CN218236422U - Positioning device for river channel embedded pipeline - Google Patents
Positioning device for river channel embedded pipeline Download PDFInfo
- Publication number
- CN218236422U CN218236422U CN202222865022.7U CN202222865022U CN218236422U CN 218236422 U CN218236422 U CN 218236422U CN 202222865022 U CN202222865022 U CN 202222865022U CN 218236422 U CN218236422 U CN 218236422U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- block
- rectangular
- arc
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Barrages (AREA)
Abstract
Description
技术领域technical field
本实用新型属于管道定位技术领域,尤其涉及一种用于河道埋设管道的定位装置。The utility model belongs to the technical field of pipeline positioning, in particular to a positioning device for buried pipelines in river courses.
背景技术Background technique
管道是用管子、管子联接件和阀门等联接成的用于输送气体、液体或带固体颗粒的流体的装置,在对河道管道进行安装时,通常将管道埋入土壤内部,首先将地面挖设基坑,随后将若干管道放置于基坑内部,并回填土壤。A pipeline is a device used to transport gas, liquid or fluid with solid particles connected by pipes, pipe connectors and valves. When installing a river pipeline, the pipeline is usually buried in the soil, and the ground is first excavated. The foundation pit, then several pipes are placed inside the foundation pit and backfilled with soil.
现有的河道埋设管道在施工过程中,需要对放置于河道基坑内部的多个管道进行连接,但管道容易因河道基坑底部不平整、地质不同和自身重力的因素,使相邻的两个管道之间产生偏移,进而降低了管道安装定位的精准性,且在对进行连接过程中,需要多个工作人员对其不断进行校正,不仅增加了施工成本,同时延长了施工时间,从而对企业的经济效益造成影响,需要进行一定的改进。During the construction of the existing buried pipelines in the river, it is necessary to connect multiple pipelines placed inside the foundation pit of the river. There is an offset between the two pipes, which reduces the accuracy of the installation and positioning of the pipes. In the process of connecting the pipes, multiple workers are required to continuously correct them, which not only increases the construction cost, but also prolongs the construction time. It has an impact on the economic benefits of the enterprise and requires certain improvements.
实用新型内容Utility model content
本实用新型的目的在于:为了解决现有的河道埋设管道在施工过程中,需要对放置于河道基坑内部的多个管道进行连接,但管道容易因河道基坑底部不平整、地质不同和自身重力的因素,使相邻的两个管道之间产生偏移,进而降低了管道安装定位的精准性,且在对进行连接过程中,需要多个工作人员对其不断进行校正,不仅增加了施工成本,同时延长了施工时间,从而对企业的经济效益造成影响的问题,而提出的一种用于河道埋设管道的定位装置。The purpose of this utility model is: in order to solve the existing river buried pipeline in the construction process, it is necessary to connect multiple pipelines placed inside the river foundation pit, but the pipeline is easy to be damaged due to the uneven bottom of the river foundation pit, different geology and its own Due to the gravity factor, there is an offset between two adjacent pipes, which reduces the accuracy of the installation and positioning of the pipes. In the process of connecting the pipes, multiple workers are required to continuously correct them, which not only increases the construction cost. cost, while prolonging the construction time, thus affecting the economic benefits of the enterprise, a positioning device for buried pipelines in rivers is proposed.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种用于河道埋设管道的定位装置,包括底座,所述底座的顶部设置有调节组件,所述调节组件的顶部设置有矩形框,所述矩形框的内部底侧固定连接有弹性气囊,所述弹性气囊的顶部固定连接有滑动板,所述滑动板滑动连接在矩形框的内部,所述滑动板的顶部固定连接有弧形固定块,所述弧形固定块的顶部设置有管道,所述矩形框的下方两侧均设置有支撑固定组件;A positioning device for buried pipelines in rivers, comprising a base, an adjustment assembly is provided on the top of the base, a rectangular frame is provided on the top of the adjustment assembly, and an elastic air bag is fixedly connected to the inner bottom of the rectangular frame. The top of the elastic airbag is fixedly connected with a sliding plate, the sliding plate is slidably connected inside the rectangular frame, the top of the sliding plate is fixedly connected with an arc-shaped fixing block, and the top of the arc-shaped fixing block is provided with a pipe, so Supporting and fixing components are arranged on both sides below the rectangular frame;
所述调节组件包括固定矩形块,所述固定矩形块的底部与底座的顶部固定连接,所述固定矩形块的内部开设有矩形内腔,矩形内腔的内部转动连接有丝杠,所述丝杠的底部设置为光杆,光杆的外侧壁固定套设有第一锥齿轮,所述第一锥齿轮的一侧啮合连接有第二锥齿轮,所述丝杠上螺纹连接有矩形螺纹套,所述矩形螺纹套的顶部转动连接有连接杆,所述连接杆的两侧均固定套设有弧形块,两个弧形块分别设置在矩形螺纹套的两侧,所述连接杆的一端设置有手摇器,所述手摇器设置在弧形块的外侧。The adjustment assembly includes a fixed rectangular block, the bottom of the fixed rectangular block is fixedly connected to the top of the base, a rectangular inner cavity is opened inside the fixed rectangular block, and a screw is connected to the inner rotation of the rectangular inner cavity. The bottom of the rod is set as a polished rod, and the outer wall of the polished rod is provided with a first bevel gear. One side of the first bevel gear is engaged with a second bevel gear. The top of the rectangular threaded sleeve is rotatably connected with a connecting rod, and both sides of the connecting rod are fixedly provided with arc blocks, and the two arc blocks are respectively arranged on both sides of the rectangular threaded sleeve, and one end of the connecting rod is set There is a hand crank, and the hand crank is arranged on the outside of the arc block.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述第二锥齿轮的内部固定套设有转轴,转轴的另一端延伸至固定矩形块的外侧后固定连接有第一转柄。The inner fixed sleeve of the second bevel gear is provided with a rotating shaft, and the other end of the rotating shaft extends to the outside of the fixed rectangular block and is fixedly connected with a first rotating handle.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述弧形块的顶部固定连接有平板,所述平板的顶部通过螺钉与矩形框的底部固定连接。A flat plate is fixedly connected to the top of the arc-shaped block, and the top of the flat plate is fixedly connected to the bottom of the rectangular frame by screws.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述支撑固定组件包括固定箱,所述固定箱的底部与底座的顶部固定连接,所述固定箱的内部一侧固定连接有隔板,所述隔板的一侧设置有第一滑动块,所述第一滑动块滑动设置在固定箱的内部,所述第一滑动块的另一侧固定连接有矩形滑动块,所述矩形滑动块的另一侧延伸至固定箱的外侧后通过销轴转动连接有连杆,所述连杆的另一侧通过销轴转动连接有固定座,固定座的顶部与矩形框的底部固定连接。The supporting and fixing assembly includes a fixed box, the bottom of the fixed box is fixedly connected to the top of the base, a partition is fixedly connected to one side of the fixed box, and a first sliding block is arranged on one side of the partition, The first sliding block is slidably arranged inside the fixed box, and the other side of the first sliding block is fixedly connected with a rectangular sliding block, and the other side of the rectangular sliding block extends to the outside of the fixed box and passes through the pin A connecting rod is rotatably connected, and the other side of the connecting rod is rotatably connected with a fixed seat through a pin shaft, and the top of the fixed seat is fixedly connected with the bottom of the rectangular frame.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述隔板的另一侧固定连接有收缩气囊,所述收缩气囊的另一侧固定连接有第二滑动块,所述第二滑动块滑动连接在固定箱的内部,所述固定箱的一侧开设有多个通孔,所述第二滑动块的另一侧固定连接有多个插杆,插杆与通孔滑动连接。The other side of the partition is fixedly connected with a shrinkable airbag, and the other side of the shrinkable airbag is fixedly connected with a second sliding block, and the second sliding block is slidably connected inside the fixed box, and one of the fixed box A plurality of through holes are opened on one side, and a plurality of insertion rods are fixedly connected to the other side of the second sliding block, and the insertion rods are slidably connected to the through holes.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述收缩气囊的一侧连通有输气管,所述输气管的另一端与弹性气囊相连通,所述输气管的外侧套设有耐蚀伸缩管套,耐蚀伸缩管套的两侧分别与底座和矩形框固定连接。One side of the shrinkable air bag is connected with an air delivery pipe, the other end of the air delivery pipe is connected with the elastic air bag, and the outer side of the air delivery pipe is covered with a corrosion-resistant telescopic tube cover, and the two sides of the corrosion-resistant telescopic tube cover are respectively connected to the The base and the rectangular frame are fixedly connected.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述矩形框的顶部通过螺栓固定连接有弧形连接块,所述弧形连接块的内部两侧均螺纹连接有螺杆,所述螺杆的顶端固定连接有二转柄,所述螺杆的底端固定连接有弧形夹紧块,弧形夹紧块的顶部两侧均固定连接有导杆,导杆滑动连接在弧形连接块的内部。The top of the rectangular frame is fixedly connected with an arc-shaped connection block by bolts, and both sides of the interior of the arc-shaped connection block are threaded with screw rods, the top of the screw rod is fixedly connected with two rotating handles, and the bottom end of the screw rod An arc-shaped clamping block is fixedly connected, guide rods are fixedly connected to both sides of the top of the arc-shaped clamping block, and the guide rods are slidably connected inside the arc-shaped connecting block.
综上所述,由于采用了上述技术方案,本实用新型的有益效果是:In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
1、本实用新型中,手动操作第二转柄使螺杆带动弧形夹紧块移动,对管道的使用位置进行固定,防止在管道在矩形框的内部产生移动,进而对多个管道之间的连接造成影响,手动操作第一转柄使转轴、第二锥齿轮、第一锥齿轮和丝杠转动,在矩形内腔的限制下,使矩形螺纹套竖直移动对管道的使用高度进行调节,通过手动操作手摇器带动连接杆、弧形块和平板转动,防止在对管道连接时相对较为不便,便于对管道的使用角度进行微调,进而便于对多个管道进行连接,提高了管道安装定位的精准性,节约了工作人员的校正时间,缩短了装置的施工周期,提高了企业的经济效益。1. In the present utility model, the second turning handle is manually operated so that the screw rod drives the arc-shaped clamping block to move, and the use position of the pipeline is fixed to prevent the pipeline from moving inside the rectangular frame, and furthermore, the movement between multiple pipelines is fixed. If the connection is affected, the first rotating handle is manually operated to rotate the rotating shaft, the second bevel gear, the first bevel gear and the lead screw. Under the restriction of the rectangular inner cavity, the rectangular threaded sleeve is moved vertically to adjust the use height of the pipeline. By manually operating the hand crank to drive the connecting rod, arc block and plate to rotate, it is relatively inconvenient to connect the pipes, and it is convenient to fine-tune the angle of use of the pipes, thereby facilitating the connection of multiple pipes and improving the installation and positioning of the pipes The accuracy saves the calibration time of the staff, shortens the construction period of the device, and improves the economic benefits of the enterprise.
2、本实用新型中,通过管道的重力作用使弧形固定块和滑动板向下进行移动,将弹性气囊内部的气体输送至收缩气囊的内部,使其产生膨胀带动第二滑动块和插杆移动,使插杆延伸至固定箱的外侧,插入到外部河道的泥土内,进一步增加装置在定位使用时的稳定性,提高了装置的适用性。2. In the utility model, the arc-shaped fixed block and the sliding plate are moved downward through the gravity of the pipeline, and the gas inside the elastic airbag is transported to the inside of the shrinkable airbag, so that it expands and drives the second sliding block and the insertion rod Move, so that the plunger extends to the outside of the fixed box, and is inserted into the soil of the external river channel, further increasing the stability of the device when it is positioned and used, and improving the applicability of the device.
附图说明Description of drawings
图1为本实用新型提出的一种用于河道埋设管道的定位装置的整体立体结构示意图;Fig. 1 is the overall three-dimensional structure schematic diagram of a kind of positioning device that is used for embedding pipeline in river course that the utility model proposes;
图2为本实用新型提出的一种用于河道埋设管道的定位装置的主视结构示意图;Fig. 2 is a schematic diagram of the front view of a positioning device for embedding pipelines in rivers proposed by the utility model;
图3为本实用新型提出的一种用于河道埋设管道的定位装置中图2的A处局部放大结构示意图;Fig. 3 is a partial enlarged structural schematic diagram of A in Fig. 2 in a positioning device for buried pipelines in rivers proposed by the utility model;
图4为本实用新型提出的一种用于河道埋设管道的定位装置中调节组件的立体拆分结构示意图。Fig. 4 is a three-dimensional disassembled structure schematic diagram of an adjusting component in a positioning device for buried pipelines proposed by the utility model.
图例说明:illustration:
1、底座;2、调节组件;201、固定矩形块;202、第一锥齿轮;203、丝杠;204、矩形螺纹套;205、连接杆;206、弧形块;207、平板;208、手摇器;209、第二锥齿轮;3、矩形框;4、弧形连接块;5、弹性气囊;6、滑动板;7、弧形固定块;8、管道;9、支撑固定组件;901、固定箱;902、隔板;903、第一滑动块;904、矩形滑动块;905、连杆;906、收缩气囊;907、第二滑动块;908、插杆;10、螺杆;11、输气管。1. Base; 2. Adjustment assembly; 201. Fixed rectangular block; 202. First bevel gear; 203. Lead screw; 204. Rectangular threaded sleeve; 205. Connecting rod; 206. Arc block; 207. Flat plate; Hand crank; 209, second bevel gear; 3, rectangular frame; 4, arc connecting block; 5, elastic airbag; 6, sliding plate; 7, arc fixing block; 8, pipeline; 9, supporting and fixing assembly; 901, fixed box; 902, clapboard; 903, first sliding block; 904, rectangular sliding block; 905, connecting rod; 906, retractable air bag; 907, second sliding block; 908, inserting rod; , Air pipe.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.
请参阅图1-4,本实用新型提供一种技术方案:一种用于河道埋设管道的定位装置,包括底座1,底座1的顶部设置有调节组件2,调节组件2的顶部设置有矩形框3,矩形框3的内部底侧固定连接有弹性气囊5,弹性气囊5的顶部固定连接有滑动板6,滑动板6滑动连接在矩形框3的内部,滑动板6的顶部固定连接有弧形固定块7,弧形固定块7的顶部设置有管道8,矩形框3的下方两侧均设置有支撑固定组件9;Please refer to Figures 1-4, the utility model provides a technical solution: a positioning device for buried pipelines in rivers, including a
调节组件2包括固定矩形块201,固定矩形块201的底部与底座1的顶部固定连接,固定矩形块201的内部开设有矩形内腔,矩形内腔的内部转动连接有丝杠203,丝杠203的底部设置为光杆,光杆的外侧壁固定套设有第一锥齿轮202,第一锥齿轮202的一侧啮合连接有第二锥齿轮209,丝杠203上螺纹连接有矩形螺纹套204,矩形螺纹套204的顶部转动连接有连接杆205,连接杆205的两侧均固定套设有弧形块206,两个弧形块206分别设置在矩形螺纹套204的两侧,连接杆205的一端设置有手摇器208,手摇器208设置在弧形块206的外侧。The
实施方式具体为:通过预埋杆将底座1固定在河道的合适地方,然后通过外部吊起装置将管道8放置到弧形固定块7的顶部,通过螺栓将弧形连接块4固定在矩形框3的顶部,手动操作第二转柄使其带动螺杆10进行转动,使螺杆10带动弧形夹紧块移动,对管道8的使用位置进行固定,防止在管道8在矩形框3的内部产生移动,进而对多个管道8之间的连接造成影响,手动操作第一转柄使其带动转轴进行转动,利用转轴和第二锥齿轮209之间的联动效应,将转动力传递到第二锥齿轮209上,第二锥齿轮209转动的同时与第一锥齿轮202相啮合,将转动力传递到第一锥齿轮202上,利用第一锥齿轮202和丝杠203之间的联动效应,将转动力传递到丝杠203上,在矩形内腔的限制下,使丝杠203只能带动矩形螺纹套204进行竖直移动,进而对管道8的使用高度进行调节,通过手动操作手摇器208带动连接杆205进行转动,利用连接杆205和弧形块206之间的联动效应,将动力传递到弧形块206和平板207上,对管道8的使用角度进行微调,在保证其定位的同时对多个管道8进行连接进行调节,防止在对管道连接时相对较为不便,进而节约了工作人员的校正时间。The implementation method is as follows: fix the
第二锥齿轮209的内部固定套设有转轴,转轴的另一端延伸至固定矩形块201的外侧后固定连接有第一转柄,弧形块206的顶部固定连接有平板207,平板207的顶部通过螺钉与矩形框3的底部固定连接,支撑固定组件9包括固定箱901,固定箱901的底部与底座1的顶部固定连接,固定箱901的内部一侧固定连接有隔板902,隔板902的一侧设置有第一滑动块903,第一滑动块903滑动设置在固定箱901的内部,第一滑动块903的另一侧固定连接有矩形滑动块904,矩形滑动块904的另一侧延伸至固定箱901的外侧后通过销轴转动连接有连杆905,连杆905的另一侧通过销轴转动连接有固定座,固定座的顶部与矩形框3的底部固定连接,隔板902的另一侧固定连接有收缩气囊906,收缩气囊906的另一侧固定连接有第二滑动块907,第二滑动块907滑动连接在固定箱901的内部,固定箱901的一侧开设有多个通孔,第二滑动块907的另一侧固定连接有多个插杆908,插杆908与通孔滑动连接,收缩气囊906的一侧连通有输气管11,输气管11的另一端与弹性气囊5相连通,输气管11的外侧套设有耐蚀伸缩管套,耐蚀伸缩管套的两侧分别与底座1和矩形框3固定连接,矩形框3的顶部通过螺栓固定连接有弧形连接块4,弧形连接块4的内部两侧均螺纹连接有螺杆10,螺杆10的顶端固定连接有二转柄,螺杆10的底端固定连接有弧形夹紧块,弧形夹紧块的顶部两侧均固定连接有导杆,导杆滑动连接在弧形连接块4的内部。The inner fixed sleeve of the
实施方式具体为:通过预埋杆将底座1固定在河道的合适地方,然后通过外部吊起装置将管道8放置到弧形固定块7的顶部,此时管道8的重力作用会对弧形固定块7进行挤压,利用弧形固定块7和滑动板6之间的联动效应,将动力传递到滑动板6上,使滑动板6在矩形框3的内部向下进行移动,此时滑动板6会对弹性气囊5进行挤压,将弹性气囊5内部的气体通过输气管11输送至收缩气囊906的内部,使其产生膨胀带动第二滑动块907在固定箱901的内部进行移动,利用第二滑动块907和插杆908之间的联动效应,将动力传递到插杆908上,使其延伸至固定箱901的外侧,插入到外部河道的泥土内,进一步增加装置在定位使用时的稳定性,提高了装置的适用性。The implementation method is as follows: the
工作原理:使用时,通过预埋杆将底座1固定在河道的合适地方,然后通过外部吊起装置将管道8放置到弧形固定块7的顶部,此时管道8的重力作用会对弧形固定块7进行挤压,利用弧形固定块7和滑动板6之间的联动效应,将动力传递到滑动板6上,使滑动板6在矩形框3的内部向下进行移动,此时滑动板6会对弹性气囊5进行挤压,将弹性气囊5内部的气体通过输气管11输送至收缩气囊906的内部,使其产生膨胀带动第二滑动块907在固定箱901的内部进行移动,利用第二滑动块907和插杆908之间的联动效应,将动力传递到插杆908上,使其延伸至固定箱901的外侧,通过螺栓将弧形连接块4固定在矩形框3的顶部,手动操作第二转柄使其带动螺杆10进行转动,使螺杆10带动弧形夹紧块移动,对管道8的使用位置进行固定,手动操作第一转柄使其带动转轴进行转动,利用转轴和第二锥齿轮209之间的联动效应,将转动力传递到第二锥齿轮209上,第二锥齿轮209转动的同时与第一锥齿轮202相啮合,将转动力传递到第一锥齿轮202上,利用第一锥齿轮202和丝杠203之间的联动效应,将转动力传递到丝杠203上,在矩形内腔的限制下,使丝杠203只能带动矩形螺纹套204进行竖直移动,通过手动操作手摇器208带动连接杆205进行转动,利用连接杆205和弧形块206之间的联动效应,将动力传递到弧形块206和平板207上,对管道8的使用角度进行微调。Working principle: When in use, the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Any equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222865022.7U CN218236422U (en) | 2022-10-28 | 2022-10-28 | Positioning device for river channel embedded pipeline |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222865022.7U CN218236422U (en) | 2022-10-28 | 2022-10-28 | Positioning device for river channel embedded pipeline |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218236422U true CN218236422U (en) | 2023-01-06 |
Family
ID=84670626
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222865022.7U Active CN218236422U (en) | 2022-10-28 | 2022-10-28 | Positioning device for river channel embedded pipeline |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218236422U (en) |
-
2022
- 2022-10-28 CN CN202222865022.7U patent/CN218236422U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207727589U (en) | Internal support of foundation pit device | |
| CN218236422U (en) | Positioning device for river channel embedded pipeline | |
| CN214462207U (en) | Concrete backfill device for wiring trough | |
| CN206346199U (en) | The guiding trestle of lattice column is laid in a kind of deep well | |
| CN213685802U (en) | Towed non-excavation pipeline prosthetic devices | |
| CN211646406U (en) | Steel pipe columns inserted into the structure for precise positioning | |
| CN216049765U (en) | Full-automatic tunnel secondary lining thickness detection instrument | |
| CN220063281U (en) | Waterproof testing device | |
| CN216501094U (en) | Long auger drilling presses and irritates stake shaping auxiliary device | |
| CN219241407U (en) | Temporary plugging tool for orifice of pipeline preformed hole | |
| CN111549834B (en) | Foundation pit excavation model test device based on surface water permeation and use method | |
| CN215326433U (en) | Temporary protection device for pipeline construction | |
| CN211118256U (en) | Pipeline restoration basement membrane laying device | |
| CN107893649A (en) | A kind of oil-field flooding simulation experiment platform | |
| CN223620948U (en) | Mountain region photovoltaic support digs basis | |
| CN222666886U (en) | Deep foundation pit plugging device | |
| CN215635410U (en) | A kind of auxiliary device for laying pipelines for water conservancy construction | |
| CN222416659U (en) | A winch fixing device for transferring liner pipe | |
| CN223180199U (en) | A soil groundwater level rise and fall simulation device | |
| CN221702510U (en) | A high-precision foundation pit monitoring device | |
| CN220505979U (en) | Long distance pipe jacking connection positioning device | |
| CN217877657U (en) | Formula earth's surface settlement monitoring device is inhaled to magnetism | |
| CN220649911U (en) | Crack infiltration testing arrangement of concrete culvert pipe | |
| CN223840013U (en) | Fluid machinery checking device | |
| CN115993167A (en) | Underground water level monitoring device and method for underground engineering waterproof and drainage construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250814 Address after: 713300 Shaanxi Province Xianyang City Qianshan County Malian Town Shangbaozicun 033.NO Patentee after: Wen Gang Wei Country or region after: China Address before: Room 313, Caizhi building, No. 9, Erwei Road, Dongli District, Tianjin 300300 Patentee before: Tianjin Hangjia Technology Co.,Ltd. Country or region before: China |