CN218479281U - Road drainage pipeline mounting structure - Google Patents

Road drainage pipeline mounting structure Download PDF

Info

Publication number
CN218479281U
CN218479281U CN202222807118.8U CN202222807118U CN218479281U CN 218479281 U CN218479281 U CN 218479281U CN 202222807118 U CN202222807118 U CN 202222807118U CN 218479281 U CN218479281 U CN 218479281U
Authority
CN
China
Prior art keywords
groove
pipeline
flaring
head tank
constant head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222807118.8U
Other languages
Chinese (zh)
Inventor
袁刚
孙勇
张银丽
朱懿德
潘孙泽
李宝山
付俊如
谢李忠
寿恺骅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xingye Municipal Engineering Co ltd
Original Assignee
Zhejiang Xingye Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xingye Municipal Engineering Co ltd filed Critical Zhejiang Xingye Municipal Engineering Co ltd
Priority to CN202222807118.8U priority Critical patent/CN218479281U/en
Application granted granted Critical
Publication of CN218479281U publication Critical patent/CN218479281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a technical field of drainage pipe installation especially relates to a road drainage pipe mounting structure, and it is including the mount pad that is used for placing the pipeline and set up the fixed subassembly on the mount pad, set up constant head tank and with the flaring groove of constant head tank intercommunication on the mount pad, the length in constant head tank and flaring groove all places the direction along the pipeline and extends, the flaring groove is used for placing the pipeline flaring end, just the groove depth in flaring groove is greater than the constant head tank, the flaring inslot is provided with the stopper, the spacing groove has been seted up on the stopper, the length of spacing groove is placed the direction along the pipeline and is extended, spacing groove and constant head tank are located same curved surface. This application has the work degree of difficulty that reduces constructor, also can improve the installation effectiveness's of construction work effect simultaneously.

Description

Road drainage pipeline mounting structure
Technical Field
The utility model relates to a field of drainage pipe installation especially relates to a road drainage pipe installation structure.
Background
Road drainage pipes are in most cases pipes laid underground and used for transporting liquids, gases or loose solids. In the construction and installation process of the road drainage pipeline, a plurality of sections of pipelines are firstly placed into an excavated groove, one end of each pipeline is flared, the end of the pipeline mouth of one pipeline is aligned with the end of the flared end of the other pipeline, and then the two adjacent pipelines are connected together in an inserting and inserting manner.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: because the pipeline has the flaring end, the inner chamber of pipeline can't guarantee the level when placing, in actual construction installation, needs the manual work to lift the pipeline off the ground, because the volume and the weight of arranging underground drainage pipe in are great, and lifting pipeline causes the degree of difficulty to constructor's construction work in the equipment process, influences the installation effect and the efficiency of pipeline simultaneously.
SUMMERY OF THE UTILITY MODEL
In order to alleviate constructor's the construction degree of difficulty, improve pipeline installation's efficiency of construction simultaneously, this application provides a road drainage pipe mounting structure.
The application provides a pair of road drainage pipe mounting structure adopts following technical scheme:
the utility model provides a road drainage pipeline mounting structure, is including the mount pad that is used for placing the pipeline and set up the fixed subassembly on the mount pad, set up the constant head tank on the mount pad and with the flaring groove of constant head tank intercommunication, the length in constant head tank and flaring groove all places the direction along the pipeline and extends, the flaring groove is used for placing pipeline flaring end, just the groove depth in flaring groove is greater than the constant head tank, the flaring inslot is provided with the stopper, the spacing groove has been seted up on the stopper, the length in spacing groove is followed the pipeline and is placed the direction and extend, spacing groove and constant head tank are located same curved surface.
Through adopting above-mentioned technical scheme, when needs are under construction two sections pipelines and are installed, place one of them pipeline on the mount pad earlier, make its pipeline place on the constant head tank, the flaring end is placed on the flaring groove, place the one end that keeps away from its self flaring end with another pipeline again at the spacing inslot, the inner chamber of two pipelines just is in the coplanar this moment, pull two pipelines again and just can realize the work of pegging graft two pipelines together, need not to lift up pipeline one end through the manual work when the installation, thereby can reduce constructor's the work degree of difficulty, also can improve the installation effectiveness of construction work simultaneously.
Optionally, the limiting block is movably disposed in the flaring groove, and the limiting block slides along the length direction of the flaring groove.
Through adopting above-mentioned technical scheme, when needs carry out grafting work with two sections pipelines, the pulling is located the pipeline on the spacing groove, and the pipeline will be along with the stopper to the direction that is close to another pipeline removes, drives the pipeline through the stopper and removes to make grafting removal process more convenient, labour saving and time saving.
Optionally, wear to be equipped with the gag lever post on the mount pad, offer on the stopper lateral wall and be used for supplying gag lever post male spacing hole, the gag lever post is located the route of sliding of stopper, just the gag lever post is used for restricting the stopper and slides.
Through adopting above-mentioned technical scheme, after two sections pipelines accomplish grafting work, through inserting the gag lever post to spacing downthehole for the gag lever post contacts with the stopper, and the gag lever post can prevent that the stopper from removing to the direction of keeping away from the constant head tank, thereby realizes the fixed action to the stopper, prevents that the stopper from taking place to slide after the pipeline grafting finishes.
Optionally, the fixing assembly comprises a fixing frame arranged on the mounting seat and used for fixing the pipeline and a fixing block arranged on the side wall of the fixing frame facing the mounting seat, the fixing block is used for abutting against the side wall of the pipeline, a fixing groove used for inserting the fixing frame is formed in the mounting seat, and a fastening piece used for abutting the fixing frame against the mounting seat is connected to the mounting seat through threads.
Through adopting above-mentioned technical scheme, when placing the pipeline on the mount pad, insert the mount in the fixed slot, after adjusting to suitable position, then fixed mount and mount pad through the fastener, fixed block and pipeline contact and support tightly this moment, fix the pipeline on the mount pad through fixed subassembly, improve the stability between pipeline and the mount pad.
Optionally, the fixed assemblies are provided with two groups, one group of the fixed assemblies are close to the positioning grooves, and the other group of the fixed assemblies are arranged on the limiting blocks.
Through adopting above-mentioned technical scheme, can further improve the firm nature between pipeline and the mount pad through setting up two sets of locating component, can guarantee two pipelines simultaneously and remove the stability of in-process in the grafting.
Optionally, the device further comprises an air cylinder connected with the two groups of fixing assemblies, and the air cylinder is used for controlling the two groups of fixing assemblies to move towards or away from each other.
Through adopting above-mentioned technical scheme, drive fixed subassembly through the cylinder and drive the pipeline and remove to the direction of being close to or keeping away from another pipeline for constructor's convenient operation is swift, labour saving and time saving.
Optionally, a plurality of pins are arranged on the side wall of the mounting seat, which is away from the positioning groove, and the pins are used for fixing the mounting seat on the ground.
Through adopting above-mentioned technical scheme, when placing the mount pad on subaerial, insert to subaerial through participating in, improve the firm nature between mount pad and the ground for the pipeline is more stable in the installation.
Optionally, a guide seat for guiding is arranged on the mounting seat, and the guide seat is symmetrically arranged on two sides of the positioning groove along the axial direction of the positioning groove.
Through adopting above-mentioned technical scheme, can make the pipeline get into smoothly to the constant head tank in through the guide holder.
Optionally, the locating slot, the flaring slot and the side wall of the limiting slot are all provided with anti-skid rubber pads.
Through adopting above-mentioned technical scheme, the frictional force between pipeline and the groove that corresponds separately can be improved to the antiskid rubber pad, and the condition of roll-off appears in the prevention in the installation.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the working difficulty of constructors can be reduced, and meanwhile, the installation efficiency of construction work can be improved;
2. the pipeline is driven to move by the limiting block, so that the inserting and moving process is more convenient, and time and labor are saved;
3. the pipeline is fixed on the mounting seat through the fixing and fixing assembly, and the stability between the pipeline and the mounting seat is improved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic structural diagram of a hidden fixing assembly according to an embodiment of the present application;
FIG. 3 is a cross-sectional view of the embodiment of the present application highlighting the stop bar and the stop hole.
Description of reference numerals: 1. a mounting seat; 10. fixing grooves; 11. positioning a groove; 12. a flared groove; 13. A limiting block; 131. a limiting groove; 132. a limiting hole; 14. a limiting rod; 15. a fastener; 16. a pin; 17. a guide seat; 2. a fixing assembly; 21. a fixed mount; 22. a fixed block; 3. a cylinder; 4. anti-skid rubber pad.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses road drainage pipe mounting structure. Referring to fig. 1, a road drainage pipeline installation structure includes an installation base 1 for placing a pipeline and a fixing assembly 2 detachably installed on the installation base 1.
Referring to fig. 2, offer constant head tank 11 and with the flaring groove 12 of constant head tank 11 intercommunication on the mount pad 1, the direction that the pipeline was placed is all followed to the length of constant head tank 11 and flaring groove 12 extends, and flaring groove 12 is used for placing the flaring end of pipeline, and constant head tank 11 is used for placing the pipeline and keeps away from the one end of flaring end, and the groove depth of flaring groove 12 is greater than the groove depth of constant head tank 11. A limiting block 13 is arranged on the side wall of the flaring slot 12 in a sliding mode, and the limiting block 13 slides along the length direction of the flaring slot 12. Spacing groove 131 has been seted up on the lateral wall that stopper 13 deviates from flaring groove 12, and the length of spacing groove 131 is placed the direction along the pipeline and is extended, and spacing groove 131 and constant head tank 11 are located same curved surface. The side walls of the positioning groove 11, the flaring groove 12 and the limiting groove 131 are fixedly attached with anti-skid rubber pads 4.
Referring to fig. 3, the mounting base 1 is provided with a limiting rod 14 located on the sliding path of the limiting block 13, and a limiting hole 132 for inserting the limiting rod 14 is formed in the side wall of the limiting block 13. Threaded connection between the limiting rod 14 and the limiting hole 132, when the limiting block 13 slides towards the direction close to the positioning groove 11, the limiting rod 14 is inserted into the limiting hole 132, so that the limiting block 13 is fixed by the limiting rod 14, and the limiting block 13 is prevented from sliding.
Referring to fig. 1 and 2, a guide seat 17 for guiding is integrally formed on the mounting seat 1, the length of the guide seat 17 extends along the length direction of the positioning slot 11, and the guide seats 17 are symmetrically arranged on two sides of the positioning slot 11. A plurality of pins 16 for fixing the mounting base 1 on the ground are integrally formed on the side wall of the mounting base 1 away from the positioning groove 11, and the pins 16 are distributed at the corners of the mounting base 1.
Referring to fig. 1 and 2, the mounting base 1 is provided with a fixing assembly 2, the fixing assembly 2 includes a fixing frame 21 inserted on the mounting base 1, a fixing block 22 for abutting the pipeline on the mounting base 1 and an air cylinder 3, and the fixing block 22 is located on a side wall of the fixing frame 21 facing the mounting base 1. The mounting seat 1 is provided with a fixing groove 10 for inserting the fixing frame 21, and the mounting seat 1 is in threaded connection with a fastener 15 for tightly abutting the fixing frame 21 on the mounting seat 1.
Referring to fig. 1, two sets of fixing components 2 are installed, one set of fixing components 2 is close to the positioning groove 11 and is used for fixing the pipeline located in the positioning groove 11, and the other set of fixing components 2 is located on the limiting block 13 and is used for fixing the pipeline located in the limiting groove 131. The cylinder 3 is fixedly mounted on the side wall of one group of fixed components 2 facing the other group of fixed components 2, the cylinder 3 is used for connecting the two groups of fixed components 2, and the fixed components 2 on the limiting block 13 are controlled to slide along the pipeline placing direction.
The implementation principle of this application embodiment a road drainage pipe mounting structure does: when two sections pipelines need to be constructed and installed, one pipeline is placed on the installation seat 1 firstly, the pipeline is placed on the positioning groove 11, the flaring end is placed on the flaring groove 12, one end of the other pipeline, which is far away from the flaring end, is placed in the limiting groove 131, the inner cavities of the two pipelines are right aligned to and in the same plane, the two pipelines can be plugged together by pulling the two pipelines, one end of the pipeline does not need to be lifted up manually when the pipeline is installed, the work difficulty of constructors can be reduced, and the installation efficiency of construction work can be improved.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a road drainage pipe mounting structure which characterized in that: including mount pad (1) and the fixed subassembly (2) of setting on mount pad (1) that are used for placing the pipeline, set up constant head tank (11) on mount pad (1) and with flaring groove (12) of constant head tank (11) intercommunication, the length of constant head tank (11) and flaring groove (12) all places the direction along the pipeline and extends, flaring groove (12) are used for placing the pipeline flaring end, just the groove depth of flaring groove (12) is greater than constant head tank (11), be provided with stopper (13) in flaring groove (12), spacing groove (131) have been seted up on stopper (13), the length of spacing groove (131) is placed the direction along the pipeline and is extended, spacing groove (131) and constant head tank (11) are located same curved surface.
2. A road drainpipe mounting structure as claimed in claim 1, wherein: the limiting block (13) is movably arranged in the flaring groove (12), and the limiting block (13) slides along the length direction of the flaring groove (12).
3. A road drainpipe mounting structure as claimed in claim 2, wherein: wear to be equipped with gag lever post (14) on mount pad (1), offer on stopper (13) lateral wall and be used for supplying gag lever post (14) male spacing hole (132), gag lever post (14) are located the route of sliding of stopper (13), just gag lever post (14) are used for restricting stopper (13) and slide.
4. A road drainpipe mounting structure as claimed in claim 2, wherein: fixed subassembly (2) are including setting up be used for fixed pipeline's mount (21) and setting fixed block (22) on mount (21) the lateral wall towards mount (1) on mount (1), fixed block (22) are used for supporting tightly on the pipeline lateral wall, offer on mount (1) and be used for supplying mount (21) male fixed slot (10), threaded connection has fastener (15) that are used for supporting tight mount (21) on mount (1).
5. A road drainpipe mounting structure as claimed in claim 4, wherein: the fixed component (2) is provided with two sets, one set of the fixed component (2) is close to the positioning groove (11), and the other set of the fixed component (2) is arranged on the limiting block (13).
6. A road drainpipe mounting structure as claimed in claim 5, wherein: the device is characterized by further comprising an air cylinder (3) connected with the two groups of fixing assemblies (2), wherein the air cylinder (3) is used for controlling the two groups of fixing assemblies (2) to move towards the direction close to or away from each other.
7. A road drainpipe mounting structure as claimed in claim 1, wherein: the side wall of the mounting seat (1) departing from the positioning groove (11) is provided with a plurality of pins (16), and the pins (16) are used for fixing the mounting seat (1) on the ground.
8. A road drainpipe mounting structure as claimed in claim 1, wherein: be provided with guide holder (17) that are used for the direction on mount pad (1), guide holder (17) set up in constant head tank (11) both sides along the axial symmetry of constant head tank (11).
9. A road drainpipe mounting structure as claimed in claim 1, wherein: and the side walls of the positioning groove (11), the flaring groove (12) and the limiting groove (131) are all provided with anti-skidding rubber pads (4).
CN202222807118.8U 2022-10-24 2022-10-24 Road drainage pipeline mounting structure Active CN218479281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222807118.8U CN218479281U (en) 2022-10-24 2022-10-24 Road drainage pipeline mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222807118.8U CN218479281U (en) 2022-10-24 2022-10-24 Road drainage pipeline mounting structure

Publications (1)

Publication Number Publication Date
CN218479281U true CN218479281U (en) 2023-02-14

Family

ID=85170535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222807118.8U Active CN218479281U (en) 2022-10-24 2022-10-24 Road drainage pipeline mounting structure

Country Status (1)

Country Link
CN (1) CN218479281U (en)

Similar Documents

Publication Publication Date Title
CN112762231B (en) Pipe jacking device and construction method thereof
CN209081261U (en) Cable and optical cable pipe network pipeline auxiliary hoisting device
CN218479281U (en) Road drainage pipeline mounting structure
CN211690291U (en) Be applied to drain bar insertion structure of picture peg machine
CN214151177U (en) Draw gear is used in optical cable construction
KR101343216B1 (en) Equipment for installating mohair into window-frame
CN217642413U (en) Adjusting bracket for cable installation
CN216075873U (en) Keel card inserting device
CN216780100U (en) Movable clamping mechanism of sheet metal bending machine
CN213960136U (en) Adjustable floating USB test head inserting mechanism
CN116425003B (en) A horizontal plate lifting device
CN212641238U (en) Automatic forward device of hanging basket
CN211830810U (en) Movable safety gateway
CN223647051U (en) A clamping mechanism for a pile extractor
CN116852407B (en) Brick clamping tool
CN113863305B (en) Static pile extractor
CN114803938A (en) Lifting device for intelligent installation of scaffold protective net template
CN214734038U (en) Hoisting support with good stability
CN223917788U (en) A hook flange assembly fixture
CN220980010U (en) Hydraulic cylinder supporting structure
CN223430584U (en) Polyurethane screen plate quick disassembly and assembly structure
CN120867297B (en) A robot for automatically laying steel mesh for reinforcing earthen caves
CN213574179U (en) Underground wind dispelling pipeline for mine
CN214829121U (en) Fixing device for water purifier
CN220982321U (en) Probe detection device mounted on tentering equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yuan Gang

Inventor after: Sun Yong

Inventor after: Zhang Yinli

Inventor after: Zhu Yide

Inventor after: Pan Sunze

Inventor after: Li Baoshan

Inventor after: Fu Junru

Inventor after: Xie Lizhong

Inventor after: Shou Kaihua

Inventor before: Yuan Gang

Inventor before: Sun Yong

Inventor before: Zhang Yinli

Inventor before: Zhu Yide

Inventor before: Pan Sunze

Inventor before: Li Baoshan

Inventor before: Fu Junru

Inventor before: Xie Lizhong

Inventor before: Shou Kaihua

CB03 Change of inventor or designer information