CN218353484U - Construction structure is planted in construction of high steep side slope combined type shore protection - Google Patents

Construction structure is planted in construction of high steep side slope combined type shore protection Download PDF

Info

Publication number
CN218353484U
CN218353484U CN202222813810.1U CN202222813810U CN218353484U CN 218353484 U CN218353484 U CN 218353484U CN 202222813810 U CN202222813810 U CN 202222813810U CN 218353484 U CN218353484 U CN 218353484U
Authority
CN
China
Prior art keywords
planting
vegetation
area
ecological
construction structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222813810.1U
Other languages
Chinese (zh)
Inventor
熊媛
姚远
刘昌源
杨璐炜
任佳龙
马大庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN202222813810.1U priority Critical patent/CN218353484U/en
Application granted granted Critical
Publication of CN218353484U publication Critical patent/CN218353484U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a construction structure for building and planting a high and steep slope combined revetment, which comprises a riprap revetment, a palmite vegetation area, a flat-bed ecological area and a stepped ecological area which are sequentially connected from bottom to top along a slope, wherein the stepped ecological area is fixed on the side wall of a retaining wall and comprises a multilayer vegetation structure which is fixed on the side wall of the retaining wall and distributed in a stepped manner; each layer of planting structure comprises a plurality of first planting grooves and a plurality of second planting grooves which are transversely arranged, each first planting groove is fixed on the side wall of the retaining wall, and small shrubs are planted in each first planting groove; the second plants and grows the trough and is fixed in first planting and grows on the lateral wall that the trough keeps away from the barricade, and the ground cover class plant is planted in every second plants and grows the trough, and the outer fringe face in every second plants and grows the trough is the arcwall face. The method solves the construction problems of high and steep slope vegetation planting and ecological restoration in the prior art, and overcomes the defects of single revetment and difficulty in permanently fixing vegetation base materials by plants.

Description

一种高陡边坡复合式护岸的建植施工结构A planting construction structure of composite revetment on high and steep slopes

技术领域technical field

本实用新型涉及边坡生态修复技术领域,具体涉及一种高陡边坡复合式护岸的建植施工结构。The utility model relates to the technical field of slope ecological restoration, in particular to a planting construction structure for a high and steep slope compound revetment.

背景技术Background technique

近年来,我国长流域出现大量的消落带,景观环境不佳,亲水性不强,植物生长不利的诸多方面的因素,另外土壤裸露高差大,形成一条灰色的带子,整体景观效果差。通常采用挡墙以及硬质混凝土护坡,这种处理手法对自然生态的水环境造成不良的影响,该类型的护岸处理手法对植物难以存活。In recent years, a large number of water-fluctuating zones have appeared in my country's long watersheds. The landscape environment is not good, the hydrophilicity is not strong, and many factors are unfavorable for plant growth. In addition, the exposed soil has a large height difference, forming a gray belt, and the overall landscape effect is poor. . Retaining walls and hard concrete slope protection are usually used. This treatment method has a negative impact on the natural ecological water environment. This type of revetment treatment method is difficult for plants to survive.

针对高陡边坡的护岸处理手法,通常采用混凝土,锚杆格梁边坡的处理手法,这种处理手法的缺陷在于不利于大面积的高陡边坡的处理,此方式只能种植低矮的草本植物,植被单一,难以种植稍大规格的乔灌木,对边坡的植物生态群落构建不利。难以将植生基材稳定地附着在坡面上,尤其是在遇到大暴雨的时候,植物被冲刷严重,附着力降低,导致边坡覆绿效果不佳。因此,在原来的边坡处理手法上,开发一种新型的高陡边坡复合式护岸来解决边坡防护和边坡植物种植的难题,营造更为生态的植物群落,使得植物在护岸上生长更加稳固,同时起到防风固沙的功能。For the treatment of high and steep slopes, the treatment method of concrete and anchor beams is usually used. The defect of this treatment method is that it is not conducive to the treatment of large-scale high and steep slopes. This method can only plant low Herbaceous plants, vegetation is single, it is difficult to plant trees and shrubs with larger specifications, which is not conducive to the construction of plant ecological communities on the slope. It is difficult to stably attach the vegetation substrate to the slope, especially in the event of heavy rain, the plants will be severely washed out and the adhesion will be reduced, resulting in poor greening effect on the slope. Therefore, on the basis of the original slope treatment method, a new type of high-steep slope composite revetment is developed to solve the problems of slope protection and slope planting, and create a more ecological plant community, allowing plants to grow on the revetment It is more stable and has the function of windproof and sand fixation at the same time.

针对上述问题,本实用新型开发一种高陡边坡复合式护岸的建植施工结构,以克服现有技术的缺陷和弊端,使其能进行有效的坡面植被恢复及景观重建。Aiming at the above problems, the utility model develops a high and steep slope compound revetment planting construction structure to overcome the defects and disadvantages of the prior art, so that it can perform effective slope vegetation restoration and landscape reconstruction.

实用新型内容Utility model content

针对现有技术中存在的不足,本实用新型提供一种高陡边坡复合式护岸的建植施工结构。以解决现有技术在高陡边坡植被建植和生态恢复遇到的施工难题,克服护岸单一,植物难以持久固定植生基材的弊端。Aiming at the deficiencies in the prior art, the utility model provides a compound bank revetment construction structure for high and steep slopes. To solve the construction problems encountered in the prior art in vegetation establishment and ecological restoration on high and steep slopes, and to overcome the disadvantages of single revetment and difficult for plants to permanently fix the substrate of vegetation.

为实现上述目的,本实用新型通过下述技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:

一种高陡边坡复合式护岸的建植施工结构,包括沿边坡自下而上依次衔接的抛石护岸、棕榈石植生区、平铺式生态区和阶梯式生态区,所述阶梯式生态区固定于挡墙的侧壁上,所述阶梯式生态区包括固定于所述挡墙的侧壁上且呈阶梯分布的多层植生结构;每层所述植生结构包括横向布置的多个第一植生槽和多个第二植生槽,每个所述第一植生槽固定于所述挡墙的侧壁上,每个所述第一植生槽内种植小型灌木;所述第二植生槽固定于所述第一植生槽远离挡墙的外侧壁上,每个所述第二植生槽内种植地被类植物,每个所述第二植生槽的外缘面为弧形面。A planting construction structure for a composite revetment on a high and steep slope, including a riprap revetment, a palm stone vegetation area, a flat ecological area and a stepped ecological area successively connected from bottom to top along the slope. The area is fixed on the side wall of the retaining wall, and the stepped ecological area includes a multi-layer vegetation structure fixed on the side wall of the retaining wall and distributed in steps; each layer of the vegetation structure includes a plurality of horizontally arranged A planting trough and a plurality of second planting troughs, each of the first planting troughs is fixed on the side wall of the retaining wall, and small shrubs are planted in each of the first planting troughs; the second planting troughs are fixed On the outer wall of the first vegetation groove away from the retaining wall, ground cover plants are planted in each of the second vegetation grooves, and the outer edge surface of each of the second vegetation grooves is an arc-shaped surface.

优选地,每个所述第二植生槽底部固定有支撑斜杆,所述支撑斜杆的另一端固设于所述挡墙的侧壁上。Preferably, a support slant is fixed at the bottom of each second planting trough, and the other end of the support slant is fixed on the side wall of the retaining wall.

优选地,每个所述第一植生槽的截面呈倒直角梯形,其斜边与所述挡墙的侧壁固定贴合。Preferably, the cross-section of each of the first planting grooves is an inverted trapezoid, and its hypotenuse is fixedly attached to the side wall of the retaining wall.

优选地,所述棕榈石植生区包括由内而外依次铺设的粗砂碎石、第一土工布、棕榈石和种植土,所述种植土内种植覆绿植被。Preferably, the palm rock vegetation area includes coarse sand and gravel, the first geotextile, palm rock and planting soil laid in sequence from inside to outside, and green vegetation is planted in the planting soil.

进一步地,所述粗砂碎石的铺设厚度为8-15cm,所述棕榈石的铺设厚度为20-25cm,所述种植土的铺设厚度为8-15cm。Further, the laying thickness of the coarse gravel is 8-15cm, the laying thickness of the palm stone is 20-25cm, and the laying thickness of the planting soil is 8-15cm.

进一步地,所述棕榈石植生区的坡度为1:3。Further, the slope of the palm rock vegetation area is 1:3.

优选地,所述平铺式生态区包括第二土工布和平铺于所述第二土工布表面的多个生态框,每个所述生态框内种植藤本植物。Preferably, the tiled ecological area includes a second geotextile and a plurality of ecological frames laid on the surface of the second geotextile, and vines are planted in each of the ecological frames.

进一步地,所述平铺式生态区的坡度为1:2。Further, the slope of the tiled ecological zone is 1:2.

优选地,所述阶梯式生态区的坡度为1:0.3。Preferably, the gradient of the stepped ecological zone is 1:0.3.

优选地,所述抛石护岸、棕榈石植生区、平铺式生态区之间的衔接处均设置有砼脚槽,所述平铺式生态区和阶梯式生态区之间的衔接处设置有砼基础。Preferably, the joints between the riprap revetment, the palm stone vegetation area, and the tiled ecological area are all provided with concrete foot grooves, and the joints between the tiled ecological area and the stepped ecological area are provided with Concrete foundation.

本实用新型与现有技术相比,具有如下显著优点:Compared with the prior art, the utility model has the following significant advantages:

第一,本实用新型的植生槽可以事先加工好,可在高陡边坡复合式护岸坡面上先安装固定植生槽、填装植生基材及种植植被,也可先填装好植生基材并种好植被,再快速安装固定到坡面,操作简便,可根据需要灵活选择建植方式。First, the planting groove of the present utility model can be processed in advance, and the planting groove can be installed and fixed on the composite revetment slope of high and steep slope, the planting base material and planting vegetation can be filled, and the planting base material can also be filled first And plant the vegetation, and then quickly install and fix it on the slope, the operation is simple, and the planting method can be flexibly selected according to the needs.

第二,本实用新型很好地解决了客土喷播技术基材难固附,易滑落的难题,可为植物生长提供持续、均衡的肥力,有效避免植被退化。Second, the utility model well solves the problem that the base material of the guest soil spraying technology is difficult to fix and is easy to slip, can provide continuous and balanced fertility for plant growth, and effectively avoid vegetation degradation.

第三,本实用新型能保证植物根系的存活,边坡覆绿的效果明显,防止水土流失,这样便于施工,适用性强。Thirdly, the utility model can ensure the survival of the plant root system, and the effect of covering the slope with green is obvious, preventing water and soil loss, which is convenient for construction and has strong applicability.

第四,本实用新型以藤本为主的多种植物组合,藤本植物向上攀爬,可以快速覆盖植生槽,达到美观效果;可种植小型乔木及灌木,达到多层次的景观效果。Fourth, the utility model is a combination of various plants based on vines. The vines climb upwards and can quickly cover the planting grooves to achieve an aesthetic effect; small trees and shrubs can be planted to achieve a multi-level landscape effect.

附图说明Description of drawings

图1为本实用新型的一种高陡边坡复合式护岸的建植施工结构示意图;Fig. 1 is the construction structure schematic diagram of a kind of high-steep slope compound revetment of the present utility model;

图2为本实用新型的阶梯式生态区的详细结构示意图(仅展示单层植生槽)。Fig. 2 is a schematic diagram of the detailed structure of the stepped ecological zone of the present invention (only a single-layer vegetation tank is shown).

图中:1、抛石护岸;2、棕榈石植生区;21、粗砂碎石;22、第一土工布;23、棕榈石;24、种植土;3、平铺式生态区;31、第二土工布;32、生态框;4、阶梯式生态区;41、植生结构;411、第一植生槽;412、第二植生槽;413、支撑斜杆;414、小型灌木;415、地被类植物;5、挡墙;6、砼脚槽;7、砼基础;8、攀爬网。In the figure: 1. Rubble revetment; 2. Palm stone vegetation area; 21. Coarse sand and gravel; 22. The first geotextile; 23. Palm stone; 24. Planting soil; 3. Tiled ecological area; 31. The second geotextile; 32, ecological frame; 4, stepped ecological area; 41, vegetation structure; 411, the first vegetation groove; 412, the second vegetation groove; 413, support inclined rod; 414, small shrubs; 415, ground Covering plants; 5. Retaining wall; 6. Concrete foot trough; 7. Concrete foundation; 8. Climbing net.

具体实施方式Detailed ways

为了使本领域的技术人员更好地理解本实用新型的技术方案,下面结合具体实施例对本实用新型的优选实施方案进行描述,但是应当理解,附图仅用于示例性说明,不能理解为对本专利的限制;为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对于本领域技术人员来说,附图中某些公知结构及其说明的省略是可以理解的。附图中描述位置关系仅用于示例性说明,不能理解为对本专利的限制。In order to enable those skilled in the art to better understand the technical solutions of the present utility model, the preferred embodiments of the present utility model are described below in conjunction with specific examples, but it should be understood that the accompanying drawings are only for illustrative purposes and cannot be interpreted as a description of the present invention. Patent restrictions; in order to better illustrate this embodiment, some parts in the drawings will be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, some known structures and their The omission of description is understandable. The positional relationship described in the drawings is for illustrative purposes only, and should not be construed as a limitation on this patent.

如图1-2所示,本实用新型的一种高陡边坡复合式护岸的建植施工结构,建植施工结构包括沿边坡自下而上依次衔接的抛石护岸1、棕榈石植生区2、平铺式生态区3和阶梯式生态区4,其中抛石护岸1、棕榈石植生区2、平铺式生态区3之间的衔接处均设置有砼脚槽6,砼脚槽6采用0.5m×0.8m的C25砼脚槽;平铺式生态区3和阶梯式生态区4之间的衔接处设置有砼基础7,砼基础7采用1.3m×0.3m的C25钢筋砼基础。As shown in Figure 1-2, the planting construction structure of a high and steep slope composite bank revetment of the present invention, the planting construction structure includes riprap bank revetment 1 and palm stone planting area successively connected along the slope from bottom to top 2. The tiled ecological area 3 and the stepped ecological area 4, among which the riprap revetment 1, the palm stone vegetation area 2, and the tiled ecological area 3 are all provided with concrete foot grooves 6 and 6 A 0.5m×0.8m C25 concrete foot trough is used; a concrete foundation 7 is provided at the connection between the tiled ecological zone 3 and the stepped ecological zone 4, and the concrete foundation 7 adopts a 1.3m×0.3m C25 reinforced concrete foundation.

本实施例中,棕榈石植生区2的坡度为1:3,棕榈石植生区2包括由内而外依次铺设的粗砂碎石21、第一土工布22、棕榈石23和种植土24,种植土24内种植覆绿植被。覆绿植被可以是狗牙根,棕榈石植生区2能保证植物根系的存活,边坡覆绿的效果明显。In the present embodiment, the slope of the palm rock vegetation area 2 is 1:3, and the palm rock vegetation area 2 includes coarse sand gravel 21, the first geotextile 22, palm rock 23 and planting soil 24 laid sequentially from the inside to the outside, Plant the green vegetation in the planting soil 24 . Green vegetation can be Bermudagrass, palm rock vegetation zone 2 can ensure the survival of plant roots, and the effect of green coverage on slopes is obvious.

具体的,粗砂碎石21的铺设厚度为10cm,棕榈石23的铺设厚度为23cm,种植土24的铺设厚度为10cm。10cm厚的粗砂碎石21结合土工布可以有效防止水土流失,这样做的好处是便于施工,适用性强。Specifically, the paving thickness of the coarse gravel 21 is 10 cm, the paving thickness of the palm stone 23 is 23 cm, and the paving thickness of the planting soil 24 is 10 cm. 10cm-thick coarse gravel 21 combined with geotextile can effectively prevent water and soil erosion. The advantage of this is that it is convenient for construction and has strong applicability.

本实施例中,平铺式生态区3的坡度为1:2,平铺式生态区3包括第二土工布31和平铺于第二土工布31表面的多个生态框32,每个生态框32内种植藤本植物。这样做的好处是藤本植物有的向上攀爬,这样可以快速覆盖植生槽。In this embodiment, the slope of the tiled ecological zone 3 is 1:2, and the tiled ecological zone 3 includes a second geotextile 31 and a plurality of ecological frames 32 laid on the surface of the second geotextile 31, each ecological frame 32 Plant vines inside. The advantage of this is that some vines climb upwards, which can quickly cover the planting groove.

本实施例中,阶梯式生态区4的坡度为1:0.3,阶梯式生态区4固定于挡墙5的侧壁上,阶梯式生态区4包括固定于挡墙5的侧壁上且呈阶梯分布的多层植生结构41;每层植生结构41包括横向布置的多个第一植生槽411和多个第二植生槽412,第一植生槽411和第二植生槽412均采用钢结构焊接成型,可利用杆件进行焊接处理,两个植生槽利用模数化事先加工好,现场进行安装。In the present embodiment, the slope of the stepped ecological area 4 is 1:0.3, the stepped ecological area 4 is fixed on the side wall of the retaining wall 5, and the stepped ecological area 4 includes a step fixed on the side wall of the retaining wall 5 and is stepped. Distributed multi-layer vegetation structure 41; each layer of vegetation structure 41 includes a plurality of first vegetation grooves 411 and a plurality of second vegetation grooves 412 arranged horizontally, and the first vegetation grooves 411 and the second vegetation grooves 412 are formed by welding steel structures , can be welded with rods, and the two planting grooves are pre-processed by modularization and installed on site.

其中,每个第一植生槽411固定于挡墙5的侧壁上,每个第一植生槽411的截面呈倒直角梯形,其斜边与挡墙5的侧壁固定贴合;每个第一植生槽411内种植小型灌木414,以小型草本灌木为主,能迅速覆绿,呈现出良好的生态景观效果。Wherein, each first planting groove 411 is fixed on the side wall of the retaining wall 5, and the section of each first planting groove 411 is an inverted trapezoid, and its hypotenuse is fixedly attached to the side wall of the retaining wall 5; Small shrubs 414 are planted in a planting trough 411, mainly small herbaceous shrubs, which can quickly cover green and present a good ecological landscape effect.

第二植生槽412固定于第一植生槽411远离挡墙5的外侧壁上;每个第二植生槽412底部固定有支撑斜杆413,支撑斜杆413的另一端固设于挡墙5的侧壁上;第二植生槽412底部有孔隙,防止植物根系在封闭环境中烂根;每个第二植生槽412内种植地被类植物415,每个第二植生槽412的外缘面为弧形面,在其内种植地被类植物415,能向上攀援至第一植生槽411,有效遮挡边缘,形成丰富的景观层次。挡墙5外侧壁上还铺设有攀爬网8,用于供植物攀爬生长。The second planting groove 412 is fixed on the outer sidewall of the first planting groove 411 away from the retaining wall 5; the bottom of each second planting groove 412 is fixed with a support slant 413, and the other end of the support slant 413 is fixed on the retaining wall 5 On the side wall; there are pores at the bottom of the second planting groove 412 to prevent plant roots from rotting in a closed environment; ground cover plants 415 are planted in each second planting groove 412, and the outer edge surface of each second planting groove 412 is The arc-shaped surface, in which ground cover plants 415 are planted, can climb up to the first vegetation groove 411, effectively shielding the edges, and forming rich landscape levels. A climbing net 8 is also laid on the outer wall of the retaining wall 5 for climbing and growing of plants.

总之,本实用新型提供了一种便捷、有效的高陡边坡复合式护岸植被建植施工结构,有效解决了高陡边坡复合式护岸景观环境不佳、亲水性不强、植物生长不利、影响生态景观等问题,可以在较短的时间内实现植被覆盖和群落的良性演替。In a word, the utility model provides a convenient and effective high-steep slope composite bank revetment vegetation construction structure, which effectively solves the problem of poor landscape environment, poor hydrophilicity and unfavorable plant growth of the high-steep slope composite bank revetment. , affecting the ecological landscape and other issues, the benign succession of vegetation coverage and communities can be achieved in a relatively short period of time.

依据本发明的描述及附图,本领域技术人员很容易制造或使用本发明的一种高陡边坡复合式护岸的建植施工结构,并且能够产生本发明所记载的积极效果。According to the description and accompanying drawings of the present invention, those skilled in the art can easily manufacture or use a high-steep slope composite revetment planting construction structure of the present invention, and can produce the positive effects recorded in the present invention.

如无特殊说明,本实用新型中,若有术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系是基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此本实用新型中描述方位或位置关系的用语仅用于示例性说明,不能理解为对本专利的限制,对于本领域的普通技术人员而言,可以结合附图,并根据具体情况理解上述术语的具体含义。Unless otherwise specified, in the present utility model, if there are terms "length", "width", "upper", "lower", "front", "back", "left", "right", "vertical", Orientation or positional relationship indicated by "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. It is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, therefore The terms describing the orientation or positional relationship in the utility model are only used for illustrative purposes, and should not be construed as limitations on this patent. For those of ordinary skill in the art, they can understand the specific terms of the above terms in combination with the accompanying drawings and according to specific situations. meaning.

除非另有明确的规定和限定,本实用新型中,若有术语“设置”、“相连”及“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。Unless otherwise clearly stipulated and limited, in the present utility model, if there are terms "setting", "connecting" and "connecting", they should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integrated Connection; it can be a direct connection or an indirect connection through an intermediary, and it can be an internal connection between two elements. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

以上所述,仅是本实用新型的较佳实施例,并非对本实用新型做任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化,均落入本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, and does not limit the utility model in any form. Any simple modification or equivalent change made to the above embodiments according to the technical essence of the utility model falls within the scope of the present utility model. Within the protection scope of the present utility model.

Claims (10)

1. The construction structure for building and planting the high and steep side slope combined revetment is characterized by comprising a riprap revetment (1), a palmite vegetation area (2), a tiled ecological area (3) and a stepped ecological area (4) which are sequentially connected from bottom to top along a side slope, wherein the stepped ecological area (4) is fixed on the side wall of a retaining wall (5), and the stepped ecological area (4) comprises a multi-layer vegetation structure (41) which is fixed on the side wall of the retaining wall (5) and is distributed in a stepped manner; each layer of the plant growth structure (41) comprises a plurality of first plant growth grooves (411) and a plurality of second plant growth grooves (412) which are transversely arranged, each first plant growth groove (411) is fixed on the side wall of the retaining wall (5), and small shrubs (414) are planted in each first plant growth groove (411); the second vegetation grooves (412) are fixed on the outer side wall, far away from the retaining wall (5), of the first vegetation groove (411), ground vegetation plants (415) are planted in each second vegetation groove (412), and the outer edge surface of each second vegetation groove (412) is an arc-shaped surface.
2. The construction structure of building and planting of the high and steep slope combined type revetment according to claim 1, wherein: every second is planted living groove (412) bottom and is fixed with support down tube (413), the other end that supports down tube (413) sets firmly in on the lateral wall of barricade (5).
3. The construction structure of building and planting of the high and steep slope combined type revetment according to claim 1, wherein: every the cross-section of first vegetation groove (411) is inverted right trapezoid, its hypotenuse with the fixed laminating of lateral wall of barricade (5).
4. The construction structure of the high and steep slope combined revetment according to claim 1, wherein: the palm stone vegetation area (2) comprises coarse sand macadam (21), first geotextile (22), palm stone (23) and planting soil (24) which are laid from inside to outside in sequence, and green-covered vegetation is planted in the planting soil (24).
5. The construction structure of building and planting of high steep side slope combined type revetment according to claim 4, characterized in that: the paving thickness of the coarse sand gravel (21) is 8-15cm, the paving thickness of the palmite (23) is 20-25cm, and the paving thickness of the planting soil (24) is 8-15cm.
6. The construction structure of building and planting of high steep side slope combined type revetment according to claim 4, characterized in that: the slope of the palm stone vegetation zone (2) is 1:3.
7. The construction structure of the high and steep slope combined revetment according to claim 1, wherein: the flat ecological area (3) comprises a second geotextile (31) and a plurality of ecological frames (32) laid on the surface of the second geotextile (31), and vines are planted in each ecological frame (32).
8. The construction structure of building and planting of high steep side slope combined type revetment according to claim 7, characterized in that: the gradient of the flat ecological area (3) is 1:2.
9. The construction structure of building and planting of the high and steep slope combined type revetment according to claim 1, wherein: the gradient of the stepped ecological area (4) is 1.
10. The construction structure of building and planting of the high and steep slope combined type revetment according to claim 1, wherein: the connection positions among the riprap revetment (1), the palmite vegetation area (2) and the flat ecological area (3) are provided with concrete foot grooves (6), and the connection positions between the flat ecological area (3) and the stepped ecological area (4) are provided with concrete foundations (7).
CN202222813810.1U 2022-10-25 2022-10-25 Construction structure is planted in construction of high steep side slope combined type shore protection Active CN218353484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222813810.1U CN218353484U (en) 2022-10-25 2022-10-25 Construction structure is planted in construction of high steep side slope combined type shore protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222813810.1U CN218353484U (en) 2022-10-25 2022-10-25 Construction structure is planted in construction of high steep side slope combined type shore protection

Publications (1)

Publication Number Publication Date
CN218353484U true CN218353484U (en) 2023-01-24

Family

ID=84935268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222813810.1U Active CN218353484U (en) 2022-10-25 2022-10-25 Construction structure is planted in construction of high steep side slope combined type shore protection

Country Status (1)

Country Link
CN (1) CN218353484U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117256351A (en) * 2023-09-01 2023-12-22 广州市设计院集团有限公司 Side slope green-covering structure and method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117256351A (en) * 2023-09-01 2023-12-22 广州市设计院集团有限公司 Side slope green-covering structure and method thereof

Similar Documents

Publication Publication Date Title
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN210827501U (en) Greening structure of stock ground rock slope
CN108677871A (en) A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
CN212772408U (en) Soil property side slope domatic ecological bank protection of drainage certainly
CN109811776B (en) An assembled lattice frame beam
CN102605793B (en) Moisture transfer and ecological management method for loess slope
CN103603316A (en) Ecological cement and geocell combination slope protection technology
CN102392453B (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN104404920B (en) A kind of trapezoidal ecological frame irrigation canals and ditches
CN101849453A (en) Earth surface planting desert reforming technology
CN114182686A (en) Log frame and resource-recycling concrete composite structure ecological slope protection and its construction method
CN218353484U (en) Construction structure is planted in construction of high steep side slope combined type shore protection
CN202000359U (en) Geocell zoology cutting wall
CN110725277A (en) A scour-resistant ecological management method for the riparian zone
CN113585296A (en) Ecological comprehensive treatment structure for assembled flexible support of artificial slope and construction method thereof
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN111894013A (en) Ecological restoration method for side slope of damaged mountain
CN101548615A (en) Porous nest brick 3D green plant technology
CN207987934U (en) A kind of robust structure for ecological treatment of slope
CN210049195U (en) Revetment bank protection module device
CN203113354U (en) Slope protection structure
CN112442996A (en) Slope protection structure and method applied to hilly area
CN108668787B (en) Ecological reconstruction structure of stereoplasm bank protection
CN202047535U (en) Microtopographic structure for planting trees on roofs
CN213390425U (en) A detachable three-dimensional ecological drainage ditch structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant