CN218403332U - Novel cement pole is with hanging clamping utensil with adjustable diameter - Google Patents
Novel cement pole is with hanging clamping utensil with adjustable diameter Download PDFInfo
- Publication number
- CN218403332U CN218403332U CN202222510421.1U CN202222510421U CN218403332U CN 218403332 U CN218403332 U CN 218403332U CN 202222510421 U CN202222510421 U CN 202222510421U CN 218403332 U CN218403332 U CN 218403332U
- Authority
- CN
- China
- Prior art keywords
- wall
- splint
- slider
- cement pole
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004568 cement Substances 0.000 title claims abstract description 33
- 239000004575 stone Substances 0.000 claims abstract description 8
- 238000009434 installation Methods 0.000 claims description 7
- 230000006978 adaptation Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a novel stone tongs for cement pole with adjustable diameter of cement pole hoist and mount technical field, including splint one, splint two, install the slider on one side outer wall of splint one, fixed orifices one has been seted up on one side outer wall of slider, fixed orifices two have been seted up on the inner wall of fixed orifices one, and the one end of slider runs through splint two and sets up, one side outer wall of slider and the interior wall connection of splint two, install the bracing piece on the inner wall of fixed orifices one, when needs hoist the cement pole of different diameters, through to keeping away from slider one side pulling supporting shoe for the supporting shoe drives the fixture block and unlocks the slider, can slide the slider in splint two this moment, thereby take the slider out, transfer to suitable position after, again to it can, can adjust the distance between splint one, splint two according to the user demand of difference, thereby press from both sides tightly the cement pole of different diameters.
Description
Technical Field
The utility model relates to a cement pole hoist and mount technical field especially relates to a novel stone tongs for cement pole with adjustable diameter.
Background
The cement pole is mainly composed of steel bars and concrete, so the cement pole is also called as a reinforced concrete cement pole and is mainly used as a stringing support in the industries of electric power, communication, railway, petroleum and the like.
At present cement pole at the in-process of installing, all be parallel to ground earlier and transport to the mounting point usually, then hoist its back by the crane again to install, and cement pole is in the hoist and mount, again usually all can carry out the centre gripping to the cement pole with stone tongs, then hoist and mount it by the lifting hook of crane again, but present stone tongs can't adjust according to the cement pole of different diameters, for this reason we propose a diameter adjustable novel stone tongs for cement pole.
SUMMERY OF THE UTILITY MODEL
To the problem, the utility model provides a novel stone tongs for cement pole with adjustable diameter can adjust the distance between splint one, the splint two according to the user demand of difference to press from both sides tightly the cement pole of different diameters.
The technical scheme of the utility model is that: the utility model provides a novel stone tongs for cement pole with adjustable diameter, includes splint one, splint two, install the slider on one side outer wall of splint one, set up fixed orifices one on one side outer wall of slider, set up fixed orifices two on the inner wall of fixed orifices one, the one end of slider runs through splint two and sets up, one side outer wall of slider and the interior wall connection of splint two, install the bracing piece on the inner wall of fixed orifices one, install the fixture block on the inner wall of fixed orifices two.
In a further technical scheme, a supporting plate is installed on the outer wall of one side of the supporting rod, and a supporting block is installed on the inner wall of the supporting plate.
In a further technical scheme, a pull rope is installed on the outer wall of one side of the supporting block, one end of the pull rope is installed on the outer wall of one side of the clamping block, a spring is installed on the outer wall of one side of the clamping block, and one end of the spring is installed on the inner wall of the supporting rod.
In a further technical scheme, the one end of stay cord runs through the bracing piece setting, the shrinkage pool has been seted up on the outer wall of one side of supporting shoe, the one end of bracing piece runs through splint two, slider setting.
In a further technical scheme, install solid fixed ring on one side outer wall of splint one, the quantity of splint one, slider, splint two is two sets of, has all seted up fixed orifices three on one side outer wall of one of them set of splint one, splint two.
In a further technical scheme, the outer walls of one side of the other group of the first clamping plate and the second clamping plate are respectively provided with an installation block, the installation blocks are matched with the fixing blocks Kong Sanxiang, and the outer surfaces of the installation blocks are provided with fixing grooves.
In a further technical scheme, wherein a set of install the threaded rod on the one side inner wall of splint one, splint two, the crank is installed to the one end of threaded rod, the fixed block is installed to the other end of threaded rod, fixed block and fixed slot looks adaptation.
The utility model has the advantages that:
1. by arranging the first clamping plate, the sliding block, the second clamping plate, the fixing rings, the crank, the threaded rod, the fixing blocks and the mounting blocks, the mounting blocks are clamped into the second clamping plate by enabling the first clamping plate and the second clamping plate to be close to each other, then the crank is rotated to fix the combination of the first clamping plate and the second clamping plate, so that the first clamping plate and the second clamping plate clamp the cement rods, then the lifting hook of a crane penetrates through the two fixing rings, and the cement rods can be hoisted, so that the cement rod hoisting device is simple, convenient and easy to operate;
2. through setting up the supporting shoe, the backup pad, the bracing piece, the stay cord, a spring, the fixture block, when needs hoist the cement pole of different diameters, through to keeping away from slider one side pulling supporting shoe, make the supporting shoe drive the fixture block and carry out the unblock to the slider, can slide the slider in splint two this moment, thereby take the slider out, after transferring suitable position, again to it fix can, can be according to the user demand of difference to splint one, the distance between splint two is adjusted, thereby press from both sides tightly the cement pole of different diameters.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
FIG. 2 is a structural diagram of a second clamping plate according to an embodiment of the present invention;
FIG. 3 is a block diagram of a slider according to an embodiment of the present invention;
fig. 4 is a structural view of a threaded rod in accordance with an embodiment of the present invention;
FIG. 5 is a structural diagram of a support rod according to an embodiment of the present invention;
fig. 6 is an exploded view of a fixture block according to an embodiment of the present invention.
Description of reference numerals:
1. a first clamping plate; 2. a slider; 3. a second clamping plate; 4. a fixing ring; 5. a crank; 6. a threaded rod; 7. a fixed block; 8. a support block; 9. a support plate; 10. a support bar; 11. pulling a rope; 12. a spring; 13. a clamping block; 14. and (7) installing the block.
Detailed Description
The embodiments of the present invention will be further explained with reference to the drawings.
Example (b):
as shown in fig. 1-6, a novel cement pole lifting clamp with adjustable diameter, including splint one 1, splint two 3, install slider 2 through hinge on one side outer wall of splint one 1, fixed orifices one has been seted up on one side outer wall of slider 2, fixed orifices two have been seted up on the inner wall of fixed orifices one, the one end of slider 2 runs through the inside that the outer wall of splint two 3 extends to splint two 3, one side outer wall of slider 2 and the inner wall sliding connection of splint two 3, slidable mounting has bracing piece 10 on the inner wall of fixed orifices one, slidable mounting has fixture block 13 on the inner wall of fixed orifices two.
The working principle of the technical scheme is as follows:
the sliding block 2 can slide in the inner part of the second clamping plate 3 and is clamped into the sliding block 2 through the supporting rod 10, and the clamping block 13 is clamped into the sliding block 2, so that the sliding block 2 can be fixed in the second clamping plate 3 and can be kept at a fixed position when not required to be moved.
In another embodiment, as shown in fig. 5 and 6, a supporting plate 9 is fixedly mounted on an outer wall of one side of the supporting rod 10, and a supporting block 8 is slidably mounted on an inner wall of the supporting plate 9.
So that the support plate 9 can obtain the supporting force of the support bar 10 while the support block 8 can obtain the supporting force of the support plate 9, the support block 8 can slide in the support plate 9.
In another embodiment, as shown in fig. 5 and 6, a pull rope 11 is fixedly mounted on an outer wall of one side of the supporting block 8, one end of the pull rope 11 is fixedly mounted on an outer wall of one side of the latch 13, a spring 12 is fixedly mounted on an outer wall of one side of the latch 13, and one end of the spring 12 is fixedly mounted on an inner wall of the supporting rod 10.
So that the spring 12 can obtain the supporting force provided by the supporting rod 10, and the latch 13 can obtain the elastic force provided by the spring 12, so that the latch 13 can be latched into the second fixing hole under the action of the spring 12.
In another embodiment, as shown in fig. 1-3, 5, and 6, one end of the pulling rope 11 penetrates through the inner wall of the supporting rod 10 and extends to the outside of the supporting rod 10, a concave hole is formed in the outer wall of one side of the supporting block 8, and one end of the supporting rod 10 penetrates through the outer wall of the clamping plate 3 and the outer wall of the sliding block 2 and extends to the inside of the clamping plate 3.
So that the support rod 10 can be clamped in the second clamping plate 3 and the sliding block 2, thereby fixing the positions of the two parts, and simultaneously the pull rope 11 can slide in the support rod 10.
In another embodiment, as shown in fig. 1, a fixing ring 4 is fixedly mounted on an outer wall of one side of the first clamping plate 1, the number of the sliding block 2, and the number of the second clamping plate 3 are two, and a third fixing hole is formed in an outer wall of one side of one of the first clamping plate 1 and the second clamping plate 3.
So that the first clamping plate 1 can provide supporting force for the fixing ring 4, and the lifting hook of the crane can lift the cement pole through the fixing ring 4.
In another embodiment, as shown in fig. 1, 2 and 4, the outer walls of one side of the other set of the first clamping plate 1 and the second clamping plate 3 are both fixedly provided with the mounting block 14, the mounting block 14 is adapted to the fixing Kong Sanxiang, and the outer surface of the mounting block 14 is provided with a fixing groove.
So that the mounting block 14 can obtain a supporting force while the mounting block 14 can be snapped into the fixing hole three.
In another embodiment, as shown in fig. 1, 2 and 4, a threaded rod 6 is threadedly mounted on an inner wall of one side of one of the first clamping plate 1 and the second clamping plate 3, a crank 5 is fixedly mounted at one end of the threaded rod 6, a fixing block 7 is movably mounted at the other end of the threaded rod 6 through a first bearing, and the fixing block 7 is matched with the fixing groove.
Drive threaded rod 6 through rotating crank 5 and rotate, threaded rod 6 drives fixed block 7 and rotates, carries on spacingly to fixed block 7 through splint one 1, splint two 3 for fixed block 7 can block into in the fixed slot, thereby fixes the position of installation piece 14, thereby fixes two sets of splint one 1, splint two 2.
The above embodiments only express the specific embodiments of the present invention, and the description thereof is specific and detailed, but not to be understood as the limitation of the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several variations and modifications can be made, which are within the scope of the present invention.
Claims (7)
1. The utility model provides a novel stone tongs for cement pole with adjustable diameter, includes splint one (1), splint two (3), its characterized in that: install slider (2) on the one side outer wall of splint one (1), fixed orifices one has been seted up on the one side outer wall of slider (2), fixed orifices two have been seted up on the inner wall of fixed orifices one, and the one end of slider (2) runs through splint two (3) and sets up, the inner wall connection of one side outer wall and splint two (3) of slider (2), install bracing piece (10) on the inner wall of fixed orifices one, install fixture block (13) on the inner wall of fixed orifices two.
2. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 1, is characterized in that: the supporting rod is characterized in that a supporting plate (9) is installed on the outer wall of one side of the supporting rod (10), and a supporting block (8) is installed on the inner wall of the supporting plate (9).
3. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 2, is characterized in that: the supporting device is characterized in that a pull rope (11) is installed on the outer wall of one side of the supporting block (8), one end of the pull rope (11) is installed on the outer wall of one side of the clamping block (13), a spring (12) is installed on the outer wall of one side of the clamping block (13), and one end of the spring (12) is installed on the inner wall of the supporting rod (10).
4. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 3, is characterized in that: the one end of stay cord (11) runs through bracing piece (10) and sets up, the shrinkage pool has been seted up on one side outer wall of supporting shoe (8), the one end of bracing piece (10) runs through splint two (3), slider (2) setting.
5. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 1, is characterized in that: the fixing device is characterized in that a fixing ring (4) is installed on the outer wall of one side of the first clamping plate (1), the number of the sliding blocks (2) and the number of the second clamping plates (3) are two, and a third fixing hole is formed in the outer wall of one side of one of the first clamping plate (1) and the outer wall of one side of the second clamping plate (3).
6. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 5, wherein: and the outer walls of one sides of the other group of the first clamping plate (1) and the second clamping plate (3) are respectively provided with an installation block (14), the installation blocks (14) are matched with the fixing blocks Kong Sanxiang, and the outer surface of each installation block (14) is provided with a fixing groove.
7. The novel cement pole lifting clamp with the adjustable diameter as claimed in claim 6, wherein: wherein a set of install threaded rod (6) on the one side inner wall of splint one (1), splint two (3), crank (5) are installed to the one end of threaded rod (6), fixed block (7) are installed to the other end of threaded rod (6), fixed block (7) and fixed slot looks adaptation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222510421.1U CN218403332U (en) | 2022-09-21 | 2022-09-21 | Novel cement pole is with hanging clamping utensil with adjustable diameter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222510421.1U CN218403332U (en) | 2022-09-21 | 2022-09-21 | Novel cement pole is with hanging clamping utensil with adjustable diameter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218403332U true CN218403332U (en) | 2023-01-31 |
Family
ID=85035101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222510421.1U Active CN218403332U (en) | 2022-09-21 | 2022-09-21 | Novel cement pole is with hanging clamping utensil with adjustable diameter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218403332U (en) |
-
2022
- 2022-09-21 CN CN202222510421.1U patent/CN218403332U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215326377U (en) | A kind of high-rise building glass curtain wall hoisting equipment | |
CN117068928B (en) | Efficient lifting device that can adapt to the installation angle of concrete facing blocks | |
CN218403332U (en) | Novel cement pole is with hanging clamping utensil with adjustable diameter | |
CN212832373U (en) | Interim power consumption construction lifting device | |
CN210528267U (en) | A gallows for concrete drain pipe | |
CN219239026U (en) | Pipeline hoisting device for building construction | |
CN221070678U (en) | Pipe body hoisting clamping mechanism for constructional engineering | |
CN220603131U (en) | Battery lifting test fixture | |
CN217486058U (en) | Cable laying auxiliary device for electric power construction | |
CN212374704U (en) | Culvert pipe lifting device for municipal construction | |
CN104291225A (en) | Non-dragging independent mast device for hoisting rigid steel pile | |
CN204012480U (en) | A kind of cable pulling hoisting machine | |
CN220866907U (en) | High-speed wire rough rolling 450 type roll changing lifting appliance | |
CN218145346U (en) | Culvert pipe lifting device for municipal construction | |
CN222042402U (en) | Building tubular pile hoisting device | |
CN215364510U (en) | Electric power overhauls uses instrument centre gripping equipment | |
CN221040854U (en) | A capacitor bank auxiliary installation tool | |
CN210915142U (en) | Generating set installation lifting device | |
CN210855046U (en) | Lifting tool for mounting wind power equipment | |
CN213356684U (en) | Prefabricated staircase hoist and mount positioner | |
CN210973693U (en) | A hoisting tool for overhead lines of distribution network | |
CN220033761U (en) | Steel construction hoisting device | |
CN220351501U (en) | Cement pipe convenient to lift by crane | |
CN218520916U (en) | Special crane anchor clamps of wire pole | |
CN220725801U (en) | Installation lifting appliance for autoclaved sand aerated concrete light partition wall batten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |