CN218290187U - A formwork installation and lifting device for road and bridge construction - Google Patents

A formwork installation and lifting device for road and bridge construction Download PDF

Info

Publication number
CN218290187U
CN218290187U CN202220603345.6U CN202220603345U CN218290187U CN 218290187 U CN218290187 U CN 218290187U CN 202220603345 U CN202220603345 U CN 202220603345U CN 218290187 U CN218290187 U CN 218290187U
Authority
CN
China
Prior art keywords
fixedly connected
rope
road
bridge construction
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220603345.6U
Other languages
Chinese (zh)
Inventor
李华
谭慧
李静
邹超英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Metallurgy College
Original Assignee
Kunming Metallurgy College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Metallurgy College filed Critical Kunming Metallurgy College
Priority to CN202220603345.6U priority Critical patent/CN218290187U/en
Application granted granted Critical
Publication of CN218290187U publication Critical patent/CN218290187U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种道桥施工用模板安装起吊装置,涉及道桥施工起吊装置技术领域,解决了现有技术中绳索在上升的过程中出现严重的摆动进而存在安全隐患的问题,包括两组支架,两组支架的顶端固定连接有横轨,横轨上滑动连接有电动葫芦,电动葫芦上连接有绳索,绳索的底端固定连接有挂钩,靠近挂钩的位置安装有套设于绳索外侧的夹持件,此道桥施工用模板安装起吊装置,通过设置有夹持件,进而通过设置的夹持件对绳索进行夹持固定,从而避免绳索在上升的过程中剧烈摆动,且通过移动组件将夹持件跟随绳索同时上升,进而对绳索进行夹持,因此解决了现有技术中绳索在上升的过程中出现严重的摆动进而存在安全隐患的问题。

Figure 202220603345

The utility model discloses a formwork installation and lifting device for road and bridge construction, relates to the technical field of road and bridge construction lifting devices, and solves the problem in the prior art that serious swings occur in the rising process of ropes and thus presents potential safety hazards, including two A set of brackets, the top of the two sets of brackets is fixedly connected with a horizontal rail, an electric hoist is slidably connected to the horizontal rail, a rope is connected to the electric hoist, and the bottom end of the rope is fixedly connected with a hook. The clamping part, the lifting device installed with the formwork for road and bridge construction, is provided with the clamping part, and then the rope is clamped and fixed by the set clamping part, so as to avoid the violent swing of the rope during the rising process, and by moving The component raises the clamping part simultaneously with the rope, and then clamps the rope, thus solving the problem in the prior art that the rope swings seriously during the ascent process and thus poses a safety hazard.

Figure 202220603345

Description

一种道桥施工用模板安装起吊装置A formwork installation and lifting device for road and bridge construction

技术领域technical field

本实用新型涉及道桥施工起吊装置技术领域,具体为一种道桥施工用模板安装起吊装置。The utility model relates to the technical field of hoisting devices for road and bridge construction, in particular to a formwork installation and hoisting device for road and bridge construction.

背景技术Background technique

起重机是指在一定范围内垂直提升和水平搬运重物的多动作起重机械,又称天车,航吊,吊车,起重设备有的工作特点是做间歇性运动,即在一个工作循环中取料、运移、卸载等动作的相应机构是交替工作的,起重机在市场上的发展和使用越来越广泛。A crane refers to a multi-action hoisting machine that vertically lifts and horizontally transports heavy objects within a certain range, also known as cranes, aerial cranes, cranes, and some lifting equipment. The corresponding mechanisms for actions such as retrieving, moving, and unloading work alternately, and the development and use of cranes in the market are becoming more and more extensive.

目前,在道路桥梁施工的过程中,当需要运输模板时,一般会使用起吊装置对模板进行运输移动,从而提高工作效率,但是现有技术中,模板一般是通过绳索连接的挂钩将模板钩住,进而对模板进行运输,在运输的过程中,由于绳索较长且为柔性,进而在运输的过程中,模板跟随绳索发生严重的摆动,进而可能存在安全隐患,为此,我们提出一种道桥施工用模板安装起吊装置。At present, in the process of road and bridge construction, when the formwork needs to be transported, the formwork is generally transported and moved by a lifting device, thereby improving work efficiency, but in the prior art, the formwork is generally hooked by a hook connected by a rope , and then the formwork is transported. During the transportation process, due to the long and flexible rope, the formwork will swing seriously following the rope during the transportation process, which may cause potential safety hazards. For this reason, we propose a road Bridge construction with formwork installation lifting device.

实用新型内容Utility model content

本实用新型的目的在于提供一种减小模板上升摆动的幅度,进而降低安全隐患的风险的道桥施工用模板安装起吊装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a formwork installation and lifting device for road and bridge construction that reduces the amplitude of the formwork's rising and swinging, thereby reducing the risk of potential safety hazards, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种道桥施工用模板安装起吊装置,包括两组支架、移动组件和转动组件,两组所述支架的顶端固定连接有横轨,所述横轨上滑动连接有电动葫芦,所述电动葫芦上连接有绳索,所述绳索的底端固定连接有挂钩,靠近所述挂钩的位置安装有套设于所述绳索外侧的夹持件,用于移动所述夹持件的所述移动组件安装于所述支架上,且与所述夹持件相连接,用于转动夹持件的所述转动组件安装于所述支架上,且与所述移动组件相连接,减小模板上升摆动的幅度,进而降低安全隐患的风险。In order to achieve the above purpose, the utility model provides the following technical solutions: a formwork installation and lifting device for road and bridge construction, including two sets of brackets, moving components and rotating components, the top ends of the two sets of brackets are fixedly connected with cross rails, the An electric hoist is slidably connected to the horizontal rail, a rope is connected to the electric hoist, a hook is fixedly connected to the bottom end of the rope, and a clamping piece sleeved on the outside of the rope is installed near the hook. The moving component for moving the clamping part is installed on the bracket and connected with the clamping part, and the rotating component for rotating the clamping part is installed on the bracket and connected with the clamping part. The mobile components are connected to reduce the amplitude of the rising and swinging of the formwork, thereby reducing the risk of potential safety hazards.

优选的,所述夹持件包括龙门架,所述龙门架内滑动连接有多组呈镜像设置的活动块,所述活动块上固定连接有与所述龙门架固定连接的第一弹簧,且转动连接有转动柱,对绳索夹持固定。Preferably, the clamping member includes a gantry frame, and multiple sets of movable blocks arranged in mirror images are slidably connected to the gantry frame, and a first spring fixedly connected to the gantry frame is fixedly connected to the movable block, and The rotation is connected with a rotation column, and the rope is clamped and fixed.

优选的,所述移动组件包括与所述支架固定连接的滑轨,所述滑轨内滑动连接有滑块,所述滑块上转动连接有与所述龙门架固定连接的连接杆,且螺纹连接有螺纹杆,所述螺纹杆的顶端固定连接有转动轴,所述转动轴与所述螺纹杆之间连接有弹性件,且所述转动轴的顶端连接有驱动件,带动龙门架随着挂钩移动。Preferably, the moving assembly includes a slide rail fixedly connected to the bracket, a slide block is slidably connected to the slide rail, and a connecting rod fixedly connected to the gantry frame is rotatably connected to the slide block, and the thread A threaded rod is connected, the top of the threaded rod is fixedly connected with a rotating shaft, an elastic member is connected between the rotating shaft and the threaded rod, and a driving member is connected to the top of the rotating shaft, which drives the gantry Hook to move.

优选的,所述驱动件包括与所述支架固定连接电机,所述电机的输出端固定连接有联轴器,所述联轴器的一端固定连接有与所述转动轴固定连接有驱动轴,提供驱动力。Preferably, the drive member includes a motor fixedly connected to the bracket, the output end of the motor is fixedly connected to a coupling, and one end of the coupling is fixedly connected to a drive shaft fixedly connected to the rotating shaft, Provide drive.

优选的,所述弹性件包括与所述转动轴固定连接的固定片,所述固定片的一端固定连接有套设于所述转动轴外侧的第二弹簧,所述第二弹簧的一端固定连接有与所述转动轴活动连接的活动片,所述活动片位于所述螺纹杆与所述转动轴连接处位置,便于对滑块限位。Preferably, the elastic member includes a fixed piece fixedly connected with the rotating shaft, one end of the fixed piece is fixedly connected with a second spring sleeved outside the rotating shaft, one end of the second spring is fixedly connected There is a movable piece movably connected with the rotating shaft, and the movable piece is located at the joint between the threaded rod and the rotating shaft, which is convenient for limiting the position of the slider.

优选的,所述转动组件包括与所述驱动轴固定连接第一平齿轮,所述第一平齿轮的外侧啮合有第二平齿轮,所述第二平齿轮的一端固定连接有与所述支架转动连接的传动轴,所述传动轴的底端延伸至支架的底端且固定连接有第一锥齿轮,所述第一锥齿轮的外侧啮合有与所述连接杆固定连接的第二锥齿轮,带动连接杆转动。Preferably, the rotating assembly includes a first spur gear fixedly connected to the drive shaft, a second spur gear is meshed on the outside of the first spur gear, and one end of the second spur gear is fixedly connected to the bracket Rotationally connected transmission shaft, the bottom end of the transmission shaft extends to the bottom end of the bracket and is fixedly connected with a first bevel gear, and the outer side of the first bevel gear is meshed with a second bevel gear fixedly connected with the connecting rod , to drive the connecting rod to rotate.

优选的,所述支架上固定连接有加固杆,且底端设置有防滑垫,提高稳定性。Preferably, a reinforcing rod is fixedly connected to the bracket, and an anti-skid pad is provided at the bottom end to improve stability.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型通过设置有夹持件,进而通过设置的夹持件对绳索进行夹持固定,从而避免绳索在上升的过程中剧烈摆动,且通过移动组件将夹持件跟随绳索同时上升,进而对绳索进行夹持,因此解决了现有技术中绳索在上升的过程中出现严重的摆动进而存在安全隐患的问题。The utility model is provided with a clamping part, and then the rope is clamped and fixed by the clamping part, thereby avoiding the violent swing of the rope during the rising process, and the clamping part is raised simultaneously with the rope through the moving component, and then the The rope is clamped, thus solving the problem in the prior art that the rope swings seriously during the ascent process and thus poses a safety hazard.

附图说明Description of drawings

图1为本实用新型整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型夹持件结构示意图;Fig. 2 is a structural schematic diagram of the clamping part of the present invention;

图3为本实用新型局部结构示意图;Fig. 3 is a schematic diagram of the local structure of the utility model;

图4为本实用新型图2中A区结构示意图;Fig. 4 is a schematic diagram of the structure of A district in Fig. 2 of the utility model;

图5为本实用新型图2中B区结构示意图;Fig. 5 is a schematic diagram of the structure of the B area in Fig. 2 of the utility model;

图6为本实用新型图2中C区结构示意图;Fig. 6 is a schematic diagram of the structure of zone C in Fig. 2 of the utility model;

图7为本实用新型转动组件与驱动件连接结构示意图;Fig. 7 is a schematic diagram of the connection structure between the rotating assembly and the driving part of the utility model;

图8为本实用新型图7中D区结构示意图。Fig. 8 is a schematic diagram of the structure of area D in Fig. 7 of the present utility model.

图中:1-支架;2-横轨;3-电动葫芦;4-绳索;5-挂钩;6-夹持件;7-移动组件;8-转动组件;9-滑轨;10-滑块;11-螺纹杆;12-连接杆;13-转动轴;14-弹性件;15-驱动件;16-电机;17-联轴器;18-驱动轴;19-第一平齿轮;20-第二平齿轮;21-传动轴;22-第一锥齿轮;23-第二锥齿轮;24-龙门架;25-活动块;26-第一弹簧;27-转动柱;28-固定片;29-第二弹簧;30-活动片。In the figure: 1-bracket; 2-horizontal rail; 3-electric hoist; 4-rope; 5-hook; 6-clamping piece; 7-moving component; ; 11-threaded rod; 12-connecting rod; 13-rotating shaft; 14-elastic part; The second flat gear; 21-transmission shaft; 22-the first bevel gear; 23-the second bevel gear; 24-gantry; 25-movable block; 26-the first spring; 29-the second spring; 30-movable sheet.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例1Example 1

请参阅图1和图2说明实施例1,图示中一种道桥施工用模板安装起吊装置,包括两组支架1、移动组件7和转动组件8,两组支架1的顶端固定连接有横轨2,横轨2上滑动连接有电动葫芦3,电动葫芦3上连接有绳索4,绳索4的底端固定连接有挂钩5,靠近挂钩5的位置安装有套设于绳索4外侧的夹持件6,用于移动夹持件6的移动组件7安装于支架1上,且与夹持件6相连接,用于转动夹持件6的转动组件8安装于支架1上,且与移动组件7相连接;Please refer to Fig. 1 and Fig. 2 to illustrate embodiment 1, a kind of formwork installation hoisting device for road and bridge construction in the illustration, comprises two groups of brackets 1, moving assembly 7 and rotating assembly 8, the top of two groups of brackets 1 is fixedly connected with horizontal The rail 2 and the cross rail 2 are slidingly connected with an electric hoist 3, and the electric hoist 3 is connected with a rope 4, and the bottom end of the rope 4 is fixedly connected with a hook 5, and a clamping sleeve set on the outside of the rope 4 is installed near the hook 5. Part 6, the moving assembly 7 for moving the clamping part 6 is installed on the bracket 1, and is connected with the clamping part 6, and the rotating assembly 8 for rotating the clamping part 6 is installed on the bracket 1, and is connected with the moving assembly 7-phase connection;

请参阅图1和图2,图示中的夹持件6包括龙门架24,龙门架24内滑动连接有多组呈镜像设置的活动块25,活动块25上固定连接有与龙门架24固定连接的第一弹簧26,且转动连接有转动柱27;Please refer to Fig. 1 and Fig. 2, the clamping part 6 in the illustration comprises gantry frame 24, and the gantry frame 24 is slidably connected with a plurality of sets of movable blocks 25 that are mirrored. The first spring 26 connected, and the rotation is connected with the rotation column 27;

请参阅图3和图4,图示中的移动组件7包括与支架1固定连接的滑轨9,滑轨9内滑动连接有滑块10,滑块10上转动连接有与龙门架24固定连接的连接杆12,且螺纹连接有螺纹杆11,螺纹杆11的顶端固定连接有转动轴13,转动轴13与螺纹杆11之间连接有弹性件14,且转动轴13的顶端连接有驱动件15;Please refer to Fig. 3 and Fig. 4, the moving assembly 7 in the illustration includes the slide rail 9 that is fixedly connected with the bracket 1, the slide rail 9 is slidably connected with a slider 10, and the slider 10 is rotatably connected with a gantry 24 fixedly connected The connecting rod 12 is connected with a threaded rod 11, the top of the threaded rod 11 is fixedly connected with a rotating shaft 13, an elastic member 14 is connected between the rotating shaft 13 and the threaded rod 11, and the top of the rotating shaft 13 is connected with a driving member 15;

请参阅图3和图5,图示中的驱动件15包括与支架1固定连接电机16,电机16的输出端固定连接有联轴器17,联轴器17的一端固定连接有与转动轴13固定连接有驱动轴18;Please refer to Fig. 3 and Fig. 5, the driving member 15 in the illustration includes the motor 16 that is fixedly connected with the bracket 1, the output end of the motor 16 is fixedly connected with a coupling 17, and one end of the coupling 17 is fixedly connected with the rotating shaft 13 fixedly connected with a drive shaft 18;

本实施方式中,在起吊模板时,通过挂钩5将模板吊起,此时通过电动葫芦3的作用带动模板左右移动,使得绳索4能够位于在转动柱27之间,此时通过第一弹簧26的作用使得转动柱27对绳索4进行挤压,因此通过转动柱27对绳索4进行夹持固定,此时再通过电动葫芦3的作用带动模板上升,在模板上升的过程中,通过启动电机16,进而电机16将会带动联轴器17转动,进而带动驱动轴18转动,进而带动转动轴13转动,进而带动螺纹杆11转动,进而带动滑块10移动,因此带动连接杆12移动,从而带动龙门架24移动,因此使得龙门架24随着挂钩5的升降而升降,进而使得龙门架24与挂钩5之间相对静止;In this embodiment, when the template is lifted, the template is lifted by the hook 5. At this time, the template is driven to move left and right by the action of the electric hoist 3, so that the rope 4 can be located between the rotating columns 27. At this time, the first spring 26 The role of the rotating column 27 to squeeze the rope 4, so the rope 4 is clamped and fixed by the rotating column 27. At this time, the template is driven by the action of the electric hoist 3. During the rising process of the template, the starting motor 16 , and then the motor 16 will drive the coupling 17 to rotate, and then drive the drive shaft 18 to rotate, and then drive the rotating shaft 13 to rotate, and then drive the threaded rod 11 to rotate, and then drive the slider 10 to move, thus driving the connecting rod 12 to move, thereby driving The gantry 24 moves, so that the gantry 24 rises and falls with the lifting of the hook 5, so that the gantry 24 and the hook 5 are relatively stationary;

本实施方式中,在模板上升至指定位置后,此时电机16持续转动,进而带动滑块10移动至螺纹杆11的顶端,且位转动轴13上,此时螺纹杆11转动不会带动滑块10继续移动,且此时转动组件8运行,进而带动连接杆12转动,进而带动龙门架24转动,从而使得绳索4置于龙门架24的外侧,此时通过电动葫芦3带动模板左右移动至指定位置;In this embodiment, after the template rises to the specified position, the motor 16 continues to rotate at this time, and then drives the slider 10 to move to the top of the threaded rod 11, and is positioned on the rotating shaft 13. At this time, the rotation of the threaded rod 11 will not drive the slider. Block 10 continues to move, and now rotating assembly 8 runs, and then drives connecting rod 12 to rotate, and then drives gantry 24 to rotate, thereby makes rope 4 be placed on the outside of gantry 24, and now drives template to move left and right by electric hoist 3 specified location;

本实施方式中,电机16优选Y80M1-2型号,电机16的供电接口通过开关连接供电系统,电机16运行电路为常规电机16正反转控制程序,电路运行为现有常规电路,本方案中涉及的电路以及控制均为现有技术,在此不进行过多赘述。In this embodiment, the motor 16 is preferably a Y80M1-2 model, and the power supply interface of the motor 16 is connected to the power supply system through a switch. The circuit and control of the present invention are all prior art, and will not be repeated here.

实施例2Example 2

请参阅图3和图6说明实施例2,本实施方式对实施例1作进一步说明,图示中弹性件14包括与转动轴13固定连接的固定片28,固定片28的一端固定连接有套设于转动轴13外侧的第二弹簧29,第二弹簧29的一端固定连接有与转动轴13活动连接的活动片30,活动片30位于螺纹杆11与转动轴13连接处位置;Please refer to Fig. 3 and Fig. 6 to illustrate embodiment 2. This embodiment will further describe embodiment 1. In the figure, the elastic member 14 includes a fixed piece 28 fixedly connected with the rotating shaft 13, and one end of the fixed piece 28 is fixedly connected with a sleeve. The second spring 29 located on the outside of the rotating shaft 13, one end of the second spring 29 is fixedly connected with a movable piece 30 that is movably connected with the rotating shaft 13, and the movable piece 30 is located at the joint between the threaded rod 11 and the rotating shaft 13;

本实施方式中,当滑块10通过螺纹杆11的作用移动至螺纹杆11顶端,且滑块10位于转动轴13上,此时滑块10将会通过活动片30对第二弹簧29进行挤压,由于滑块10位于转动轴13上,因此在螺纹杆11转动时不会带动滑块10继续移动,在螺纹杆11反转时,此时弹簧将会释放弹力,使得滑块10与螺纹杆11紧密贴合,进而螺纹杆11将会带动滑块10反向移动。In this embodiment, when the slider 10 is moved to the top of the threaded rod 11 by the action of the threaded rod 11, and the slider 10 is located on the rotating shaft 13, the slider 10 will press the second spring 29 through the movable piece 30. Because the slider 10 is located on the rotating shaft 13, the slider 10 will not be driven to continue moving when the threaded rod 11 rotates. When the threaded rod 11 reverses, the spring will release the elastic force at this time, so that the slider 10 and the threaded The rod 11 fits closely, and then the threaded rod 11 will drive the slider 10 to move in reverse.

实施例3Example 3

请参阅图5-图8说明实施例3,本实施方式对实施例1作进一步说明,图示中转动组件8包括与驱动轴18固定连接第一平齿轮19,第一平齿轮19的外侧啮合有第二平齿轮20,第二平齿轮20的一端固定连接有与支架1转动连接的传动轴21,传动轴21的底端延伸至支架1的底端且固定连接有第一锥齿轮22,第一锥齿轮22的外侧啮合有与连接杆12固定连接的第二锥齿轮23;Please refer to Fig. 5-Fig. 8 to illustrate embodiment 3. This embodiment will further illustrate embodiment 1. In the figure, the rotating assembly 8 includes a first spur gear 19 fixedly connected to the drive shaft 18, and the outer side of the first spur gear 19 is meshed. There is a second spur gear 20, one end of the second spur gear 20 is fixedly connected with a transmission shaft 21 which is rotationally connected with the bracket 1, the bottom end of the transmission shaft 21 extends to the bottom end of the bracket 1 and is fixedly connected with a first bevel gear 22, The outer side of the first bevel gear 22 is meshed with a second bevel gear 23 fixedly connected with the connecting rod 12;

本实施方式中,在滑块10移动至螺纹杆11顶端且位于转动轴13上时,此时第二锥齿轮23刚好与第一锥齿轮22啮合,因此电机16转动将会带动驱动轴18转动,进而带动第一平齿轮19转动,进而带动第二平齿轮20转动,进而带动传动轴21转动,进而带动第一锥齿轮22转动,进而带动第二锥齿轮23转动,进而带动连接杆12转动,进而带动龙门架24转动,从而使得转动柱27转动,因此使得转动柱27失去对绳索4的夹持,因此便于电动葫芦3带动绳索4沿着横轨2作用移动。In this embodiment, when the slider 10 moves to the top of the threaded rod 11 and is positioned on the rotating shaft 13, the second bevel gear 23 just meshes with the first bevel gear 22, so the rotation of the motor 16 will drive the rotation of the drive shaft 18 , and then drives the first spur gear 19 to rotate, and then drives the second spur gear 20 to rotate, and then drives the transmission shaft 21 to rotate, and then drives the first bevel gear 22 to rotate, and then drives the second bevel gear 23 to rotate, and then drives the connecting rod 12 to rotate , and then drive the gantry 24 to rotate, so that the rotating column 27 rotates, so that the rotating column 27 loses the clamping of the rope 4, so that the electric hoist 3 drives the rope 4 to move along the horizontal rail 2.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (7)

1.一种道桥施工用模板安装起吊装置,其特征在于,包括:1. a kind of formwork installation hoisting device for road and bridge construction, is characterized in that, comprises: 两组支架(1),两组所述支架(1)的顶端固定连接有横轨(2),所述横轨(2)上滑动连接有电动葫芦(3),所述电动葫芦(3)上连接有绳索(4),所述绳索(4)的底端固定连接有挂钩(5),靠近所述挂钩(5)的位置安装有套设于所述绳索(4)外侧的夹持件(6);Two sets of brackets (1), the tops of the two sets of brackets (1) are fixedly connected with a cross rail (2), and an electric hoist (3) is slidably connected to the cross rail (2), and the electric hoist (3) A rope (4) is connected to the top, and a hook (5) is fixedly connected to the bottom end of the rope (4), and a clamping piece sleeved on the outside of the rope (4) is installed near the hook (5) (6); 还包括:Also includes: 移动组件(7),用于移动所述夹持件(6)的所述移动组件(7)安装于所述支架(1)上,且与所述夹持件(6)相连接;a moving component (7), the moving component (7) for moving the clamping piece (6) is installed on the bracket (1) and connected with the clamping piece (6); 转动组件(8),用于转动夹持件(6)的所述转动组件(8)安装于所述支架(1)上,且与所述移动组件(7)相连接。A rotating assembly (8), the rotating assembly (8) used to rotate the clamping part (6) is installed on the support (1) and connected with the moving assembly (7). 2.根据权利要求1所述的一种道桥施工用模板安装起吊装置,其特征在于:所述夹持件(6)包括龙门架(24),所述龙门架(24)内滑动连接有多组呈镜像设置的活动块(25),所述活动块(25)上固定连接有与所述龙门架(24)固定连接的第一弹簧(26),且转动连接有转动柱(27)。2. a kind of road and bridge construction according to claim 1 is characterized in that: described clamping part (6) comprises portal frame (24), and described portal frame (24) is slidably connected with A plurality of sets of movable blocks (25) arranged in mirror image, the first spring (26) fixedly connected with the gantry (24) is fixedly connected to the movable block (25), and a rotating column (27) is connected in rotation . 3.根据权利要求2所述的一种道桥施工用模板安装起吊装置,其特征在于:所述移动组件(7)包括与所述支架(1)固定连接的滑轨(9),所述滑轨(9)内滑动连接有滑块(10),所述滑块(10)上转动连接有与所述龙门架(24)固定连接的连接杆(12),且螺纹连接有螺纹杆(11),所述螺纹杆(11)的顶端固定连接有转动轴(13),所述转动轴(13)与所述螺纹杆(11)之间连接有弹性件(14),且所述转动轴(13)的顶端连接有驱动件(15)。3. The template installation and lifting device for road and bridge construction according to claim 2, characterized in that: the moving assembly (7) includes a slide rail (9) fixedly connected with the support (1), the Slider (10) is slidably connected in slide rail (9), and the connecting rod (12) that is fixedly connected with described gantry (24) is rotatably connected on described slider (10), and is threadedly connected with threaded rod ( 11), the top end of the threaded rod (11) is fixedly connected with a rotating shaft (13), and an elastic member (14) is connected between the rotating shaft (13) and the threaded rod (11), and the rotating The top end of the shaft (13) is connected with a driver (15). 4.根据权利要求3所述的一种道桥施工用模板安装起吊装置,其特征在于:所述驱动件(15)包括与所述支架(1)固定连接的电机(16),所述电机(16)的输出端固定连接有联轴器(17),所述联轴器(17)的一端固定连接有与所述转动轴(13)固定连接有驱动轴(18)。4. A kind of road bridge construction template installation lifting device according to claim 3, is characterized in that: described driving part (15) comprises the motor (16) that is fixedly connected with described support (1), and described motor The output end of (16) is fixedly connected with a shaft coupling (17), and one end of the shaft coupling (17) is fixedly connected with a drive shaft (18) fixedly connected with the rotating shaft (13). 5.根据权利要求3所述的一种道桥施工用模板安装起吊装置,其特征在于:所述弹性件(14)包括与所述转动轴(13)固定连接的固定片(28),所述固定片(28)的一端固定连接有套设于所述转动轴(13)外侧的第二弹簧(29),所述第二弹簧(29)的一端固定连接有与所述转动轴(13)活动连接的活动片(30),所述活动片(30)位于所述螺纹杆(11)与所述转动轴(13)连接处位置。5. A kind of road and bridge construction according to claim 3 is characterized in that: described elastic member (14) comprises the fixed plate (28) that is fixedly connected with described rotating shaft (13), and One end of the fixed piece (28) is fixedly connected with a second spring (29) sleeved on the outside of the rotating shaft (13), and one end of the second spring (29) is fixedly connected with the rotating shaft (13). ) a movable piece (30) that is movably connected, and the movable piece (30) is located at the position where the threaded rod (11) is connected with the rotating shaft (13). 6.根据权利要求4所述的一种道桥施工用模板安装起吊装置,其特征在于:所述转动组件(8)包括与所述驱动轴(18)固定连接第一平齿轮(19),所述第一平齿轮(19)的外侧啮合有第二平齿轮(20),所述第二平齿轮(20)的一端固定连接有与所述支架(1)转动连接的传动轴(21),所述传动轴(21)的底端延伸至支架(1)的底端且固定连接有第一锥齿轮(22),所述第一锥齿轮(22)的外侧啮合有与所述连接杆(12)固定连接的第二锥齿轮(23)。6. The template installation and lifting device for road and bridge construction according to claim 4, characterized in that: the rotating assembly (8) includes a first spur gear (19) fixedly connected with the drive shaft (18), The outer side of the first spur gear (19) is meshed with a second spur gear (20), and one end of the second spur gear (20) is fixedly connected with a transmission shaft (21) that is rotatably connected with the support (1) , the bottom end of the transmission shaft (21) extends to the bottom end of the bracket (1) and is fixedly connected with a first bevel gear (22), and the outer side of the first bevel gear (22) is meshed with the connecting rod (12) The second bevel gear (23) that is fixedly connected. 7.根据权利要求1所述的一种道桥施工用模板安装起吊装置,其特征在于:所述支架(1)上固定连接有加固杆,且底端设置有防滑垫。7. A lifting device for installing templates for road and bridge construction according to claim 1, characterized in that: said bracket (1) is fixedly connected with a reinforcing rod, and the bottom end is provided with an anti-skid pad.
CN202220603345.6U 2022-03-20 2022-03-20 A formwork installation and lifting device for road and bridge construction Active CN218290187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220603345.6U CN218290187U (en) 2022-03-20 2022-03-20 A formwork installation and lifting device for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220603345.6U CN218290187U (en) 2022-03-20 2022-03-20 A formwork installation and lifting device for road and bridge construction

Publications (1)

Publication Number Publication Date
CN218290187U true CN218290187U (en) 2023-01-13

Family

ID=84803621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220603345.6U Active CN218290187U (en) 2022-03-20 2022-03-20 A formwork installation and lifting device for road and bridge construction

Country Status (1)

Country Link
CN (1) CN218290187U (en)

Similar Documents

Publication Publication Date Title
CN203667522U (en) Lifting and turnover device for container
CN206267586U (en) A kind of vertical garage Special-purpose lifting device
CN111236865A (en) A kind of shackle clamp and method for realizing automatic make-up and break-up of sucker rod
CN218290187U (en) A formwork installation and lifting device for road and bridge construction
CN206750921U (en) Automatic seal cover taking device
CN108544441A (en) A kind of handware processing fixed station
CN218024902U (en) Steel case roof beam hoist device for construction
CN216462656U (en) Welding equipment for machining control box of automatically-controlled engineering truck
CN205313014U (en) Lift of taking a trial run
CN206703685U (en) A kind of cylinder printing unit with elevating mechanism
CN206827935U (en) Transporting and hoisting device
CN209598156U (en) A kind of jacket core bubble coating device
CN209396825U (en) Integrated mounting device for lifting pump station
CN202594706U (en) Special rail lifting device
CN206680069U (en) A kind of offline suspender of vehicle body
CN219807677U (en) Lifting appliance device for overhauling converter station
CN220868761U (en) Take pulley anticollision elevator well construction platform
CN210419147U (en) Elevating gear is used in electromechanical installation
CN221442064U (en) Steel construction canopy construction platform
CN206051427U (en) A kind of lowering or hoisting gear for the flaw detection of train non-pulling wheel
CN212154254U (en) Adjustable supporting device for building
CN220078493U (en) Mechanical equipment maintenance elevating gear
CN222781292U (en) A hoisting device with a protective structure
CN211521408U (en) Based on apparatus jack-up hoist device for electric power
CN217709674U (en) Panel corner passivation equipment suitable for production of stainless steel water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant