CN218293029U - A kind of UHV transmission tower - Google Patents
A kind of UHV transmission tower Download PDFInfo
- Publication number
- CN218293029U CN218293029U CN202222483993.5U CN202222483993U CN218293029U CN 218293029 U CN218293029 U CN 218293029U CN 202222483993 U CN202222483993 U CN 202222483993U CN 218293029 U CN218293029 U CN 218293029U
- Authority
- CN
- China
- Prior art keywords
- setting
- groove
- fixedly installed
- transmission tower
- power transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 claims abstract description 25
- 230000009194 climbing Effects 0.000 claims abstract description 19
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 8
- 229910052742 iron Inorganic materials 0.000 claims abstract description 4
- 125000006850 spacer group Chemical group 0.000 claims abstract description 4
- 230000000087 stabilizing effect Effects 0.000 claims description 13
- 238000000034 method Methods 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
Images
Landscapes
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
本实用新型公开了一种特高压输电铁塔,包括安装底座,所述安装底座的顶部固定安装有稳定支架,所述稳定支架的内腔固定安装有均匀分布的限位架,所述稳定支架的正面设置有卡板,所述卡板的正面固定安装有均匀分布的攀爬架,所述安装底座正面的两侧均固定安装有安装块,所述安装块的内部开设有通槽,所述通槽的内部设置有限位杆,所述安装块的正面设置有转盘。本实用新型通过设置安装底座对稳定支架进行安装,通过设置稳定支架增加整体装置的稳定性,通过设置限位架对线路进行固定安装,通过设置卡板对攀爬架进行安装,通过设置攀爬架便于攀爬对线缆进行检测维护,通过设置通槽对限位杆进行容纳。
The utility model discloses an ultra-high voltage transmission iron tower, which comprises a mounting base, a stable bracket is fixedly installed on the top of the mounting base, and evenly distributed spacer frames are fixedly installed in the inner cavity of the stable bracket. The front is provided with clamping boards, and evenly distributed climbing frames are fixedly installed on the front of the clamping boards, and installation blocks are fixedly installed on both sides of the front of the installation base, and through grooves are opened inside the installation blocks. A limit rod is arranged inside the through slot, and a turntable is arranged on the front of the installation block. The utility model installs the stable support by setting the installation base, increases the stability of the overall device by setting the stable support, fixes and installs the line by setting the limit frame, installs the climbing frame by setting the clamping plate, and installs the climbing frame by setting the The frame is convenient for climbing to detect and maintain the cables, and the limit rod is accommodated by setting a through slot.
Description
技术领域technical field
本实用新型涉及输电铁塔技术领域,具体地说,涉及一种特高压输电铁塔。The utility model relates to the technical field of power transmission towers, in particular to an ultra-high voltage power transmission tower.
背景技术Background technique
输电塔则是架空线路的支撑点,在输电塔上架设一个回路则是单回路输电塔,在输电塔上架设两个回路则是双回路输电塔,单回路就是指一个负荷有一个供电电源的回路;双回路就是指一个负荷有2个供电电源的回路,一般,对供电可靠性要求高的企业,或地区重要变电站,均采用双回线供电,这样可保护其中一个电源因故停电,另一个电源可继续供电,但对一般的对供电可靠性要求不高的中小用户往往采用单电源供电,实际使用过程中,输电铁塔容易攀爬,虽设有警示标语仍无法对人们进行警示,一些不法分子攀爬输电铁塔,可能对输电设施造成损害,影响电力的输送,给管理人员增加了麻烦。The transmission tower is the supporting point of the overhead line. If one circuit is erected on the transmission tower, it is a single-circuit transmission tower, and if two circuits are erected on the transmission tower, it is a double-circuit transmission tower. A single circuit means that one load has one power supply. circuit; double circuit refers to a circuit with two power supplies for a load. Generally, enterprises that require high power supply reliability, or important substations in regions, use double circuit power supply, which can protect one of the power supplies from power failure for some reason, and the other One power supply can continue to supply power, but for general small and medium-sized users who do not require high power supply reliability, they often use a single power supply for power supply. In actual use, the transmission tower is easy to climb. Criminals climbing the transmission tower may cause damage to the transmission facilities, affect the transmission of power, and increase troubles for management personnel.
实用新型内容Utility model content
(一)解决的技术问题(1) Solved technical problems
针对现有技术的不足,本实用新型的目的在于提供一种特高压输电铁塔,具备防攀爬效果好的优点,解决了实际使用过程中,输电铁塔容易攀爬,虽设有警示标语仍无法对人们进行警示,一些不法分子攀爬输电铁塔,可能对输电设施造成损害,影响电力的输送,给管理人员增加了麻烦的问题。Aiming at the deficiencies of the prior art, the purpose of this utility model is to provide an ultra-high voltage transmission iron tower, which has the advantages of good anti-climbing effect, and solves the problem that the transmission iron tower is easy to climb during actual use. To warn people, some criminals climb the transmission tower, which may cause damage to the transmission facilities, affect the transmission of power, and add troublesome problems to the management personnel.
(二)技术方案(2) Technical solution
本为实现上述目的,本实用新型提供如下技术方案,一种特高压输电铁塔所采用的技术方案是:包括安装底座,所述安装底座的顶部固定安装有稳定支架,所述稳定支架的内腔固定安装有均匀分布的限位架,所述稳定支架的正面设置有卡板,所述卡板的正面固定安装有均匀分布的攀爬架,所述安装底座正面的两侧均固定安装有安装块,所述安装块的内部开设有通槽,所述通槽的内部设置有限位杆,所述安装块的正面设置有转盘,所述安装块的内部且位于通槽的正面开设有螺纹槽。In order to achieve the above object, the utility model provides the following technical solutions. The technical solution adopted by a UHV power transmission tower is: comprising a mounting base, the top of the mounting base is fixedly equipped with a stabilizing bracket, and the inner cavity of the stabilizing bracket is Evenly distributed spacer frames are fixedly installed, and the front of the stable support is provided with clamping plates, and evenly distributed climbing frames are fixedly installed on the front of the clamping plates, and both sides of the front of the installation base are fixedly installed with mounting brackets. block, the inside of the installation block is provided with a through groove, the inside of the through groove is provided with a limit rod, the front of the installation block is provided with a turntable, and the inside of the installation block is provided with a thread groove on the front of the through groove .
作为优选方案,所述安装块的内部且位于通槽的两侧均开设有第一滑槽,所述第一滑槽的内部滑动连接有第一滑块。As a preferred solution, a first chute is provided inside the installation block and on both sides of the through groove, and a first sliding block is slidably connected to the inside of the first chute.
作为优选方案,所述第一滑块相对靠近的一侧与限位杆的两侧固定连接,所述第一滑槽的内部且位于第一滑块相对远离的一侧固定安装有第一弹簧。As a preferred solution, the relatively close side of the first slider is fixedly connected to both sides of the limit rod, and the first spring is fixedly installed inside the first sliding groove and on the side relatively far away from the first slider. .
作为优选方案,所述卡板的背面开设有第二滑槽,所述第二滑槽的内部滑动连接有第二滑块。As a preferred solution, a second chute is provided on the back of the clamp, and a second sliding block is slidably connected to the inside of the second chute.
作为优选方案,所述第二滑块的背面与稳定支架的正面固定连接,所述第二滑槽的内腔且位于第二滑块的顶部固定安装有第二弹簧。As a preferred solution, the back side of the second slider is fixedly connected to the front side of the stabilizing bracket, and a second spring is fixedly installed in the inner chamber of the second chute and on the top of the second slider.
作为优选方案,所述螺纹槽的内部转动连接有螺纹杆,所述螺纹杆的正面与转盘的背面固定连接。As a preferred solution, a threaded rod is rotatably connected to the inside of the threaded groove, and the front side of the threaded rod is fixedly connected to the back side of the turntable.
作为优选方案,所述限位杆的正面开设有固定槽,所述卡板的两侧均开设有定位槽。As a preferred solution, a fixing slot is opened on the front of the limit rod, and positioning slots are opened on both sides of the clamping plate.
(三)有益效果(3) Beneficial effects
与现有技术相比,本实用新型提供了一种特高压输电铁塔,具备以下有益效果。Compared with the prior art, the utility model provides an ultra-high voltage transmission tower, which has the following beneficial effects.
1、该一种特高压输电铁塔,通过设置安装底座对稳定支架进行安装,通过设置稳定支架增加整体装置的稳定性,通过设置限位架对线路进行固定安装,通过设置卡板对攀爬架进行安装,通过设置攀爬架便于攀爬对线缆进行检测维护,通过设置通槽对限位杆进行容纳,通过设置螺纹槽对螺纹杆进行限位,通过设置限位杆便于对卡板的两侧进行固定,解决了实际使用过程中,输电铁塔容易攀爬,虽设有警示标语仍无法对人们进行警示,一些不法分子攀爬输电铁塔,可能对输电设施造成损害,影响电力的输送,给管理人员增加了麻烦的问题。1. This kind of UHV power transmission tower installs the stable support by setting the installation base, increases the stability of the overall device by setting the stable support, fixes the line by setting the limit frame, and fixes the climbing frame by setting the clamping plate. For installation, it is easy to climb to detect and maintain the cable by setting the climbing frame, accommodate the limit rod by setting the through groove, limit the threaded rod by setting the thread groove, and facilitate the clamping by setting the limit rod The two sides are fixed to solve the problem that the transmission tower is easy to climb during actual use. Although there are warning signs, it is still impossible to warn people. Some criminals climb the transmission tower, which may cause damage to the transmission facilities and affect the transmission of electricity. Added troublesome problems to managers.
2、该一种特高压输电铁塔,通过设置第一滑槽对第一滑块进行限位,防止第一滑块在移动的过程中发生晃动,通过设置第一滑块对限位杆进行限位,防止限位杆在移动的过程中发生晃动,通过设置第一弹簧对第一滑块进行复位,通过设置第二滑槽对第二滑块进行限位,防止第二滑块在移动的过程中发生晃动,通过设置第二滑块对卡板进行限位,防止卡板在移动的过程中发生晃动,通过设置第二弹簧对卡板进行复位,通过设置转盘对螺纹杆进行驱动,通过设置固定槽便于对螺纹杆的内侧进行固定,间接对限位杆进行限位固定,通过设置定位槽对限位杆相对靠近的一侧进行固定。2. For this kind of UHV power transmission tower, the first sliding block is set to limit the position of the first slider to prevent the first slider from shaking during the movement, and the first slider is set to limit the position of the limit rod. position, to prevent the limit rod from shaking during the movement, reset the first slider by setting the first spring, and limit the second slider by setting the second chute, so as to prevent the second slider from moving Shaking occurs during the process, the clamping plate is limited by setting the second slider to prevent the clamping plate from shaking during the movement, the clamping plate is reset by setting the second spring, the threaded rod is driven by setting the turntable, and the Setting the fixing groove is convenient for fixing the inner side of the threaded rod, indirectly fixing the limit rod, and fixing the relatively close side of the limit rod by setting the positioning groove.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型安装块截面结构示意图;Fig. 2 is the schematic diagram of the section structure of the installation block of the utility model;
图3为本实用新型卡板侧面截面结构示意图;Fig. 3 is a schematic diagram of the side cross-sectional structure of the pallet of the present invention;
图4为本实用新型安装块俯视截面结构示意图。Fig. 4 is a schematic cross-sectional view of the installation block of the present invention.
图中:1、安装底座;2、稳定支架;3、限位架;4、卡板;5、攀爬架;6、定位槽;7、安装块;8、转盘;9、限位杆;10、通槽;11、第一滑槽;12、第一弹簧;13、第一滑块;14、第二滑槽;15、第二弹簧;16、第二滑块;17、固定槽;18、螺纹槽;19、螺纹杆。In the figure: 1. Installation base; 2. Stabilizing bracket; 3. Limiting frame; 4. Clamping plate; 5. Climbing frame; 6. Positioning groove; 7. Mounting block; 10. Through groove; 11. First chute; 12. First spring; 13. First slider; 14. Second chute; 15. Second spring; 16. Second slider; 17. Fixed groove; 18, thread groove; 19, thread rod.
具体实施方式detailed description
下面结合附图和实施例对本实用新型的实施方式作进一步详细描述。以下实施例用于说明本实用新型,但不能用来限制本实用新型的范围。The implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the utility model, but cannot be used to limit the scope of the utility model.
在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”、“下”、“左”、“右”、“内”、“外”、“前端”、“后端”、“头部”、“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present utility model, unless otherwise specified, the meaning of "multiple" is two or more; the terms "upper", "lower", "left", "right", "inner", "outer" ", "front end", "rear end", "head", "tail", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the utility model and simplifying the description. It does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the present invention. In addition, the terms "first", "second", "third", etc. are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that unless otherwise specified and limited, the terms "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, or Integratively connected; it can be mechanically or electrically connected; it can be directly connected or indirectly connected through an intermediary. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.
请参阅图1-4,本实用新型:一种特高压输电铁塔,包括安装底座1,安装底座1的顶部固定安装有稳定支架2,稳定支架2的内腔固定安装有均匀分布的限位架3,稳定支架2的正面设置有卡板4,卡板4的正面固定安装有均匀分布的攀爬架5,安装底座1正面的两侧均固定安装有安装块7,安装块7的内部开设有通槽10,通槽10的内部设置有限位杆9,安装块7的正面设置有转盘8,安装块7的内部且位于通槽10的正面开设有螺纹槽18。Please refer to Figures 1-4, the utility model: an ultra-high voltage transmission tower, including a mounting base 1, a stabilizing
通过上述技术方案,通过设置安装底座1对稳定支架2进行安装,通过设置稳定支架2增加整体装置的稳定性,通过设置限位架3对线路进行固定安装,通过设置卡板4对攀爬架5进行安装,通过设置攀爬架5便于攀爬对线缆进行检测维护,通过设置通槽10对限位杆9进行容纳,通过设置螺纹槽18对螺纹杆19进行限位,通过设置限位杆9便于对卡板4的两侧进行固定。Through the above technical scheme, the stabilizing
安装块7的内部且位于通槽10的两侧均开设有第一滑槽11,第一滑槽11的内部滑动连接有第一滑块13。Inside the mounting
通过上述技术方案,通过设置第一滑槽11对第一滑块13进行限位,防止第一滑块13在移动的过程中发生晃动。Through the above technical solution, the
第一滑块13相对靠近的一侧与限位杆9的两侧固定连接,第一滑槽11的内部且位于第一滑块13相对远离的一侧固定安装有第一弹簧12。The relatively close side of the first sliding
通过上述技术方案,通过设置第一滑块13对限位杆9进行限位,防止限位杆9在移动的过程中发生晃动,通过设置第一弹簧12对第一滑块13进行复位。Through the above technical solution, the
卡板4的背面开设有第二滑槽14,第二滑槽14的内部滑动连接有第二滑块16。A
通过上述技术方案,通过设置第二滑槽14对第二滑块16进行限位,防止第二滑块16在移动的过程中发生晃动。Through the above technical solution, the
第二滑块16的背面与稳定支架2的正面固定连接,第二滑槽14的内腔且位于第二滑块16的顶部固定安装有第二弹簧15。The back of the second sliding
通过上述技术方案,通过设置第二滑块16对卡板4进行限位,防止卡板4在移动的过程中发生晃动,通过设置第二弹簧15对卡板4进行复位。Through the above technical solution, the clamping
螺纹槽18的内部转动连接有螺纹杆19,螺纹杆19的正面与转盘8的背面固定连接。The inside of the
通过上述技术方案,通过设置转盘8对螺纹杆19进行驱动。Through the above technical solution, the threaded
限位杆9的正面开设有固定槽17,卡板4的两侧均开设有定位槽6。A fixing
通过上述技术方案,通过设置固定槽17便于对螺纹杆19的内侧进行固定,间接对限位杆9进行限位固定,通过设置定位槽6对限位杆9相对靠近的一侧进行固定。Through the above technical solution, the inner side of the threaded
本实用新型的工作原理是;当工作人员检修时,用较长的钩子将攀爬架5向下拉动,通过攀爬架5带动卡板4向下移动,此时第二弹簧15发生形变,当卡板4向下移动后,在第一弹簧12的作用下,使得限位杆9通过定位槽6进入卡板4的内部对卡板4进行固定,同时工作人员通过攀爬架5向上攀爬,转动转盘8,通过转盘8带动螺纹杆19通过固定槽17进入限位杆9的内部,从而对限位杆9进行固定,最后工作人员可通过攀爬架5对其进行检修维护,有效的防止其路人攀爬。The working principle of the present utility model is: when the staff overhauls, the climbing frame 5 is pulled downward with a longer hook, and the
最后应当说明的是,以上实施例仅用以说明本实用新型的技术方案,而非对本实用新型保护范围的限制,尽管参照较佳实施例对本实用新型作了详细地说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的实质和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model, rather than limiting the protection scope of the present utility model. Although the utility model has been described in detail with reference to the preferred embodiments, those skilled in the art Personnel should understand that the technical solution of the utility model can be modified or equivalently replaced without departing from the essence and scope of the technical solution of the utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222483993.5U CN218293029U (en) | 2022-09-19 | 2022-09-19 | A kind of UHV transmission tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222483993.5U CN218293029U (en) | 2022-09-19 | 2022-09-19 | A kind of UHV transmission tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218293029U true CN218293029U (en) | 2023-01-13 |
Family
ID=84815338
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222483993.5U Active CN218293029U (en) | 2022-09-19 | 2022-09-19 | A kind of UHV transmission tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218293029U (en) |
-
2022
- 2022-09-19 CN CN202222483993.5U patent/CN218293029U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210688010U (en) | A display installation structure of a smart street lamp | |
| CN218293029U (en) | A kind of UHV transmission tower | |
| CN112134198A (en) | Substation equipment overhauls device | |
| CN211127010U (en) | Combined cable bracket for bridge and tunnel wall | |
| CN110635443B (en) | Stand-alone power supply backup transfer device for special buildings | |
| CN210129417U (en) | A post insulator for easy installation and connection | |
| CN212366738U (en) | Cable rack for synchronously arranging multiple cables | |
| CN214538486U (en) | Circuit breaker mechanical characteristic testing device | |
| CN208142780U (en) | One kind joint use it is double draw fall isolation baffle plate device | |
| CN213743217U (en) | Dedicated ladder of distribution fortune dimension | |
| CN107565484A (en) | Line fixing device more than bypass cable | |
| CN211789986U (en) | Lightning protection device of communication base station | |
| CN222215587U (en) | Photovoltaic module mounting frame easy to install | |
| CN217783394U (en) | Rod body connecting and debugging device for electric power tower pole | |
| CN206727473U (en) | A kind of casing of new transmission line of electricity monitoring server | |
| CN208380236U (en) | A kind of weathering steel electric power pylon | |
| CN219414092U (en) | Monitoring device | |
| CN218918749U (en) | Mounting structure of pole-mounted circuit breaker | |
| CN219346024U (en) | Cabinet suspension device for laboratory furniture | |
| CN219739652U (en) | Small-sized low-voltage distribution power distribution cabinet | |
| CN218848854U (en) | Reservoir monitoring and warning device | |
| CN207768939U (en) | A kind of safety belt fixed frame of substation equipment maintenance and repair | |
| CN207671561U (en) | A kind of frame type capacitive device group quick replacement device | |
| CN220335751U (en) | A safety warning device | |
| CN212023873U (en) | Guide rail mounting structure for input electric iron tower lifting equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A type of ultra-high voltage transmission tower Granted publication date: 20230113 Pledgee: China Life Property insurance Co.,Ltd. Qingdao Branch Pledgor: Qingdao Xingchen iron tower Co.,Ltd. Registration number: Y2024370010017 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20230113 Pledgee: China Life Property insurance Co.,Ltd. Qingdao Branch Pledgor: Qingdao Xingchen iron tower Co.,Ltd. Registration number: Y2024370010017 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |