CN218292897U - Building Lifting Fence - Google Patents

Building Lifting Fence Download PDF

Info

Publication number
CN218292897U
CN218292897U CN202222281296.1U CN202222281296U CN218292897U CN 218292897 U CN218292897 U CN 218292897U CN 202222281296 U CN202222281296 U CN 202222281296U CN 218292897 U CN218292897 U CN 218292897U
Authority
CN
China
Prior art keywords
rack
railing
gear
telescopic
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222281296.1U
Other languages
Chinese (zh)
Inventor
王志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222281296.1U priority Critical patent/CN218292897U/en
Application granted granted Critical
Publication of CN218292897U publication Critical patent/CN218292897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了建筑升降防护栏,属于建筑施工安全防护栏相关领域,包括:底板、齿条、支撑杆、齿轮,底板上安装多个伸缩栏杆,多个伸缩栏杆上方之间安装有横杆;齿条位于伸缩栏杆一侧且安装在横杆上,齿条下方外部上下滑动套接固定筒,固定筒下端安装在底板上方;支撑杆位于齿条远离伸缩栏杆的一侧,支撑杆安装在底板的上方,支撑杆上方安装有固定块;齿轮转动连接在固定块上,齿轮与齿条相互啮合,固定块另一侧侧壁上安装有用于驱动齿轮的手摇把手。本发明可以在地上自由升降,使用效率高,还可以使多个护栏连接一起,方便使用。

Figure 202222281296

The utility model discloses a building lifting guardrail, which belongs to the related field of building construction safety guardrails, and comprises: a bottom plate, a rack, a support rod, and a gear; a plurality of telescopic railings are installed on the bottom plate; ;The rack is located on one side of the telescopic railing and is installed on the crossbar. The outer part of the rack slides up and down to connect with the fixed cylinder, and the lower end of the fixed cylinder is installed above the bottom plate; Above the bottom plate, a fixed block is installed above the support rod; the gear is connected to the fixed block in rotation, the gear and the rack are meshed with each other, and a hand handle for driving the gear is installed on the side wall of the other side of the fixed block. The invention can be lifted and lowered freely on the ground, has high use efficiency, and can also connect a plurality of guardrails together, which is convenient to use.

Figure 202222281296

Description

建筑升降防护栏Building Lifting Fence

技术领域technical field

本实用新型涉及建筑施工安全防护栏相关领域,具体是指建筑升降防护栏。The utility model relates to the related field of building construction safety guardrails, in particular to building lifting guardrails.

背景技术Background technique

护栏是一种常见的防护设备,特别建筑施工用的防护栏,作为在建筑施工时的一种隔离装置,可以将施工点与周边隔离开防止外人不注意误入。建筑施工时,保证施工人员的安全是必须要做的事情,搭设施工防护栏是建筑施工的重要环节之一。Guardrail is a common protective equipment, especially for building construction. As a kind of isolation device during building construction, it can isolate the construction site from the surrounding area to prevent outsiders from accidentally entering. During building construction, ensuring the safety of construction workers is a must. Setting up construction fences is one of the important links in building construction.

现有的建筑防护栏,在组装的时候十分繁琐,导致后期拆卸十分繁琐,同时现有防护栏的高度调节不便,大多采用定位插件和防护栏支撑架的定位孔配合调节防护栏的高度,需要人工较多,防护栏的防护高度调节实用性差;另外现有防护栏也不便于移动,提高了劳力的投入,风大等情况易造成安全隐患。The existing building guardrails are very cumbersome to assemble, which leads to cumbersome disassembly in the later stage. At the same time, the height adjustment of the existing guardrails is inconvenient. Most of them use positioning plug-ins and positioning holes of the guardrail support frame to adjust the height of the guardrail. There is a lot of labor, and the practicability of the protective height adjustment of the guardrail is poor; in addition, the existing guardrail is not easy to move, which increases the labor input, and the wind and other conditions are likely to cause safety hazards.

申请号为202011503791.1的中国实用新型专利公开的一种便于升降的建筑施工防护栏及其安装方法,上述专利记载了,在使用时,需要通过升降机构使防护栏上升,但上方为防护栏,下方为升降装置,因此下方无法进行防护,局限性较大,降低工作效率。The Chinese utility model patent with the application number 202011503791.1 discloses an easy-to-lift building construction guardrail and its installation method. The above-mentioned patent records that when in use, the guardrail needs to be raised by a lifting mechanism, but the upper part is the guardrail, and the lower part is the guardrail. It is a lifting device, so the lower part cannot be protected, which has great limitations and reduces work efficiency.

实用新型内容Utility model content

本实用新型要解决现有技术中存在上述的技术问题,提供建筑升降防护栏,可以在地上自由升降,使用效率高,还可以使多个护栏连接一起,方便使用。The utility model aims to solve the above-mentioned technical problems in the prior art, and provides a building lifting protection fence, which can be freely lifted and lowered on the ground, has high use efficiency, and can also connect multiple protection fences together, which is convenient for use.

为解决上述技术问题,本实用新型提供建筑升降防护栏,包括底板、齿条、支撑杆、齿轮,底板上安装多个伸缩栏杆,多个伸缩栏杆上方之间安装有横杆;齿条位于伸缩栏杆一侧且安装在横杆上,齿条下方外部上下滑动套接固定筒,固定筒下端安装在底板上方;支撑杆位于齿条远离伸缩栏杆的一侧,支撑杆安装在底板的上方,支撑杆上方安装有固定块;齿轮转动连接在固定块上,齿轮与齿条相互啮合,固定块另一侧侧壁上安装有用于驱动齿轮的手摇把手。In order to solve the above technical problems, the utility model provides a building lifting protection fence, including a base plate, a rack, a support rod, and a gear. A plurality of telescopic railings are installed on the bottom plate, and a cross bar is installed between the upper parts of the telescopic railings; One side of the railing is installed on the cross bar, and the outer part of the lower rack slides up and down to connect with the fixed cylinder, and the lower end of the fixed cylinder is installed above the bottom plate; A fixed block is installed above the rod; the gear is rotatably connected to the fixed block, and the gear and the rack mesh with each other, and a hand handle for driving the gear is installed on the side wall of the other side of the fixed block.

进一步的,底板底部的两侧均设置有支撑腿,支撑腿底部为橡胶材质。Further, both sides of the bottom of the bottom plate are provided with supporting legs, and the bottom of the supporting legs is made of rubber material.

进一步的,横杆上设有用于放置水管的水管槽,水管槽内安装多个卡扣,横杆一端两侧的侧壁上分别设有两个连接环,两个连接环远离横杆的一端设有固定孔,横杆另一端相对两侧壁上设有配合固定孔的通孔。Further, the cross bar is provided with a water pipe groove for placing water pipes, and a plurality of buckles are installed in the water pipe groove, and two connecting rings are respectively arranged on the side walls on both sides of one end of the cross bar, and the two connecting rings are far away from the end of the cross bar. A fixing hole is provided, and a through hole matching the fixing hole is arranged on the opposite side wall at the other end of the cross bar.

进一步的,伸缩栏杆包括位于底板的上方的下栏杆,下栏杆上方插接上栏杆,上栏杆侧壁上从上到下依次设有多个限位孔。Further, the telescopic railing includes a lower railing above the bottom plate, the upper railing is inserted above the lower railing, and a plurality of limiting holes are sequentially provided on the side wall of the upper railing from top to bottom.

进一步的,多个下栏杆的限位孔之间插接有固定杆。Further, a fixing rod is inserted between the limiting holes of the plurality of lower railings.

进一步的,固定杆为不锈钢材质。Further, the fixing rod is made of stainless steel.

本实用新型与现有技术相比的优点在于:通过设置可伸缩围栏,可以使护栏上下移动,增加施工时的高度范围,横杆内设有水管槽,方便水管进入,连接喷头喷水降温增湿,另外设置连接环,方便多个护栏相连接,实用性更好,更加安全方便。Compared with the prior art, the utility model has the advantages that: by setting the retractable fence, the fence can be moved up and down, and the height range during construction can be increased; In addition, a connecting ring is provided to facilitate the connection of multiple guardrails, which is more practical, safer and more convenient.

附图说明Description of drawings

图1是本实用新型建筑升降防护栏的立面结构示意图。Fig. 1 is a schematic diagram of the facade structure of a building lifting guardrail of the present invention.

图2是本实用新型建筑升降防护栏的齿轮杆结构示意图。Fig. 2 is a schematic diagram of the structure of the gear rod of the building lifting protection fence of the present invention.

图3是本实用新型建筑升降防护栏的伸缩栏杆结构示意图。Fig. 3 is a structural schematic diagram of the telescopic railing of the building lifting protective railing of the present invention.

图4是本实用新型建筑升降防护栏的卡扣结构示意图。Fig. 4 is a schematic diagram of the buckle structure of the building lifting protection fence of the present invention.

图5是本实用新型建筑升降防护栏的使用说明示意图。Fig. 5 is a schematic view illustrating the use of the building lifting protection fence of the present invention.

如图所示:1、底板;2、伸缩栏杆;201、限位孔;202、固定杆;203、上栏杆;204、下栏杆;3、横杆;4、齿轮;5、固定块;6、手摇把手;7、齿条;8、支撑腿;9、支撑杆;10固定筒;11、水管槽;12、卡扣;13、连接环;14、通孔。As shown in the figure: 1. Bottom plate; 2. Telescopic railing; 201. Limit hole; 202. Fixed rod; 203. Upper railing; 204. Lower railing; 3. Crossbar; 4. Gear; 5. Fixed block; 6 , hand crank handle; 7, rack; 8, support leg; 9, support rod; 10 fixed cylinder; 11, water pipe groove;

具体实施方式detailed description

在本实用新型的描述中,需要理解的是,术语“中心”、“横向”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上。另外,术语“包括”及其任何变形,意图在于覆盖不排他的包含。In describing the present invention, it should be understood that the terms "central", "lateral", "upper", "lower", "left", "right", "vertical", "horizontal", "top" , "bottom", "inner", "outer" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying Any device or element must have a specific orientation, be constructed and operate in a specific orientation, and thus should not be construed as limiting the invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present utility model, unless otherwise specified, "plurality" means two or more. Additionally, the term "comprise" and any variations thereof, are intended to cover a non-exclusive inclusion.

下面结合附图对本实用新型做进一步的详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

如图1-5所示,建筑升降防护栏,包括:As shown in Figure 1-5, the building lift protection fence includes:

底板1上安装多个伸缩栏杆2,多个伸缩栏杆2上方之间安装有横杆3,横杆3上设有用于放置水管的水管槽11,方便后期放置水管,所述水管槽11内安装多个卡扣12,可以固定水管,防止水管移动,所述横杆3一端两侧的侧壁上分别设有两个连接环13,两个所述连接环13远离横杆的一端设有固定孔,所述横杆3另一端相对两侧壁上设有配合固定孔的通孔14,可以使两个护栏相互连接;底板1底部的两侧均设置有支撑腿8,所述支撑腿8底部为橡胶材质,方便与地面固定;A plurality of telescopic railings 2 are installed on the bottom plate 1, and crossbars 3 are installed between the tops of the plurality of telescopic railings 2. A water pipe groove 11 for placing water pipes is provided on the crossbar 3, which is convenient for placing water pipes in the later stage. A plurality of buckles 12 can fix the water pipe and prevent the water pipe from moving. Two connecting rings 13 are respectively arranged on the side walls on both sides of one end of the cross bar 3, and the ends of the two connecting rings 13 away from the cross bar are provided with fixing rings 13. hole, the other end of the cross bar 3 is provided with a through hole 14 matching the fixing hole on the opposite side wall, so that the two guardrails can be connected to each other; both sides of the bottom of the bottom plate 1 are provided with supporting legs 8, and the supporting legs 8 The bottom is made of rubber material, which is convenient to fix with the ground;

齿条7位于伸缩栏杆2一侧且安装在横杆3上,齿条7下方外部上下滑动套接固定筒10,固定筒10内有滑轨,方便与齿条7上下移动,固定筒10下端安装在底板1上方,当不使用时,固定筒10可遮挡齿条7,防止齿条7内进入物体;The rack 7 is located on one side of the telescopic railing 2 and is installed on the cross bar 3. The outside of the rack 7 slides up and down to connect with the fixed cylinder 10. There is a slide rail in the fixed cylinder 10, which is convenient to move up and down with the rack 7. The lower end of the fixed cylinder 10 Installed above the bottom plate 1, when not in use, the fixed cylinder 10 can cover the rack 7 to prevent objects from entering the rack 7;

支撑杆9位于齿条7远离伸缩栏杆2的一侧,支撑杆9安装在底板1的上方,支撑杆9上方安装有固定块5,伸缩栏杆2包括位于所述底板1的上方的下栏杆204,所述下栏杆204上方插接上栏杆203,所述上栏杆203侧壁上从上到下依次设有多个限位孔201,多个所述下栏杆204的限位孔201之间插接有固定杆202,使上栏杆203的底部与固定杆202接触,固定上栏杆203防止下滑,固定杆202为不锈钢材质;The support bar 9 is located on the side of the tooth bar 7 away from the telescopic railing 2, the support bar 9 is installed above the base plate 1, the fixing block 5 is installed above the support bar 9, and the telescopic railing 2 includes a lower rail 204 positioned above the base plate 1 , the upper railing 203 is inserted above the lower railing 204, and the side wall of the upper railing 203 is provided with a plurality of limiting holes 201 from top to bottom, and a plurality of limiting holes 201 of the lower railing 204 are inserted between them. Connect with fixed bar 202, make the bottom of upper railing 203 contact with fixed bar 202, fix upper railing 203 and prevent from sliding down, and fixed bar 202 is made of stainless steel;

齿轮4转动连接在固定块5上,齿轮4与齿条7相互啮合,固定块5另一侧侧壁上安装有用于驱动齿轮4的手摇把手6,方便齿轮4转动。The gear 4 is rotatably connected to the fixed block 5, and the gear 4 and the rack 7 are meshed with each other. A hand handle 6 for driving the gear 4 is installed on the side wall of the other side of the fixed block 5 to facilitate the rotation of the gear 4.

本实用新型在具体实施时,首先将防护栏放置到合适的位置,转动手摇把手6,使齿轮4与齿条7配合转动,通过横杆3带动伸缩栏杆2向上移动,伸缩栏杆2的下栏杆204上从上到下依次设有多个限位孔201,当移动到合适的高度时,使用固定杆202贯穿多个的下栏杆204上的限位孔201,方便上栏杆203底部与固定杆202接触,上栏杆203不会下滑;当范围比较大时,可以连接多个防护栏,使固定螺栓穿过两个连接环13和通孔14,固定防护栏;若需要喷水,水管可以放置在横杆3里的水管槽11内,通过多个卡扣12扣住水管,防止水管移动。When the utility model is implemented, firstly, the guardrail is placed in a suitable position, and the hand handle 6 is rotated to make the gear 4 and the rack 7 cooperate to rotate. The railing 204 is provided with a plurality of limiting holes 201 from top to bottom in turn. When moving to a suitable height, use the fixed rod 202 to penetrate through the limiting holes 201 on the lower railing 204 to facilitate the fixing of the bottom of the upper railing 203. Bar 202 contacts, and upper railing 203 can not slide down; When scope is larger, can connect a plurality of protective fences, make fixing bolt pass two connecting rings 13 and through hole 14, fixed protective fence; If need spray water, water pipe can Placed in the water pipe groove 11 in the cross bar 3, the water pipe is buckled by a plurality of buckles 12 to prevent the water pipe from moving.

本装置在实际使用过程中,结构合理、设计巧妙、整体一致性强、方便快捷,省时省力。During actual use, the device has reasonable structure, ingenious design, strong overall consistency, convenience and speed, and saves time and effort.

以上对本实用新型及其实施方式进行了描述,这种描述没有限制性,附图中所示的也只是本实用新型的实施方式之一,实际的结构并不局限于此。总而言之如果本领域的普通技术人员受其启示,在不脱离本实用新型创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本实用新型的保护范围。The utility model and its implementation have been described above. This description is not restrictive. What is shown in the drawings is only one implementation of the utility model, and the actual structure is not limited thereto. All in all, if a person of ordinary skill in the art is inspired by it, without departing from the purpose of the utility model, without creatively designing a structural method and embodiment similar to the technical solution, it shall be protected by the utility model scope.

Claims (6)

1.建筑升降防护栏,其特征在于,包括:1. The building lifting protection fence is characterized in that it comprises: 底板(1),所述底板(1)上安装多个伸缩栏杆(2),多个所述伸缩栏杆(2)上方之间安装有横杆(3);A base plate (1), a plurality of telescopic railings (2) are installed on the base plate (1), and a cross bar (3) is installed between the tops of the plurality of telescopic railings (2); 齿条(7),所述齿条(7)位于所述伸缩栏杆(2)一侧且安装在所述横杆(3)上,所述齿条(7)下方外部上下滑动套接固定筒(10),所述固定筒(10)下端安装在所述底板(1)上方;The rack (7), the rack (7) is located on one side of the telescopic railing (2) and is installed on the crossbar (3), the lower part of the rack (7) slides up and down outside the fixed cylinder (10), the lower end of the fixing cylinder (10) is installed above the bottom plate (1); 支撑杆(9),所述支撑杆(9)位于所述齿条(7)远离伸缩栏杆(2)的一侧,所述支撑杆(9)安装在所述底板(1)的上方,所述支撑杆(9)上方安装有固定块(5);A support rod (9), the support rod (9) is located on the side of the rack (7) away from the telescopic railing (2), the support rod (9) is installed above the bottom plate (1), the A fixed block (5) is installed above the support rod (9); 齿轮(4),所述齿轮(4)转动连接在固定块(5)上,所述齿轮(4)与所述齿条(7)相互啮合,所述固定块(5)另一侧侧壁上安装有用于驱动所述齿轮(4)的手摇把手(6)。A gear (4), the gear (4) is rotatably connected to the fixed block (5), the gear (4) and the rack (7) mesh with each other, and the other side wall of the fixed block (5) A hand handle (6) for driving the gear (4) is installed on it. 2.根据权利要求1所述的建筑升降防护栏,其特征在于:所述底板(1)底部的两侧均设置有支撑腿(8),所述支撑腿(8)底部为橡胶材质。2. The building lifting protection fence according to claim 1, characterized in that: both sides of the bottom of the bottom plate (1) are provided with supporting legs (8), and the bottom of the supporting legs (8) is made of rubber material. 3.根据权利要求1所述的建筑升降防护栏,其特征在于:所述横杆(3)上设有用于放置水管的水管槽(11),所述水管槽(11)内安装多个卡扣(12),所述横杆(3)一端两侧的侧壁上分别设有两个连接环(13),两个所述连接环(13)远离横杆的一端设有固定孔,所述横杆(3)另一端相对两侧壁上设有配合固定孔的通孔(14)。3. The building lifting protection fence according to claim 1, characterized in that: the crossbar (3) is provided with a water pipe groove (11) for placing water pipes, and a plurality of clips are installed in the water pipe groove (11) buckle (12), two connecting rings (13) are respectively arranged on the side walls on both sides of one end of the cross bar (3), and two connecting rings (13) are provided with fixing holes at the end far away from the cross bar, so The other end of the cross bar (3) is provided with a through hole (14) matching the fixing hole on the opposite side wall. 4.根据权利要求1所述的建筑升降防护栏,其特征在于:所述伸缩栏杆(2)包括位于所述底板(1)的上方的下栏杆(204),所述下栏杆(204)上方插接上栏杆(203),所述上栏杆(203)侧壁上从上到下依次设有多个限位孔(201)。4. The building lifting protection fence according to claim 1, characterized in that: the telescopic railing (2) comprises a lower railing (204) above the base plate (1), and the upper railing (204) is Inserting the upper railing (203), the side wall of the upper railing (203) is sequentially provided with a plurality of limiting holes (201) from top to bottom. 5.根据权利要求4所述的建筑升降防护栏,其特征在于:多个所述下栏杆(204)的限位孔(201)之间插接有固定杆(202)。5. The building lifting protection fence according to claim 4, characterized in that: fixed rods (202) are inserted between the limiting holes (201) of the plurality of lower railings (204). 6.根据权利要求5所述的建筑升降防护栏,其特征在于:所述固定杆(202)为不锈钢材质。6. The building lifting protection fence according to claim 5, characterized in that: the fixing rod (202) is made of stainless steel.
CN202222281296.1U 2022-08-29 2022-08-29 Building Lifting Fence Expired - Fee Related CN218292897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222281296.1U CN218292897U (en) 2022-08-29 2022-08-29 Building Lifting Fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222281296.1U CN218292897U (en) 2022-08-29 2022-08-29 Building Lifting Fence

Publications (1)

Publication Number Publication Date
CN218292897U true CN218292897U (en) 2023-01-13

Family

ID=84811033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222281296.1U Expired - Fee Related CN218292897U (en) 2022-08-29 2022-08-29 Building Lifting Fence

Country Status (1)

Country Link
CN (1) CN218292897U (en)

Similar Documents

Publication Publication Date Title
CN212656515U (en) Adjustable movable scaffold
CN109235861B (en) Be applied to small high-rise building's assembled scaffold frame
CN106284956A (en) The scaffold of a kind of automatic lifting and construction method thereof
CN204125829U (en) Half high-rise unsettled insulation maintenance gap bridge
US2142651A (en) Scaffolding
CN218292897U (en) Building Lifting Fence
CN205822747U (en) Architectural engineering scaffold
CN204876578U (en) Building construction system
CN201125536Y (en) Window construction protection device
CN213205052U (en) Assembled safety ladder cage
CN220620972U (en) Building construction frame
CN211007705U (en) unloading platform
CN201121405Y (en) Adjustable Mobile Scaffolding
CN213297074U (en) A convenient outer wall cantilever operation frame
CN218541800U (en) Safety fence for construction engineering management construction
CN209397897U (en) A kind of Multi-functional indoor scaffold
CN105927032A (en) Electric fence
CN114427304A (en) An assembled edge protection device for cast-in-place concrete stairs
CN215886132U (en) A tower crane anti-climbing platform
CN219136063U (en) Adjustable foundation supporting device for construction lifter
CN105064396B (en) A kind of mass concrete movable up-down operation platform
CN217268703U (en) Walking type overhanging scaffold
CN222810738U (en) Water tank stainless steel safety protection guardrail
CN116905864B (en) An attached working platform
CN215561952U (en) Integrated operation platform for binding and positioning reinforcement of turnover formwork high pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230113