的较佳实施例而已,并非用于限定本实用新型的保护范围。凡在本实用新型的精神和原则之内所作的任何修改、等同替换、改进等,均包含在本实用新型的保护范围内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. All modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model are included in the protection scope of the present utility model.

Claims (8)

1. The utility model provides a module is pour to regularization secondary structure turn-ups, a serial communication port, include:
the template unit comprises a first panel and a second panel, and two horizontal reinforcing pieces are arranged on the outer side surfaces of the first panel and the second panel respectively; the two horizontal reinforcing pieces are respectively provided with vertical slot clamps which are opposite up and down;
a plurality of reinforcement units comprising a first reinforcement assembly and a second reinforcement assembly; the first reinforcing assembly comprises a first horizontal rod and a first vertical rod, and the second reinforcing assembly comprises a second horizontal rod and a second vertical rod; the first vertical rod is connected with each vertical slot card contained in the first panel in an inserting manner, and the second vertical rod is used for being connected with each vertical slot card contained in the second panel in an inserting manner;
the first horizontal rod is provided with a socket part, and the socket part is provided with a first jack; the second horizontal rod is provided with a plug rod part, the plug rod part is provided with a second plug hole, and the plug rod part is used for being plugged in the socket part and connected with the first plug hole and the second plug hole through plug pins plugged in the first plug hole and the second plug hole, so that the first reinforcing assembly and the second reinforcing assembly form an integral structure.
2. The modular sizing secondary structural flange pouring module according to claim 1, wherein the first jacks include a plurality of first jacks evenly distributed in the axial direction of the socket portion, and the second jacks include a plurality of second jacks evenly distributed in the axial direction of the jack portion.
3. The modular sizing secondary structural flange pouring module according to claim 1, wherein the first reinforcing assembly further comprises a first diagonal support rod, and two ends of the first diagonal support rod are connected to the first horizontal rod and the first vertical rod respectively; the second reinforcing assembly further comprises a second oblique supporting rod, and two ends of the second oblique supporting rod are connected to the second horizontal rod and the second vertical rod respectively.
4. The modular sizing secondary structure flange pouring module according to claim 3, wherein the first horizontal rod and the second horizontal rod are both made of square steel tubes of 40x40 mm, and the first oblique supporting rod and the second oblique supporting rod are both made of square steel tubes of 20x40 mm.
5. The modular sizing secondary structure flange pouring module according to claim 1, wherein the first panel and the second panel are both made of steel plates.
6. The modular sizing secondary structural flange pouring module according to claim 5, wherein the first panel is connected with the two horizontal reinforcements by a welding process, and the second panel is connected with the two horizontal reinforcements by a welding process.
7. The modular sizing secondary structural flange casting module according to claim 6, wherein the vertical slot clamp and the horizontal stiffener are connected by a welding process.
8. The modular shaped secondary structural flange casting module of claim 1, wherein an end plate is disposed between the first panel and the second panel.
CN202221651610.4U 2022-06-28 2022-06-28 Regularization secondary structure turn-ups pours module Active CN218493084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221651610.4U CN218493084U (en) 2022-06-28 2022-06-28 Regularization secondary structure turn-ups pours module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221651610.4U CN218493084U (en) 2022-06-28 2022-06-28 Regularization secondary structure turn-ups pours module

Publications (1)

Publication Number Publication Date
CN218493084U true CN218493084U (en) 2023-02-17

Family

ID=85184318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221651610.4U Active CN218493084U (en) 2022-06-28 2022-06-28 Regularization secondary structure turn-ups pours module

Country Status (1)

Country Link
CN (1) CN218493084U (en)

Similar Documents

Publication Publication Date Title
CN102425306B (en) Construction method of steel bar truss floor bearing plate and steel bar truss floor bearing plate
CN209817088U (en) A prefabricated balcony
CN105089270A (en) Construction method for formwork system of concrete beam slab quick demounting wood formwork device
CN209585623U (en) A kind of deformation joint construction formwork structure
CN110397275A (en) A shear wall reinforcement
CN205915488U (en) Reserve door and window pouring mold
CN209703778U (en) A kind of assembled disassembly-free thermal-insulation form board with hoisting structure
CN221609524U (en) Aluminum formwork and wooden formwork connection structure
CN222045049U (en) Wall body pull rod-free construction device, single wall body construction structure and integral construction structure
CN218061424U (en) Fish-bellied profile steel supporting beam mold supporting system for cast-in-place floor
CN219387166U (en) Quick reinforcing apparatus among even wall post template work progress
CN208009896U (en) A kind of construction column template and the fixed attachment device of wall
CN216921353U (en) A kind of reinforcement tool for water-retaining and anti-sill aluminum formwork
CN116464331A (en) A standardized assembled flag stand
CN212026617U (en) An installation node of a concrete prefabricated member
CN218176640U (en) Bottom chamfer hangs mould greatly subsides in bathroom
CN209603488U (en) Shear wall removable removing template in expansion joint two sides in a kind of house construction engineering
CN210032582U (en) A toilet descending plate pouring mold that is easy to assemble and disassemble
CN221973009U (en) Novel upper and lower corner back edge
CN219527942U (en) A connection device for steel structure building
CN220565690U (en) Quick-assembling template for building and splicing and locking structure thereof
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN218234334U (en) Bathroom arc structure system
CN207892016U (en) A kind of H profile steel combination pedestal in house
CN217167200U (en) An adjustable steel plate positioning welding combination device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 310000 Zhejiang Province, Hangzhou City, Xihu District, Jiangcun Street, Xixi International Business Center, Building 5, Room 809

Patentee after: Zhejiang Zhulemei City Development Co., Ltd.

Country or region after: China

Address before: 310012 Zhejiang Province Hangzhou City Xihu District San Dun Town Zi Xuan Road 158 Building 1 902 Room

Patentee before: Zhejiang green city zhulemei City Development Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address