CN218330459U - An air tightness detection device for the production of grooved pipe fittings - Google Patents

An air tightness detection device for the production of grooved pipe fittings Download PDF

Info

Publication number
CN218330459U
CN218330459U CN202222398789.3U CN202222398789U CN218330459U CN 218330459 U CN218330459 U CN 218330459U CN 202222398789 U CN202222398789 U CN 202222398789U CN 218330459 U CN218330459 U CN 218330459U
Authority
CN
China
Prior art keywords
water tank
plate
pipe fittings
grooved pipe
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222398789.3U
Other languages
Chinese (zh)
Inventor
王乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Maiwei Fire Technology Co ltd
Original Assignee
Shandong Maiwei Fire Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Maiwei Fire Technology Co ltd filed Critical Shandong Maiwei Fire Technology Co ltd
Priority to CN202222398789.3U priority Critical patent/CN218330459U/en
Application granted granted Critical
Publication of CN218330459U publication Critical patent/CN218330459U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model belongs to slot pipe fitting production field especially relates to a slot pipe fitting is air tightness detection device for production, including the detection water tank, the detection water tank internalization is provided with places board, its characterized in that: the top of placing the board evenly is provided with a plurality of clamping components that are used for the fixed slot pipe fitting of centre gripping, still is provided with the drive in the detection water tank and places the board and carry out the lifting unit who goes up and down in the detection water tank, is provided with on the detection water tank to be used for aerifing the pressurized gas charging assembly in the slot pipe fitting, the utility model discloses simple structure, the simple operation makes simply, and is with low costs, and the commonality is strong, and detection efficiency is high, and detection cost is low.

Description

一种沟槽管件生产用气密性检测装置An air tightness detection device for the production of grooved pipe fittings

技术领域technical field

本实用新型属于沟槽管件生产领域,尤其是涉及一种沟槽管件生产用气密性检测装置。The utility model belongs to the production field of grooved pipe fittings, in particular to an air tightness detection device for the production of grooved pipe fittings.

背景技术Background technique

沟槽管件是一种新型的钢管连接管件,沟槽式管件只需安装配套供应的标准件,不需焊接和镀锌等后续工作,因而安装速度比螺纹连接和法兰连接明显加快,最大限度的简化了现场操作的技术难度,节省工时,从而也稳定了工程质量,提高了工作效率,是较为常见的管道连接件,而管件在生产后均需要进行气密性检测,以保证沟槽管件的密封使用。Grooved pipe fittings are a new type of steel pipe connection pipe fittings. Grooved pipe fittings only need to install the standard parts supplied, and do not need follow-up work such as welding and galvanizing, so the installation speed is significantly faster than threaded connections and flange connections. It simplifies the technical difficulty of on-site operation and saves man-hours, thereby stabilizing the project quality and improving work efficiency. It is a relatively common pipe connector, and the pipe fittings need to be tested for air tightness after production to ensure that grooved pipe fittings sealed use.

如中国专利公开号CN202021520597.X,公开了一种沟槽管件加工用气密性检测装置,包括蓄水槽,所述蓄水槽内盛装有清水,蓄水槽内通过多个均匀分布的第一升降液压缸安装有固定座,固定座的数量为两个且间隔分布,蓄水槽内侧中间位置通过第二升降液压缸安装有装夹机构,该专利实现了对沟槽管件气密性检测,但是还存在以下不足:结构单一实用性差,不方便对弯头类、三通类、四通类以及其他异形类沟槽管件等进行气密性检测,使得沟槽管件气密性检测装置的适用性较差。For example, Chinese Patent Publication No. CN202021520597.X discloses an air tightness detection device for processing grooved pipe fittings, which includes a water storage tank filled with clear water, and passes through a plurality of evenly distributed first The lifting hydraulic cylinder is equipped with a fixed seat, and the number of the fixed seat is two and distributed at intervals. The middle position inside the water storage tank is equipped with a clamping mechanism through the second lifting hydraulic cylinder. This patent realizes the air tightness detection of the grooved pipe fittings, but There are also the following deficiencies: the single structure is poor in practicability, and it is inconvenient to perform air tightness testing on elbows, tees, crosses, and other special-shaped grooved pipe fittings, which makes the applicability of the grooved pipe airtightness detection device poor.

实用新型内容Utility model content

本实用新型要解决的主要技术问题是提供一种结构简单,操作便捷,制造简单,成本低,通用性强,检测效率高,检测成本低的沟槽管件生产用气密性检测装置。The main technical problem to be solved by the utility model is to provide an air tightness detection device for the production of grooved pipe fittings with simple structure, convenient operation, simple manufacture, low cost, strong versatility, high detection efficiency and low detection cost.

为解决上述技术问题,本实用新型提供如下技术方案:In order to solve the above technical problems, the utility model provides the following technical solutions:

一种沟槽管件生产用气密性检测装置,包括检测水箱,检测水箱内活动设置有放置板,其特征在于:放置板的顶部均匀设置有多个用于夹持固定沟槽管件的夹持组件,检测水箱内还设置有驱动放置板在检测水箱内进行升降的升降组件,检测水箱上设置有用于向沟槽管件内充气加压的充气组件。An air-tightness detection device for the production of grooved pipe fittings, including a detection water tank, and a placement plate is movable in the detection water tank, and is characterized in that a plurality of clamps for clamping and fixing grooved pipe fittings are uniformly arranged on the top of the placement plate Components, the detection water tank is also provided with a lifting assembly that drives the placement plate to lift in the detection water tank, and the detection water tank is provided with an inflatable assembly for inflating and pressurizing the grooved pipe fittings.

以下是本实用新型对上述技术方案的进一步优化:Below is the further optimization of the utility model to above-mentioned technical scheme:

所述检测水箱的外侧壁上固定安装有放置箱,放置箱内放置有多种规格的第一密封塞,第一密封塞的外侧壁上设置有定位凹槽。A placement box is fixedly installed on the outer side wall of the detection water tank, and first sealing plugs of various specifications are placed in the placement box, and positioning grooves are arranged on the outer side wall of the first sealing plug.

进一步优化:所述夹持组件包括固定安装在放置板顶部的第一夹持板,第一夹持板的一侧活动设置有与其相对应的第二夹持板。Further optimization: the clamping assembly includes a first clamping plate fixedly installed on the top of the placing plate, and a second clamping plate corresponding to the first clamping plate is movably arranged on one side.

进一步优化:所述第二夹持板远离第一夹持板的一侧设置有支撑板,支撑板上滑动套设有拉杆,拉杆的其中一端固定连接有拉手,拉杆的另一端与第二夹持板固定连接。Further optimization: the side of the second clamping plate away from the first clamping plate is provided with a support plate, a pull rod is provided on the sliding sleeve on the support plate, one end of the pull rod is fixedly connected with a handle, and the other end of the pull rod is connected to the second clamping plate. Holder fixed connection.

进一步优化:所述拉杆的外侧套设有弹簧,弹簧的两端分别与第二夹持板和支撑板固定连接。Further optimization: a spring is sleeved on the outside of the pull rod, and the two ends of the spring are respectively fixedly connected to the second clamping plate and the supporting plate.

进一步优化:所述放置板的顶部位于第一夹持板与第二夹持板之间固定安装有定位块,定位块与定位凹槽相适配。Further optimization: the top of the placement plate is fixedly installed with a positioning block between the first clamping plate and the second clamping plate, and the positioning block is adapted to the positioning groove.

进一步优化:所述充气组件包括固定安装在检测水箱外侧壁上的空气压缩机,空气压缩机的输出端连通有输气管,输气管的另一端连通有空气分配箱。Further optimization: the inflatable assembly includes an air compressor fixedly installed on the outer wall of the detection water tank, the output end of the air compressor is connected with an air delivery pipe, and the other end of the air delivery pipe is connected with an air distribution box.

进一步优化:所述空气分配箱上连通有多个分气管,分气管上设置有控制分气管通断的第一阀门,分气管另一端螺纹连通有连接头,连接头的另一端一体连通有第二密封塞。Further optimization: the air distribution box is connected with a plurality of air distribution pipes, the air distribution pipe is provided with a first valve to control the on-off of the air distribution pipe, the other end of the air distribution pipe is threadedly connected with a connector, and the other end of the connector is integrally connected with a second valve. Two sealing plugs.

进一步优化:所述升降组件包括固定安装在检测水箱底部的驱动电机,驱动电机的动力输出端贯穿检测水箱并传动连接有螺纹杆,螺纹杆的顶端贯穿放置板并固定连接有第一限位板,且螺纹杆与放置板螺纹连接。Further optimization: the lifting assembly includes a drive motor fixedly installed at the bottom of the detection water tank, the power output end of the drive motor penetrates the detection water tank and is connected to a threaded rod, and the top end of the threaded rod passes through the placement plate and is fixedly connected to the first limit plate , and the threaded rod is threadedly connected with the placement plate.

进一步优化:所述放置板上远离螺纹杆的一侧对称滑动套设有两个导向杆,导向杆的顶端固定连接有第二限位板,导向杆的底端与检测水箱底部内壁固定连接。Further optimization: two guide rods are provided on the symmetrical sliding sleeve on the side away from the threaded rod on the placement plate, the top end of the guide rods is fixedly connected with the second limiting plate, and the bottom end of the guide rods is fixedly connected with the bottom inner wall of the detection water tank.

采用上述技术方案,本实用新型通过夹持组件、充气组件、升降组件以及检测水箱的配合设置,从而不仅实现通过观察检测水箱内的沟槽管件是否有气泡冒出,选出不合格的沟槽管件,具有检测成本低、环保无污染、检测效率高,误检率低的优点,并且能够方便的检测三通、四通及其他异形类的沟槽管件,提高了装置的通用性,方便用户使用,节省了企业成本,提高了市场竞争力。By adopting the above-mentioned technical scheme, the utility model not only realizes checking whether there are bubbles coming out of the groove fittings in the water tank, but also selects unqualified grooves through the cooperative arrangement of the clamping component, the inflatable component, the lifting component and the detection water tank Pipe fittings have the advantages of low detection cost, environmental protection and pollution-free, high detection efficiency, and low false detection rate, and can conveniently detect three-way, four-way and other special-shaped grooved pipe fittings, which improves the versatility of the device and is convenient for users The use saves the cost of the enterprise and improves the market competitiveness.

附图说明Description of drawings

图1为本实用新型实施例的总体结构示意图;Fig. 1 is the overall structural representation of the utility model embodiment;

图2为本实用新型实施例中部分结构示意图;Fig. 2 is the partial structure schematic diagram in the utility model embodiment;

图3为图2中A处放大图。Fig. 3 is an enlarged view of A in Fig. 2 .

图中:1-检测水箱;2-放置板;3-夹持组件;31-第一夹持板;32-第二夹持板;33-支撑板;34-拉杆;35-拉手;36-弹簧;37-定位块; 4-升降组件;41-驱动电机;42-螺纹杆;43-第一限位板;44-导向杆;45-第二限位板;5-充气组件;51-空气压缩机;52-输气管;53-空气分配箱;54-分气管;55-第一阀门;56-第二密封塞;6-放置箱;7-第一密封塞;8-定位凹槽;9-通水孔;10-出水管。In the figure: 1-testing water tank; 2-placement plate; 3-clamping assembly; 31-first clamping plate; 32-second clamping plate; Spring; 37-positioning block; 4-lifting assembly; 41-drive motor; 42-threaded rod; 43-first limiting plate; 44-guide rod; 45-second limiting plate; Air compressor; 52-air pipe; 53-air distribution box; 54-air distribution pipe; 55-first valve; 56-second sealing plug; 6-placement box; 7-first sealing plug; 8-positioning groove ; 9-water hole; 10-outlet pipe.

具体实施方式detailed description

如图1-3所示,一种沟槽管件生产用气密性检测装置,包括检测水箱1,检测水箱1内活动设置有放置板2,放置板2的顶部均匀设置有多个用于夹持固定沟槽管件的夹持组件3,检测水箱1内还设置有驱动放置板2在检测水箱1内进行升降的升降组件4,检测水箱1上设置有用于向沟槽管件内充气加压的充气组件5。As shown in Fig. 1-3, an air tightness detection device for the production of grooved pipe fittings includes a detection water tank 1, and a placement plate 2 is movable in the detection water tank 1, and a plurality of clamping plates are uniformly arranged on the top of the placement plate 2. The clamping assembly 3 that holds and fixes the grooved pipe fittings, and the lifting assembly 4 that drives the placement plate 2 to move up and down in the detection water tank 1 is also arranged in the detection water tank 1, and the detection water tank 1 is provided with a device for inflating and pressurizing the grooved pipe fittings. Inflatable components5.

所述检测水箱1的外侧壁上固定安装有放置箱6,放置箱6内放置有多种规格的第一密封塞7,第一密封塞7的外侧壁上设置有定位凹槽8。A placement box 6 is fixedly installed on the outer side wall of the detection water tank 1, and a first sealing plug 7 of various specifications is placed in the placement box 6, and a positioning groove 8 is arranged on the outer side wall of the first sealing plug 7.

所述第一密封塞7的材质为橡胶且与管件的管口过盈配合。The material of the first sealing plug 7 is rubber and is interference fit with the nozzle of the pipe fitting.

所述放置板2上均匀贯穿开设有多个通水孔9,这样设计,大大降低放置板2升降时水对其产生的阻力。A plurality of water passage holes 9 are evenly penetrated on the placement plate 2, which is designed to greatly reduce the resistance generated by water when the placement plate 2 is raised and lowered.

所述夹持组件3包括固定安装在放置板2顶部的第一夹持板31,第一夹持板31的一侧活动设置有与其相对应的第二夹持板32。The clamping assembly 3 includes a first clamping plate 31 fixedly installed on the top of the placement plate 2 , and a second clamping plate 32 corresponding to the first clamping plate 31 is movably arranged on one side.

所述第二夹持板32远离第一夹持板31的一侧设置有支撑板33,支撑板33上滑动套设有拉杆34。A support plate 33 is provided on the side of the second clamping plate 32 away from the first clamping plate 31 , and a pull rod 34 is slidably sleeved on the support plate 33 .

所述拉杆34的其中一端固定连接有拉手35,拉杆34的另一端与第二夹持板32固定连接。One end of the pull rod 34 is fixedly connected with a handle 35 , and the other end of the pull rod 34 is fixedly connected with the second clamping plate 32 .

所述拉杆34的外侧套设有弹簧36,弹簧36的两端分别与第二夹持板32和支撑板33固定连接。A spring 36 is sleeved on the outer side of the pull rod 34 , and two ends of the spring 36 are fixedly connected to the second clamping plate 32 and the supporting plate 33 respectively.

所述放置板2顶部位于第一夹持板31与第二夹持板32之间固定安装有定位块37,定位块37与定位凹槽8相适配。A positioning block 37 is fixedly installed on the top of the placing plate 2 between the first clamping plate 31 and the second clamping plate 32 , and the positioning block 37 is adapted to the positioning groove 8 .

当需要夹持沟槽管件时,其中一个管口安装上第一密封塞7,之后拉动拉手35,拉手35通过拉杆34带动第二夹持板32远离第一夹持板31,同时第二夹持板32挤压弹簧36,弹簧36产生弹力,然后将第一密封塞7上的定位凹槽8与定位块37相连接,最后松开拉手35,第二夹持板32在弹簧36的弹力作用下对沟槽管件进行夹持。When the grooved pipe needs to be clamped, one of the nozzles is installed with the first sealing plug 7, and then the handle 35 is pulled, and the handle 35 drives the second clamping plate 32 away from the first clamping plate 31 through the pull rod 34, while the second clamping The holding plate 32 squeezes the spring 36, and the spring 36 generates elastic force, then the positioning groove 8 on the first sealing plug 7 is connected with the positioning block 37, and finally the handle 35 is released, and the second clamping plate 32 under the elastic force of the spring 36 Under the action, the grooved pipe fittings are clamped.

所述充气组件5包括固定安装在检测水箱1外侧壁上的空气压缩机51,空气压缩机51的输出端连通有输气管52,输气管52的另一端连通有空气分配箱53。The inflatable assembly 5 includes an air compressor 51 fixedly installed on the outer wall of the detection water tank 1 , the output end of the air compressor 51 is communicated with an air pipe 52 , and the other end of the air pipe 52 is communicated with an air distribution box 53 .

所述空气分配箱53上连通有多个分气管54,分气管54上设置有控制分气管54通断的第一阀门55。The air distribution box 53 is connected with a plurality of air distribution pipes 54 , and the air distribution pipe 54 is provided with a first valve 55 for controlling the opening and closing of the air distribution pipes 54 .

所述分气管54另一端螺纹连通有连接头,连接头的另一端一体连通有第二密封塞56。The other end of the air distribution pipe 54 is threadedly connected with a connector, and the other end of the connector is integrally connected with a second sealing plug 56 .

所述第二密封塞56的材质为橡胶且与管件的管口过盈配合。The second sealing plug 56 is made of rubber and has an interference fit with the nozzle of the pipe.

所述升降组件4包括固定安装在检测水箱1底部的驱动电机41,驱动电机41的动力输出端贯穿检测水箱1并传动连接有螺纹杆42,螺纹杆42的顶端贯穿放置板2并固定连接有第一限位板43,且螺纹杆42与放置板2螺纹连接。The lifting assembly 4 includes a drive motor 41 fixedly installed at the bottom of the detection water tank 1. The power output end of the drive motor 41 runs through the detection water tank 1 and is connected with a threaded rod 42. The top end of the threaded rod 42 penetrates the placement plate 2 and is fixedly connected with a The first limiting plate 43 and the threaded rod 42 are threadedly connected with the placement plate 2 .

所述放置板2上远离螺纹杆42的一侧对称滑动套设有两个导向杆44,导向杆44的顶端固定连接有第二限位板45,导向杆44的底端与检测水箱1底部内壁固定连接。Two guide rods 44 are provided on the symmetrical sliding sleeve on the side away from the threaded rod 42 on the said placement plate 2, and the top of the guide rods 44 is fixedly connected with a second limit plate 45, and the bottom of the guide rods 44 is connected to the bottom of the detection water tank 1. The inner wall is fixedly connected.

启动驱动电机41,驱动电机41转动带动螺纹杆42转动,由于导向杆44的导向作用,因此螺纹杆42转动带动放置板2沿着螺纹杆42的轴线方向上下移动,从而实现放置板2在检测水箱1内进行升降。Start the driving motor 41, and the driving motor 41 rotates to drive the threaded rod 42 to rotate. Due to the guiding effect of the guide rod 44, the threaded rod 42 rotates to drive the placement plate 2 to move up and down along the axial direction of the threaded rod 42, so that the placement plate 2 is detected. Carry out lifting in the water tank 1.

所述检测水箱1的一侧壁上连通有出水管10,出水管10上设置有控制出水管10通断的第二阀门(在图中未示出)。A water outlet pipe 10 is communicated with a side wall of the detection water tank 1, and a second valve (not shown in the figure) for controlling the opening and closing of the water outlet pipe 10 is arranged on the water outlet pipe 10 .

所述检测水箱1采用透明材质制成,这样设计,便于进行气密性检测时观察检测水箱1内的沟槽管件。The detection water tank 1 is made of a transparent material, which is designed to facilitate the observation and detection of grooved pipe fittings in the water tank 1 when performing air tightness detection.

具体使用,首先向检测水箱1内加入适量的水,然后将待检测的沟槽管件中的其中一个管口安装上第二密封塞56,其它的管口安装上第一密封塞7,之后拉动拉手35,拉手35通过拉杆34带动第二夹持板32远离第一夹持板31,同时第二夹持板32挤压弹簧36,弹簧36产生弹力,然后将其中一个第一密封塞7上的定位凹槽8与定位块37相连接,最后松开拉手35,第二夹持板32在弹簧36的弹力作用下对沟槽管件进行夹持。For specific use, first add an appropriate amount of water into the detection water tank 1, then install the second sealing plug 56 on one of the nozzles of the grooved pipe fittings to be detected, and install the first sealing plug 7 on the other nozzles, and then pull The handle 35, the handle 35 drives the second clamping plate 32 away from the first clamping plate 31 through the pull rod 34, and at the same time the second clamping plate 32 squeezes the spring 36, the spring 36 generates elastic force, and then one of the first sealing plugs 7 is closed The positioning groove 8 is connected with the positioning block 37, and finally the handle 35 is released, and the second clamping plate 32 clamps the grooved pipe under the elastic force of the spring 36.

启动驱动电机41,驱动电机41正向转动带动螺纹杆42正向转动,由于导向杆44的导向作用,因此螺纹杆42转动带动放置板2沿着螺纹杆42的轴线方向下移动,从而实现放置板2在检测水箱1内进行下降,沟槽管件完全浸入水内,停止驱动电机41。Start the driving motor 41, and the forward rotation of the driving motor 41 drives the threaded rod 42 to rotate forward. Due to the guiding effect of the guide rod 44, the rotation of the threaded rod 42 drives the placement plate 2 to move down along the axis of the threaded rod 42, thereby realizing placement The plate 2 descends in the detection water tank 1, the grooved pipe fitting is fully immersed in the water, and the drive motor 41 is stopped.

然后打开对应的第一阀门55,启动空气压缩机51,压缩空气通过输气管52进入空气分配箱53,空气分配箱53通过分气管54输入到沟槽管件内,观察沟槽管件是否有气泡冒出,选出不合格的沟槽管件,进入下一个沟槽管件的检测。Then open the corresponding first valve 55, start the air compressor 51, the compressed air enters the air distribution box 53 through the air delivery pipe 52, and the air distribution box 53 is input into the grooved pipe fitting through the air distribution pipe 54, and observe whether there are bubbles in the grooved pipe fitting. Out, select unqualified grooved pipe fittings, and enter the next detection of grooved pipe fittings.

对于本领域的普通技术人员而言,根据本实用新型的教导,在不脱离本实用新型的原理与精神的情况下,对实施方式所进行的改变、修改、替换和变型仍落入本实用新型的保护范围之内。For those of ordinary skill in the art, according to the teachings of the utility model, without departing from the principle and spirit of the utility model, the changes, modifications, replacements and modifications made to the embodiments still fall within the scope of the utility model. within the scope of protection.

Claims (10)

1.一种沟槽管件生产用气密性检测装置,包括检测水箱(1),检测水箱(1)内活动设置有放置板(2),其特征在于:放置板(2)的顶部均匀设置有多个用于夹持固定沟槽管件的夹持组件(3),检测水箱(1)内还设置有驱动放置板(2)在检测水箱(1)内进行升降的升降组件(4),检测水箱(1)上设置有用于向沟槽管件内充气加压的充气组件(5)。1. An air tightness detection device for the production of grooved pipe fittings, including a detection water tank (1), and a placement plate (2) is movable in the detection water tank (1), and the feature is that the top of the placement plate (2) is uniformly arranged There are multiple clamping components (3) for clamping and fixing grooved pipe fittings, and a lifting component (4) that drives the placement plate (2) to lift up and down in the testing water tank (1) is also provided in the testing water tank (1), The detection water tank (1) is provided with an inflatable component (5) for inflating and pressurizing the grooved pipe fitting. 2.根据权利要求1所述的一种沟槽管件生产用气密性检测装置,其特征在于:检测水箱(1)的外侧壁上固定安装有放置箱(6),放置箱(6)内放置有多种规格的第一密封塞(7),第一密封塞(7)的外侧壁上设置有定位凹槽(8)。2. The air tightness detection device for the production of grooved pipe fittings according to claim 1, characterized in that: a placement box (6) is fixedly installed on the outer wall of the detection water tank (1), and the placement box (6) First sealing plugs (7) of various specifications are placed, and positioning grooves (8) are arranged on the outer side walls of the first sealing plugs (7). 3.根据权利要求2所述的一种沟槽管件生产用气密性检测装置,其特征在于:夹持组件(3)包括固定安装在放置板(2)顶部的第一夹持板(31),第一夹持板(31)的一侧活动设置有与其相对应的第二夹持板(32)。3. The air tightness detection device for grooved pipe fittings production according to claim 2, characterized in that the clamping assembly (3) includes a first clamping plate (31) fixedly installed on the top of the placing plate (2) ), one side of the first clamping plate (31) is movably provided with a corresponding second clamping plate (32). 4.根据权利要求3所述的一种沟槽管件生产用气密性检测装置,其特征在于:第二夹持板(32)远离第一夹持板(31)的一侧设置有支撑板(33),支撑板(33)上滑动套设有拉杆(34),拉杆(34)的其中一端固定连接有拉手(35),拉杆(34)的另一端与第二夹持板(32)固定连接。4. The airtightness detection device for grooved pipe fittings production according to claim 3, characterized in that: the side of the second clamping plate (32) away from the first clamping plate (31) is provided with a support plate (33), the sliding sleeve on the support plate (33) is provided with a pull rod (34), one end of the pull rod (34) is fixedly connected with a handle (35), and the other end of the pull rod (34) is connected to the second clamping plate (32) Fixed connection. 5.根据权利要求4所述的一种沟槽管件生产用气密性检测装置,其特征在于:拉杆(34)的外侧套设有弹簧(36),弹簧(36)的两端分别与第二夹持板(32)和支撑板(33)固定连接。5. The air-tightness detection device for the production of grooved pipe fittings according to claim 4, characterized in that: a spring (36) is sleeved on the outside of the pull rod (34), and the two ends of the spring (36) are respectively connected to the first The two clamping plates (32) are fixedly connected with the supporting plate (33). 6.根据权利要求5所述的一种沟槽管件生产用气密性检测装置,其特征在于:放置板(2)的顶部位于第一夹持板(31)与第二夹持板(32)之间固定安装有定位块(37),定位块(37)与定位凹槽(8)相适配。6. The air tightness detection device for grooved pipe fittings production according to claim 5, characterized in that: the top of the placing plate (2) is located between the first clamping plate (31) and the second clamping plate (32) ) is fixedly installed with a positioning block (37), and the positioning block (37) is adapted to the positioning groove (8). 7.根据权利要求6所述的一种沟槽管件生产用气密性检测装置,其特征在于:充气组件(5)包括固定安装在检测水箱(1)外侧壁上的空气压缩机(51),空气压缩机(51)的输出端连通有输气管(52),输气管(52)的另一端连通有空气分配箱(53)。7. The air tightness detection device for grooved pipe fittings production according to claim 6, characterized in that: the inflatable assembly (5) includes an air compressor (51) fixedly installed on the outer wall of the detection water tank (1) , the output end of the air compressor (51) is connected with an air delivery pipe (52), and the other end of the air delivery pipe (52) is connected with an air distribution box (53). 8.根据权利要求7所述的一种沟槽管件生产用气密性检测装置,其特征在于:空气分配箱(53)上连通有多个分气管(54),分气管(54)上设置有控制分气管(54)通断的第一阀门(55),分气管(54)另一端螺纹连通有连接头,连接头的另一端一体连通有第二密封塞(56)。8. The air tightness detection device for the production of grooved pipe fittings according to claim 7, characterized in that: the air distribution box (53) is connected with a plurality of air distribution pipes (54), and the air distribution pipes (54) are provided with There is a first valve (55) for controlling the on-off of the air distribution pipe (54). The other end of the air distribution pipe (54) is threadedly connected with a connector, and the other end of the connector is integrally connected with a second sealing plug (56). 9.根据权利要求8所述的一种沟槽管件生产用气密性检测装置,其特征在于:升降组件(4)包括固定安装在检测水箱(1)底部的驱动电机(41),驱动电机(41)的动力输出端贯穿检测水箱(1)并传动连接有螺纹杆(42),螺纹杆(42)的顶端贯穿放置板(2)并固定连接有第一限位板(43),且螺纹杆(42)与放置板(2)螺纹连接。9. The air tightness testing device for grooved pipe fittings production according to claim 8, characterized in that: the lifting assembly (4) includes a driving motor (41) fixedly installed at the bottom of the testing water tank (1), and the driving motor The power output end of (41) runs through the detection water tank (1) and is connected with a threaded rod (42), and the top of the threaded rod (42) runs through the placement plate (2) and is fixedly connected with the first limiting plate (43), and Threaded rod (42) is threadedly connected with placement plate (2). 10.根据权利要求9所述的一种沟槽管件生产用气密性检测装置,其特征在于:放置板(2)上远离螺纹杆(42)的一侧对称滑动套设有两个导向杆(44),导向杆(44)的顶端固定连接有第二限位板(45),导向杆(44)的底端与检测水箱(1)底部内壁固定连接。10. The airtightness detection device for grooved pipe fittings production according to claim 9, characterized in that two guide rods are provided on the side of the placement plate (2) that is away from the threaded rod (42) and is symmetrically sliding sleeve (44), the top of the guide rod (44) is fixedly connected with a second limiting plate (45), and the bottom end of the guide rod (44) is fixedly connected with the bottom inner wall of the detection water tank (1).
CN202222398789.3U 2022-09-09 2022-09-09 An air tightness detection device for the production of grooved pipe fittings Expired - Fee Related CN218330459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222398789.3U CN218330459U (en) 2022-09-09 2022-09-09 An air tightness detection device for the production of grooved pipe fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222398789.3U CN218330459U (en) 2022-09-09 2022-09-09 An air tightness detection device for the production of grooved pipe fittings

Publications (1)

Publication Number Publication Date
CN218330459U true CN218330459U (en) 2023-01-17

Family

ID=84835152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222398789.3U Expired - Fee Related CN218330459U (en) 2022-09-09 2022-09-09 An air tightness detection device for the production of grooved pipe fittings

Country Status (1)

Country Link
CN (1) CN218330459U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117213745A (en) * 2023-11-08 2023-12-12 潍坊派尔消防科技有限公司 Air tightness detection device for groove pipe fitting
CN118794612A (en) * 2024-09-06 2024-10-18 山东鲁源消防科技有限公司 Gas tightness detection device and method for grooved pipe fittings

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117213745A (en) * 2023-11-08 2023-12-12 潍坊派尔消防科技有限公司 Air tightness detection device for groove pipe fitting
CN117213745B (en) * 2023-11-08 2024-03-08 潍坊派尔消防科技有限公司 Air tightness detection device for groove pipe fitting
CN118794612A (en) * 2024-09-06 2024-10-18 山东鲁源消防科技有限公司 Gas tightness detection device and method for grooved pipe fittings

Similar Documents

Publication Publication Date Title
CN218330459U (en) An air tightness detection device for the production of grooved pipe fittings
CN111397816A (en) PE valve air tightness test device
CN210375684U (en) Valve pressing test device for welding connection
CN116818207B (en) An air tightness performance testing device and method for hydraulic components
CN104165739B (en) Method for testing pressure by adoption of vertical and automatic heat collector flow channel pressure test machine
CN203275204U (en) Hydraulic test equipment for rare metal pipes
CN116222913A (en) An automatic air tightness detection device for welded pipes
CN115324908A (en) Automatic static pressure test device of vertical centrifugal pump and working method thereof
CN212007700U (en) A PE valve air tightness test device
CN222393721U (en) Pipeline gas tightness detects platform
CN112317361A (en) Tap gas tightness detection device
CN219956807U (en) Tightness test equipment for valve production
CN221594210U (en) Tightness detection equipment for heating power pipeline
CN109268693B (en) Positioning mechanism for pipeline compression and recovery test
CN217211396U (en) Engineering water supply and drainage pipe pressure testing machine
CN214502874U (en) A valve testing device
CN212254511U (en) Pipeline detection equipment
CN204064591U (en) Collector runner vertical automatic pressure test machine
CN112033817B (en) A water pressure testing machine
CN211855730U (en) A device for measuring air duct tightness
CN203337334U (en) Ball valve leakage detection machine
CN219890657U (en) Ball valve tightness test equipment
CN223122430U (en) Air tightness detection device of valve casting
CN202305188U (en) Bending moment resistance testing machine for ball valve
CN220960465U (en) Gas self-closing valve performance detection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230117