CN218374278U - Water passing groove structure for electric power engineering - Google Patents

Water passing groove structure for electric power engineering Download PDF

Info

Publication number
CN218374278U
CN218374278U CN202222593148.3U CN202222593148U CN218374278U CN 218374278 U CN218374278 U CN 218374278U CN 202222593148 U CN202222593148 U CN 202222593148U CN 218374278 U CN218374278 U CN 218374278U
Authority
CN
China
Prior art keywords
frame
electric power
water tank
main part
water passing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222593148.3U
Other languages
Chinese (zh)
Inventor
周勇
周峰
宋淑娟
李小虎
张亚红
薛凯喜
刘峥
李鲁鑫
王德志
李明东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Yongfeng Construction Engineering Co ltd
Original Assignee
Ningxia Yongfeng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Yongfeng Construction Engineering Co ltd filed Critical Ningxia Yongfeng Construction Engineering Co ltd
Priority to CN202222593148.3U priority Critical patent/CN218374278U/en
Application granted granted Critical
Publication of CN218374278U publication Critical patent/CN218374278U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an electric power engineering is with crossing water tank structure relates to crossing water tank technical field, including the stone brick, be equipped with between the stone brick and cross the water tank main part, the side of crossing the water tank main part is equipped with the guide rail admittedly, sliding connection has the frame between the guide rail, the intermediate position department of frame is equipped with the filter screen, the side fixedly connected with layer board of frame, the last fixed surface who crosses the water tank main part installs the aluminium slat, the surface of aluminium slat is seted up flutedly, the internal surface fixed mounting who crosses the water tank main part has the strengthening rib, when ponding in the transformer substation, has used the basin to discharge inside ponding, avoids electric power equipment to receive the ponding influence, in addition, uses the filter screen in the middle of the frame, can block the debris in the ponding, prevents to flow into the debris in the basin too much and cause the condition of jam to take place, after the ponding, maintainer can use the arc buckle to pull out the frame to this clears up debris on the layer board, does benefit to practical use.

Description

Water passing groove structure for electric power engineering
Technical Field
The utility model relates to a cross basin technical field, especially relate to an electric power engineering is with crossing basin structure.
Background
The transformer substation is to changing voltage and electric current among the electric power system, receive the place of electric energy and distribution electric energy, be equipped with many power equipment in the region of transformer substation, if meet the torrential rain weather, can produce ponding in the transformer substation, ponding too much can cause the influence to equipment, consequently need use the ponding of basin in with the transformer substation and flow automatically and discharge, in order not to influence maintainer tour transformer substation, nevertheless in the basin use, when ponding outwards flows, can be mingled with like debris such as falling leaf in the ponding, the time has been of a specified duration and may have caused the basin to block up.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a water passing trough structure for electric power engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides an electric power engineering is with crossing water tank structure, includes the stone brick, be equipped with between the stone brick and cross the water tank main part, the side of crossing the water tank main part is equipped with the guide rail admittedly, sliding connection has the frame between the guide rail, the intermediate position department of frame is equipped with the filter screen, the side fixedly connected with layer board of frame.
In order to improve the connectivity of crossing basin main part and stone brick, the utility model discloses the improvement has, the last fixed surface who crosses the basin main part installs the aluminium slat, the surface of aluminium slat is seted up flutedly.
In order to improve the structural strength who crosses the basin main part, the utility model discloses the improvement has, the internal fixed surface who crosses the basin main part installs the strengthening rib, the strengthening rib is the equidistance and arranges.
For the life of extension frame, the utility model discloses the improvement has, the side of crossing the basin main part is equipped with reflection of light strip, the material of frame is the stainless steel.
For the convenience of people moving the frame, the utility model discloses the improvement has, the upper end fixed mounting of frame has the arc buckle.
In order to improve the comfort level of holding between the fingers arc buckle, the utility model discloses the improvement has, the lower fixed surface of arc buckle is connected with rubber pad.
Compared with the prior art, the utility model has the advantages and positive effects that,
the utility model discloses in, during the in-service use, through setting up the stone brick, cross the basin main part, the guide rail, a frame, the filter screen, the layer board, the aluminium slat, the recess, the strengthening rib, reflection of light strip and arc buckle, when ponding in the transformer substation, use the basin to discharge inside ponding, avoid electric power equipment to receive the ponding influence, in addition, use the filter screen in the middle of the frame, can block the debris in the ponding, prevent to flow into the condition emergence that the debris in the basin was too much and caused the jam, after the ponding was discharged, maintainer can use the arc buckle to pull out the frame, with this clear up the debris on the layer board, do benefit to practical use.
Drawings
Fig. 1 is a front view of a water passing trough structure for electric power engineering according to the present invention;
fig. 2 is a top view of a water passing trough structure for power engineering according to the present invention;
fig. 3 is a side view and an explosion diagram of a water passing trough structure for electric power engineering according to the present invention;
fig. 4 is an exploded bottom view of the water passing trough structure for power engineering.
Illustration of the drawings:
1. stone bricks; 2. a water passing trough main body; 3. a guide rail; 4. a frame; 5. filtering with a screen; 6. a pallet; 7. an aluminum ribbon board; 8. a groove; 9. reinforcing ribs; 10. a reflective strip; 11. an arc buckle plate.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations set forth in the following description of the specific embodiments.
Example one
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an electric power engineering is with crossing water tank structure, including stone brick 1, it crosses water tank main part 2 to be equipped with between the stone brick 1, it is equipped with guide rail 3 admittedly to cross the side of water tank main part 2 through setting up, make things convenient for people's dismouting frame 4, sliding connection has frame 4 between the guide rail 3, sliding connection has frame 4 through setting up between the guide rail 3, a supporting effect for improving filter screen 5, filter screen 5 is equipped with in the intermediate position department of frame 4, filter screen 5 is equipped with through the intermediate position department that sets up frame 4, be used for filtering the debris of ponding, the side fixedly connected with layer board 6 of frame 4, through the side fixedly connected with layer board 6 that sets up frame 4, when ponding is all to be arranged, debris can pile up on layer board 6, and layer board 6 can hold up debris.
Referring to fig. 1-4, an aluminum strip plate 7 is fixedly installed on the upper surface of a water passing groove main body 2, a groove 8 is formed in the surface of the aluminum strip plate 7, the anti-skid property of the surface of the aluminum strip plate 7 is improved, a reinforcing rib 9 is fixedly installed on the inner surface of the water passing groove main body 2, the structural strength of the water passing groove main body 2 is improved, the reinforcing rib 9 is arranged at equal intervals, a reflecting strip 10 is installed on the side surface of the water passing groove main body 2, the reflecting strip 10 is installed on the side surface of the water passing groove main body 2, people can see the water passing groove main body 2 at night in a striking mode, the frame 4 is made of stainless steel, the frame 4 needs to be in contact with rainwater, the service life of the frame 4 can be prolonged by using the stainless steel, an arc buckle plate 11 is fixedly installed on the upper end of the frame 4, the arc buckle plate 11 can improve the contact area of a hand of the arc buckle plate, people can conveniently take the position of the frame 4, the rubber gasket is fixedly connected with the arc buckle plate 11, and the rubber gasket on the lower surface of the arc buckle plate 11, and the rubber gasket when the arc buckle plate 11, the rubber gasket is arranged on the arc buckle plate, the rubber buckle plate, and the rubber buckle plate, the rubber buckle plate 11.
The working principle is as follows: through setting up the stone brick 1, cross water tank main part 2, guide rail 3, frame 4, filter screen 5, layer board 6, aluminium strip board 7, recess 8, strengthening rib 9, reflection of light strip 10 and arc buckle 11, if meet torrential rain weather, can make the transformer substation inside accumulate rainwater, at this moment, use water tank main part 2 can conveniently make ponding in the transformer substation flow automatically and discharge, thereby do not influence maintainer tour transformer substation, in the ponding discharge in-process, filter screen 5 can keep out the debris in the aquatic, so as to avoid too much debris to flow into in water tank main part 2, the debris that are kept out then can stop in the top of layer board 6, after ponding is completely discharged, maintainer when patrolling, can use arc buckle 11 to stimulate frame 4 upwards this moment, in the in-process of frame 4 motion, filter screen 5 and layer board 6 move along with frame 4, frame 4 then slides between guide rail 3 simultaneously, so take frame 4 out from between guide rail 3, then can clear up the debris on layer board 6, after the completion, again slide frame 4 between the guide rail 3 again, thereby prevent that the condition that many debris in the water tank 2 of debris from taking place to cause the jam.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may apply the equivalent embodiments modified or modified by the above technical contents disclosed as equivalent variations to other fields, but any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical spirit of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (6)

1. The utility model provides an electric power engineering is with crossing water tank structure, includes stone brick (1), its characterized in that: be equipped with between stone brick (1) and cross water groove main part (2), cross the side of water groove main part (2) and adorn guide rail (3) admittedly, sliding connection has frame (4) between guide rail (3), the intermediate position department of frame (4) is equipped with filter screen (5), the side fixedly connected with layer board (6) of frame (4).
2. The water passing trough structure for electric power engineering of claim 1, wherein: an aluminum strip plate (7) is fixedly mounted on the upper surface of the water passing groove main body (2), and a groove (8) is formed in the surface of the aluminum strip plate (7).
3. The water passing trough structure for electric power engineering of claim 1, wherein: the internal surface fixed mounting who crosses basin main part (2) has strengthening rib (9), strengthening rib (9) are the equidistance and arrange.
4. The water passing trough structure for electric power engineering of claim 1, wherein: the side of the water passing trough main body (2) is provided with a reflective strip (10), and the frame (4) is made of stainless steel.
5. The water passing trough structure for electric power engineering of claim 1, wherein: and an arc-shaped buckle plate (11) is fixedly arranged at the upper end of the frame (4).
6. The water passing trough structure for electric power engineering of claim 5, wherein: the lower surface of the arc-shaped buckle plate (11) is fixedly connected with a rubber gasket.
CN202222593148.3U 2022-09-29 2022-09-29 Water passing groove structure for electric power engineering Active CN218374278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222593148.3U CN218374278U (en) 2022-09-29 2022-09-29 Water passing groove structure for electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222593148.3U CN218374278U (en) 2022-09-29 2022-09-29 Water passing groove structure for electric power engineering

Publications (1)

Publication Number Publication Date
CN218374278U true CN218374278U (en) 2023-01-24

Family

ID=84927470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222593148.3U Active CN218374278U (en) 2022-09-29 2022-09-29 Water passing groove structure for electric power engineering

Country Status (1)

Country Link
CN (1) CN218374278U (en)

Similar Documents

Publication Publication Date Title
CN208201740U (en) A kind of highway maintenance guard bar washing device
CN205417216U (en) Electric vehicle charging pile
CN218374278U (en) Water passing groove structure for electric power engineering
CN209373803U (en) A kind of intelligent traffic light with monitoring function
CN104120684B (en) A kind of rubber fender device
CN210291644U (en) Street lamp convenient to it is clean
CN219240829U (en) Sealed electric gate for sewage treatment
CN216240328U (en) Heat-insulation integrated window with external sunshade
CN212944217U (en) Wall brushing device special for self-cleaning of I-shaped steel joint
CN210839459U (en) Solar photovoltaic power generation cell panel
CN212000801U (en) Road and bridge guardrail washs curing means
CN209585451U (en) A kind of building eaves Anti-drip construction
CN210507225U (en) Temporary guardrail for highway safety facility
CN209320906U (en) A kind of slag car
CN208105143U (en) A kind of labour-saving highway guard rail cleaning device
CN212388875U (en) Self-cleaning mechanism of municipal decorative canopy
CN205445319U (en) Telescopic window movable window's that wafts sliding fit structure
CN213653189U (en) Bridge floor drainage structures for bridge
CN219077426U (en) Environment-friendly and energy-saving leisure sightseeing yacht
CN103422626B (en) Stair
CN204753431U (en) Stable form construction warning sign
CN108272379A (en) A kind of window wiping systems
CN216586107U (en) Non-column type bridge
CN220572797U (en) Interception mechanism for sewage treatment
CN218373092U (en) But pavement brick that anti-seepage of drainage was prevented

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant